26-0256-ITB-C_Pricing_Proposal_(for_reference_only).pdf

PDF 161 KB Posted

Attached to
South Cross Bayou Replacement of Generator Controls and Switchgear (GEN2) (PID 004906A) - STEP 1
Solicitation number
26-0256-ITB-C
Issued by
Pinellas County, Clewiston City, Florida

About this file

This is a Pricing Proposal document for an Invitation to Bid (ITB-C) issued by Pinellas County, Florida, for the replacement of generator controls and switchgear at the South Cross Bayou Advanced Water Reclamation Facility (SCBAWRF). The project involves the removal and replacement of four 3200-ampere draw-out generator circuit breakers and six 2000-ampere draw-out feeder circuit breakers in two 277/480-volt, 3-phase switchgear lineups with 6000-ampere main bus ratings, as well as removal of six generator/engine control cabinets and installation of new control systems. Additional scope includes ABB circuit breaker installation, generator control panel construction with PLC programming, conduit and conductor installation, temporary engine/generator sets for three months, arc flash and circuit breaker trip coordination studies, and training. The Step 1 qualification submittals were due March 19, 2026, at 3:00 p.m., with a non-mandatory pre-bid conference scheduled for March 11, 2026. Step 2 sealed bids are due March 31, 2026, at 3:00 p.m. Performance shall not exceed 450 consecutive calendar days from Notice to Proceed, with liquidated damages of $1,352.17 per day for non-completion.

The pricing proposal template includes ten line items for utilities work with blank unit costs and totals, an allowance of $15,000 for permits, and an unspecified work line item of 418,000 units at $1.00 each. Bidders must provide a 5 percent bid bond and performance and payment bonds at 100 percent of contract value. Insurance requirements include Workers' Compensation ($500,000 per employee), Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Excess or Umbrella Liability ($2,000,000), and Cyber Risk Liability ($1,000,000). A 4 percent Small Business Enterprise participation goal has been established, with specific targeting of wire and conduit installation work. The County retains 5 percent of monthly payments until final completion, with net 45-day payment terms available through the county's ePayables credit card program in accordance with Florida's Local Government Prompt Payment Act.

View the file

Other files

File Type Posted
South_Cross_Bayou_Replacement_of_Generator_Controls_and_Switchgear_(GEN2)_(PID_004906A)_-_STEP_1_(Addendum_#1_Revision).pdf PDF
South_Cross_Bayou_Replacement_of_Generator_Controls_and_Switchgear_(GEN2)_(PID_004906A)_-_STEP_1.pdf PDF
Appendix_4_-_Special_Notice.pdf PDF
SCB_AWRF_Generator_Controls_&_Switchgear_Replacement_S&S_11x17_Drawings_09-10-25.pdf PDF
26-0256-ITB-C_Pricing_Proposal_(for_reference_only).pdf PDF
26-0256_-_Insurance_Requirements_-_South_Cross_Bayou_Replacement_of_Generator_and_Switchgear.docx DOCX document
26-0256_Sample_P&P_Bonds.pdf PDF
Sample_Change_Order.pdf PDF
E-Verify_Affidavit.pdf PDF
Affdavit_of_Release_and_Guarantee.pdf PDF
APPENDIX_7_-_SBE_COMPLIANCE_FORM.pdf PDF
Florida_Trench_Safety_Form.pdf PDF
26-0256-ITB-C_Sample_Construction_Agreement.pdf PDF
Switchgear_Map_location.pdf PDF
SCB_AWRF_Generator_Controls_&_Switchgear_Replacement_Revised_Specs_04-29-25_(2).pdf PDF
QUALIFICATION_SUBMITTAL_FORM_8-25.pdf PDF
Sample_Application_for_Payment.pdf PDF
OpenGov_Fillable-_Final.pdf PDF
Airport_Security_Program.pdf PDF
Notice_of_Intent_to_Sole_Source_07-25-2023.pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
SCB_AWRF_SBE_Memo_03-24-23.pdf PDF
Bid_Submittal_Form-JOC.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation to Bid - Construction (ITB-C) #26-0256-ITB-C Title: South Cross Bayou Replacement of Generator Controls and Switchgear (GEN2) (PID 004906A)

1. Pricing Proposal

UTILITES

Line Item Description Quantity Unit of

Measure Unit Cost Total

1 Remove existing GE circuit breakers in

Switchgear A and Switchgear B

1 LS

2 Remove existing generator control cabinets

1 LS

3 ABB 3200A SACE EMAX 2 series circuit breakers

1 LS

4 ABB 2000A SACE EMAX 2 series circuit breakers

1 LS

5 ABB field installation services of ten

(10) ABB SACE EMAX 2 series circuit breakers into existing GE Switchgear A and Switchgear B lineups

1 LS

6 Generator control panels - includes

PLC programming, components and construction. Labor is for field installation and connection.

1 LS

7 Conduit/conductors 1 LS

8 Temporary Engine/Generator Sets, Fuel Tank and Cabling (3 months)

1 LS

9 Arc Flash and Circuit Breaker Trip

Coordination Report

1 LS

10 Training 1 LS

TOTAL

PERMITS

Invitation to Bid - Construction (ITB-C) #26-0256-ITB-C Title: South Cross Bayou Replacement of Generator Controls and Switchgear (GEN2) (PID 004906A)

Line Item Description Quantity Unit of

Measure Unit Cost Total

11 Permit Allowance 15,000 LS

OTHER WORK

Line Item Description Quantity Unit of

Measure Unit Cost Total

12 Unspecified Work 418,000 EA $1.00

TOTAL

File details come from the government source that posted it. Updated .