Room finish schedule.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813726R0026
Issued by

About this file

This is a Room Finish Schedule specification document that details the interior finishes and materials required for a REACT VII facility construction project at Building 9001. The schedule specifies finishes for four rooms: two offices (Rooms 101-102) and two material testing rooms (Rooms 103-104), with standardized material specifications applied across all spaces. Floor finishes include carpet tile over epoxy (CT over EP-1) in offices and full epoxy flooring (EP-1) in testing rooms, extending to the centerline of perimeter walls and to the whiteline at Aisle 19 on the east wall. Base trim consists of 4.5-inch Roppe black 1/8-inch vinyl cove wall base (B-1) throughout. Wall finishes specify Sherwin Williams High Reflective White PROMAR 200 Zero VOC interior latex with eggshell sheen in two applications: PT-1 for standard walls and PT-2 with full-height orange peel finish, both meeting ASTM Finish Level 4 standards. Ceiling finishes vary by location, incorporating 2x2 acoustical grid ceilings (CLG-1) and 5/8-inch gypsum board with tape and bed finish Level 4 (CLG-2) in appropriate areas. Exposed exterior walls receive the same wall and base finishes as interior spaces. This specification is directly associated with solicitation FA813726R0026, which is reserved exclusively for SBA-certified Women Owned Small Businesses (WOSB) and requires attendance at a mandatory Initial Site Visit on July 20, 2026, at 0900 CST at Building 9001's northwest parking lot.

View the file

Other files

File Type Posted
Solicitation Amendment FA813726R00260001 - CANCELLATION.pdf PDF
Solicitation Amendment FA813726R00260001 SF 30.pdf PDF
250063_ATT 10_Submittal Register.pdf PDF
250063_ATT 9_SOW.pdf PDF
250063_ATT 11_Drawings.pdf PDF
WWYK250063-04March2026.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
22 00 00.pdf PDF
28 31 76.pdf PDF
23 09 23.02.pdf PDF
07 14 00.pdf PDF
08 51 23.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 72 00.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 33 00.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 78 23.pdf PDF
esvperf_singledual_2023_V2.pdf PDF
lrad331965pd_spec.pdf PDF
REACT VII SA-01.pdf PDF
TAFB B9001 VAV Schedule.pdf PDF
ARCH-COMBINED.pdf PDF
4500-MUG.pdf PDF
overall plan 04.15.2021.pdf PDF
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
26 05 73 POWER STUDIES.pdf PDF
26 20 00.pdf PDF
09 90 00.pdf PDF
23 09 13.pdf PDF
23 36 00.00 40.pdf PDF
08 71 00.pdf PDF
05 40 00.pdf PDF
10 14 00.10.pdf PDF
08 33 23.pdf PDF
08 11 13.pdf PDF
07 92 00.pdf PDF
01 33 16.00 10.pdf PDF
01 32 16.00 20.pdf PDF
image.png PNG image
250063 React VII_Hardware schedule 25MAR26 JL.xlsx XLSX spreadsheet
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
ELECTRICAL PANEL SCHEDULE U18L.xlsx XLSX spreadsheet
esvEH_singledual_2023_V2.pdf PDF
lk406gn05t4_spec.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ROOM FINISH SCHEDULE
ROOM #ROOM NAMEFLOORBASEWALLSCEILING BELOW ROOF PRAMONGROOM CEILINGUPPER CEILINGCOMMENTS
101OFFICE-1CT OVER EP-1B-1PT-1PT-2, CLG-2CLG-1CLG-2, PT-2
102OFFICE-2CT OVER EP-1B-1PT-1PT-2, CLG-2CLG-1CLG-2, PT-2
103MATERIAL TESSTING ROOM - 1EP1B-1PT-1PT-2, CLG-2CLG-1CLG-2, PT-2
104MATERIAL TESSTING ROOM - 2EP1B-1PT-1PT-2, CLG-2CLG-1CLG-2, PT-2
EXPOSED EXT. WALLSB-1PT-1
PT-1SHERWIN WILLIAMS HIGH REFLECTIVE WHITE PROMAR 200 ZEROVOC INTERIOR LATEX WITH "EGGSHELL" SHEEN. FINISH LEVEL 4
PT-2SHERWIN WILLIAMS HIGH REFLECTIVE WHITE PROMAR 200 ZEROVOC INTERIOR LATEX WITH "EGGSHELL" SHEEN. FINISH LEVEL 4 WITH ORANGE PEEL FINISH FULL HEIGHT OF WALL.
B-14 1/2" ROPPE BLACK 1/8" VINYL COVE WALL BASE
CLG-12X2 ACOUSTICAL GRID CEILING
CLG-25/8" GYPSUM BOARD TAPE & BED FINISH LEVEL 4.
CTCARPET TILE OVER EXPOXY FLOOR (EP-1
EP-1EPOXY FLOOR SYSTEM - FULL FOOTPRINT OF REACT VII TO CENTERLINE OF PERMIMETER WALLS. AT EAST REACT VII WALL, FINISH TO EXTENT TO WHITELINE AT AISLE 19 OR TO WESTSIDE OF EXISTING WALL ALONG AISLE 19

File details come from the government source that posted it. Updated .