25-8575_-_Bid_Schedule.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Collier County Sheriff's Office (CCSO) Marco Substation Floating Dock
Solicitation number
25-8575
Issued by
Collier County, Miami City, Florida

About this file

This bid schedule document is associated with Collier County's solicitation for the construction of a floating dock facility for the Collier County Sheriff's Office (CCSO) Marco Substation located at 990 N. Barfield Drive, Marco Island, Florida, under ITB #25-8575. The base scope of work includes mobilization and demobilization, four 10-inch diameter timber piles, a 74 square-foot fixed dock with an aluminum safety ladder, an aluminum gangway, a 222 square-foot aluminum-framed floating dock, three additional timber piles for the floating dock, a 16,000-pound boat lift with four timber piles, and connections for electrical utilities, plumbing utilities, fire protection systems, and security systems. A non-mandatory pre-bid meeting and site visit were scheduled for January 26, 2026, at 10:00 a.m., with sealed bids due by February 23, 2026, at 3:00 p.m. The project involves a unique interlocal agreement that includes optional alternates for an adjacent floating dock facility for the Marco Island Police Department, encompassing an additional 638 square feet of dock space and various lift options.

The bid schedule establishes multiple pricing scenarios for County scope work, City scope work, and various alternates including wood framing substitutions and dredging operations. The base bid and individual alternates are structured separately to allow flexibility in project implementation, with dredging quantities specified at 45 cubic yards for County scope and 118 cubic yards for City scope. An Owner's Allowance of $14,300 for County scope and $24,800 for City scope is designated for unforeseen conditions and will only be expended through formal Change Orders with supporting documentation. The anticipated total budget for the project is $500,000 for the base bid and all alternates combined. Bidders are required to submit a certified bid bond equal to five percent of the total bid amount, and upon award, must provide 100% Performance and Payment Bonds within ten calendar days of Notice of Award. Liquidated damages are assessed at $183 per calendar day for failure to achieve substantial completion within 180 days.

View the file

Other files

File Type Posted
25-8575_-_Solicitation_r1.pdf PDF
25-8575_-_Exhibit_L_-_Specification_Notes.pdf PDF
25-8575_-_Exhibit_L_-_Floating_Docks_Scope_of_Work.pdf PDF
25-8575_-_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
Specsheet-PWB_Series-Rev2208a.pdf PDF
25-8575_-_Exhibit_M_-_Floating-Dock_S&S.pdf PDF
Construction_Services_Agreement_2025_Template_ver_3_-_3rd_Party_Interlocal.pdf PDF
DataSheet_PNM-C32083RVQ_230809_EN.pdf PDF
Specsheet-WES4_Series-Rev2106.pdf PDF
Provisions_for_preservation_of_the_west_indian_manatee.pdf PDF
Specsheet-PWB_Series-Rev2208a.pdf PDF
Recorded_Interlocal_Agreement_Item_#16F4_(BCC_05132025).pdf PDF
25-8575_-_Authorization_to_Advertise_-.pdf PDF
25-8575_-_Exhibit_L_-_Floating_Docks_Scope_of_Work.pdf PDF
25-8575_-_Exhibit_M_-_Floating-Dock_S&S.pdf PDF
Construction_Services_Agreement_2025_Template_ver_3_-_3rd_Party_Interlocal.pdf PDF
DataSheet_PNM-C32083RVQ_230809_EN.pdf PDF
Specsheet-WES4_Series-Rev2106.pdf PDF
25-8575_-_Authorization_to_Advertise_-.pdf PDF
Provisions_for_preservation_of_the_west_indian_manatee.pdf PDF
25-8575_-_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
Recorded_Interlocal_Agreement_Item_#16F4_(BCC_05132025).pdf PDF
25-8575_-_Bid_Schedule.xlsx XLSX spreadsheet
Construction_Bid_Instructions_Form_2025_Rev.2.pdf PDF
25-8575_-_Solicitation.pdf PDF
25-8575_-_Exhibit_M_-_Dredge_Permit_Plans_S&S.pdf PDF
25-8575_-_Exhibit_M_-_Dredge_Permit_Plans_S&S.pdf PDF
Construction_Bid_Instructions_Form_2025_Rev.2.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Collier County Sheriff's Office (CCSO) Marco Substation Floating Dock Construction ITB #25-8575 Bid Schedule

ItemEstimated QtyUnitUnit CostTotal Cost
a. Mobilization and Demobilization - County Scope1L.S$0.00
b. Fixed Dock Piles. 10" Diameter 2.5 CCA PT Timber Piles. Includes Pile Wraps4E.A$0.00
c. Fixed Dock. Include (1) Aluminum Safety Ladder for Emergency Access Fastened to Fixed Dock74S.F.$0.00
d. Aluminum Gangway (Refer to Specification Note 1)1E.A$0.00
e. Aluminum Framed CCSO Floating Dock (Refer to Specification Note 2)222S.F.$0.00
f. CCSO Floating Dock Piles. 10" Diameter 2.5 CCA PT Timber Piles. Includes Pile Wraps3E.A.$0.00
g. 16K Boat Lift w/ (4) Timber Piles Per the Plans. Includes Pile Wraps. Refer to Specification Note 31L.S.$0.00
h. Electrical Utilities CCSO dock - Includes tying in to 990 N. Barfield Drive existing service. See Specification Note 41L.S.$0.00
i. Plumbing Utilities CCSO dock - Includes tying in to 990 N. Barfield Drive existing service. See Specification Note 51L.S.$0.00
j. Fire Protection CCSO dock. See Specification Note 61L.S.$0.00
k. Security CCSO dock. See Specification Note 71L.S.$0.00
Total Base Bid$0.00
ALTERNATES - COUNTY SCOPE
Alternate 1 - CCSO Floating Dock To Be Constructed of PT Wood Framing In Lieu of Aluminum Framing222S.F.$0.00
Alternate 2 - Dredging associated with CCSO floating dock (See Specification Note 8)45C.Y.$0.00
Total Base Bid plus Alt 1$0.00
Total Base Bid plus Alt 2$0.00
Total Base Bid plus Alt 1+2$0.00

Staff will allocate $14,300 for County's Owner's Allowance - for Owners Use as Directed. This allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owner's Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.

ALTERNATES - CITY SCOPE
Alternate 3 - Mobilization and Demobilization - City Scope1L.S$0.00
Alternate 4 - Aluminum Framed MPD Floating Dock (Refer to Specification Note 2)638S.F.$0.00
Alternate 5 - MPD Floating Dock To Be Constructed of PT Wood Framing In Lieu of Aluminum Framing638S.F.$0.00
Alternate 6 - MPD Floating Dock Piles. 10" Diameter 2.5 CCA PT Timber Piles. Includes Pile Wraps5E.A.$0.00
Alternate 7 - 20K Boat Lift w/ (4) Timber Piles Per the Plans. Includes Pile Wraps. Refer to Specification Note 31L.S.$0.00
Alternate 8 - 10K Boat Lift w/ (4) Timber Piles Per the Plans. Includes Pile Wraps. Refer to Specification Note 31L.S.$0.00
Alternate 9 - Dual Jet Ski Lift w/ (4) Timber Piles Per the Plans. Includes Pile Wraps. Refer to Specification Note 31L.S.$0.00
Alternate 10 - Electrical Utilities MPD dock - Includes tying in to 807 E. Elkham existing service. See Specification Note 41L.S.$0.00
Alternate 11 - Plumbing Utilities MPD dock - Includes tying in to 807 E. Elkham existing service. See Specification Note 51L.S.$0.00
Alternate 12 - Fire Protection MPD dock. See Specification Note 61L.S.$0.00
Alternate 13 - Dredging associated with MPD floating dock. See Specification Note 8118C.Y.$0.00
Total City Scope$0.00
Total City Scope plus Alt 5$0.00
Total City Scope plus Alt 13$0.00
Total City Scope plus Alt 5+13$0.00

Staff will allocate $24,800 for City's Owner's Allowance - for Owners Use as Directed. This allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance.