25-032-ITB_ARFF_Stn_1_Refurb_-_Ph_4_-_Dwgs_-_Add_1.pdf
PDF 6 MB Posted
- Attached to
- ARFF Station #1 (South) Refurbishment - Phase 4
- Solicitation number
- 25-032-ITB
- Issued by
- Kenton County, Kentucky
About this file
These documents are architectural and engineering design plans for the Phase 4 Remodel of the South ARFF (Aircraft Rescue and Firefighting) Fire Station located at the Cincinnati/Northern Kentucky International Airport in Kentucky. The project involves comprehensive interior and exterior upgrades to the existing fire station, with detailed mechanical, electrical, and demolition plans. The design documents are dated May 7, 2025, and include comprehensive floor plans, mechanical demolition and new work plans, electrical demolition and new work plans, and various technical schedules and details.
The design documents specify specific upgrades including mechanical system modifications such as installing new VAV (variable air volume) boxes, hot water piping, control valves, thermostats, and rebalancing air devices. Electrical work includes maintaining existing access control systems while reconfiguring door wiring, relocating electrical devices, and ensuring continuity of existing circuits during renovation. The plans indicate a complex, multi-room renovation involving spaces like offices, dormitories, training rooms, day rooms, and utility areas. The project appears to be a comprehensive modernization effort to upgrade the functionality and systems of the airport's fire station, with careful attention to maintaining operational continuity during the renovation process.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15141312 161110987654321
A
D
B
C
E
F
G
H
J
K
L
M
TH
IS
D O
C U M
EN
T, A N
D T
H E
ID
EA
S A N
D D
ES
IG
N S
IN
C O
R
PO
R A
TE
D H
ER
EI
N , A
S A N
I N
ST
R U M
EN
T
O F
PR
O
FE
SS
IO
N
A L
SE
R V
IC
E, I S
TH
E
PR
O
PE
R
TY
O F
EM
BO
SS
D
ES
IG
N , P
.S .C
A N
D I S
N O
T
TO
B E
U
SE
D I N
2025-005
OVERALL FLOOR PLAN
IS
SU
E DATE DESCRIPTION
3/20/25 60% REVIEW
4/25/25 90% REVIEW
BIDDING & PERMIT5/7/25
NO.
15141312 161110987654321
A
D
B
C
E
F
G
H
J
K
L
M
W H
O
LE
O R I N
P A R T
FO
R A
N Y
O
TH
ER
P
R O
JE
C T, W
IT
H O
U T
TH
E
W R
IT
TE
N
A U
TH
O R
IZ
A
TI
O N
O F
EM
BO
SS
D
ES
IG
N , P
.S .C
C O
PY
R
IG
H T
-2
5:
E
M
BO
SS
D
ES
IG
N , P
.S .C
A
LL
R
IG
H
TS
R
ES
ER
V
ED
A100
A1 OVERALL FIRST FLOOR PLAN
SCALE: 1/4" =1'-0"
P:
\2
5\
PR
-0
-S
O U
TH
A
R
FF
P H
AS
E
4\
-D R
AW
IN
G S
Cincinnati/Northern Kentucky International Airport
SOUTH ARFF
FIRE STATION
Phase 4 - Interior/Exterior Upgrades
AutoCAD SHX Text 119A
AutoCAD SHX Text
APPARATUS
AutoCAD SHX Text
BAYS
AutoCAD SHX Text
AutoCAD SHX Text
APPARATUS
AutoCAD SHX Text
BAYS
AutoCAD SHX Text
AutoCAD SHX Text 119B
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text 120A
AutoCAD SHX Text 120B
AutoCAD SHX Text 133A
AutoCAD SHX Text 133B
AutoCAD SHX Text
CONTROL TOWER ABOVE - SEE A11/A101
AutoCAD SHX Text
AutoCAD SHX Text 100B
AutoCAD SHX Text 100A
AutoCAD SHX Text
AutoCAD SHX Text
DINING
AutoCAD SHX Text
AutoCAD SHX Text
EXERCISE
AutoCAD SHX Text
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text
DEMO DOOR/FRAME PROVIDE NEW
AutoCAD SHX Text
DEMO DOOR/FRAME PROVIDE NEW
AutoCAD SHX Text
DEMO DOOR/FRAME PROVIDE NEW
AutoCAD SHX Text
DEMO DOOR/FRAME PROVIDE NEW
AutoCAD SHX Text
DEMO DOOR/FRAME PROVIDE NEW
AutoCAD SHX Text
DEMO DOOR/FRAME PROVIDE NEW
AutoCAD SHX Text
MEN
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
TRAINING
AutoCAD SHX Text
AutoCAD SHX Text
DAY ROOM
AutoCAD SHX Text
AutoCAD SHX Text
DORMITORY
AutoCAD SHX Text
AutoCAD SHX Text
CONTROL
AutoCAD SHX Text
TOWER
AutoCAD SHX Text
AutoCAD SHX Text
SF7
AutoCAD SHX Text
SF8
AutoCAD SHX Text
SF7
AutoCAD SHX Text
OPERABLE PANE
AutoCAD SHX Text
OPERABLE PANE
AutoCAD SHX Text 1B
AutoCAD SHX Text 1B
AutoCAD SHX Text 1B
AutoCAD SHX Text 4B
AutoCAD SHX Text 4B
AutoCAD SHX Text 4B
AutoCAD SHX Text
TYP
AutoCAD SHX Text 1C
AutoCAD SHX Text 1C
AutoCAD SHX Text 906 Monmouth Street, AutoCAD SHX Text Newport, KY 41071
AutoCAD SHX Text EmbossDesign.com
AutoCAD SHX Text (859)431-8612
AutoCAD SHX Text A101
AutoCAD SHX Text A1
GENERAL NOTES - MECHANICAL
1. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE GENERAL AND SPECIAL CONDITIONS,
"GENERAL CONDITIONS - MECHANICAL" OF THE PROJECT SPECIFICATIONS AND TO ALL OTHER
CONTRACT DOCUMENTS AS THEY APPLY TO THIS BRANCH OF WORK. ATTENTION IS ALSO
DIRECTED TO ALL OTHER SECTIONS OF THE CONTRACT DOCUMENTS WHICH AFFECTS THE WORK
AND WHICH ARE HEREBY MADE A PART OF THE WORK SPECIFIED.
2. ALL MANUFACTURERS, SUPPLIERS, FABRICATORS, CONTRACTORS, ETC. SUBMITTING PROPOSALS
FOR ANY PART OF THE WORK, SERVICES, MATERIALS OR EQUIPMENT TO BE USED ON OR APPLIED
TO THIS PROJECT ARE HEREBY DIRECTED TO FAMILIARIZE THEMSELVES WITH THE CONTRACT
DOCUMENTS. IN CASE OF CONFLICTS, THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR
CLARIFICATION AND FINAL DETERMINATION PRIOR TO THE BID.
3. THE WORK SHALL CONSIST OF FURNISHING ALL LABOR, EQUIPMENT, TRANSPORTATION, SUPPLIES, MATERIALS, APPURTENANCES AND SERVICES NECESSARY FOR THE SATISFACTORY INSTALLATION
OF THE COMPLETE AND OPERATING SYSTEMS INDICATED OR SPECIFIED IN THE CONTRACT
DOCUMENTS.
4. ANY MATERIALS, LABOR, EQUIPMENT OR SERVICES NOT MENTIONED SPECIFICALLY HEREIN WHICH
MAY BE NECESSARY TO COMPLETE ANY PART OF THE SYSTEMS IN A SUBSTANTIAL MANNER, IN
COMPLIANCE WITH THE REQUIREMENTS STATED, IMPLIED OR INTENDED IN THE PLANS AND
SPECIFICATIONS, SHALL BE INCLUDED IN THE BID AS PART OF THE CONTRACT.
5. THE ENGINEER DOES NOT DEFINE THE SCOPE OF INDIVIDUAL TRADES, SUBCONTRACTORS,
MATERIAL SUPPLIERS AND VENDORS. ANY SHEET NUMBERING OR SPECIFICATION NUMBERING
SYSTEM USED WHICH IDENTIFIES DISCIPLINES IS SOLELY FOR THE ENGINEER'S CONVENIENCE AND
IS NOT INTENDED TO DEFINE A SUBCONTRACTOR'S SCOPE OF WORK. INFORMATION REGARDING
INDIVIDUAL TRADES, SUBCONTRACTORS, MATERIAL SUPPLIERS AND VENDORS MAY BE DETAILED, DESCRIBED AND INDICATED AT DIFFERENT LOCATIONS THROUGHOUT THE CONTRACT
DOCUMENTS. NO CONSIDERATION WILL BE GIVEN TO REQUESTS FOR CHANGE ORDERS FOR
FAILURE TO OBTAIN AND REVIEW THE COMPLETE SET OF CONTRACT DOCUMENTS WHEN
PREPARING BIDS, PRICES AND QUOTATIONS. UNLESS STATED OTHERWISE, THE SUBDIVISION AND
ASSIGNMENT OF WORK UNDER THE VARIOUS SECTIONS SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR HOLDING THE PRIME CONTRACT.
6. IT IS THE INTENTION OF THE CONTRACT DOCUMENTS TO CALL FOR A COMPLETE AND
OPERATIONAL SYSTEM, INCLUDING ALL COMPONENTS, ACCESSORIES, FINISH WORK, ETC
NECESSARY FOR TROUBLE FREE OPERATION; TESTED AND READY FOR OPERATION. ANYTHING
THAT MAY BE REQUIRED, IMPLIED, OR INFERRED BY THE CONTRACT DOCUMENTS SHALL BE
PROVIDED AND INCLUDED AS PART OF THE BID.
7. ALL CONTRACTORS AND VENDORS PROVIDING A BID FOR THIS PROJECT SHALL REVIEW THE PLANS
AND SPECIFICATIONS AND DETERMINE ANY MODIFICATIONS AND/OR ADJUSTMENTS NECESSARY
RELATIVE TO THE PROPOSED EQUIPMENT AND MATERIALS WITH SPECIFIC MANUFACTURER'S
INSTALLATION REQUIREMENTS. INCLUDE IN THE BID ANY NECESSARY METHODS, FEATURES,
OPTIONS, ACCESSORIES, ETC. NECESSARY TO INSTALL THE PROPOSED EQUIPMENT AND
MATERIALS, REGARDLESS OF WHETHER USED AS BASIS OF DESIGN OR BEING OFFERED AS A
SUBSTITUTION, IN ACCORDANCE WITH THE SPECIFIC MANUFACTURER'S INSTALLATION
REQUIREMENTS, WHETHER SPECIFICALLY DETAILED OR NOT, WITHIN THE PLANS AND
SPECIFICATIONS.
8. THE BIDDER/PROPOSER SHALL COMPLETELY REVIEW THE CONTRACT DOCUMENTS. ANY
INTERPRETATION AS TO DESIGN INTENT OR SCOPE SHALL BE PROVIDED BY THE ENGINEER.
SHOULD ANY INTERPRETATION BE REQUIRED, THE BIDDER/PROPOSER SHALL REQUEST A
CLARIFICATION NOT LESS THAN TEN (10) DAYS PRIOR TO THE SUBMISSION OF THE BID SO THAT
THE CONDITION MAY BE CLARIFIED BY ADDENDUM. IN THE EVENT OF ANY CONFLICT,
DISCREPANCY, OR INCONSISTENCY DEVELOPS; THE INTERPRETATION OF THE ENGINEER SHALL BE
FINAL.
9. THE CONTRACTOR SHALL PROVIDE LAYOUT CONFIRMATION OF EQUIPMENT LOCATIONS TO VERIFY
THAT ALL COMPONENTS WILL FIT IN THE PROPOSED SPACE AND HAVE ADEQUATE CLEARANCE FOR
SERVICES. COORDINATE THE LOCATION OF DRAINS, CONNECTIONS, ETC. PRIOR TO COMMENCING
INSTALLATION. WORK NOT SO COORDINATED SHALL BE REMOVED AND PROPERLY INSTALLED AT
THE EXPENSE OF THE RESPONSIBLE CONTRACTOR(S).
10. EQUIPMENT AND MATERIALS SUBSTITUTIONS OR DEVIATIONS SHALL COMPLY WITH "GENERAL
PROVISIONS - MECHANICAL PART 6." ANY VENDOR WISHING TO OBTAIN AN EQUIPMENT
SUBSTITUTION SHALL REQUEST A CLARIFICATION NOT LESS THAN TEN (10) DAYS PRIOR TO THE
SUBMISSION OF THE PROPOSAL SO THAT IT MAY BE CONSIDERED AND POTENTIALLY INCLUDED BY
ADDENDUM. REQUESTS MADE AFTER THIS PERIOD WILL BE REJECTED.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE REGARDLESS IF CONTRACTOR IS
IGNORANT OF CODES, RULES, REGULATIONS, LAWS, ETC. THE CONTRACTOR SHALL ALSO BE
VERSED IN ALL CODES, RULES, REGULATIONS, LAWS, ETC. PERTINENT TO THEIR PART OF THE
WORK PRIOR TO SUBMISSION OF THE PROPOSAL.
12. ALL WARRANTIES SHALL BEGIN STARTING AT THE PROJECT'S SUBSTANTIAL COMPLETION DATE.
ALL EQUIPMENT, MATERIAL AND LABOR WARRANTIES SHALL BE FURNISHED BY THE EQUIPMENT
SUPPLIER/VENDOR.
13. WHEREVER WORK PENETRATES ROOFING, IT SHALL BE DONE IN A MANNER THAT WILL NOT
DIMINISH OR VOID THE ROOFING GUARANTEE OR WARRANTY IN ANY WAY. COORDINATE ALL SUCH
WORK WITH THE ROOFING INSTALLER.
14. DUCTWORK, PIPING AND EQUIPMENT SHALL BE KEPT CLEAN AT ALL TIMES. DUCTWORK STORED ON
THE JOB SITE SHALL BE PLACED A MINIMUM OF 4" ABOVE THE FLOOR AND BE COMPLETELY
COVERED IN PLASTIC. INSTALLED DUCTWORK SHALL BE PROTECTED WITH PLASTIC. DO NOT
INSTALL THE DUCTWORK OR INSULATION (PIPE OR DUCT) IF THE BUILDING IS NOT "DRIED-IN". IF
THIS IS REQUIRED, THE ENTIRE LENGTHS SHALL BE COVERED IN PLASTIC TO PROTECT. THE
OWNER/ENGINEER SHALL PERIODICALLY INSPECT THAT THESE PROCEDURES ARE FOLLOWED. IF
DEEMED UNACCEPTABLE, THE CONTRACTOR SHALL BE REQUIRED TO CLEAN THE DUCT SYSTEM
UTILIZING A NADCA CERTIFIED CONTRACTOR.
15. THE PERMANENT SYSTEMS, WHEN INSTALLED, MAY BE USED FOR TEMPORARY SERVICES WITH THE
CONSENT OF THE ENGINEER AND IN STRICT ACCORDANCE WITH "GENERAL PROVISIONS -
MECHANICAL - TEMPORARY USE OF EQUIPMENT."
16. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL INCLUDE IN THE BID TO PROVIDE
EQUIPMENT AND CONTROLS STARTUP AND VERIFICATION FOR ALL MECHANICAL SYSTEMS
SPECIFIED FOR THIS PROJECT AND IN STRICT ACCORDANCE WITH "GENERAL PROVISIONS -
MECHANICAL - EQUIPMENT/CONTROLS STARTUP & VERIFICATION."
17. THE CONTRACTOR SHALL DETERMINE FROM THE CONTRACT DOCUMENTS, THE DATE OF
COMPLETION FOR THE PROJECT AND INSURE THAT EQUIPMENT DELIVERY SCHEDULES CAN BE MET
SO AS TO ALLOW THIS COMPLETION TO BE MET.
18. THROUGH COORDINATION WITH OTHER CONTRACTORS, VENDORS, AND SUPPLIERS ASSOCIATED
WITH THIS PROJECT, THIS CONTRACTOR SHALL INSURE, 100% FUNCTIONAL, TESTED, INSPECTED
AND APPROVED SYSTEMS. CLAIMS FOR ADDITIONAL COST OR CHANGE ORDERS WILL BE
REJECTED.
19. PRIOR TO ORDERING ANY MATERIALS OR ROUGH-IN OF ANY KIND, THE MECHANICAL CONTRACTOR
SHALL BE RESPONSIBLE FOR FINAL COORDINATION OF ALL ELECTRICAL REQUIREMENTS (I.E.
VOLTAGE, PHASE, CIRCUIT BREAKER, WIRE SIZING, ETC.) WITH THE ELECTRICAL CONTRACTOR.
THERE WILL BE NO CHANGE IN THE CONTRACT AMOUNT FOR ANY DISCREPANCIES.
20. ALL OFFSETS, TURNS, FITTINGS, TRIM, DETAIL, ETC., MAY NOT BE INDICATED, BUT SHALL BE
PROVIDED AS REQUIRED. ADDITIONAL ALLOWANCES SHALL BE INCLUDED FOR SAME AT EACH
PROPOSERS' DISCRETION.
21. DO NOT SCALE FROM DRAWINGS, PRINTING DISTORTS SCALE. WORK SHALL BE LAID OUT FROM
CONTRACTOR GENERATED DIMENSIONED DRAWINGS.
22. THE CONTRACTOR SHALL ENSURE PROPER COORDINATION BETWEEN ALL TRADES SUCH THAT
CONDUITS, PIPING, DUCTWORK, ETC, DOES NOT BLOCK ACCESS TO VALVES, EQUIPMENT, DUCT
ACCESS DOORS, ETC. ITEMS THAT HAVE BEEN INSTALLED WHERE ACCESS IS COMPROMISED SHALL
BE RELOCATED AT THE CONTRACTOR'S EXPENSE.
23. THESE DRAWINGS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE, HOWEVER LOCATIONS AND
SIZES WERE TAKEN FROM DIFFERENT SOURCES AND ARE SUBJECT TO DEVIATION. THE
CONTRACTOR SHALL ASSUME SOME DEVIATIONS AND INCLUDE OFFSETS, ADDITIONAL PIPING, ETC.
AT THE TIME OF BID.
24. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR
THEIR WORK. ALL CUTTING AND PATCHING SHALL MATCH ADJACENT SURFACES AND PERFORMED
BY SKILLED WORKERS OF THE TRADE. REFER TO SPECIFICATION SECTION "SLEEVING, CUTTING, PATCHING, REPAIRING, ETC." AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
25. ALL SUPPORTS FOR EQUIPMENT, DEVICES OR FIXTURES SHALL BE UNIQUE, FROM THE BUILDING
STRUCTURE. DO NOT SUPPORT WORK FROM OTHER TRADES, EQUIPMENT OR SUPPORTS WITHOUT
WRITTEN PERMISSION FROM THE ENGINEER AND CONSENT OF THE OTHER TRADE, IN WRITING.
26. PRIOR TO PURCHASE OR FABRICATION OF PIPING, THE CONTRACTOR SHALL COORDINATE
INSTALLATION WITH ACTUAL CONDITIONS AND INSTALL ACCORDINGLY.
27. VALVES, BALANCING DAMPERS OR ANY MECHANICAL/ELECTRICAL ITEM SHALL NOT BE LOCATED
ABOVE A HARD CEILING. IF THIS IS NOT POSSIBLE, THEN AN APPROPRIATELY SIZED ACCESS DOOR
SHALL BE PLACED AT NO ADDITIONAL COST UNDER THE ITEM WHETHER SHOWN OR NOT ON THE
PLANS TO ALLOW ACCESS AND ADJUSTMENT.
28. THE CONTRACTOR SHALL VISIT THE SITE FOR EXACT LOCATIONS OF ALL WALL AND CEILING
DEVICES. THIS SHALL INCLUDE PLUMBING FIXTURES, CEILING GRILLES AND DIFFUSERS, ETC.
29. CONTRACTOR SHALL CLEAN UP CONSTRUCTION DEBRIS AT ALL TIMES DURING CONSTRUCTION.
NOTE: NOT ALL SYMBOLS AND ABBREVIATIONS MAY BE USED ON THIS PROJECT
GENERAL NOTES - DEMOLITION
A. THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR AREAS
IN WHICH THE CEILING IS REMAINING. THE CONTRACTOR IS RESPONSIBLE
FOR REMOVING THE EXISTING CEILING AS REQUIRED AND REINSTALLATION.
TEMPORARILY SUPPORT LIGHTS, DIFFUSERS, CEILING ETC. REPLACE BROKEN
CEILING TILES WITH NEW AT NO ADDITIONAL COST TO OWNER. FIELED
VERIFY EXACT REQUIREMENTS.
B. ALL OUTAGES SHALL BE SCHEDULED THROUGH THE PROJECT
REPRESENTATIVE FOR PROPER COORDINATION. A REQUEST FOR AN OUTAGE
SHALL BE SUBMITTED IN WRITING A MINIMUM OF TWO WEEKS IN ADVANCE.
C. DURING SPRINKLER SYSTEM OUTAGES THE CONTRACTORS SHALL PROVIDE
FIRE WATCH OF AREAS WITH OUTAGES.
D. ALL WALLS AND FLOOR SLABS SHALL BE REPAIRED TO MATCH EXISTING AND
TO A LIKE NEW CONDITION. ALL RATED WALLS AND FLOOR SLABS SHALL BE
PATCHED AND REPAIRED TO MAINTAIN RATING.
E. ALL EXISTING BUILDING FINISHES SHALL BE PROTECTED DURING THE
DEMOLITION PHASE.
F. HEAVY DASHED LINES INDICATE ITEMS FOR REMOVAL (U.O.N) AND LIGHT
SOLID LINES INDICATE EXISTING ITEMS TO REMAIN.
G. COORDINATE DISPOSAL OF ALL FIXTURES, DEVICES, ETC. (INDICATED FOR
DEMOLITION) WITH THE OWNER.
PHASING NOTES
A. THIS PROJECT INTERFACES EXTENSIVELY WITH EXISTING BUILDING
SERVICES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
COORDINATE AND PHASE ALL TIE-INS AND INTERRUPTIONS OF EXISTING
SERVICES TO MINIMIZE OR ELIMINATE DOWNTIME. AS AN EXAMPLE, MAIN
GAS SERVICE, WATER SERVICE, ELECTRICAL SERVICE, HVAC SERVICES,
STEAM GENERATION, ETC., WILL BE AFFECTED AND REPLACED OR MOVED
DURING THIS PROJECT. THE CONTRACTOR SHALL INSTALL ALL NEW
SERVICES AND EQUIPMENT AND HAVE THEM TESTED AND FULLY AND
RELIABLY FUNCTIONAL PRIOR TO INTERRUPTING, RELOCATING OR
REMOVING ANY EXISTING SERVICES. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO BARE ANY AND ALL COSTS ASSOCIATED WITH THIS
PHASING, INCLUDING TEMPORARY SERVICES, TEMPORARY RELOCATION,
PREMIUM TIME WORK, ETC. CONTRACTOR SHALL COORDINATE ALL SAID
WORK WITH THE OWNER AND APPLICABLE UTILITIES PER THE CONTRACT
DOCUMENTS.
ABBREVIATIONS
TAGGED NOTE DESIGNATOR
GENERAL SYMBOLS
X REVISION TRIANGLE
ROOM NAME
RM # ROOM TAG
AFF ABOVE FINISHED FLOOR
AFR ABOVE FINISHED ROOF
ADJ ADJUSTABLE
APD AIR PRESSURE DROP
HVAC LEGEND
SUPPLY AIR DIFFUSER
TRANSFER AIR GRILLE W/ SOUND ATTENUATING BOOT
POINT OF CONNECTION / CONNECT TO EXISTING
POINT OF DEMOLITION
SIDEWALL DIFFUSER/GRILLE
RETURN AIR GRILLE
EXHAUST AIR DIFFUSER
MECHANICAL PIPING LEGEND
AIR DEVICE TAG (REGISTER, GRILLE, DIFFUSER,LOUVER)
AIRFLOW
TAG
SA AIR DUCT TURNING UP
SA AIR DUCT TURNING DOWN
SUPPLY AIR DUCT
RETURN AIR DUCT
EXHAUST AIR DUCT
OUTSIDE AIR DUCT
TRANSFER AIR DUCT
COMBUSTION AIR EXHAUST DUCT
COMBUSTION AIR INTAKE DUCT
RA AIR DUCT TURNING UP
RA AIR DUCT TURNING DOWN
EA AIR DUCT TURNING UP
EA AIR DUCT TURNING DOWN
DUCT TO BE DEMOLISHED - (XXX) DENOTES SYSTEM
EXISTING DUCT - (XXX) DENOTES SYSTEM
RA
SA
EA
OA
TA
CAE
CAI
SA
SA
RA
RA
EA
EA
D(XXX)
E(XXX)
DUCT TO BE ABANDONED IN PLACE - (XXX) DENOTES SYSTEMA(XXX)
RECTANGULAR DUCT
ROUND/SPIRAL DUCT
FLAT OVAL DUCT
#ø
##x##
PIPE ELBOW TURNING DOWN
PIPE ELBOW TURNING UP
PIPE TEE; CONNECTION ON BOTTOM
PIPE TEE; CONNECTION ON TOP
EXISTING PIPING - (XXX) DENOTES SYSTEM
PIPING TO BE DEMOLISHED - (XXX) DENOTES SYSTEMD(XXX)
E(XXX)
CONDENSATE DRAINCD
CHILLED WATER SUPPLY/RETURNCHWS/R
GEOTHERMAL WATER SUPPLY/RETURN
HEAT PUMP WATER SUPPLY/RETURN
GS/R
HPS/R
CONDENSER WATER SUPPLY/RETURN
DUAL TEMP. WATER SUPPLY/RETURN
CWS/R
DTS/R
HIGH PRESSURE STEAM CONDENSATEHPC
HIGH PRESSURE STEAM; (#) DENOTES PRESSUREHPS(#)
LOW PRESSURE STEAM; (#) DENOTES PRESSURE
LOW PRESSURE STEAM CONDENSATE
LPS(#)
LPC
HEATING WATER SUPPLY/RETURNHWS/R
MPS(#) MEDIUM PRESSURE STEAM; (#) DENOTES PRESSURE
MEDIUM PRESSURE STEAM RETURNMPC
HEAT RECOVERY SUPPLY/RETURN PIPINGHRS/R
STEAM VENT PIPINGSVT
PIPE CAP
FLEXIBLE DUCT
THERMOSTAT
TS
T
C
TEMPERATURE SENSOR
CARBON DIOXIDE SENSOR
TC TEMPERATURE & CARBON DIOXIDE SENSOR
MANUAL BALANCING/VOLUME DAMPER
MOTORIZED DAMPER
H HUMIDITY SENSOR
VERT. HORIZ.
VERT. HORIZ.
MITERED ELBOW WITH TURNING VANES
EQUIPMENT TAG
BAS BUILDING AUTOMATION SYSTEM
AVG AVERAGE
BHP BREAK HORSEPOWER
CAV CONSTANT AIR VOLUME
BTU BRITISH THERMAL UNIT
CFM CUBIC FEET PER MINUTE
CO CARBON MONOXIDE
CO2 CARBON DIOXIDE
DB DRY BULB
ABBREVIATIONS (CONTINUED)
FIRE PROTECTION CONTRACTORFPC
FEET PER MINUTEFPM
FEET PER SECONDFPS
GALLON (-S)GAL
GENERAL CONTRACTORGC
GALLONS PER MINUTEGPM
GRAINSGR
HEADHD
H (-ORSEPOWER, -EAT PUMP)HP
KILOWATTkW
LEAVING AIR TEMPERATURELAT
LEAVING WATER TEMPERATURELWT
BTU PER HOUR [THOUSANDS]MBH
MINIMUM CIRCUIT AMPSMCA
MANUFACTURERMFG
MAXIMUM OVERCURRENT PROTECTION [AMPS]MOCP
ID I (-DENTIFICATION, -NSIDE DIAMETER, -NSIDE DIMENSION)
FIRE DAMPERFD
FULL LOAD AMPSFLA
NOISE CRITERIA OR NORMALLY CLOSEDNC
NORMALLY OPEN OR NUMBERNO
NOT TO SCALENTS
OUTSIDE DI (-AMETER, -MENSION)OD
OWNER FURNISHED, CONTRACTOR INSTALLEDOFCI
OWNER FURNISHED, OWNER INSTALLEDOFOI
PLUMBING CONTRACTORPC
PHASE [ELECTRICAL]PH
PARTS PER MILLIONPPM
PRESSURE DROPPD
PRESSURE REDUCING STATIONPRS
PRESSURE REDUCING VALVE (STEAM, WATER, GAS)PRV
POUNDS PER SQUARE INCHPSI
POUNDS PER SQUARE FOOTPSF
PSI GAUGEPSIG
RELATIVE HUMIDITY [%]RH
REVOLUTIONS PER MINUTERPM
SMOKE DAMPERSD
STATIC PRESSURESP
SQUARE FEET OR FOOTSQ FT
TYPICALTYP
UNLESS NOTED OTHERWISEUNO
TOTAL STATIC PRESSURETSP
VOLT (-AGE, -S)V
VARI (-ABLE, -IES)VAR
VARIABLE AIR VOLUMEVAV
VELOCITYVEL
VARIABLE FEQUENCY DRIVEVFD
WATT (-AGE, -S)W
WET BULBWB
WATER PRESSURE DROPWPD
DIFFERENTIAL PRESSUREΔP
TEMPERATURE DIFFERENCEΔT
℄ CENTERLINE
DDC DIRECT DIGITAL CONTROLS
DN DOWN
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EWT ENTERING WATER TEMPERATURE
ESP EXTERNAL STATIC PRESSURE
ETR EXISTING TO REMAIN
FREE AREAFA
XXX-X
FSD FIRE SMOKE DAMPER
906 Monmouth Street, Newport, KY 41071
EmbossDesign.com
(859)431-8612
2025-005
Cincinnati/Northern Kentucky International Airport
SOUTH ARFF
FIRE STATION
Phase 4 - Remodel
TH
IS
D O
C U M
EN
T, A N
D T
H E
ID
EA
S A N
D D
ES
IG
N S
IN
C O
R
PO
R A
TE
D H
ER
EI
N , A
S A N
I N
ST
R U M
EN
T
O F
PR
O
FE
SS
IO
N
A L
SE
R V
IC
E, I S
TH
E
PR
O
PE
R
TY
O F
EM
BO
SS
D
ES
IG
N , P
.S .C
A N
D I S
N O
T
TO
B E
U
SE
D I N
W H
O
LE
O R I N
P A R T
FO
R A
N Y
O
TH
ER
P
R O
JE
C T, W
IT
H O
U T
TH
E
W R
IT
TE
N
A U
TH
O R
IZ
A
TI
O N
O F
EM
B O
SS
D
ES
IG
N , P
.S .C
C O
PY
R
IG
H T
-2
5:
E
M B O
SS
D
ES
IG
N , P
.S .C
A
LL
R
IG
H
TS
R
ES
ER
V
ED
15141312 161110987654321
A
D
B
C
E
F
G
H
J
K
L
M
15141312 161110987654321
A
D
B
C
E
F
G
H
J
K
L
M
IS
SU
E DATE DESCRIPTIONNO.
5/7/2025 Bidding and Permit
M E C H A N I C A L L E G E N D
M 0 0 1
T
T
T
T
T
T
T
T
M2
M1
M1 M2
M1
M2
M1
M2
M2
M2
M1
M2 M1
M1
M1
M2
M6
906 Monmouth Street, Newport, KY 41071
EmbossDesign.com
(859)431-8612
N O
T
FO
R C
O N
ST
R U
C
TI
O N
2025-005
Cincinnati/Northern Kentucky International Airport
SOUTH ARFF
FIRE STATION
Phase 4 - Remodel
TH
IS
D O
C U M
EN
T, A N
D T
H E
ID
EA
S A N
D D
ES
IG
N S
IN
C O
R
PO
R A
TE
D H
ER
EI
N , A
S A N
I N
ST
R U M
EN
T
O F
PR
O
FE
SS
IO
N
A L
SE
R V
IC
E, I S
TH
E
PR
O
PE
R
TY
O F
EM
BO
SS
D
ES
IG
N , P
.S .C
A N
D I S
N O
T
TO
B E
U
SE
D I N
W H
O
LE
O R I N
P A R T
FO
R A
N Y
O
TH
ER
P
R O
JE
C T, W
IT
H O
U T
TH
E
W R
IT
TE
N
A U
TH
O R
IZ
A
TI
O N
O F
EM
B O
SS
D
ES
IG
N , P
.S .C
C O
PY
R
IG
H T
-2
5:
E
M B O
SS
D
ES
IG
N , P
.S .C
A
LL
R
IG
H
TS
R
ES
ER
V
ED
15141312 161110987654321
A
D
B
C
E
F
G
H
J
K
L
M
15141312 161110987654321
A
D
B
C
E
F
G
H
J
K
L
M
IS
SU
E DATE DESCRIPTIONNO.
5/7/2025 Bidding and Permit
S C A L E : 1 / 8 " = 1 ' - 0 "
M 1 0 1 M E C H A N I C A L D E M O L I T I O N
M E C H A N I C A L D E M O L I T I O N
M 1 0 1
TAGGED NOTES
M1 REMOVE EXISTING VAV BOX AND ASSOCIATED PIPING, VALVES
AND ACCESSORIES, AND CONTROLS. PIPING TO BE REMOVED
BACK TO EXISTING ISOLATION VALVES. ISOLATION BALL
VALVES TO REMAIN.
M2 REMOVE EXISTING THERMOSTAT CONTROLLING VAV SERVING
THIS ZONE. LOCATION TO BE REUSED FOR NEW THERMOSTAT.
M6 REMOVE EXISTING THERMOSTAT AND 3-WAY CONTROL VALVE
SERVING BASEBOARD HEATERS. LOCATION TO BE REUSED
FOR NEW THERMOSTAT.
T
T
T
T
T
T
T
OFFICE
OFFICE
OFFICE
CORRIDOR
103B
TRAINING
DAY ROOM
OFFICE
STORAGE
STAIR
CORRIDOR
CORRIDOR
103A
UTILITY
VAV1-10
VAV1-11
VAV1-14
VAV1-9
VAV1-5
VAV1-12
VAV1-3
VAV1-6
S-E
S-E
S-E
S-E
S-E
S-E
S-E
S-E
S-E
S-E
S-E
S-E
S-E
145 S-E
S-E
S-E
S-E
S-E
S-E
S-E
S-E
S-E
(TYP)
M5
M3
M3
M3
M3
M3
M3
M3
M3
M4
M4
M4
M4
M4
M4
(TYP)
M5
M5
(TYP)
M5
(TYP)
M5
(TYP)
M5
M5
M5 M5
M5
M5
M4
M7
M4
906 Monmouth Street, Newport, KY 41071
EmbossDesign.com
(859)431-8612
N O
T
FO
R C
O N
ST
R U
C
TI
O N
2025-005
Cincinnati/Northern Kentucky International Airport
SOUTH ARFF
FIRE STATION
Phase 4 - Remodel
TH
IS
D O
C U M
EN
T, A N
D T
H E
ID
EA
S A N
D D
ES
IG
N S
IN
C O
R
PO
R A
TE
D H
ER
EI
N , A
S A N
I N
ST
R U M
EN
T
O F
PR
O
FE
SS
IO
N
A L
SE
R V
IC
E, I S
TH
E
PR
O
PE
R
TY
O F
EM
BO
SS
D
ES
IG
N , P
.S .C
A N
D I S
N O
T
TO
B E
U
SE
D I N
W H
O
LE
O R I N
P A R T
FO
R A
N Y
O
TH
ER
P
R O
JE
C T, W
IT
H O
U T
TH
E
W R
IT
TE
N
A U
TH
O R
IZ
A
TI
O N
O F
EM
B O
SS
D
ES
IG
N , P
.S .C
C O
PY
R
IG
H T
-2
5:
E
M B O
SS
D
ES
IG
N , P
.S .C
A
LL
R
IG
H
TS
R
ES
ER
V
ED
15141312 161110987654321
A
D
B
C
E
F
G
H
J
K
L
M
15141312 161110987654321
A
D
B
C
E
F
G
H
J
K
L
M
IS
SU
E DATE DESCRIPTIONNO.
5/7/2025 Bidding and Permit
S C A L E : 1 / 8 " = 1 ' - 0 "
M 2 0 1 M E C H A N I C A L N E W W O R K
M E C H A N I C A L N E W W O R K
M 2 0 1
TAGGED NOTES
M3 PROVIDE NEW VAV BOX. CONTRACTOR TO COORDINATE
REQUIRED HANDING TO ENSURE PROPER SERVICE
CLEARANCE IS MAINTAINED. PROVIDE DUCT TRANSITIONS AS
REQUIRED TO CONNECT NEW BOX TO EXISTING DUCTWORK.
PROVIDE NEW HOT WATER PIPING, VALVES, AND
ACCESSORIES PER THE VAV PIPING SCHEMATIC
M4 PROVIDE NEW DDC WALL MOUNTED THERMOSTAT AND WIRE
TO NEW VAV BOX. THERMOSTAT LOCATION TO MATCH
EXISTING.
M5 REBALANCE AIR DEVICES IN THIS ROOM TO AIRFLOWS AS
INDICATED ON PLAN
M7 PROVIDE NEW 3-WAY DDC CONTROL VALVE AND THERMOSTAT
TO CONTROL BASEBOARD HEATERS. INTEGRATE NEW
THERMOSTAT AND CONTROL VALVE WITH EXISTING BAS AND
PROVIDE GRAPHICS INDICATING SPACE TEMPERATURE AND
VALVE POSITION.
BALL VALVE
AIR FLOW
HOT WATER COIL
WALL
THERMOSTAT
MANUAL AIR
VENT WITH 12"
OF SOFT
COPPER TUBING
T
UNION
PETES PLUG
HWR
HWS
MODULATING 3-WAY
CONTROL VALVE. INSTALL
MINIMUM OF 6" AWAY FROM
COIL
DUCTWORK
DRAIN VALVE. NORMALLY
CLOSED WITH SCREW CAP.
HOT WATER SUPPLY
& HOT WATER
RETURN MAIN PIPING
BALANCING VALVE (SIMILAR
TO B&G CIRCUIT-SETTER.)
BYPASS BALANCING VALVE - SET TO
MATCH COIL PRESSURE DROP
ALL PIPING AND
VALVES/ACCESSORIES
DOWNSTREAM OF EXISTING
BALL VALVES TO BE
REPLACED. IF CONTRACTOR
DETERMINES EXISTING BALL
VALVES ARE DEFECTIVE,
CONTRACTOR TO REPLACE
% OPEN
DPR CMD
AIRFLOW
AIRFLOW CMD
MAX CFM
MIN CFM
°F
OA T OA H DATE & TIME
%RHLOCATION:
ROOM#:
HOME PAGE LINK
AHU# LINK
FLOOR PLAN LINK
SEQUENCE LINK
OCCUPIED/UNOCCUPIED
ROOM TEMP
°F
ROOM HUMIDITY
% RH
°F
°F
°F
°F
°F
°F
°F
FROM AHU
TO BUILDING
AIR TERMINALS
TO
OCCUPIED
SPACES
UNIT-MOUNTED
CONTROLLER
SA
CONSTANT & VARIABLE AIR VOLUME (CAV/VAV) BOX TERMINAL UNIT
H C
HWR
HWS
Ts
°F
DAT
% OPEN
HW VALVE
CLG OFFSET
UNOCC CLG STPT
HTG OFFSET
UNOCC HTG SETPT
TEMP HL ALARM
TEMP LL ALARM
HTG SETPT
HL HUMIDITY ALARM
SET POINTSCAV/VAV
°F
906 Monmouth Street, Newport, KY 41071
EmbossDesign.com
(859)431-8612
2025-005
Cincinnati/Northern Kentucky International Airport
SOUTH ARFF
FIRE STATION
Phase 4 - Remodel
TH
IS
D O
C U M
EN
T, A N
D T
H E
ID
EA
S A N
D D
ES
IG
N S
IN
C O
R
PO
R A
TE
D H
ER
EI
N , A
S A N
I N
ST
R U M
EN
T
O F
PR
O
FE
SS
IO
N
A L
SE
R V
IC
E, I S
TH
E
PR
O
PE
R
TY
O F
EM
BO
SS
D
ES
IG
N , P
.S .C
A N
D I S
N O
T
TO
B E
U
SE
D I N
W H
O
LE
O R I N
P A R T
FO
R A
N Y
O
TH
ER
P
R O
JE
C T, W
IT
H O
U T
TH
E
W R
IT
TE
N
A U
TH
O R
IZ
A
TI
O N
O F
EM
B O
SS
D
ES
IG
N , P
.S .C
C O
PY
R
IG
H T
-2
5:
E
M B O
SS
D
ES
IG
N , P
.S .C
A
LL
R
IG
H
TS
R
ES
ER
V
ED
15141312 161110987654321
A
D
B
C
E
F
G
H
J
K
L
M
15141312 161110987654321
A
D
B
C
E
F
G
H
J
K
L
M
IS
SU
E DATE DESCRIPTIONNO.
5/7/2025 Bidding and Permit
M E C H A N I C A L S C H E D U L E S , D E T A I L S & C O N T R O L S
M 3 0 1
HOT WATER COIL PIPING SCHEMATIC
VAV TERMINAL UNIT CONTROL SEQUENCE
1. EACH VAV BOX SHALL HAVE A PRESSURE INDEPENDENT CONTROL SYSTEM.
2. THE TCC SHALL PROVIDE AND INSTALL A UNIT MOUNTED DDC CONTROLLER. THE CONTROLLER SHALL BE WIRED INTO A WALL MOUNTED DDC THERMOSTAT
PROVIDED AND INSTALLED BY THE TCC.
3. SPACE TEMPERATURE SETPOINTS SHALL BE ADJUSTABLE FROM THE WALL MOUNTED THERMOSTAT AND FROM THE BAS.
4. EACH VAV BOX SHALL HAVE A MINIMUM AND MAXIMUM AIRFLOW SETPOINT. REFER TO THE VAV SCHEDULE.
5. COOLING CONTROL:
A. THE INLET DAMPER SHALL MODULATE THE AIRFLOW BETWEEN MINIMUM AND MAXIMUM SETPOINTS TO MAINTAIN SPACE TEMPERATURE SETPOINT.
6. HEATING CONTROL:
A. THE INLET DAMPER SHALL MODULATE TO THE HEATING CFM SETPOINT. THE 3-WAY CONTROL VALVE SHALL MODULATE TO MAINTAIN SPACE TEMPERATURE
SETPOINT.
VAV BOX SCHEDULE
MARK MANUFACTURER MODEL # INLET SIZE (IN.) MAX CFM MIN CFM HTG CFM
HOT WATER HEATING COIL
REMARKSCAPACITY (MBH) FLOW (GPM) COIL ROWS EAT (°F) LAT (°F) APD (IN. W.G.) EWT (°F) LWT (°F) FPD (FT. WG.)
VAV1-3 PRICE SDV 16 1800 540 810 35.20 4.00 1 55 95 0.12 180 161.9 2.96 ALL
VAV1-5 PRICE SDV 6 170 55 110 4.90 0.45 1 55 95 0.03 180 157.4 0.15 ALL
VAV1-6 PRICE SDV 8 400 120 225 9.80 1.61 1 55 95 0.08 180 167.4 2.17 ALL
VAV1-9 PRICE SDV 10 500 150 345 15.00 2.35 1 55 95 0.06 180 166.8 0.71 ALL
VAV1-10 PRICE SDV 10 580 145 225 9.90 0.85 1 55 95 0.08 180 156 0.12 ALL
VAV1-11 PRICE SDV 10 660 200 315 13.70 1.77 1 55 95 0.10 180 164.1 0.43 ALL
VAV1-12 PRICE SDV 9 590 180 250 10.9 1.03 1 55 95 0.08 180 158.2 0.16 ALL
VAV1-14 PRICE SDV 6 150 40 150 6.60 0.89 1 55 95 0.02 180 164.8 0.52 ALL
REMARKS:
1. PRESSURE INDEPENDENT CONTROLS.
2. VAV CONTROLLER SHALL BE PROVIDED BY TCC. CONTROLLER SHALL BE
AUTOMATED LOGIC MODEL ZN341A.
3. PROVIDE 3-WAY MODULATING CONTROL VALVE. VALVE TO BE BELIMO 24V
WITH 2-10 VOLT CONTROL. FLOATING VALVES WILL NOT BE ACCEPTED.
4. THERMOSTAT TO BE ALC PART # ZS2P-ALC.
5. VAV TERMINAL SHALL INCLUDE CFM READING WITH +/-5% ACCURACY.
6. PROVIDE WITH VALVES AND PIPING ACCESSORIES PER SCHEMATIC.
7. MAX NC RATING OF 30.
8. CONTRACTOR SHALL COORDINATE REQUIRED HANDING PRIOR TO
PURCHASE.
9. PROVIDE WITH MANUFACTURER ACCESS DOOR FOR ACCESS TO HEATING
COIL.
SD
UON
EM
CFOI
OFOI
CFCI
OFCI
J
DESCRIPTION
S
S
S 3
S D
SK
PC
SOS
OS
GROUND FAULT PROTECTED DUPLEX WITH
WEATHER-PROOF "WHILE IN USE" TYPE DIE-CAST
METAL COVERPLATE WITH LOCKABLE
ENCLOSURE AT OUTLET - SEE SPECIFICATIONS
WP
CDCARBON MONOXIDE DUCT DETECTOR
POWER SUPPLY/CONTROL FOR AUDIO/VISUAL DEVICES
SLASH THROUGH ANY DEVICE INDICATES MOUNTING
ABOVE COUNTERTOP 2" ABOVE BACKSPLASH, OR AT
48" WHERE NO COUNTER IS PRESENT
SVS
VS
LV
FILLED CENTER BAR INDICATES INTEGRAL GROUND
FAULT PROTECTION (GFCI)
NON-REVERSING MOTOR STARTER SNAP SWITCH
CONTRACTOR FURNISHED OWNER INSTALLED
CONTRACTOR FURNISHED CONTRACTOR INSTALLED
OWNER FURNISHED OWNER INSTALLED
OWNER FURNISHED CONTRACTOR INSTALLEDCONNECTION TO SPRINKLER TAMPER
SWITCH WITH ADDRESSABLE MODULE
PHOTO-ELECTRIC SMOKE DETECTOR
MAIN CONTROL PANEL CENTRAL PROCESSING
UNIT (CPU)
DOOR ALARM/POSITION SWITCH
LIGHT SWITCH:GENERAL PURPOSE
AS NOTED
AS NOTED
6'-6'' TO
TOP
46" TO
LEVER
PULL STATION : DOUBLE ACTION
AUDIO-ONLY NOTIFICATION APPLIANCE
VISUAL-ONLY NOTIFICATION APPLIANCE
AUDIO/VISUAL NOTIFICATION APPLIANCE
HEAT DETECTOR
DOOR HOLDER : WALL TYPE
DUCT SMOKE DETECTOR
REMOTE L.C.D. FIRE ALARM ANNUNCIATOR
ISOLATION MODULE
H.V.A.C. SMOKE DAMPER CONNECTION
UNLESS OTHERWISE NOTED
INDICATES EMERGENCY POWER
HD
ABV CLG
DH
ABV CLG DD
FS
46"
I
ZONE ADDRESSABLE MODULE Z
SM
ABBREVIATIONS
STRIP FIXTURE
POWER OUTLETS
SIMPLEX RECEPTACLE
DUPLEX RECEPTACLE-SAFETY TYPE,
TAMPER-RESISTANT
DUPLEX RECEPTACLE
QUADRUPLEX RECEPTACLE
JUNCTION BOX, CEILING OR WALL
VOLTAGE/1PH RECEPTACLE, AS NOTED
VOLTAGE/3PH RECEPTACLE, AS NOTED
DIMMER SWITCH
THREE-WAY SWITCH
KEYED SWITCH
OCCUPANCY OR VACANCY SENSOR SWITCH
OCCUPANCY OR VACANCY SENSOR, CEILING MOUNT
LOW VOLTAGE SWITCH
PHOTO-CELL AS NOTED
EXIT LIGHT (CEILING, END, WALL MOUNT)
LIGHTING
SECURITY ACCESS CONTROL
DOOR RELEASE KEYPAD STATION
DOOR
FRAME
WALL, CLG
CLG
CLG
54"
46"
46"
46"
46"
46"
46"
1'-6"
1'-6"
1'-6"
1'-6"
1'-6"
1'-6"
2'-2"
CLG
AS NOTED
46''
S
S M
M O
U N
T
IN
G H
E
IG
H T
(T O
C E
N T
E R
O F
B O
X
D R
A W
IN
G
S
Y M
B O
L
SURFACE OR SUSPENDED CEILING FIXTURE (SLASH
INDICATES RECESSED)
WALL MOUNT FIXTURE ,
FLOODLIGHT
V
A
F
F
WALL
WALL
ADDRESSABLE RELAY MODULE R
ELECTRONIC LOCK(S)
WP
CONDUIT CONCEALED IN WALLS OR IN CEILING
SPACE: ARROW(S) INDICATE(S) HOME RUN & #
OF CIRCUITS: HASHMARKS INDICATE # OF
CONDUCTORS. DASHED LINE INDICATES
CONDUIT BELOW FLOOR.
PANELBOARD, SURFACE OR FLUSH MOUNTED,
HATCHING INDICATES EMERGENCY
EQUIPMENT TAG, REFER TO EQUIPMENT SCHEDULE
MECHANICAL EQUIPMENT DESIGNATOR
(SEE MECH. SCHEDULES)
EQUIPMENT HARDWIRE CONNECTION (SEE DETAIL)
AS NOTED
MISCELLANEOUS
DISCONNECT SWITCH
MAGNETIC STARTER
MAGNETIC COMBINATION STARTER
ENCLOSED FLUSH MTD. CIRCUIT BREAKER
WEATHERPROOF - NEMA-3R, WET LOCATION LISTED.
PROVIDE COVERS, RATINGS, ETC, AS SUITABLE FOR
OUTDOORS.
PUSHBUTTON STATION
FLEXIBLE CONDUIT
TRANSFORMER
TAGGED NOTE
REVISION TAG
LOW VOLTAGE CABLE PATH
5'-0"
5'-0"
5'-0"
5'-0"
46"
6'-6'' TO TOP
THERMOSTAT PROVIDED BY MECHANICAL
CONTRACTOR, ELECTRICAL CONTRACTOR SHALL
PROVIDE BACK-BOX CONDUIT STUB-UP, REFER TO
MECHANICAL DRAWINGS FOR LOCATIONS
C A
B L
IN
G C
O N
D U
C T
O R
S
O F
O I
C A
B L
IN
G
C O
N D
U C
T O
R S
O
F C
I
C O
N D
U
IT
R
O U
G H
-I N
O
F O
I
IT
E
M U
S E
D O
N P
R O
J E
C T
D E
V
IC
E S
O
F C
I
D E
V
IC
E S
C
F C
I
SYSTEM D
E
V
IC
E S
O
F O
I
SECURITY: ACCESS CONTROL
SYSTEM
RESPONSIBILITY
MATRIX
SYSTEM RESPONSIBILITY GENERAL NOTES:
A. CMTA IS NOT RESPONSIBILE FOR ASSIGNING SCOPE(S) OR WORK. THE INTENT OF
CONTRACTOR IN THIS MATRIX IS TO SEPERATE OWNER PROVIDED ITEMS FROM THE
GENERAL CONTRACTOR / CONSTRUCTION MANAGER. THE GC SHALL BE RESPONSIBLE
FOR A COMPLETE SCOPE OF WORK.
B. REFER TO VENDOR DRAWINGS FOR COMPLETE SCOPE OF WORK RELATING TO
VENDOR-FURNISHED EQUIPMENT. ALL WORK INDICATED ON VENDOR DRAWINGS SHALL
BE INCLUDED BY THE CONTRACTOR.
C. REFER TO ARCHITECTURAL DOOR HARDWARE SPECIFICATIONS FOR ACCESS CONTROL
DEVICE SPECIFICATIONS AND FURTHER REQUIREMENTS.
D. PROVIDE BACKBOXES AND CONDUIT WITH PULL-STRINGS FOR ALL SYSTEMS.
CONTRACTOR SHALL VERIFY BACKBOX SIZES, CONDUIT, ETC. AND EXACT
INSTALLATION LOCATIONS/REQUIREMENTS WITH SUCCESSFUL VENDORS OF ALL
SYSTEMS PRIOR TO CONSTRUCTION.
E. AT ALL SYSTEMS EQUIPMENT CABINET/TERMINAL BOARD LOCATIONS, CONTRACTOR
SHALL PROVIDE SIZE AND NUMBER OF CONDUIT STUB-OUTS TO CABLE PATHS AS
REQUIRED BY SYSTEM VENDORS, TERMINATE CONDUITS AT CABINETS/ON
BACKBOARDS AS REQUIRED. COORDINATE EXACT REQUIREMENTS WITH APPROPRIATE
VENDORS PRIOR TO CONSTRUCTION.
F. REFER TO SPECIFICATIONS FOR REQUIREMENTS APPLICABLE TO ALL SYSTEMS
INCLUDING CABLING, CABLE MANAGEMENT, INSTALLATION, GROUNDING, TESTING,
LABELING, ETC.
SWITCHES
TIMER SWITCH S T46"
FIRE ALARM
SECURITY INTRUSION DETECTION
E,EMINDICATES EMERGENCY POWER
PUSH-TO-EXIT BUTTON 46'' PE
J
EL
NAC
DA
KP
FAA
FACP
T
EQUIP-1
GROUND
NEUTRAL
PHASE
WALL, CLG
WALL, CLG V
A
F
FIRE ALARM CONTROL EXTENDER EXT
FILLED OUTER BARS INDICATES INTEGRAL INTEGRAL
USB OUTLETS IN ADDITION TO POWER RECEPTACLES
1'-6"
, J
VARIABLE FREQUENCY DRIVE 5'-0"
MOTOR CONNECTION, REFER TO EQUIPMENT
CONNECTION SCHEDULE
DUPLEX RECEPTACLE, CEILING MOUNTED CLG
CONDUIT UP
CONDUIT DOWN
GROUND BUS BAR ON INSULATED STANDOFFS 2'-0''
DESCRIPTION M
O
U N
T
IN
G H
E
IG
H T
(T O
C E
N T
E R
O F
B O
X
D R
A W
IN
G
S
Y M
B O
L
REFER TO LUMINAIRE SCHEDULE FOR EXACT FIXTURE
SPECIFICATIONS, MOUNTING HEIGHTS, ETC.
DESCRIPTION
LV#S,
LEGEND
INDICATES SELECTED SYSTEM
INDICATES NOT AVAILALBE
INDICATES NOT SELECTED
C O
N D
U
IT
R
O U
G H
-I N
O
F C
I
C O
N D
U
IT
R
O U
G H
-I N
C
F C
I
C A
B L
IN
G
C O
N D
U C
T O
R S
C
F C
I
P R
O G
R A
M M
IN
G
S
E T
U P
O
F O
I
P R
O G
R A
M M
IN
G
S
E T
U P
O
F C
I
P R
O G
R A
M M
IN
G
S
E T
U P
C
F C
I
906 Monmouth Street, Newport, KY 41071
EmbossDesign.com
(859)431-8612
2025-005
Cincinnati/Northern Kentucky International Airport
SOUTH ARFF
FIRE STATION
Phase 4 - Remodel
TH
IS
D O
C U M
EN
T, A N
D T
H E
ID
EA
S A N
D D
ES
IG
N S
IN
C O
R
PO
R A
TE
D H
ER
EI
N , A
S A N
I N
ST
R U M
EN
T
O F
PR
O
FE
SS
IO
N
A L
SE
R V
IC
E, I S
TH
E
PR
O
PE
R
TY
O F
EM
BO
SS
D
ES
IG
N , P
.S .C
A N
D I S
N O
T
TO
B E
U
SE
D I N
W H
O
LE
O R I N
P A R T
FO
R A
N Y
O
TH
ER
P
R O
JE
C T, W
IT
H O
U T
TH
E
W R
IT
TE
N
A U
TH
O R
IZ
A
TI
O N
O F
EM
B O
SS
D
ES
IG
N , P
.S .C
C O
PY
R
IG
H T
-2
5:
E
M B O
SS
D
ES
IG
N , P
.S .C
A
LL
R
IG
H
TS
R
ES
ER
V
ED
15141312 161110987654321
A
D
B
C
E
F
G
H
J
K
L
M
15141312 161110987654321
A
D
B
C
E
F
G
H
J
K
L
M
IS
SU
E DATE DESCRIPTIONNO.
5/7/2025 Bidding and Permit
S C A L E : 1 2 " = 1 ' - 0 "
E 0 0 1 E L E C T R I C A L L E G E N D
E L E C T R I C A L L E G E N D
E 0 0 1
ELECTRICAL GENERAL NOTES:
A. EACH CONTRACTOR, PROPOSER, SUPPLIER AND/OR MANUFACTURER SHALL REFER TO ALL DOCUMENTS
PERTAINING TO THIS PROJECT AND COORDINATE ACCORDINGLY SO AS TO ENSURE ADEQUACY OF FIT, COMPLIANCE WITH SPECIFICATIONS, PROPER VOLTAGE AND CURRENT CHARACTERISTICS TO AVOID
CONFLICT WITH ANY OTHER BUILDINGS SYSTEMS. VERIFY SAME WITH SHOP DRAWINGS.
B. ADDITIONAL ELECTRICAL REQUIREMENTS MAY BE SHOWN ON PLANS FROM OTHER DISCIPLINES IN THIS SET.
IT IS THE CONTRACTOR’S RESPONSIBILITY TO REVIEW ALL PLANS AND SPECIFICATIONS FOR A COMPLETE
UNDERSTANDING OF THE PROJECT REQUIREMENTS.
C. WORK SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ALL LOCAL, STATE, AND NATIONAL CODES.
INCLUDING BUT NOT LIMITED TO NFPA 70 (NEC), NFPA 72, INTERNATIONAL BUILDING CODES, ETC.
D. CONTRACTOR SHALL FOLLOW SEISMIC RESTRAINT AND DESIGN REQUIREMENTS CONTAINED IN LATEST ADOPTED STATE AND INTERNATIONAL BUILDING CODES, WITH ALL AMENDMENTS AS ADOPTED BY THE CURRENT LEGISLATION. REFER TO ELECTRICAL AND STRUCTURAL SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
E. ALL OFFSETS, TURNS, FITTINGS, TRIM, DETAIL, ETC. MAY NOT BE INDICATED, BUT SHALL BE PROVIDED AS REQUIRED. ADDITIONAL ALLOWANCES SHALL BE INCLUDED FOR SAME AT EACH PROPOSER’S DISCRETION.
F. INSTALL NO PIPING, CONDUIT, DUCTWORK, ETC. IN A LOCATION OR IN A MANNER WHICH WILL ALLOW FREEZING OR THE COLLECTION OF CONDENSATION THEREON. IF IN DOUBT, CONTACT THE ENGINEER.
G. ADVISE THE ENGINEER OF ANY CONFLICTS, ERRORS, OMISSIONS, ETC. AT LEAST TEN DAYS PRIOR TO BID
DATE, TO ALLOW CLARIFICATION BY WRITTEN ADDENDUM.
H. WHERE CONFLICTS ARE FOUND BETWEEN DRAWINGS, DETAILS, OR SPECIFICATIONS, THE MORE STRINGENT
REQUIREMENT SHALL APPLY. NOTIFY ARCHITECT OF DISCREPANCY IN WRITING.
I. DEVIATION FROM SPECIFICATIONS OR PLANS REQUIRES PRIOR WRITTEN APPROVAL FROM THE ENGINEERS
AND MUST BE SUBMITTED IN WRITING NO LATER THAN TEN DAYS PRIOR TO THE BID DATE.
J. OBSERVE ALL APPLICABLE CODES, RULES AND REGULATIONS THAT MAY APPLY TO THE WORK UNDER THIS CONTRACT. (CITY, COUNTY, LOCAL, STATE, FEDERAL, MUNICIPALITY, UTILITY COMPANY, OSHA, ETC.).
K. MOUNTING HEIGHTS FOR WALL MOUNTED DEVICES INDICATED ABOVE FINISHED FLOOR ARE TO CENTER OF DEVICE UNO. MOUNTING HEIGHTS TO CEILING SUSPENDED DEVICES ARE TO BOTTOM OF DEVICE UNO.
L. INSTALL EQUIPMENT, MATERIALS, ETC. IN STRICT ACCORDANCE WITH MANUFACTURER’S
RECOMMENDATIONS AND DIRECTIONS. IF IN CONFLICT WITH THE DESIGN INDICATED IN CONTRACT
DOCUMENTS, ADVISE THE ENGINEER PRIOR TO INSTALLATION FOR CLARIFICATION.
M. THE PURPOSE AND INTENT OF ALL OF THE DOCUMENTS PERTAINING TO THIS PROJECT IS TO PROVIDE A COMPLETE, FUNCTIONAL, SAFE, LIKE-NEW FACILITY. ANYTHING LESS SHALL BE UNACCEPTABLE.
N. ALL SYSTEMS, EQUIPMENT AND MATERIALS ARE TO BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER.
WORK NOT MEETING THIS CRITERION SHALL BE REMOVED AND REINSTALLED SATISFACTORILY. FINAL DETERMINATION OF THE ACCEPTABILITY OF THE QUALITY OF WORK RESIDES WITH THE ENGINEER
O. ALL WORK, MATERIALS, EQUIPMENT, ETC. SHALL BE FULLY GUARANTEED FOR ONE FULL CALENDAR YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION AS DOCUMENTED BY THE ENGINEER, UNLESS LONGER
WARRANTY PERIODS FOR EQUIPMENT ARE SPECIFIED.
P. UNLESS OTHERWISE SPECIFIED OR INDICATED, ALL EQUIPMENT AND/OR MATERIALS WITHIN OCCUPIED SPACES OR EXPOSED TO VIEW ON THE BUILDING EXTERIOR SHALL BE PRIMED AND FINISHED SO AS TO COMPLEMENT ADJACENT SURFACE, UNLESS OTHERWISE NOTED. COORDINATE WORK AND COLORS WITH
ARCHITECT.
Q. WHERE PENETRATING ROOFING MEMBRANE OR OTHER MATERIALS USED FOR WEATHERPROOFING THE BUILDING, MAKE SUCH PENETRATION IN A WAY THAT WILL NOT VOID OR DIMINISH THE ROOFING WARRANTY OR INTEGRITY IN ANYWAY. COORDINATE ALL SUCH PENETRATIONS WITH THE ROOFING MANUFACTURER AND
ARCHITECT.
R. DEVIATIONS IN SIZES, CAPACITIES, FIT, FINISH, ETC. FOR EQUIPMENT FROM THAT PRIME SPECIFIED SHALL BE THE RESPONSIBILITY OF THE PURCHASER OF THAT EQUIPMENT. ANY PROVISIONS REQUIRED TO
ACCOMMODATE A DEVIATION, WHETHER APPROVED BY THE ENGINEER OR NOT, SHALL BE THE
RESPONSIBILITY OF THE PURCHASER.
S. THE CONSTRUCTION MANAGER, GENERAL CONTRACTOR, OR WHOMEVER HOLDS THE PRIME CONTRACT(S) FOR THIS CONSTRUCTION IS RESPONSIBLE FOR THE COORDINATION, APPEARANCE, SCHEDULING AND TIMELINESS OF THE WORK OF ALL TRADES, CONTRACTORS, SUPPLIERS, INSTALLERS, ETC. POOR OR UNTIMELY WORK ON THE PART OF ANY SUBCONTRACTOR SHALL BE RESOLVED BY THE PARTY WHO
ENGAGED THEM ON THIS PROJECT.
T. WHERE MOUNTING HEIGHTS ARE NOT INDICATED OR ARE IN CONFLICT WITH ANY OTHER BUILDING SYSTEM, CONTACT THE ENGINEER BEFORE AFFECTING INSTALLATION. REFER ALSO TO ARCHITECTURAL INTERIOR AND EXTERIOR ELEVATIONS, CEILING HEIGHTS AND OTHER DETAILS OF THESE DOCUMENTS, AS APPLICABLE.
U. WHERE FIRE-RATED CEILING ASSEMBLIES ARE NOTED, PROVIDE UL-LISTED FIRE-RATED GYPSUM BOARD OR PRE-MANUFACTURED ENCLOSURES ABOVE LUMINAIRES, CEILING DEVICES, ETC. IN OR ON CEILING, AS
REQUIRED TO MAINTAIN CEILING RATINGS.
V. ALL ELECTRICAL COMPONENTS OR EQUIPMENT SHALL BE LISTED AND LABELED BY UNDERWRITER'S LABORATORIES OR OTHER APPROVED LISTING AGENCY. APPROVAL AND LABELING OF INDIVIDUAL COMPONENTS ON AN ASSEMBLY IS NOT ACCEPTABLE AS MEETING THIS REQUIREMENT, UNLESS WAIVED BY
THE ENGINEER IN WRITING.
W. ALL WIRING SYSTEMS SHALL BE INSTALLED WITH A MINIMUM OF SPLICES. CONDUCTORS, WHETHER SINGLE OR MULTI-PAIR, SHALL BE INSTALLED CONTINUOUS INSOFAR AS POSSIBLE FROM TERMINAL POINT TO
TERMINAL POINT.
X. NO CONDUIT, SUPPORTS, ETC. SHALL BE RUN THROUGH ACCESS CLEARANCES OF EQUIPMENT BY OTHER
TRADES (I.E. VAV BOXES). COORDINATE WITH ALL TRADES PRIOR TO CONSTRUCTION.
Y. ALL CONTRACTORS SHALL EXERCISE EXTREME CARE IN THE COURSE OF THEIR WORK SO AS TO ENSURE THAT THEY DO NOT INTERRUPT ANY EXISTING SERVICE OR SUB-SERVICE FOR SAFETY PURPOSES. PAY PARTICULAR ATTENTION TO THIS PRECAUTION RELATIVE TO NATURAL GAS AND ELECTRICAL LINES. VERIFY THE LOCATION, SIZE, TYPE, ETC. OF EACH UNDERGROUND OR OVERHEAD UTILITY. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL FEDERAL, STATE AND/OR LOCAL RULES, REGULATIONS, STANDARD AND SAFETY REQUIREMENTS. UTILITIES SHALL BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE MUNICIPALITY OR UTILITY COMPANY STANDARDS. IN ALL CASES, THE MOST STRINGENT REQUIREMENT SHALL
APPLY.
Z. ALL SUPPORTS FOR EQUIPMENT, DEVICES OR FIXTURES SHALL BE UNIQUE, DIRECTLY FROM THE BUILDING STRUCTURE. DO NOT SUPPORT WORK FROM OTHER TRADES EQUIPMENT OR SUPPORTS WITHOUT WRITTEN
PERMISSION FROM THE ENGINEER AND CONSENT OF THE OTHER TRADE, IN WRITING.
AA. WHERE INTERRUPTING AN EXISTING UTILITY OR SERVICE DELIBERATELY OR ACCIDENTALLY, THE RESPONSIBLE CONTRACTOR SHALL WORK CONTINUOUSLY AS NEEDED TO RESTORE SAME, PROVIDING PREMIUM TIME AS NEEDED. ALL ELECTRICAL SHUTDOWNS SHALL BE COORDINATED WITH GC AND
MAINTENANCE IN ADVANCE.
BB. AS APPLICABLE, REFER TO ARCHITECTURAL PHASING PLANS AND PHASING BOUNDARIES ON THESE DRAWINGS FOR SEQUENCING OF WORK, FULL EXTENT OF AREAS INVOLVED, EXTENT OF CEILING WORK, ETC.
PROVIDE TEMPORARY CONNECTIONS FOR CIRCUITS AND WORK AS REQUIRED TO MAINTAIN SEQUENCE OF
THE WORK FROM PHASE TO PHASE.
CC. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR HIS WORK.
ALL CUTTING AND PATCHING SHALL BE IN ACCORDANCE WITH THE ARCHITECT'S STANDARDS FOR SUCH
WORK.
DD. ALL WORK SHALL BE CONCEALED UNLESS SPECIFICALLY INDICATED TO BE EXPOSED, OR REQUIRED TO BE EXPOSED. IF IN DOUBT, CONTACT THE ENGINEER FOR CLARIFICATIONS PRIOR TO INSTALLING ANY SUCH
WORK.
EE. INTERRUPTION OF ANY EXISTING SERVICES SHALL BE COORDINATED WITH THE OWNER, GENERAL CONTRACTOR, UTILITY COMPANY AS NECESSARY, AND THE ARCHITECT, AT LEAST TWO WEEKS IN ADVANCE OF ANTICIPATED INTERRUPTION. A SCHEDULE FOR THESE OUTAGES SHALL BE DEVELOPED AND AGREED UPON BETWEEN THE PARTIES MENTIONED TO AVOID UNNECESSARY INCONVENIENCE TO THE OWNER OR ANY AFFECTED PARTY. NOTIFY THE UTILITY COMPANY OF ANY ANTICIPATED SERVICES REQUIRED TWO WEEKS IN ADVANCE, IN WRITING. IF UTILITY COMPANY REQUIRES A LONGER NOTIFICATION PERIOD, SO
PROVIDE.
FF. JUNCTION BOXES LOCATED ABOVE ACCESSIBLE CEILINGS SHALL BE LOCATED NO MORE THAN 36” ABOVE CEILING LEVEL. LABEL EACH BOX IN AREA OF WORK WITH A PERMANENT MARKER OR IN ACCORDANCE WITH
SPECIFICATIONS, WHICHEVER IS MORE STRINGENT.
GG. ALL MATERIALS FURNISHED AND ALL WORK INSTALLED SHALL COMPLY WITH THE CURRENT EDITION OF THE NATIONAL ELECTRICAL CODES, NATIONAL FIRE CODES OF THE NATIONAL FIRE PROTECTION ASSOCIATION, THE REQUIREMENTS OF LOCAL UTILITY COMPANIES, AND WITH THE REQUIREMENTS OF ALL GOVERNMENTAL AGENCIES OR DEPARTMENTS HAVING JURISDICTION. IF ANY CONFLICTS OR DISCREPANCIES OCCUR THE
MOST STRINGENT SHALL APPLY.
HH. DO NOT SCALE FROM DRAWINGS, AS PRINTING DISTORTS SCALE. WORK SHALL BE LAID OUT FROM
DIMENSIONED DRAWINGS, OR DIMENSIONS SUPPLIED TO THE CONTRACTOR.
II. NOISY WORK, WORK OUTSIDE CONSTRUCTION BARRIERS, WORK IN OCCUPIED AREAS, ETC. SHALL BE PERFORMED AFTER HOURS OR ON WEEKENDS. COORDINATE EXACT SCHEDULING WITH FACILITY PRIOR TO
CONSTRUCTION.
JJ. ALL ITEMS HAVING KEYED LOCKS/OPERATORS SHALL HAVE CORED LOCKS/OPERATORS. ALL KEYING SHALL MATCH THE OWNER'S EXISTING KEY-WAYS. COORDINATE EXACT REQUIREMENTS WITH OWNER PRIOR TO
CONSTRUCTION.
KK. REFER TO ARCHITECTURAL PLANS FOR PHASING REQUIREMENTS. WORK SHALL BE COMPLETED IN PHASES PER THE PHASING PLAN AND AS COORDINATED WITH OWNER AND GENERAL CONTRACTOR. PROVIDE ALL REQUIRED INCREMENTAL INSPECTIONS, CERTIFICATIONS, ETC. AND ALL TEMPORARY SERVICES AS
REQUIRED BY OWNER TO ACCOMPLISH THE PHASING PLAN.
GENERAL NOTES (POWER):
A. REFER TO THE ARCHITECT'S REFLECTED CEILING PLANS, ELEVATIONS, AND
CASEWORK DETAILS FOR EXACT LOCATIONS OF ALL WALL AND CEILING
MOUNTED ELECTRICAL DEVICES.
B. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, AS INDICATED
ON THE FLOOR PLANS, WITH A MAXIMUM OF THREE (3) BRANCH CIRCUITS PER
HOMERUN. EACH BRANCH CIRCUIT SHALL BE PROVIDED WITH A DEDICATED
NEUTRAL CONDUCTOR. DEDICATED NEUTRAL CONDUCTORS SHALL BE
CONSIDERED CURRENT CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN
THE SAME CONDUIT WITH THOSE INDICATED, CONTRACTOR SHALL DERATE
ALL CURRENT CARRYING CONDUCTORS PER NEC 310.15(B)(3), AND UPSIZE
CONDUIT AS REQUIRED PER NEC 300.17 AND ANNEX C. MULTIWIRE BRANCH
CIRCUITS AS DEFINED IN NEC 100 / 210.4 (CIRCUITS SHARING A COMMON
NEUTRAL CONDUCTOR) SHALL NOT BE PERMITTED.
C. IDENTIFY THE PANEL AND CIRCUIT NUMBER FOR ALL RECEPTACLES,
SWITCHES, ETC. IN AREA OF CONSTRUCTION. PROVIDE CLEAR ADHESIVE
LABELS WITH BLACK LETTERING. IN HEALTHCARE FACILITIES, ENGRAVE
EMERGENCY DEVICE COVERPLATES IN PATIENT CARE AREAS. MARK INSIDES
OF ALL DEVICE BOXES WITH PANEL AND CIRCUIT NUMBER.
D. RECEPTACLES THAT ARE CONTROLLED BY AN AUTOMATIC MEANS SUCH AS
OCCUPANCY SENSOR OR ENERGY MANAGEMENT SYSTEM SHALL BE MARKED
IN ACCORDANCE WITH NEC 406.3(E).
E. LOCATIONS OF ELECTRICAL CONNECTIONS AND LOCAL DISCONNECTS SHALL
BE COORDINATED WITH MECHANICAL AND PLUMBING CONTRACTORS TO
ENSURE ACCESS AND WORKING CLEARANCE IS MAINTAINED PER NEC.
NOTIFY OTHER TRADES OF REQUIRED CLEARANCE AREAS TO AVOID
ROUTING OF OTHER SYSTEMS IN THESE AREAS. DO NOT INSTALL
ELECTRICAL EQUIPMENT OVER EQUIPMENT NAMEPLATES OR ACCESS
PANELS OR THROUGH ACCESS/MAINTENANCE CLEARANCES OF EQUIPMENT
BY OTHER TRADES.
SHOWER
EXERCISE
DORMITORY
LOCKERS
WATER
HEATER
MEN
WOMEN
SHOWER
SHOWER
SHOWER
UTILITY
DATA
DINING
KITCHEN
STORAGE
MEN
VESTIBULE
WOMEN
STAIR
STORAGE
OFFICE
CORRIDOR
103A
CONFERENCE
OFFICE
OFFICE
STORAGE
DAY
ROOM
TRAINING
OFFICE
STORAGE
STORAGE
CORRIDOR
CORRIDOR
103B
ADMIN
ASSISTANT
103C
VESTIBULE
133A
VESTIBULE
119A
NEED 11"
ACCESS CONTROL
ACCESS CONTROL
ACCESS CONTROL
900 SF
520 SF
PE
F
EL KP
F P
E
EL
KP
F
PE
EL
KP
E1E2
E1 E2
E1 E2
906 Monmouth Street, Newport, KY 41071
EmbossDesign.com
(859)431-8612
2025-005
Cincinnati/Northern Kentucky International Airport
SOUTH ARFF
FIRE STATION
Phase 4 - Remodel
TH
IS
D O
C U M
EN
T, A N
D T
H E
ID
EA
S A N
D D
ES
IG
N S
IN
C O
R
PO
R A
TE
D H
ER
EI
N , A
S A N
I N
ST
R U M
EN
T
O F
PR
O
FE
SS
IO
N
A L
SE
R V
IC
E, I S
TH
E
PR
O
PE
R
TY
O F
EM
BO
SS
D
ES
IG
N , P
.S .C
A N
D I S
N O
T
TO
B E
U
SE
D I N
W H
O
LE
O R I N
P A R T
FO
R A
N Y
O
TH
ER
P
R O
JE
C T, W
IT
H O
U T
TH
E
W R
IT
TE
N
A U
TH
O R
IZ
A
TI
O N
O F
EM
B O
SS
D
ES
IG
N , P
.S .C
C O
PY
R
IG
H T
-2
5:
E
M B O
SS
D
ES
IG
N , P
.S .C
A
LL
R
IG
H
TS
R
ES
ER
V
ED
15141312 161110987654321
A
D
B
C
E
F
G
H
J
K
L
M
15141312 161110987654321
A
D
B
C
E
F
G
H
J
K
L
M
IS
SU
E DATE DESCRIPTIONNO.
5/7/2025 Bidding and Permit
S C A L E : 1 / 8 " = 1 ' - 0 "
E 1 0 1 E L E C T R I C A L D E M O L I T I O N
E L E C T R I C A L D E M O L I T I O N
E 1 0 1
TAGGED NOTES
E1 EXISTING ACCESS CONTROLS, INCLUDING KEYPAD, REQUEST TO EXIT
BUTTONS,…ETC TO REMAIN. CONTRACTOR SHALL DISCONNECT WIRING
FROM EXISTING DOOR TO BE DEMOLISHED. MAINTAIN WIRING FOR
CONNECTION TO NEW DOOR WITH SAME ACCESS CONTROL CAPABILITIES.
E2 RECONNECT EXISTING WIRING TO NEW LOCKS, POSITION
SWITCHES,…ETC PROVIDE WITH NEW DOOR.
ELECTRICAL DEMOLITION NOTES:
A. DOTTED LINES INDICATE ITEMS FOR REMOVAL (UON) AND THIN SOLID
LINES INDICATE EXISTING ITEMS TO REMAIN.
B. THE CONTRACTOR SHALL MAINTAIN THE CONTINUITY OF EXISTING
CIRCUITS THAT CONTAIN DEVICES OR EQUIPMENT THAT ARE TO
REMAIN. MAINTAIN EMERGENCY POWER AND EXIT LIGHTING
THROUGHOUT CONSTRUCTION. WHEN DEMOLITION OF AN ELECTRICAL
DEVICE (OR CIRCUIT) IS INDICATED ON THE DRAWINGS: THE
CONTRACTOR SHALL ENSURE THAT OTHER DEVICES OR EQUIPMENT
"UPSTREAM" OR "DOWNSTREAM" ON THE CIRCUITS SHALL REMAIN IN
"PRE- DEMOLITION" WORKING ORDER. "LEFT-OVER" CIRCUIT BREAKERS
SHALL REMAIN, BE SWITCHED TO OFF POSITION, AND BE LABELED AS
SPARES IN THEIR PANELS. PROVIDE NEW TYPEWRITTEN DIRECTORIES
FOR ALL PANELS AFFECTED.
C. LOCATIONS OF DEVICES, CONNECTIONS, ETC., INDICATED ON THIS
DRAWING WERE TAKEN FROM VARIOUS SOURCES. THEY ARE
DIAGRAMMATIC ONLY AND ARE SUBJECT TO VARIATION FROM EXISTING
CONDITIONS. CERTAIN EXISTING ELEMENTS MAY NOT BE INDICATED AT
ALL. THE CONTRACTOR PROPOSING TO DO ANY PART OF THE WORK
INDICATED HEREON SHALL VISIT THIS SITE AND DETERMINE TO HIS
SATISFACTION THAT THEY MAY COMPLETE ALL WORK REQUIRED FOR
THE BID WHICH HE PROPOSES.
D. REMOVE ALL ASSOCIATED BACKBOXES, CONDUIT AND CONDUCTORS
FOR DEVICES / FIXTURES / ETC. BEING REMOVED (BACK TO SOURCE),
WHETHER INDICATED OR NOT (UON). CONTRACTOR SHALL PATCH AND
REPAIR ANY EXISTING WALLS, FLOORS OR CEILINGS WHERE DEVICES
ARE SHOWN TO BE REMOVED (PATCH AND REPAIR TO RECEIVE NEW
FINISHES - SEE ARCHITECTURAL PLANS).
E. INACCESSIBLE ABANDONED CONDUIT RUNS SHALL BE LABELLED
"ABANDONED" AND CAPPED ON BOTH ENDS.
F. COORDINATE DISPOSAL OF ALL FIXTURES, DEVICES, ETC. (INDICATED
FOR DEMOLITION) WITH OWNER. TURN OVER ITEMS REMOVED TO
OWNER AT THEIR OPTION.
G. COORDINATE WITH OTHER TRADES FOR THE REMOVAL AND/OR
RELOCATION OF ELECTRICAL DEVICES AND CONNECTIONS ASSOCIATED
WITH THEIR EQUIPMENT.
H. PROVIDE TEMPORARY EMERGENCY EXIT LIGHTS AT CONSTRUCTION
BARRIERS AS REQUIRED.
I. CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING WALLS /
CEILINGS AS REQUIRED WHERE DEVICES ARE BEING REMOVED OR
INSTALLED.
J. UNUSED/ABANDONED CONDUCTORS DISCOVERED ABOVE ACCESSIBLE
CEILINGS SHALL BE REMOVED IN ACCORDANCE WITH NEC
REQUIREMENTS.
K. EXISTING ELECTRICAL SYSTEMS IN CONFLICT WITH CONSTRUCTION
SHALL BE RELOCATED TO PERMIT INSTALLATION OF DEVICES AND
EQUIPMENT SHOWN ON PLANS.
L. CONTRACTOR SHALL SEAL ALL EXISTING AND NEW PENETRATIONS OF
BUILDING ENVELOPE (EXTERIOR WALLS, ROOF, ETC.) WATER-TIGHT AND
AS APPROVED BY ARCHITECT AND ENGINEER. ROOFING SHALL BE
RESTORED BY A LICENSED ROOFING CONTRACTOR BASED ON WRITTEN
INSTRUCTIONS AND DETAILS FROM ROOFING MANUFACTURER AS
REQUIRED TO MAINTAIN ROOF WARRANTY. REFER TO ARCHITECTURAL
AND ENGINEERING PLANS AND SPECIFICATIONS FOR FURTHER
REQUIREMENTS.
M. DEVICES INDICATED WITH AN ''R'' SHALL BE RELOCATED. REMOVE,
PROTECT, AND REINSTALL IN NEW LOCATION INDICATED ON NEW WORK
PLANS. INTERCEPT AND EXTEND ALL EXISTING CABLING TO NEW
LOCATION. CLEAN AND RE-LAMP RELOCATED LUMINAIRES.
N. ALL EXISTING PANELS AFFECTED BY THIS CONTRACTOR'S WORK SHALL
BE PROVIDED WITH NEW TYPE-WRITTEN PANEL DIRECTORIES AND
INSERT SLEEVES. PANEL DIRECTORIES SHALL NOT USE ROOM NAMES
OR NUMBERS FROM THESE DRAWINGS. DIRECTORIES SHALL BE
DETAILED AND COORDINATED WITH OWNER'S SUITE NUMBERS, FINAL
ROOM NUMBERS, IT RACK NAMES, WORKSTATION DESIGNATIONS, ETC.
UNUSED BREAKERS SHALL BE IN OFF POSITION.
SHOWER
EXERCISE
DORMITORY
LOCKERS
WATER
HEATER
MEN
WOMEN
SHOWER
SHOWER
SHOWER
UTILITY
DATA
DINING
KITCHEN
STORAGE
MEN
VESTIBULE
WOMEN
STAIR
STORAGE
OFFICE
CORRIDOR
103A
CONFERENCE
OFFICE
OFFICE
STORAGE
DAY
ROOM
TRAINING
OFFICE
STORAGE
STORAGE
CORRIDOR
CORRIDOR
103B
ADMIN
ASSISTANT
103C
VESTIBULE
133A
VESTIBULE
119A
NEED 11"
ACCESS CONTROL
ACCESS CONTROL
ACCESS CONTROL
900 SF
520 SF
PE
F
EL KP
F P
E
EL
KP
F
PE
EL
KP
E1 E2
E1 E2
E1E2
906 Monmouth Street, Newport, KY 41071
EmbossDesign.com
(859)431-8612
2025-005
Cincinnati/Northern Kentucky International Airport
SOUTH ARFF
FIRE STATION
Phase 4 - Remodel
TH
IS
D O
C U M
EN
T, A N
D T
H E
ID
EA
S A N
D D
ES
IG
N S
IN
C O
R
PO
R A
TE
D H
ER
EI
N , A
S A N
I N
ST
R U M
EN
T
O F
PR
O
FE
SS
IO
N
A L
SE
R V
IC
E, I S
TH
E
PR
O
PE
R
TY
O F
EM
BO
SS
D
ES
IG
N , P
.S .C
A N
D I S
N O
T
TO
B E
U
SE
D I N
W H
O
LE
O R I N
P A R T
FO
R A
N Y
O
TH
ER
P
R O
JE
C T, W
IT
H O
U T
TH
E
W R
IT
TE
N
A U
TH
O R
IZ
A
TI
O N
O F
EM
B O
SS
D
ES
IG
N , P
.S .C
C O
PY
R
IG
H T
-2
5:
E
M B O
SS
D
ES
IG
N , P
.S .C
A
LL
R
IG
H
TS
R
ES
ER
V
ED
15141312 161110987654321
A
D
B
C
E
F
G
H
J
K
L
M
15141312 161110987654321
A
D
B
C
E
F
G
H
J
K
L
M
IS
SU
E DATE DESCRIPTIONNO.
5/7/2025 Bidding and Permit
S C A L E : 1 / 8 " = 1 ' - 0 "
E 2 0 1 E L E C T R I C A L N E W W O R K
E L E C T R I C A L N E W W O R K
E 2 0 1
TAGGED NOTES
E1 EXISTING ACCESS CONTROLS, INCLUDING KEYPAD, REQUEST TO EXIT
BUTTONS,…ETC TO REMAIN. CONTRACTOR SHALL DISCONNECT WIRING
FROM EXISTING DOOR TO BE DEMOLISHED. MAINTAIN WIRING FOR
CONNECTION TO NEW DOOR WITH SAME ACCESS CONTROL
CAPABILITIES.
E2 RECONNECT EXISTING WIRING TO NEW LOCKS, POSITION
SWITCHES,…ETC PROVIDE WITH NEW DOOR.
GENERAL NOTES (POWER):
A. REFER TO THE ARCHITECT'S REFLECTED CEILING PLANS, ELEVATIONS, AND
CASEWORK DETAILS FOR EXACT LOCATIONS OF ALL WALL AND CEILING
MOUNTED ELECTRICAL DEVICES.
B. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, AS INDICATED
ON THE FLOOR PLANS, WITH A MAXIMUM OF THREE (3) BRANCH CIRCUITS PER
HOMERUN. EACH BRANCH CIRCUIT SHALL BE PROVIDED WITH A DEDICATED
NEUTRAL CONDUCTOR. DEDICATED NEUTRAL CONDUCTORS SHALL BE
CONSIDERED CURRENT CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN
THE SAME CONDUIT WITH THOSE INDICATED, CONTRACTOR SHALL DERATE
ALL CURRENT CARRYING CONDUCTORS PER NEC 310.15(B)(3), AND UPSIZE
CONDUIT AS REQUIRED PER NEC 300.17 AND ANNEX C. MULTIWIRE BRANCH
CIRCUITS AS DEFINED IN NEC 100 / 210.4 (CIRCUITS SHARING A COMMON
NEUTRAL CONDUCTOR) SHALL NOT BE PERMITTED.
C. IDENTIFY THE PANEL AND CIRCUIT NUMBER FOR ALL RECEPTACLES,
SWITCHES, ETC. IN AREA OF CONSTRUCTION. PROVIDE CLEAR ADHESIVE
LABELS WITH BLACK LETTERING. IN HEALTHCARE FACILITIES, ENGRAVE
EMERGENCY DEVICE COVERPLATES IN PATIENT CARE AREAS. MARK INSIDES
OF ALL DEVICE BOXES WITH PANEL AND CIRCUIT NUMBER.
D. RECEPTACLES THAT ARE CONTROLLED BY AN AUTOMATIC MEANS SUCH AS
OCCUPANCY SENSOR OR ENERGY MANAGEMENT SYSTEM SHALL BE MARKED
IN ACCORDANCE WITH NEC 406.3(E).
E. LOCATIONS OF ELECTRICAL CONNECTIONS AND LOCAL DISCONNECTS SHALL
BE COORDINATED WITH MECHANICAL AND PLUMBING CONTRACTORS TO
ENSURE ACCESS AND WORKING CLEARANCE IS MAINTAINED PER NEC.
NOTIFY OTHER TRADES OF REQUIRED CLEARANCE AREAS TO AVOID
ROUTING OF OTHER SYSTEMS IN THESE AREAS. DO NOT INSTALL
ELECTRICAL EQUIPMENT OVER EQUIPMENT NAMEPLATES OR ACCESS
PANELS OR THROUGH ACCESS/MAINTENANCE CLEARANCES OF EQUIPMENT
BY OTHER TRADES.
| G100 |
| PLANS |
| 2025-005A100-A100 |
| 2025-005A100-A101 |
| 2025-005A100-A200 |
| M001 - MECHANICAL LEGEND |
| M101 - MECHANICAL DEMOLITION |
| M201 - MECHANICAL NEW WORK |
| M301 - MECHANICAL SCHEDULES, DETAILS & CONTROLS |
| E001 - ELECTRICAL LEGEND |
| E101 - ELECTRICAL DEMOLITION |
| E201 - ELECTRICAL NEW WORK |
File details come from the government source that posted it. Updated .