This is a technical architectural drawing document containing two detailed construction specifications for structural steel work.

Detail 2 presents a typical roof opening frame and mechanical unit support system. The drawing specifies steel joist configurations using L6x4x3/8 and L3x3x3/8 angles for spans ranging from 7'-1" to 11'-0", with supporting members constructed from L3x3x3/8x0'-4" angles welded to support members. The detail includes specifications for roof opening frames to be installed before the steel deck is in place, with all exposed surfaces requiring welding typical for roof opening frames installed after the deck is positioned.

Detail 3 provides bracing specifications for steel joists with point loads. This detail includes RTU (Roof Top Unit) angle frame point load locations on top of chords, with double-angle bracing (2x2x2x1/8" configurations) at specified locations. A critical note indicates that when point loads exceed 50 pounds and the joist manufacturer has designed the joist for full concentrated load capacity, angles must be in place prior to load application. The contractor is required to coordinate all superimposed loads with the joist manufacturer and engineer before applying any load to ensure proper structural integrity and load distribution.

View the file

Other files

File Type Posted
Solicitation Amendment FA813726R00260001 - CANCELLATION.pdf PDF
Solicitation Amendment FA813726R00260001 SF 30.pdf PDF
250063_ATT 10_Submittal Register.pdf PDF
250063_ATT 9_SOW.pdf PDF
250063_ATT 11_Drawings.pdf PDF
WWYK250063-04March2026.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
22 00 00.pdf PDF
28 31 76.pdf PDF
23 09 23.02.pdf PDF
07 14 00.pdf PDF
08 51 23.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 72 00.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 33 00.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 78 23.pdf PDF
esvperf_singledual_2023_V2.pdf PDF
lrad331965pd_spec.pdf PDF
REACT VII SA-01.pdf PDF
TAFB B9001 VAV Schedule.pdf PDF
ARCH-COMBINED.pdf PDF
4500-MUG.pdf PDF
overall plan 04.15.2021.pdf PDF
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
26 05 73 POWER STUDIES.pdf PDF
26 20 00.pdf PDF
09 90 00.pdf PDF
23 09 13.pdf PDF
23 36 00.00 40.pdf PDF
08 71 00.pdf PDF
05 40 00.pdf PDF
10 14 00.10.pdf PDF
08 33 23.pdf PDF
08 11 13.pdf PDF
07 92 00.pdf PDF
01 33 16.00 10.pdf PDF
01 32 16.00 20.pdf PDF
image.png PNG image
250063 React VII_Hardware schedule 25MAR26 JL.xlsx XLSX spreadsheet
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
ELECTRICAL PANEL SCHEDULE U18L.xlsx XLSX spreadsheet
esvEH_singledual_2023_V2.pdf PDF
lk406gn05t4_spec.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .