Room finish schedule.xlsx
XLSX spreadsheet 10 KB Posted
- Solicitation number
- FA813726R0026
About this file
This is a Room Finish Schedule specification document that details the interior finishes and materials required for a REACT VII facility construction project at Building 9001. The schedule specifies finishes for four rooms: two offices (Rooms 101-102) and two material testing rooms (Rooms 103-104), with standardized material specifications applied across all spaces. Floor finishes include carpet tile over epoxy (CT over EP-1) in offices and full epoxy flooring (EP-1) in testing rooms, extending to the centerline of perimeter walls and to the whiteline at Aisle 19 on the east wall. Base trim consists of 4.5-inch Roppe black 1/8-inch vinyl cove wall base (B-1) throughout. Wall finishes specify Sherwin Williams High Reflective White PROMAR 200 Zero VOC interior latex with eggshell sheen in two applications: PT-1 for standard walls and PT-2 with full-height orange peel finish, both meeting ASTM Finish Level 4 standards. Ceiling finishes vary by location, incorporating 2x2 acoustical grid ceilings (CLG-1) and 5/8-inch gypsum board with tape and bed finish Level 4 (CLG-2) in appropriate areas. Exposed exterior walls receive the same wall and base finishes as interior spaces. This specification is directly associated with solicitation FA813726R0026, which is reserved exclusively for SBA-certified Women Owned Small Businesses (WOSB) and requires attendance at a mandatory Initial Site Visit on July 20, 2026, at 0900 CST at Building 9001's northwest parking lot.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ROOM FINISH SCHEDULE | ||||||||
| ROOM # | ROOM NAME | FLOOR | BASE | WALLS | CEILING BELOW ROOF PRAMONG | ROOM CEILING | UPPER CEILING | COMMENTS |
| 101 | OFFICE-1 | CT OVER EP-1 | B-1 | PT-1 | PT-2, CLG-2 | CLG-1 | CLG-2, PT-2 | |
| 102 | OFFICE-2 | CT OVER EP-1 | B-1 | PT-1 | PT-2, CLG-2 | CLG-1 | CLG-2, PT-2 | |
| 103 | MATERIAL TESSTING ROOM - 1 | EP1 | B-1 | PT-1 | PT-2, CLG-2 | CLG-1 | CLG-2, PT-2 | |
| 104 | MATERIAL TESSTING ROOM - 2 | EP1 | B-1 | PT-1 | PT-2, CLG-2 | CLG-1 | CLG-2, PT-2 | |
| EXPOSED EXT. WALLS | B-1 | PT-1 | ||||||
| PT-1 | SHERWIN WILLIAMS HIGH REFLECTIVE WHITE PROMAR 200 ZEROVOC INTERIOR LATEX WITH "EGGSHELL" SHEEN. FINISH LEVEL 4 | |||||||
| PT-2 | SHERWIN WILLIAMS HIGH REFLECTIVE WHITE PROMAR 200 ZEROVOC INTERIOR LATEX WITH "EGGSHELL" SHEEN. FINISH LEVEL 4 WITH ORANGE PEEL FINISH FULL HEIGHT OF WALL. | |||||||
| B-1 | 4 1/2" ROPPE BLACK 1/8" VINYL COVE WALL BASE | |||||||
| CLG-1 | 2X2 ACOUSTICAL GRID CEILING | |||||||
| CLG-2 | 5/8" GYPSUM BOARD TAPE & BED FINISH LEVEL 4. | |||||||
| CT | CARPET TILE OVER EXPOXY FLOOR (EP-1 | |||||||
| EP-1 | EPOXY FLOOR SYSTEM - FULL FOOTPRINT OF REACT VII TO CENTERLINE OF PERMIMETER WALLS. AT EAST REACT VII WALL, FINISH TO EXTENT TO WHITELINE AT AISLE 19 OR TO WESTSIDE OF EXISTING WALL ALONG AISLE 19 |