About this file
This document is a set of construction plans and specifications for the Collier County Sheriff's Office (CCSO) Marco Substation Floating Dock Project located at 990 N. Barfield Drive, Marco Island, Florida. The project involves the design and installation of a comprehensive dock system including a fixed dock (73.8 square feet), a floating dock (855.8 square feet), a gangway, and multiple boat lifts with capacities of 16,000 pounds, 20,000 pounds, 10,000 pounds, and a dual jet ski lift. The total dock area spans 979 square feet with a maximum waterway projection of 24.5 feet and a waterway width of 100.1 feet. The contractor is responsible for furnishing and installing all components, including the dock structures, gangway, lifts, decking materials, and related appurtenances as specified in the plans. Construction must comply with all local, state, and national building codes, FDEP and USACE regulations, and permit conditions. The sealed bid deadline is February 23, 2026, at 3:00 p.m. local time, with a non-mandatory pre-bid meeting scheduled for January 26, 2026, at 10:00 a.m. at the project site.
The project specifications require the contractor to provide all labor, equipment, materials, and operations necessary for construction. Key structural components include 2.5 CCA pressure-treated wood piles with minimum embedment depths ranging from 12 to 14 feet, high-density polyethylene pile wraps, 0.60 CCA pressure-treated wood pile caps and stringers, and composite or marine-grade pressure-treated wood decking with 0.5-inch spacing. The floating dock must feature HDPE-encapsulated expanded polystyrene foam floats, marine-grade aluminum or pressure-treated wood framing with galvanized steel hardware, and commercial-grade double-molded dock edging. The gangway shall be marine-grade aluminum construction with aluminum pipe railings and slip-resistant decking, with a minimum length of 20 feet. All construction must adhere to comprehensive environmental management requirements, including turbidity control barriers, erosion and sediment control measures, spill prevention protocols, and compliance with the Clean Water Act Section 404 permit and Section 401 water quality certification. The contractor is responsible for site restoration, utility location and protection, and maintaining safety measures to exclude public access during construction operations.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLLIER COUNTY, FLORIDA
SHEET INDEX
GENERAL INFORMATION
01 COVER SHEET
02 GENERAL NOTES
PLANS & DETAILS
03 SITE PLAN
04 FIXED DOCK PLAN
05 FIXED DOCK PILE PLAN
06 FLOATING DOCK PLAN
07 DOCK SECTION A
08 DOCK SECTION B
09 DOCK SECTION C
10 DOCK DETAILS
N
WATER BODY
(TIDAL)PROJECT
LOCATION
SCALE : 1" = 1000'
990 N. BARFIELD DR
FLOATING DOCK PLANS
MARCO ISLAND, COLLIER COUNTY COUNTY, FLORIDA
TOWNSHIP: 52S, RANGE: 26E, SECTION 08
PROJECT LOCATION
990 N. BARFIELD DR, MARCO ISLAND, FLORIDA 34145
PROJECT
LOCATION
OF 10
FOSTER CONSULTING
FL PROFESSIONAL ENGINEER NO. 79708
FL CERTIFICATE OF AUTHORIZATION NO. 32050
WWW.JFOSTERCONSULTING.COM
P: (727) 821-1949
P.O. BOX 7370, ST. PETERSBURG, FL 33734
DATE:
DRAWN BY:
CHECKED BY:
SCALE:
FILE: REV:
SHEET:
DH
JTF
AS NOTED
990 N. BARFIELD DR
MARCO ISLAND, FLORIDA
DE LIC. # 18618 · NJ LIC. # 24GE05181200 · TX LIC. # 133648
NOT VALID UNLESS SIGNED & SEALED
01/15/24 22450
COVER SHEET 01
NOTES:
1. COORDINATES SHOWN ARE IN FEET BASED ON THE NORTH AMERICAN DATUM OF 1983, EAST
ZONE (NAD83)
2. ELEVATIONS SHOWN ARE IN FEET BASED ON THE NORTH AMERICAN VERTICAL DATUM OF 1988
(NAVD88)
3. THE VERTICAL DATUMS ESTABLISHED BY DEP FOR THIS AREA ARE: MEAN HIGH WATER
ELEVATION & MEAN LOW WATER ELEVATION AS DETAILED IN THE TIDE INFORMATION CHART.
4. NOTE: THESE PERMIT DRAWINGS SHALL NOT BE CONSIDERED VALID FOR CONSTRUCTION
PURPOSES UNLESS SIGNED AND SEALED BY:
JOSEPH T. FOSTER. P.E.
FL LIC# 79708
TIDE INFORMATION
M.H.W.
NAVD 1988
M.L.W.
RELATIONSHIP BETWEEN NAVD 1988,
MEAN HIGH WATER, MEAN LOW WATER
TIDAL DATUM (1983 - 2001 EPOCH)
NOTE:
TIDE INFORMATION OBTAINED
FROM TIDE STATION I.D.
+0.35'
-1.66'
8725110, FLORIDA
Jill Larner JF Stamp
1. GENERAL
1.A. THE WORK CONSISTS OF PROVIDING ALL CONSTRUCTION, LABOR, EQUIPMENT, MATERIAL & OPERATIONS IN CONNECTION WITH THE
INSTALLATION OF THE DOCK & RELATED IMPROVEMENTS AS SHOWN ON THESE DRAWINGS.
1.B. ANY DISCREPANCIES IN THE PLANS WITH THE FIELD CONDITIONS SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ENGINEER.
CONSTRUCTION SHALL NOT CONTINUE UNTIL THE ENGINEER HAS ADDRESSED THE DISCREPANCIES.
1.C. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT EXISTING STRUCTURES IN THE PROJECT VICINITY. ANY DAMAGE TO PRIVATE OR PUBLIC PROPERTY WITHIN THE PROJECT VICINITY, INCLUDING STAGING SITES, WORK & ACCESS AREAS SHALL BE REPAIRED PROMPTLY BY THE CONTRACTOR. ANY DAMAGE AS A RESULT OF THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED AT NO COST TO THE OWNER. ALL ACCESS & STAGING AREAS SHALL BE KEPT NEAT, ORDERLY & IN A SAFE MANNER. ALL ACCESS & STAGING AREAS SHALL BE RESTORED TO THE PRE-CONSTRUCTION CONDITION UPON PROJECT COMPLETION AT THE COST OF THE CONTRACTOR. THE SITE SHALL BE RESTORED BY REMOVING & FINISHING ALL EVIDENCE FOR CONSTRUCTION. IN THE EVENT INFRASTRUCTURE (SUCH AS WALKWAYS, SIDEWALKS, FENCES, VEGETATION, ETC.) IS TEMPORARILY REMOVED OR RELOCATED OR THERE IS UNAUTHORIZED DAMAGE TO VEGETATION AND/OR FACILITIES BY THE CONTRACTOR, THE CONTRACTOR SHALL RESTORE ALL DAMAGE TO STRUCTURES & NATURAL FEATURES TO
PRE-CONSTRUCTION CONDITIONS OR BETTER. UNLESS OTHERWISE NOTED IN CONTRACT.
1.D. UTILITIES ARE NOT SHOWN IN THE PLANS. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL PRESENT UTILITIES PRIOR TO CONSTRUCTION.PRIOR TO DEMOLITION, CUTTING AND PATCHING, THE CONTRACTOR SHALL LOCATE AND DISCONNECT UTILITY SERVICES AND ELECTRICAL / MECHANICAL SYSTEMS, OR TEMPORARILY CAP/SUPPORT SUCH SERVICES TO THE AFFECTED AREAS. GIVE NOTICE TO, AND COORDINATE WITH UTILITY COMPANIES. OBTAIN WRITTEN APPROVAL FROM, AND COOPERATE WITH OTHER PARTIES WHO MAY BE AFFECTED
BY INTERRUPTION OF SERVICES.
1.E. CONTRACTOR IS RESPONSIBLE FOR PROVIDING PROPER CLEARANCE & PROTECTION TO ALL OVERHEAD WIRES & OBSTRUCTIONS.
1.F. THE CONTRACTOR SHALL EXCLUDE THE PUBLIC FROM THE WORK AREAS IN THE IMMEDIATE VICINITY OF OPERATIONS. CONTRACTOR SHALL
PROVIDE APPROPRIATE SAFETY MEASURES TO PROTECT THE PUBLIC.
1.G. WHEN PUMPING CONCRETE, THE TRUCK CHUTE & PUMP WILL HAVE VISQUEEN OR SIMILAR PROTECTIVE MATERIAL ON THE ROADWAYS TO
PREVENT SPILLAGE ONTO THE ASPHALT OR PAVERS.
1.H. ANY EXISTING UTILITIES (PEDESTALS, WATER) LADDER OR CLEAT FOUND ATTACHED TO THE EXISTING CAP OR DOCK THAT WILL BE IMPACTED
BY THIS WORK SHALL BE REMOVED & REATTACHED TO THE NEW WORK.UNLESS OTHERWISE NOTED IN CONTRACT.
1.I. ANY EXISTING UTILITIES THAT ARE NOT BEING REMOVED, BUT ARE BEING IMPACTED, SHALL BE TEMPORARILY SUPPORTED & REATTACHED AS
REQUIRED.
1.J. ANY DAMAGED DOCK PILES OR PORTIONS OF DOCK SHALL BE REMOVED & REPLACED AS REQUIRED.
1.K. ALL NEW STRUCTURAL WORK INCLUDING CONCRETE & REINFORCEMENT SHALL BE ACCURATELY FIELD MEASURED & DIMENSIONS VERIFIED BY
THE CONTRACTOR PRIOR TO ORDERING MATERIALS. CONTRACTOR SHALL BE PREPARED TO MAKE FIELD ADJUSTMENTS TO ACCURATELY FIT
THE NEW WORK TO EXISTING CONDITIONS.
1.L. NO CONSTRUCTION SHALL COMMENCE UNTIL ALL REQUIRED PERMITS & APPROVALS HAVE BEEN SECURED.
1.M. ATTENTION IS DIRECTED TO THE FACT THAT THESE PLANS MAY HAVE BEEN CHANGED IN SIZE BY REPRODUCTION. THIS SHOULD BE
CONSIDERED WHEN OBTAINING SCALED DATA. THESE DRAWINGS SHALL NOT BE SCALED. RELY ONLY ON SPECIFIED DIMENSIONS.
1.N. CONSTRUCTION WORK SHALL BE EXECUTED IN ACCORDANCE WITH ALL LOCAL, STATE, & NATIONAL BUILDING CODES & GOVERNING
REGULATIONS, FDEP & USACE. CONTRACTOR SHALL ADHERE TO ALL CONDITIONS OF THE PERMITS & EXEMPTIONS.
1.O. REVIEW OF SUBMITTALS BY THE STRUCTURAL ENGINEER IS FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT AS PRESENTED BY
THE CONTRACT DOCUMENTS. NO DETAILED CHECK OF QUANTITIES OR DIMENSIONS WILL BE MADE.
2. LAYOUT & TESTING
2.A. ALL CONSTRUCTION STAKEOUTS SHALL BE PERFORMED BY & PAID FOR BY THE CONTRACTOR UNLESS OTHERWISE NOTED IN CONTRACT. ALL TESTING & INSPECTION FOR CONCRETE MATERIALS SHALL BE IN ACCORDANCE WITH FDOT SPECIFICATIONS.
3. DEMOLITION
3.A. CONTRACTOR SHALL VERIFY THE EXTENTS, LOCATION & QUANTITIES OF EXISTING ELEMENTS TO BE REMOVED.
3.B. ALL DEBRIS WITHIN THE LIMITS OF THE PROJECT SHALL BE HAULED OFF SITE BY THE CONTRACTOR & DISPOSED OF IN A PROPER LOCATION.
NO ILLEGAL DUMPING'
3.C. CONTRACTOR SHALL NOT DAMAGE ANY STRUCTURAL COMPONENTS BEYOND THE DEMOLITION REQUIREMENTS DEPICTED IN THESE
DRAWINGS. ANY DAMAGE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
4. ENVIRONMENTAL MANAGEMENT PLAN
4.A. ALL WORK WILL ADHERE TO PERFORMANCE REQUIREMENTS OF THE CLEAN WATER ACT, SECTION 404 PERMIT & SECTION 401 WATER QUALITY CERTIFICATION. NO IN-WATER WORK WILL BEGIN UNTIL AFTER ISSUANCE OF REGULATORY AUTHORIZATIONS.
4.B. THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE FOR PREPARATION OF AN ENVIRONMENTAL PROTECTION PLAN. THE PLAN WILL IDENTIFY CONSTRUCTION ELEMENTS & RECOGNIZE SPILL SOURCES AT THE SITE. THE PLAN WILL OUTLINE BMP'S, RESPONSIVE ACTIONS IN THE EVENT OF A SPILL OR RELEASE, & NOTIFICATION & REPORTING PROCEDURES. THE PLAN WILL ALSO OUTLINE CONTRACTOR MANAGEMENT ELEMENTS SUCH AS PERSONNEL RESPONSIBILITIES, ACTION AREA SECURITY, SITE INSPECTIONS & TRAINING.
4.C. NO PETROLEUM PRODUCTS, LIME, CHEMICALS, OR OTHER TOXIC OR HARMFUL MATERIALS WILL BE ALLOWED TO ENTER SURFACE WATERS.
4.D. WASH WATER RESULTING FROM WASH-DOWN OF EQUIPMENT OR WORK AREAS WILL BE CONTAINED FOR PROPER DISPOSAL.
4.E. EQUIPMENT THAT ENTERS SURFACE WATERS WILL BE MAINTAINED TO PREVENT ANY VISIBLE SHEEN FROM PETROLEUM PRODUCTS.
4.F. NO OIL, FUELS, OR CHEMICALS WILL BE DISCHARGED TO SURFACE WATERS, OR ONTO LAND WHERE THERE IS A POTENTIAL FOR RE-ENTRY
INTO SURFACE WATERS. FUEL HOSES, OIL DRUMS, OIL OR FUEL TRANSFER VALVES, FITTINGS, ETC. WILL BE CHECKED REGULARLY FOR
LEAKS & WILL BE MAINTAINED & STORED PROPERLY TO PREVENT SPILLS.
4.G. NO CLEANING SOLVENTS OR CHEMICALS USED FOR TOOLS OR EQUIPMENT CLEANING WILL BE DISCHARGED TO GROUNDWATER OR
SURFACE WATERS.
4.H. CONSTRUCTION MATERIALS WILL NOT BE STORED WHERE HIGH TIDES, WAVE ACTION, OR UPLAND RUNOFF COULD CAUSE MATERIALS TO
ENTER SURFACE WATERS.
4.I. BARGE OPERATIONS WILL BE RESTRICTED TO TIDAL ELEVATIONS ADEQUATE TO PREVENT GROUNDING OF A BARGE.
5. TURBIDITY BARRIERS
5.A. THE CONTRACTOR SHALL FURNISH, INSTALL & MAINTAIN TURBIDITY CONTROL BARRIERS AROUND THE WORK AREA AS NECESSARY.
THE PURPOSE OF THE BARRIER IS TO AVOID ANY DEBRIS FROM GOING INTO THE MAIN WATERS. THE CONTRACTOR HAS THE OPTION TO ENCLOSE THE ENTIRE WATERSIDE OF THE SITE, WITHIN THE LIMITS OF DISTURBANCE, OR TO INSTALL & MOVE THE BARRIER IN STAGES. THE CONTRACTOR SHALL MAINTAIN SUCH BARRIERS AT ALL TIMES IN THE AREAS WHERE WORK IS IN PROGRESS UNLESS STRONG CURRENT
PREVENTS THEIR DEPLOYMENT.
5.B. TURBIDITY BARRIERS TO BE MANUFACTURED IN ACCORDANCE WITH FDOT ROADWAY & TRAFFIC DESIGN STANDARDS INDEX NO. 103.
5.C. BARRIERS SHALL BE ANCHORED AT 100 FT INTERVALS MAX. PROVIDE A BUOY AT EACH ANCHOR LOCATION.
6. EROSION & SEDIMENT CONTROL
6.A. SILT FENCES TO BE MANUFACTURED & INSTALLED IN ACCORDANCE WITH FDOT ROADWAY & TRAFFIC DESIGN STANDARDS INDEX NO. 102
& FDOT STANDARD SPECIFICATIONS FOR ROAD & BRIDGE CONSTRUCTION SECTION 104.
7. TIDAL DATA
7.A. CONTRACTOR MAY NEED TO ADJUST WORK PLAN TO ACCOUNT FOR ACTUAL WATERLEVELS & CHANGING WATER LEVELS. THE SITE MAY BE SUBJECT TO VARIABLE WAVE & SURGE CONDITIONS & IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE TEMPORARY SUPPORT FOR MARINE STRUCTURES & SHORELINE DURING CONSTRUCTION. TIDAL DATA OBTAINED FROM CLOSEST NOAA STATION.
TURBIDITY BARRIER TO ENCLOSE
WORKING/DISTURBANCE AREA
DURING CONSTRUCTION
WORK AREA
CONSTRUCTION
BARGE
PLAN - OFF SHORE PLAN - ALONG SHORE
DETAIL: TURBIDITY CONTROL BARRIER
NOTE: TURBIDITY BARRIERS SHALL BE MANUFACTURED IN ACCORDANCE WITH
FDOT ROADWAY AND TRAFFIC STANDARDS INDEX NO. 103, 2010 EDITION
CONSTRUCTION
BARGE
WORK AREA
TURBIDITY BARRIER TO ENCLOSE
WORKING/DISTURBANCE AREA
DURING CONSTRUCTION
ANCHOR AT SHORELINE EXISTING SHORELINE
TBTB TB
TB
TB
TB
TB
TB
TB
TB TB
TB TB
TB
TB
TB
TB
KNOW WHAT'S BELOW.
ALWAYS CALL 811.
CALL BEFORE YOU DIG.
IT'S FAST. IT'S FREE. IT'S
THE LAW.
WWW.CALLSUNSHINE.COM
CONTRACTOR TO VERIFY THAT
ELECTRICAL LINES ARE DEENERGIZED
PRIOR TO ANY WORK
TURBIDITY CURTAINS TO BE USED IN
ACTIVE CONSTRUCTION AREA DURING
IN-WATER ACTIVITIES
SYMBOLS LEGEND
DIRECTION OF
CUT VIEW
A
SHEET NUMBER
SECTION IS ON
DETAIL LETTER
SHEET NUMBER
DETAIL IS ON
SECTION NUMBER
OF 10
FOSTER CONSULTING
FL PROFESSIONAL ENGINEER NO. 79708
FL CERTIFICATE OF AUTHORIZATION NO. 32050
WWW.JFOSTERCONSULTING.COM
P: (727) 821-1949
P.O. BOX 7370, ST. PETERSBURG, FL 33734
DATE:
DRAWN BY:
CHECKED BY:
SCALE:
FILE: REV:
SHEET:
DH
JTF
AS NOTED
990 N. BARFIELD DR
MARCO ISLAND, FLORIDA
DE LIC. # 18618 · NJ LIC. # 24GE05181200 · TX LIC. # 133648
NOT VALID UNLESS SIGNED & SEALED
01/15/24 22450
GENERAL NOTES 02
SCALE:
PLAN
1" = 50'-0"
OF 10
FOSTER CONSULTING
FL PROFESSIONAL ENGINEER NO. 79708
FL CERTIFICATE OF AUTHORIZATION NO. 32050
WWW.JFOSTERCONSULTING.COM
P: (727) 821-1949
P.O. BOX 7370, ST. PETERSBURG, FL 33734
DATE:
DRAWN BY:
CHECKED BY:
SCALE:
FILE: REV:
SHEET:
DH
JTF
AS NOTED
990 N. BARFIELD DR
MARCO ISLAND, FLORIDA
DE LIC. # 18618 · NJ LIC. # 24GE05181200 · TX LIC. # 133648
NOT VALID UNLESS SIGNED & SEALED
01/15/24 22450
SITE PLAN 03
N
WATER
STORAGE
TANK
WATER
STORAGE
TANK
990 N BARFIELD DR
807 E ELKCAM CIRCLE
(WATER TREATMENT FACILITY)
PROPOSED
GANGWAY (TO
BE SUPPLIED &
INSTALLED BY
CONTRACTOR)
PROPOSED 855.8 SQ
FT FLOATING DOCK
(TO BE SUPPLIED &
INSTALLED BY
CONTRACTOR)
PROPOSED
73.8 SQ FT
FIXED DOCK
(1) (2) (3) (4)
PROPOSED SEAWALL
(REF SEAWALL PLAN SET)
PROPOSED 16K
LB LIFT (TO BE
SUPPLIED &
INSTALLED BY
CONTRACTOR)
PROPOSED
20K LB LIFT (TO
BE SUPPLIED &
INSTALLED BY
CONTRACTOR)
PROPOSED 10K
LB LIFT (TO BE
SUPPLIED &
INSTALLED BY
CONTRACTOR)
PROPOSED DUAL
JET SKI LIFT (TO
BE SUPPLIED &
INSTALLED BY
CONTRACTOR)
PR
O
PE
R
TY
L
IN
E
990 N BARFIELD DR 807 E ELKCAM CIRCLE
(WATER TREATMENT FACILITY)
PR
O
PE
R
TY
L
IN
E
SCALE:
FIXED DOCK PLAN
3/8" = 1'-0"
OF 10
FOSTER CONSULTING
FL PROFESSIONAL ENGINEER NO. 79708
FL CERTIFICATE OF AUTHORIZATION NO. 32050
WWW.JFOSTERCONSULTING.COM
P: (727) 821-1949
P.O. BOX 7370, ST. PETERSBURG, FL 33734
DATE:
DRAWN BY:
CHECKED BY:
SCALE:
FILE: REV:
SHEET:
DH
JTF
AS NOTED
990 N. BARFIELD DR
MARCO ISLAND, FLORIDA
DE LIC. # 18618 · NJ LIC. # 24GE05181200 · TX LIC. # 133648
NOT VALID UNLESS SIGNED & SEALED
01/15/24 22450
FIXED DOCK PLAN 04
N
5.3'
8.2'
10.2'
12.0'
PROPOSED SEAWALL
TO REMAIN (REF
SEAWALL PLAN SET)
EXISTING
SEAWALL TO
REMAIN
2" DECKING OVERHANG
(ALL SIDES)
PROPOSED DOCK TO
MATCH PROPOSED
SEAWALL CAP ELEV.
(5.5' NAVD)
0.40 C.C.A. PT WOOD OR
COMPOSITE DECKING
NOTE: TURBIDITY CURTAIN TO BE DEPLOYED DURING
ACTIVE CONSTRUCTION. NOT SHOWN FOR CLARITY.
PROPOSED GANGWAY (TO
BE SUPPLIED & INSTALLED
BY CONTRACTOR)
990 N BARFIELD DR
807 E ELKCAM CIRCLE
(WATER TREATMENT FACILITY)
PR
O
PE
R
TY
L
IN
E
SCALE:
FIXED DOCK PILE PLAN
3/8" = 1'-0"
OF 10
FOSTER CONSULTING
FL PROFESSIONAL ENGINEER NO. 79708
FL CERTIFICATE OF AUTHORIZATION NO. 32050
WWW.JFOSTERCONSULTING.COM
P: (727) 821-1949
P.O. BOX 7370, ST. PETERSBURG, FL 33734
DATE:
DRAWN BY:
CHECKED BY:
SCALE:
FILE: REV:
SHEET:
DH
JTF
AS NOTED
990 N. BARFIELD DR
MARCO ISLAND, FLORIDA
DE LIC. # 18618 · NJ LIC. # 24GE05181200 · TX LIC. # 133648
NOT VALID UNLESS SIGNED & SEALED
01/15/24 22450
FIXED DOCK PILE PLAN 05
N
PROPOSED
SEAWALL TO
REMAIN (REF
SEAWALL
PLAN SET)
EXISTING
SEAWALL TO
REMAIN
2.5 C.C.A PT
WOOD DOCK PILE
(INTERIOR)
0.60 C.C.A PT
WOOD PILE CAP
NOTE: TURBIDITY CURTAIN TO BE DEPLOYED DURING
ACTIVE CONSTRUCTION. NOT SHOWN FOR CLARITY.
PT W
D
JO
ISTS
16" O
.C
C
7.3'
4.3'
8.7'
10.4'
PROPOSED
GANGWAY (TO
BE SUPPLIED &
INSTALLED BY
CONTRACTOR)
SCALE:
FLOATING DOCK PLAN
1" = 30'-0"
N
OF 10
FOSTER CONSULTING
FL PROFESSIONAL ENGINEER NO. 79708
FL CERTIFICATE OF AUTHORIZATION NO. 32050
WWW.JFOSTERCONSULTING.COM
P: (727) 821-1949
P.O. BOX 7370, ST. PETERSBURG, FL 33734
DATE:
DRAWN BY:
CHECKED BY:
SCALE:
FILE: REV:
SHEET:
DH
JTF
AS NOTED
990 N. BARFIELD DR
MARCO ISLAND, FLORIDA
DE LIC. # 18618 · NJ LIC. # 24GE05181200 · TX LIC. # 133648
NOT VALID UNLESS SIGNED & SEALED
01/15/24 22450
FLOATING DOCK PLAN 06
5.3'
8.2'
10.2'
12.0'
180.0'
990 N BARFIELD DR
807 E ELKCAM CIRCLE
(WATER TREATMENT FACILITY)
EXISTING
SEAWALL TO
REMAIN
PR
O
PE
R
TY
L
IN
E
2.5 C.C.A
FLOATING
DOCK PILE
5.0'
5.0'
CCSO DOCKGANGWAY (TO
BE SUPPLIED &
INSTALLED BY
CONTRACTOR)
191.0'
PROPOSED
FIXED
DOCK
11.0'
WATER
STORAGE
TANK WATER
STORAGE
TANK
MPD DOCK
8.0'
TURBIDITY
CURTAIN AS
REQ'D
B
A
- TOTAL DOCK (FIXED/FLOATING) AREA: 979 SQ FT
- WATERWAY WIDTH: 100.1'
- MAX PROPOSED PROJECTION: 24.5'
100.1'
· CONTRACTOR TO VERIFY
ALL LIFT PILE LOCATIONS
PROPOSED
20K LB LIFT (TO
BE SUPPLIED &
INSTALLED BY
CONTRACTOR)
PROPOSED
10K LB LIFT
(TO BE
SUPPLIED &
INSTALLED BY
CONTRACTOR)
172.0'
127.6'
PROPOSED
DUAL JETSKI
LIFT (TO BE
SUPPLIED &
INSTALLED BY
CONTRACTOR)
PROPOSED
FLOATING DOCK
(TO BE SUPPLIED
& INSTALLED BY
CONTRACTOR)
2.5 C.C.A
LIFT PILE
25.4'25.4'25.4'25.4'20.4'20.4'
52.4'
PROPOSED 16K
LB LIFT (TO BE
SUPPLIED &
INSTALLED BY
CONTRACTOR)
25.4'
OF 10
FOSTER CONSULTING
FL PROFESSIONAL ENGINEER NO. 79708
FL CERTIFICATE OF AUTHORIZATION NO. 32050
WWW.JFOSTERCONSULTING.COM
P: (727) 821-1949
P.O. BOX 7370, ST. PETERSBURG, FL 33734
DATE:
DRAWN BY:
CHECKED BY:
SCALE:
FILE: REV:
SHEET:
DH
JTF
AS NOTED
990 N. BARFIELD DR
MARCO ISLAND, FLORIDA
DE LIC. # 18618 · NJ LIC. # 24GE05181200 · TX LIC. # 133648
NOT VALID UNLESS SIGNED & SEALED
01/15/24 22450
FLOATING DOCK SECTION 07
SCALE:A FLOATING DOCK SECTION
1" = 20'-0"
807 E ELKCAM
CIRCLE
EXISTING
SEAWALL
T/DOCK EL. 5.5'
NAVD TO MATCH
PROPOSED
SEAWALL EL.
MHW : +0.35'
NAVD
MLW : -1.66'
NAVD
APPROX.
MUD LINE
PROPOSED
FLOATING DOCK
(TO BE SUPPLIED
& INSTALLED BY
CONTRACTOR)
GANGWAY (TO
BE SUPPLIED &
INSTALLED BY
CONTRACTOR)
FIXED
DOCK
2.5 C.C.A. PT
WOOD FLOATING
DOCK PILE
3.3' FROM MUDLINE TO MLW
T/PILE EL.
12' NAVD
12.0' 12.0'
TOP OF PILE
WRAP +1.35' NAVD
6" 1.0'
2.5 C.C.A. PT
WOOD DOCK
PILE12' (ACCOUNTS FOR
UP TO 1.7' OF
FUTURE DREDGE)
MHW : +0.35' NAVD
MLW : -1.66' NAVD
APPROX. MUD LINE
OF 10
FOSTER CONSULTING
FL PROFESSIONAL ENGINEER NO. 79708
FL CERTIFICATE OF AUTHORIZATION NO. 32050
WWW.JFOSTERCONSULTING.COM
P: (727) 821-1949
P.O. BOX 7370, ST. PETERSBURG, FL 33734
DATE:
DRAWN BY:
CHECKED BY:
SCALE:
FILE: REV:
SHEET:
DH
JTF
AS NOTED
990 N. BARFIELD DR
MARCO ISLAND, FLORIDA
DE LIC. # 18618 · NJ LIC. # 24GE05181200 · TX LIC. # 133648
NOT VALID UNLESS SIGNED & SEALED
01/15/24 22450
FLOATING DOCK SECTION 08
SCALE:B FLOATING DOCK SECTION
1"=10'
990 BARFIELD
PROPOSED
SEAWALL
NEW LIFT (TO BE
SUPPLIED & INSTALLED
BY CONTRACTOR)
PROPOSED
FIXED DOCK
PROPOSED
FLOATING DOCK
(TO BE SUPPLIED
& INSTALLED BY
CONTRACTOR)
2.5 C.C.A.
WOOD LIFT
PILE
T/PILE EL.
12' NAVD
3.6'
GANGWAY TO
FLOATING DOCK (TO BE
SUPPLIED & INSTALLED
BY CONTRACTOR)
12.0' 12.0'
2.5 C.C.A. PT
WOOD DOCK
PILE
2.5 C.C.A.
PT WOOD
FLOATING
DOCK PILE
HIGH DENSITY
POLYETHYLENE PILE
WRAP
(1.0' ABOVE MHW TO
6" BELOW MUDLINE)
0.40 A.C.Q. PT WOOD OR
COMPOSITE DECKING
0.60 C.C.A. PT
WOOD PILE CAP
0.60 C.C.A. PT
STRINGER
3.3' FROM
MUDLINE TO MLW
STAINLESS STEEL
THRU-BOLTS, TYP.
TOP OF PILE
WRAP +1.35' NAVD
DOCK EL. TO MATCH
PROPOSED CAP
EL. 5.5' NAVD
6"
1.0'
12' (ACCOUNTS FOR
UP TO 1.7' OF FUTURE
DREDGE)
14.0' (ACCOUNTS FOR UP TO
1.7' OF FUTURE DREDGE)
MHW : +0.35' NAVD
MLW : -1.66' NAVD
APPROX. MUD LINE
HIGH DENSITY
POLYETHYLENE PILE
WRAP
(1.0' ABOVE MHW TO
6" BELOW MUDLINE)
0.40 A.C.Q. PT WOOD OR
COMPOSITE DECKING
0.60 C.C.A. PT
WOOD PILE CAP
0.60 C.C.A. PT
STRINGER
3.3' FROM
MUDLINE TO MLW
OF 10
FOSTER CONSULTING
FL PROFESSIONAL ENGINEER NO. 79708
FL CERTIFICATE OF AUTHORIZATION NO. 32050
WWW.JFOSTERCONSULTING.COM
P: (727) 821-1949
P.O. BOX 7370, ST. PETERSBURG, FL 33734
DATE:
DRAWN BY:
CHECKED BY:
SCALE:
FILE: REV:
SHEET:
DH
JTF
AS NOTED
990 N. BARFIELD DR
MARCO ISLAND, FLORIDA
DE LIC. # 18618 · NJ LIC. # 24GE05181200 · TX LIC. # 133648
NOT VALID UNLESS SIGNED & SEALED
01/15/24 22450
FLOATING DOCK SECTION 09
SCALE:C FIXED DOCK SECTION
1"=10'
990 BARFIELD
PROPOSED
SEAWALL
PROPOSED
FIXED DOCK 2.5 C.C.A.
WOOD LIFT
PILE
TOP OF PILE
WRAP +1.35' NAVD
DECK EL. TO MATCH
PROPOSED CAP
EL. 5.5' NAVD
NEIGHBOR'S
EXISTING
SEAWALL
12.0' (ACCOUNTS
FOR UP TO 1.7' OF
FUTURE DREDGE)
1.0'
6"
OF 10
FOSTER CONSULTING
FL PROFESSIONAL ENGINEER NO. 79708
FL CERTIFICATE OF AUTHORIZATION NO. 32050
WWW.JFOSTERCONSULTING.COM
P: (727) 821-1949
P.O. BOX 7370, ST. PETERSBURG, FL 33734
DATE:
DRAWN BY:
CHECKED BY:
SCALE:
FILE: REV:
SHEET:
DH
JTF
AS NOTED
990 N. BARFIELD DR
MARCO ISLAND, FLORIDA
DE LIC. # 18618 · NJ LIC. # 24GE05181200 · TX LIC. # 133648
NOT VALID UNLESS SIGNED & SEALED
01/15/24 22450
DOCK DETAILS 10
2.5 CCA PT WOOD PILE
(2) 0.60 CCA PT WOOD PILE CAP
(EACH SIDE)
S.S. THRU BOLTS
0.60 CCA PT WOOD STRINGER
WOOD OR COMPOSITE DECKING
SIMPSON H2.5 CLIP @ EACH PILE CAP
TO STRINGER CONNECTION (OR EQUAL)
0.60 C.C.A. PT WOOD SCAB BOARD
FASTENED TO STRINGER W/ (10) 16D
RINGSHANK NAILS
EDGE OF SCAB BOARD (BEHIND)
0.60 C.C.A. PT
WOOD STRINGER
0.60 C.C.A. PT WOOD SCAB
BOARD
(2) 0.60 C.C.A. PT
WOOD PILE CAP
0.60 C.C.A. SCAB BOARD FASTENED TO
STRINGER W/ (10) 16D RINGSHANK NAILS
CONNECTION DETAIL SCAB BOARD DETAIL
FIXED DOCK CONSTRUCTION DETAILS:
1. STRINGERS - 2"X10" 0.60 CCA P.T. WOOD @ 16" O.C. (MAX.)
2. PILE CAP - 2"X12" 0.60 CCA P.T. WOOD (ONE EACH SIDE) OR (2)-2"X12" 0.60 CCA P.T.
WOOD. USE 2"X12" WHERE NOTED ON PLAN.
3. PILE WRAP- ALL PT WOOD PILES ARE TO BE PRE-WRAPPED WITH A 0.30" HIGH
DENSITY POLYETHYLENE PILE WRAP. 1' ABOVE MHW, 6" BELOW MUDLINE.
4. DOCK PILES - 10" Ø 2.5 C.C.A. P.T. WOOD PILE, MIN 12'-0" EMBEDMENT.
5. 16K & 20K LIFT PILES - 12" Ø 2.5 C.C.A. P.T. WOOD PILE, 14'-0" EMBEDMENT.
5.1 10K LIFT PILES + JETSKI - 10" Ø 2.5 C.C.A. P.T. WOOD PILE, 12'-0" EMBEDMENT.
6. THRU BOLTS - (1) 5/8" Ø THRU BOLT @ PILE TO OUTSIDE STRINGER (2) 5/8" Ø THRU
BOLTS @ PILE TO PILE CAP
6.1. ALL BOLTS SHALL BE STAINLESS STEEL (S.S.) UNLESS NOTED OTHERWISE.
7. DECKING BOARDS - 1"X6" TREX TRANSEND OR 2"X6" COMPOSITE DECKING OR #1
GRADE, 0.40 A.C.Q. HAND SELECT MARINE GRADE DECK BOARDS.
7.1. 1/2" SPACING BETWEEN DECK BOARDS.
7.2. 1 1/2" DECKING OVERHANG (ALL SIDES).
FLOATING DOCK CONSTRUCTION DETAILS:
8. FLOATING DOCK: FLOATING DOCKS TO BE CONSTRUCTED PER FLOATING DOCK
MANUFACTURER'S SPECIFICATIONS. SPECIFICATIONS FOR THE FLOATING DOCK TO BE
SUPPLIED AND INSTALLED BY THE CONTRACTOR ARE:
-FLOATS: HDPE (HIGH-DENSITY POLYETHYLENE) ENCAPSULATED EPS (EXPANDED
POLYSTYRENE) FOAM
-FRAME: FULLY WELDED MARINE GRADE ALUMINUM OR PT WOOD WITH GALVANIZED STEEL
HARDWARE
-DECKING: PT WOOD OR COMPOSITE (COLOR TO BE SELECTED VIA SUBMITTAL) TO MATCH
NEW FIXED DOCK
-FREEBOARD HEIGHT: 17-18”
-COMMERCIAL-GRADE DOUBLE-MOLDED DOCK EDGING TO BE LOCATED ON THE ENTIRE
EASTERN SIDE OF THE DOCK.
-CAST ALUMINUM 14” MINIMUM LENGTH CLEATS: FOUR (CCSO) AND TWELVE (MARCO PD) TO
BE LOCATED ON EASTERN SIDE OF THE DOCK (POSITIONING TO BE SELECTED VIA
SUBMITTAL)
-EACH PILE GUIDE IS TO BE EQUIPPED WITH FOUR ROLLERS.
9. GANGWAY: GANGWAYS TO BE CONSTRUCTED PER GANGWAY MANUFACTURER'S
SPECIFICATIONS. SPECIFICATIONS FOR THE GANGWAY TO BE SUPPLIED AND INSTALLED BY
THE CONTRACTOR ARE:
-MARINE GRADE ALUMINUM CONSTRUCTION
-ALUMINUM PIPE RAILINGS WITH MINIMUM CLEARANCE OF 42” IN-BETWEEN
-SLIP RESISTANT ALUMINUM DECKING.
-GANGWAY MINIMUM 20' IN LENGTH
10. DOCK PILES: 10" Ø 2.5 C.C.A. P.T. WOOD PILE, MIN 12'-0" EMBEDMENT.
11. MEETS FBC 2023, 8TH-EDITION.
AutoCAD SHX Text 2'-0"
AutoCAD SHX Text 2'-0"
AutoCAD SHX Text 1'-0"
| Sheets and Views |
| 20240115_Marco-Island_N-Barfield_Floating-Dock-01 COVER SHEET |
| 20240115_Marco-Island_N-Barfield_Floating-Dock-02 GENERAL NOTES |
| 20240115_Marco-Island_N-Barfield_Floating-Dock-03 SITE PLAN |
| 20240115_Marco-Island_N-Barfield_Floating-Dock-04 FIXED DOCK PLAN |
| 20240115_Marco-Island_N-Barfield_Floating-Dock-05 FIXED DOCK PILE PLAN |
| 20240115_Marco-Island_N-Barfield_Floating-Dock-06 DOCK PLAN |
| 20240115_Marco-Island_N-Barfield_Floating-Dock-07 DOCK SECTION A |
| 20240115_Marco-Island_N-Barfield_Floating-Dock-08 DOCK SECTION B |
| 20240115_Marco-Island_N-Barfield_Floating-Dock-09 DOCK SECTION C |
| 20240115_Marco-Island_N-Barfield_Floating-Dock-10 DOCK DETAILS |
| 2024-05-31T09:54:43-0400 | |
| Joseph Foster |
| 2024-05-31T09:54:58-0400 | |
| Joseph Foster |
| 2024-05-31T09:55:31-0400 | |
| Joseph Foster |
| 2024-05-31T09:55:52-0400 | |
| Joseph Foster |
| 2024-05-31T09:56:09-0400 | |
| Joseph Foster |
| 2024-05-31T09:56:25-0400 | |
| Joseph Foster |
| 2024-05-31T09:56:42-0400 | |
| Joseph Foster |
| 2024-05-31T09:57:01-0400 | |
| Joseph Foster |
| 2024-05-31T09:57:24-0400 | |
| Joseph Foster |
| 2024-05-31T09:57:50-0400 | |
| Joseph Foster |
File details come from the government source that posted it. Updated .