This is a Frequently Asked Questions document for Macon-Bibb County related to an asphalt milling and paving project. The project involves full-width milling from curb to curb (or road edge to road edge on roads without curb and gutter) with subsequent asphalt placement. Work hours are restricted to 8 a.m. to 5 p.m., Monday through Friday, or as daylight permits, with special requests for night work requiring approval. Contractors may use tripod stands or post-mount installations for advance warning signs. Final repaving must be completed within one day of milling work. Patching operations require milling to remove cracking as needed to a maximum depth of four inches, with patches placed at least one lane width wide. The project specifies 9.5mm asphalt Type 1 at 1.25 inches depth for all roads except Fulton Mill Road, which requires 19mm asphalt at 1.5 inches depth.
Compaction testing is not required for submission to Macon-Bibb County. Milling and paving at side road intersections must extend through the side road end of the curb radius, but driveway paving is not included in the project scope. Contractors are responsible for clipping and removing all shoulder material from the site, with shoulder building, grassing, barrel placement, and Low/Soft Shoulder sign installation not required on shoulders without curb and gutter. Patching mix must match the paving mix specifications. A shuttle buggy is permitted but not required during 12.5mm placement operations.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Frequently Asked Questions
1. What will be the allowed work hours on this project?
Answer: 8-5, Monday – Friday, or as daylight permits. Special requests for night work (like on downtown streets) may be approved by request.
2. Will the contractor be required to post mount the advanced warning signs or can these signs be placed on tripod stands?
Answer: Advance warning signs may be placed on a tripod or post mounted.
3. How long will a milled surface be allowed to remain without the finished asphalt layer?
Answer: Final repaving to be completed within one day of the milling work.
4. Will the contractor be required to mill and pave into side roads?
Answer: Mill and pave, at the side road intersection, through the side road end of the curb radius.
5. Will the contractor be required to mill and pave into driveways?
Answer: No driveway paving is included.
6. Will any asphalt compaction test be required on this project?
Answer: You are not required to submit compaction tests to Macon – Bibb County.
7. The Milling will be Full Width Milling at the depth of the asphalt being placed – Is this correct?
Answer: Milling to be full depth, lip of curb to lip of curb, or road edge to road edge on roads without curb and gutter.
8. What will the depth of the Patching be?
Answer: Milling for patching to be to a depth to remove cracking as needed, maximum four inches deep.
9. Will the patch areas be marked 7.5’ or wider so a milling machine can be used in this operation?
Answer: Patching width to be at least one lane width. Contractor to patch areas needed, according to his judgement.
10. Will 19mm be used for the Patching operation?
Answer: All mix placed shall be 9.5 mm asphalt (1.25” asphalt) except for Fulton Mill Road (19mm, for 1.5” asphalt).
11. Looks like the depth of the 12.5mm asphalt will be 1.5” – is this correct?
Answer: That is correct.
12. Looks like the depth of the 9.5mm asphalt will be 1.25” – is this correct?
Answer: That is correct.
13. What type 9.5mm will be used for this project – Type 1 or Type 2?
Answer: Type 1.
14. For the pay item Clip Grass Shoulders will the clipped material be left on the shoulder or will the contractor be required to remove the material?
Answer: Contractor to remove all clipped material from the site.
15. Will an MTV (Shuttle Buggy) be required when placing 12.5mm?
Answer: A shuttle buggy is allowed but not required.
16. Will the contractor be required to perform any shoulder building, grassing, place barrels or install any Low/Soft Shoulder Signs on the shoulders without curb and gutter?
Answer: The contractor is only required to clip and remove shoulder material from the site.
17. What mix type will be used for the Patching line item?
Answer: Patching mix to match the paving mix.
18. What thickness will the asphalt topping be placed?
Answer: 1.25” on all roads except for Fulton Mill Road (1.5”).