SOUTH_ARFF_PHASE_4_ISSUE_FOR_BID_SET.pdf

PDF 5 MB Posted

Attached to
ARFF Station #1 (South) Refurbishment - Phase 4
Solicitation number
25-032-ITB
Issued by
Kenton County, Kentucky

About this file

These are comprehensive architectural and engineering design documents for the South ARFF (Aircraft Rescue and Firefighting) Fire Station Phase 4 Remodel project at the Cincinnati/Northern Kentucky International Airport. The project involves interior and exterior upgrades to an existing fire station, with detailed mechanical, electrical, and demolition plans spanning multiple drawing sheets. The design documents, prepared by Emboss Design in May 2025, include floor plans, mechanical demolition and new work layouts, VAV terminal unit control sequences, electrical legends, and demolition/new work electrical plans. The documents provide extensive technical specifications for HVAC, electrical systems, and building infrastructure modifications.

The design set indicates a comprehensive renovation approach, with specific focus on upgrading mechanical systems like VAV boxes, hot water coil piping, thermostats, and building automation system integration. The mechanical plans detail precise airflow requirements, equipment specifications, and control sequences for each zone. Electrical plans show detailed demolition and new work requirements, including access control system modifications, device relocations, and circuit management. The project appears to be funded through the Kenton County Airport Board, with a planned bid process in June 2025. The documents suggest a thorough, systematic approach to modernizing the fire station's infrastructure while maintaining operational continuity during the renovation process.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

TH

IS

D O

C U M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

C O

R

PO

R A

TE

D H

ER

EI

N , A

S A N

I N

ST

R U M

EN

T

O F

PR

O

FE

SS

IO

N

A L

SE

R V

IC

E, I S

TH

E

PR

O

PE

R

TY

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D I S

N O

T

TO

B E

U

SE

D I N

2025-005

OVERALL FLOOR PLAN

IS

SU

E DATE DESCRIPTION

3/20/25 60% REVIEW

4/25/25 90% REVIEW

BIDDING & PERMIT5/7/25

NO.

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

W H

O

LE

O R I N

P A R T

FO

R A

N Y

O

TH

ER

P

R O

JE

C T, W

IT

H O

U T

TH

E

W R

IT

TE

N

A U

TH

O R

IZ

A

TI

O N

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

C O

PY

R

IG

H T

-2

5:

E

M

BO

SS

D

ES

IG

N , P

.S .C

A

LL

R

IG

H

TS

R

ES

ER

V

ED

A100

A1 OVERALL FIRST FLOOR PLAN

SCALE: 1/4" =1'-0"

P:

\2

5\

PR

-0

-S

O U

TH

A

R

FF

P H

AS

E

4\

-D R

AW

IN

G S

Cincinnati/Northern Kentucky International Airport

SOUTH ARFF

FIRE STATION

Phase 4 - Interior/Exterior Upgrades

AutoCAD SHX Text 119A

AutoCAD SHX Text

APPARATUS

AutoCAD SHX Text

BAYS

AutoCAD SHX Text

AutoCAD SHX Text

APPARATUS

AutoCAD SHX Text

BAYS

AutoCAD SHX Text

AutoCAD SHX Text 119B

AutoCAD SHX Text

VEST.

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text 120A

AutoCAD SHX Text 120B

AutoCAD SHX Text 133A

AutoCAD SHX Text 133B

AutoCAD SHX Text

CONTROL TOWER ABOVE - SEE A11/A101

AutoCAD SHX Text

AutoCAD SHX Text 100B

AutoCAD SHX Text 100A

AutoCAD SHX Text

AutoCAD SHX Text

DINING

AutoCAD SHX Text

AutoCAD SHX Text

EXERCISE

AutoCAD SHX Text

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

AutoCAD SHX Text

DEMO DOOR/FRAME PROVIDE NEW

AutoCAD SHX Text

DEMO DOOR/FRAME PROVIDE NEW

AutoCAD SHX Text

DEMO DOOR/FRAME PROVIDE NEW

AutoCAD SHX Text

DEMO DOOR/FRAME PROVIDE NEW

AutoCAD SHX Text

DEMO DOOR/FRAME PROVIDE NEW

AutoCAD SHX Text

DEMO DOOR/FRAME PROVIDE NEW

AutoCAD SHX Text

MEN

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

TRAINING

AutoCAD SHX Text

AutoCAD SHX Text

DAY ROOM

AutoCAD SHX Text

AutoCAD SHX Text

DORMITORY

AutoCAD SHX Text

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text

TOWER

AutoCAD SHX Text

AutoCAD SHX Text

SF7

AutoCAD SHX Text

SF8

AutoCAD SHX Text

SF7

AutoCAD SHX Text

OPERABLE PANE

AutoCAD SHX Text

OPERABLE PANE

AutoCAD SHX Text 1B

AutoCAD SHX Text 1B

AutoCAD SHX Text 1B

AutoCAD SHX Text 4B

AutoCAD SHX Text 4B

AutoCAD SHX Text 4B

AutoCAD SHX Text

TYP

AutoCAD SHX Text 1C

AutoCAD SHX Text 1C

AutoCAD SHX Text 906 Monmouth Street, AutoCAD SHX Text Newport, KY 41071

AutoCAD SHX Text EmbossDesign.com

AutoCAD SHX Text (859)431-8612

AutoCAD SHX Text A101

AutoCAD SHX Text A1

D

B

C

E

F

G

H

J

K

L

M

TH

IS

D O

C U M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

C O

R

PO

R A

TE

D H

ER

EI

N , A

S A N

I N

ST

R U M

EN

T

O F

PR

O

FE

SS

IO

N

A L

SE

R V

IC

E, I S

TH

E

PR

O

PE

R

TY

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D I S

N O

T

TO

B E

U

SE

D I N

2025-005

ENLARGED FLOOR PLANS

IS

SU

E DATE DESCRIPTION

3/20/25 60% REVIEW

4/25/25 90% REVIEW

BIDDING & PERMIT5/7/25

NO.

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

W H

O

LE

O R I N

P A R T

FO

R A

N Y

O

TH

ER

P

R O

JE

C T, W

IT

H O

U T

TH

E

W R

IT

TE

N

A U

TH

O R

IZ

A

TI

O N

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

C O

PY

R

IG

H T

-2

5:

E

M

BO

SS

D

ES

IG

N , P

.S .C

A

LL

R

IG

H

TS

R

ES

ER

V

ED

A101

A1 PARTIAL FIRST FLOOR PLAN

SCALE: 1/8" =1'-0"

P:

\2

5\

PR

-0

-S

O U

TH

A

R

FF

P H

AS

E

4\

-D R

AW

IN

G S

Cincinnati/Northern Kentucky International Airport

SOUTH ARFF

FIRE STATION

Phase 4 - Interior/Exterior Upgrades

A11 CONTROL TOWER PLAN - ALTERNATE BID

SCALE: 1/4" =1'-0"

CONSTRUCTION NOTES

G12 SILL DETAIL

SCALE: 1-1/2" =1'-0"

K12 SILL DETAIL

SCALE: 1-1/2" =1'-0"

GENERAL NOTES

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text

TOWER

AutoCAD SHX Text

AutoCAD SHX Text

SF7

AutoCAD SHX Text

SF8

AutoCAD SHX Text

SF7

AutoCAD SHX Text

OPERABLE PANE

AutoCAD SHX Text

OPERABLE PANE

AutoCAD SHX Text 1B

AutoCAD SHX Text 1B

AutoCAD SHX Text 1B

AutoCAD SHX Text 4B

AutoCAD SHX Text 4B

AutoCAD SHX Text 4B

AutoCAD SHX Text

TYP

AutoCAD SHX Text 1C

AutoCAD SHX Text 1C

AutoCAD SHX Text A101

AutoCAD SHX Text K12

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

AutoCAD SHX Text

EXERCISE

AutoCAD SHX Text

AutoCAD SHX Text

DORMITORY

AutoCAD SHX Text

AutoCAD SHX Text

LOCKERS

AutoCAD SHX Text

AutoCAD SHX Text

WATER

AutoCAD SHX Text

HEATER

AutoCAD SHX Text

AutoCAD SHX Text

MEN

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text

AutoCAD SHX Text

DATA

AutoCAD SHX Text

AutoCAD SHX Text

DINING

AutoCAD SHX Text

AutoCAD SHX Text

MEN

AutoCAD SHX Text

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 103A

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

TRAINING

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 103B

AutoCAD SHX Text

ADMIN

AutoCAD SHX Text

ASSISTANT

AutoCAD SHX Text 103C

AutoCAD SHX Text

EX. SOLID SURFACE STOOL TO REMAIN

AutoCAD SHX Text

EX. SOLID SURFACE STOOL TO REMAIN

AutoCAD SHX Text

SF1

AutoCAD SHX Text

SF2

AutoCAD SHX Text

SF3

AutoCAD SHX Text

SF3

AutoCAD SHX Text

SF3

AutoCAD SHX Text

SF4

AutoCAD SHX Text

SF5

AutoCAD SHX Text

SF3

AutoCAD SHX Text

SF3

AutoCAD SHX Text

SF3

AutoCAD SHX Text

SF3

AutoCAD SHX Text

SF6

AutoCAD SHX Text

EX. CER. TILE FLOOR

AutoCAD SHX Text

EX. CER. TILE FLOOR

AutoCAD SHX Text 1B

AutoCAD SHX Text 1C

AutoCAD SHX Text 1B

AutoCAD SHX Text 1C

AutoCAD SHX Text 1C

AutoCAD SHX Text 4A

AutoCAD SHX Text 4A

AutoCAD SHX Text 2A

AutoCAD SHX Text 2A

AutoCAD SHX Text 1A

AutoCAD SHX Text 1A

AutoCAD SHX Text 3A

AutoCAD SHX Text 1B

AutoCAD SHX Text 1B

AutoCAD SHX Text 1B

AutoCAD SHX Text 1A

AutoCAD SHX Text 1B

AutoCAD SHX Text 1C

AutoCAD SHX Text 1C

AutoCAD SHX Text 1C

AutoCAD SHX Text 1A

AutoCAD SHX Text A101

AutoCAD SHX Text G12

AutoCAD SHX Text A101

AutoCAD SHX Text K12

AutoCAD SHX Text

TYP

AutoCAD SHX Text 6A

AutoCAD SHX Text 5A

AutoCAD SHX Text 24"

AutoCAD SHX Text 5A

AutoCAD SHX Text 40"

AutoCAD SHX Text 5A

AutoCAD SHX Text 40"

AutoCAD SHX Text 5A

AutoCAD SHX Text 40"

AutoCAD SHX Text 5A

AutoCAD SHX Text 40"

AutoCAD SHX Text 5A

AutoCAD SHX Text 12"

AutoCAD SHX Text 5A

AutoCAD SHX Text 12"

AutoCAD SHX Text A101

AutoCAD SHX Text G12

AutoCAD SHX Text A101

AutoCAD SHX Text K12

AutoCAD SHX Text

TYP

AutoCAD SHX Text 5A

AutoCAD SHX Text 12"

AutoCAD SHX Text A101

AutoCAD SHX Text G12

AutoCAD SHX Text 7 1/2"±

AutoCAD SHX Text 7 1/2"±

AutoCAD SHX Text 7 1/2"±

AutoCAD SHX Text 7 1/2"±

AutoCAD SHX Text

MATCH EX.

AutoCAD SHX Text

EXISTING CMU VENEER

AutoCAD SHX Text

EX. SOLID SURFACE STOOL

AutoCAD SHX Text

NEW ALUM. STFT. PROVIDE BACKING ROD & SEALANT AROUND PERIMETER, BOTH SIDES

AutoCAD SHX Text PREFIN. SILL FLASHING TO MATCH STFT., SHIM WINDOW & FLASHING AS REQ'D TO PROVIDE POSITIVE SLOPE FOR DRAINAGE. EXTEND FLASHING OVER CMU CHAMFER

AutoCAD SHX Text

EX. GYP. BD.

AutoCAD SHX Text 3 1/2"±

AutoCAD SHX Text 3 1/2"±

AutoCAD SHX Text 3 1/2"±

AutoCAD SHX Text 3 1/2"±

AutoCAD SHX Text

EX. GYP. BD.

AutoCAD SHX Text

EX. SOLID SURFACE STOOL

AutoCAD SHX Text

NEW ALUM. STFT. PROVIDE BACKING ROD & SEALANT AROUND PERIMETER, BOTH SIDES

AutoCAD SHX Text

EXISTING CMU VENEER

AutoCAD SHX Text PREFIN. SILL FLASHING TO MATCH STFT., SHIM WINDOW & FLASHING AS REQ'D TO PROVIDE POSITIVE SLOPE FOR DRAINAGE. EXTEND FLASHING OVER CMU CHAMFER

AutoCAD SHX Text 906 Monmouth Street, AutoCAD SHX Text Newport, KY 41071

AutoCAD SHX Text EmbossDesign.com

AutoCAD SHX Text (859)431-8612

AutoCAD SHX Text X

AutoCAD SHX Text 1A. REPLACE EXISTING STOREFRONT SYSTEM IN IT'S ENTIRETY INCLUDING DOOR W/ NEW. PANIC DEVICE, ELECTRIC STRIKE, EMERGENCY EXIT PUSH BUTTON, AND CARD READER SHALL BE SALVAGED FOR REUSE WITH NEW DOOR 1B. REPLACE STOREFRONT SYSTEM IN IT'S ENTIRETY 1C. REPLACE COLUMN ALUMINUM CLADDING WITH NEW BREAK METAL CLADDING TO MATCH NEW STOREFRONT 2A. PROVIDE 48"H x .040" KOROSEAL KOROGARD WALL PROTECTION (COLOR TO MACH EXISTING WALL PROTECTION IN DINING #130) INCLUDING TOP CAP, INSIDE CORNER MOLDING, CORNER GUARDS, ETC. ALIGN WITH TOP OF EXISTING TILE WAINSCOT. REMOVE EXISTING RESILIENT BASE AND PROVIDE NEW BASE TO MATCH OVER WALL PROTECTION 3A. GRIND CONCRETE PAVING DOWN AS REQUIRED TO ALL DOOR TO OPEN FREELY 4A. EXISTING SOLID SURFACE STOOL TO REMAIN. READHERE TO T/WALL 4B. REMOVE EXISTING PLASTIC LAMINATE STOOL 5A. TUCKPOINT CMU JOINTS TO MATCH EXISTING AT MISC. AREAS OF WALL BELOW WINDOW SILL. SEE PLAN FOR APPROX. LENGTH IN INCHES 6A. REPLACE BACKING ROD AND SEALANT FULL WIDTH OF CONC. PAVING AT JOINT WITH BUILDING WALL

1. REMOVE AND REINSTALL BLINDS AS REQUIRED TO REPLACE REMOVE AND REINSTALL BLINDS AS REQUIRED TO REPLACE STOREFRONT SYSTEM EXCEPT AT EXERCISE 107 & CONTROL TOWER 200 (DO NOT REINSTALL BLINDS, OWNER WILL INSTALL NEW) AND MEN 108 (BLINDS DO NOT EXIST) 2. PATCH AND REPAINT GYPSUM BOARD IF/WHERE DAMAGED BY PATCH AND REPAINT GYPSUM BOARD IF/WHERE DAMAGED BY DOOR/STOREFRONT REPLACEMENT

D

B

C

E

F

G

H

J

K

L

M

TH

IS

D O

C U M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

C O

R

PO

R A

TE

D H

ER

EI

N , A

S A N

I N

ST

R U M

EN

T

O F

PR

O

FE

SS

IO

N

A L

SE

R V

IC

E, I S

TH

E

PR

O

PE

R

TY

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D I S

N O

T

TO

B E

U

SE

D I N

2025-005

DOOR, FRAME, &

STORERONT TYPES

IS

SU

E DATE DESCRIPTION

3/20/25 60% REVIEW

4/25/25 90% REVIEW

BIDDING & PERMIT5/7/25

NO.

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

W H

O

LE

O R I N

P A R T

FO

R A

N Y

O

TH

ER

P

R O

JE

C T, W

IT

H O

U T

TH

E

W R

IT

TE

N

A U

TH

O R

IZ

A

TI

O N

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

C O

PY

R

IG

H T

-2

5:

E

M

BO

SS

D

ES

IG

N , P

.S .C

A

LL

R

IG

H

TS

R

ES

ER

V

ED

A200

A1 DOOR, FRAME, AND STOREFRTONT TYPES

SCALE: 1/4" =1'-0"

P:

\2

5\

PR

-0

-S

O U

TH

A

R

FF

P H

AS

E

4\

-D R

AW

IN

G S

Cincinnati/Northern Kentucky International Airport

SOUTH ARFF

FIRE STATION

Phase 4 - Interior/Exterior Upgrades

AutoCAD SHX Text

STOREFRONT TYPE - "SF1"

AutoCAD SHX Text 2'-8"±

AutoCAD SHX Text 14'-8"±

AutoCAD SHX Text

EQ.

AutoCAD SHX Text

EQ.

AutoCAD SHX Text NOTE: ALL STOREFRONT TO BE CLEAR ANODIZED WITH 1" INSULATING, LOW-E, TINTED GLASS (TINT TO MATCH EXISTING). PROVIDE TEMPERED GLASS WHERE REQUIRED BY GOVERNING CODES AND AUTHORITIES. FIELD VERIFY ALL EXISTING OPENINGS.

AutoCAD SHX Text 7'-0"

AutoCAD SHX Text 9'-1"±

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text 9'-4"±

AutoCAD SHX Text 6'-8"±

AutoCAD SHX Text 6'-8"±

AutoCAD SHX Text 6'-8"±

AutoCAD SHX Text 6'-8"±

AutoCAD SHX Text

(5) EQ. PANES

AutoCAD SHX Text

STOREFRONT TYPE - "SF2"

AutoCAD SHX Text

STOREFRONT TYPE - "SF3"

AutoCAD SHX Text

STOREFRONT TYPE - "SF4"

AutoCAD SHX Text 9'-4"±

AutoCAD SHX Text 6'-8"±

AutoCAD SHX Text 6'-8"±

AutoCAD SHX Text 6'-8"±

AutoCAD SHX Text 6'-8"±

AutoCAD SHX Text

(5) EQ. PANES

AutoCAD SHX Text 7'-0"

AutoCAD SHX Text 6'-1"±

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text

EQ.

AutoCAD SHX Text

EQ.

AutoCAD SHX Text

STOREFRONT TYPE - "SF5"

AutoCAD SHX Text

PROVIDE TRANSLUCENT FILM ON INTERIOR SIDE OF GLASS

AutoCAD SHX Text 7'-0"

AutoCAD SHX Text 16'-0"±

AutoCAD SHX Text 6'-0"

AutoCAD SHX Text 9'-4"±

AutoCAD SHX Text 6'-8"±

AutoCAD SHX Text 6'-8"±

AutoCAD SHX Text 6'-8"±

AutoCAD SHX Text 6'-8"±

AutoCAD SHX Text

(5) EQ. PANES

AutoCAD SHX Text 5'-0"±

AutoCAD SHX Text 5'-0"±

AutoCAD SHX Text

EQ.

AutoCAD SHX Text

EQ.

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text

STOREFRONT TYPE - "SF6"

AutoCAD SHX Text 7'-0"

AutoCAD SHX Text 18'-0"±

AutoCAD SHX Text 9'-4"±

AutoCAD SHX Text 6'-8"±

AutoCAD SHX Text 6'-8"±

AutoCAD SHX Text 6'-8"±

AutoCAD SHX Text 6'-8"±

AutoCAD SHX Text

(5) EQ. PANES

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text

STOREFRONT TYPE - "SF7"

AutoCAD SHX Text

STOREFRONT TYPE - "SF8"

AutoCAD SHX Text 18'-2"±

AutoCAD SHX Text 18'-2"±

AutoCAD SHX Text 18'-2"±

AutoCAD SHX Text 18'-2"±

AutoCAD SHX Text

(4) EQUAL PANES

AutoCAD SHX Text 4'-0"±

AutoCAD SHX Text 16'-8"±

AutoCAD SHX Text 16'-8"±

AutoCAD SHX Text 16'-8"±

AutoCAD SHX Text 16'-8"±

AutoCAD SHX Text

(4) EQUAL PANES

AutoCAD SHX Text OPERABLE PROJECT OUT SASH KAWNEER "GLASSvent" OR EQUAL

AutoCAD SHX Text

SEE DOOR SCHEDULE

AutoCAD SHX Text

SEE DOOR

AutoCAD SHX Text

SEE DOOR

AutoCAD SHX Text

SCHEDULE

AutoCAD SHX Text 16 GA GALV. HOLLOW METAL FRAME GROUT SOLID THROAT SIZE TO MATCH EX. INSTALL IN CURRENT LOCATION

AutoCAD SHX Text

FRAME TYPE - "F1"

AutoCAD SHX Text

SEE DOOR

AutoCAD SHX Text

SEE DOOR

AutoCAD SHX Text

SCHEDULE

AutoCAD SHX Text

SEE DOOR SCHEDULE

AutoCAD SHX Text

DOOR TYPE - "D1"

AutoCAD SHX Text

GALV., INSULATED HOLLOW METAL

AutoCAD SHX Text

DOOR TYPE - "D2"

AutoCAD SHX Text

SEE DOOR

AutoCAD SHX Text

SEE DOOR

AutoCAD SHX Text

SCHEDULE

AutoCAD SHX Text

SEE DOOR SCHEDULE

AutoCAD SHX Text

CLEAR ANOD. ALUM. STOREFT. DOOR

AutoCAD SHX Text

1/4" TEMP. GLASS DOOR 100B INSUL., LOW-E TEMP. GLASS DOOR 100A

AutoCAD SHX Text 6"x30" INSUL., TEMP. GLASS

AutoCAD SHX Text 906 Monmouth Street, AutoCAD SHX Text Newport, KY 41071

AutoCAD SHX Text EmbossDesign.com

(859)431-8612

GENERAL NOTES - MECHANICAL

1. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE GENERAL AND SPECIAL CONDITIONS,

"GENERAL CONDITIONS - MECHANICAL" OF THE PROJECT SPECIFICATIONS AND TO ALL OTHER

CONTRACT DOCUMENTS AS THEY APPLY TO THIS BRANCH OF WORK. ATTENTION IS ALSO

DIRECTED TO ALL OTHER SECTIONS OF THE CONTRACT DOCUMENTS WHICH AFFECTS THE WORK

AND WHICH ARE HEREBY MADE A PART OF THE WORK SPECIFIED.

2. ALL MANUFACTURERS, SUPPLIERS, FABRICATORS, CONTRACTORS, ETC. SUBMITTING PROPOSALS

FOR ANY PART OF THE WORK, SERVICES, MATERIALS OR EQUIPMENT TO BE USED ON OR APPLIED

TO THIS PROJECT ARE HEREBY DIRECTED TO FAMILIARIZE THEMSELVES WITH THE CONTRACT

DOCUMENTS. IN CASE OF CONFLICTS, THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR

CLARIFICATION AND FINAL DETERMINATION PRIOR TO THE BID.

3. THE WORK SHALL CONSIST OF FURNISHING ALL LABOR, EQUIPMENT, TRANSPORTATION, SUPPLIES, MATERIALS, APPURTENANCES AND SERVICES NECESSARY FOR THE SATISFACTORY INSTALLATION

OF THE COMPLETE AND OPERATING SYSTEMS INDICATED OR SPECIFIED IN THE CONTRACT

DOCUMENTS.

4. ANY MATERIALS, LABOR, EQUIPMENT OR SERVICES NOT MENTIONED SPECIFICALLY HEREIN WHICH

MAY BE NECESSARY TO COMPLETE ANY PART OF THE SYSTEMS IN A SUBSTANTIAL MANNER, IN

COMPLIANCE WITH THE REQUIREMENTS STATED, IMPLIED OR INTENDED IN THE PLANS AND

SPECIFICATIONS, SHALL BE INCLUDED IN THE BID AS PART OF THE CONTRACT.

5. THE ENGINEER DOES NOT DEFINE THE SCOPE OF INDIVIDUAL TRADES, SUBCONTRACTORS,

MATERIAL SUPPLIERS AND VENDORS. ANY SHEET NUMBERING OR SPECIFICATION NUMBERING

SYSTEM USED WHICH IDENTIFIES DISCIPLINES IS SOLELY FOR THE ENGINEER'S CONVENIENCE AND

IS NOT INTENDED TO DEFINE A SUBCONTRACTOR'S SCOPE OF WORK. INFORMATION REGARDING

INDIVIDUAL TRADES, SUBCONTRACTORS, MATERIAL SUPPLIERS AND VENDORS MAY BE DETAILED, DESCRIBED AND INDICATED AT DIFFERENT LOCATIONS THROUGHOUT THE CONTRACT

DOCUMENTS. NO CONSIDERATION WILL BE GIVEN TO REQUESTS FOR CHANGE ORDERS FOR

FAILURE TO OBTAIN AND REVIEW THE COMPLETE SET OF CONTRACT DOCUMENTS WHEN

PREPARING BIDS, PRICES AND QUOTATIONS. UNLESS STATED OTHERWISE, THE SUBDIVISION AND

ASSIGNMENT OF WORK UNDER THE VARIOUS SECTIONS SHALL BE THE RESPONSIBILITY OF THE

CONTRACTOR HOLDING THE PRIME CONTRACT.

6. IT IS THE INTENTION OF THE CONTRACT DOCUMENTS TO CALL FOR A COMPLETE AND

OPERATIONAL SYSTEM, INCLUDING ALL COMPONENTS, ACCESSORIES, FINISH WORK, ETC

NECESSARY FOR TROUBLE FREE OPERATION; TESTED AND READY FOR OPERATION. ANYTHING

THAT MAY BE REQUIRED, IMPLIED, OR INFERRED BY THE CONTRACT DOCUMENTS SHALL BE

PROVIDED AND INCLUDED AS PART OF THE BID.

7. ALL CONTRACTORS AND VENDORS PROVIDING A BID FOR THIS PROJECT SHALL REVIEW THE PLANS

AND SPECIFICATIONS AND DETERMINE ANY MODIFICATIONS AND/OR ADJUSTMENTS NECESSARY

RELATIVE TO THE PROPOSED EQUIPMENT AND MATERIALS WITH SPECIFIC MANUFACTURER'S

INSTALLATION REQUIREMENTS. INCLUDE IN THE BID ANY NECESSARY METHODS, FEATURES,

OPTIONS, ACCESSORIES, ETC. NECESSARY TO INSTALL THE PROPOSED EQUIPMENT AND

MATERIALS, REGARDLESS OF WHETHER USED AS BASIS OF DESIGN OR BEING OFFERED AS A

SUBSTITUTION, IN ACCORDANCE WITH THE SPECIFIC MANUFACTURER'S INSTALLATION

REQUIREMENTS, WHETHER SPECIFICALLY DETAILED OR NOT, WITHIN THE PLANS AND

SPECIFICATIONS.

8. THE BIDDER/PROPOSER SHALL COMPLETELY REVIEW THE CONTRACT DOCUMENTS. ANY

INTERPRETATION AS TO DESIGN INTENT OR SCOPE SHALL BE PROVIDED BY THE ENGINEER.

SHOULD ANY INTERPRETATION BE REQUIRED, THE BIDDER/PROPOSER SHALL REQUEST A

CLARIFICATION NOT LESS THAN TEN (10) DAYS PRIOR TO THE SUBMISSION OF THE BID SO THAT

THE CONDITION MAY BE CLARIFIED BY ADDENDUM. IN THE EVENT OF ANY CONFLICT,

DISCREPANCY, OR INCONSISTENCY DEVELOPS; THE INTERPRETATION OF THE ENGINEER SHALL BE

FINAL.

9. THE CONTRACTOR SHALL PROVIDE LAYOUT CONFIRMATION OF EQUIPMENT LOCATIONS TO VERIFY

THAT ALL COMPONENTS WILL FIT IN THE PROPOSED SPACE AND HAVE ADEQUATE CLEARANCE FOR

SERVICES. COORDINATE THE LOCATION OF DRAINS, CONNECTIONS, ETC. PRIOR TO COMMENCING

INSTALLATION. WORK NOT SO COORDINATED SHALL BE REMOVED AND PROPERLY INSTALLED AT

THE EXPENSE OF THE RESPONSIBLE CONTRACTOR(S).

10. EQUIPMENT AND MATERIALS SUBSTITUTIONS OR DEVIATIONS SHALL COMPLY WITH "GENERAL

PROVISIONS - MECHANICAL PART 6." ANY VENDOR WISHING TO OBTAIN AN EQUIPMENT

SUBSTITUTION SHALL REQUEST A CLARIFICATION NOT LESS THAN TEN (10) DAYS PRIOR TO THE

SUBMISSION OF THE PROPOSAL SO THAT IT MAY BE CONSIDERED AND POTENTIALLY INCLUDED BY

ADDENDUM. REQUESTS MADE AFTER THIS PERIOD WILL BE REJECTED.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE REGARDLESS IF CONTRACTOR IS

IGNORANT OF CODES, RULES, REGULATIONS, LAWS, ETC. THE CONTRACTOR SHALL ALSO BE

VERSED IN ALL CODES, RULES, REGULATIONS, LAWS, ETC. PERTINENT TO THEIR PART OF THE

WORK PRIOR TO SUBMISSION OF THE PROPOSAL.

12. ALL WARRANTIES SHALL BEGIN STARTING AT THE PROJECT'S SUBSTANTIAL COMPLETION DATE.

ALL EQUIPMENT, MATERIAL AND LABOR WARRANTIES SHALL BE FURNISHED BY THE EQUIPMENT

SUPPLIER/VENDOR.

13. WHEREVER WORK PENETRATES ROOFING, IT SHALL BE DONE IN A MANNER THAT WILL NOT

DIMINISH OR VOID THE ROOFING GUARANTEE OR WARRANTY IN ANY WAY. COORDINATE ALL SUCH

WORK WITH THE ROOFING INSTALLER.

14. DUCTWORK, PIPING AND EQUIPMENT SHALL BE KEPT CLEAN AT ALL TIMES. DUCTWORK STORED ON

THE JOB SITE SHALL BE PLACED A MINIMUM OF 4" ABOVE THE FLOOR AND BE COMPLETELY

COVERED IN PLASTIC. INSTALLED DUCTWORK SHALL BE PROTECTED WITH PLASTIC. DO NOT

INSTALL THE DUCTWORK OR INSULATION (PIPE OR DUCT) IF THE BUILDING IS NOT "DRIED-IN". IF

THIS IS REQUIRED, THE ENTIRE LENGTHS SHALL BE COVERED IN PLASTIC TO PROTECT. THE

OWNER/ENGINEER SHALL PERIODICALLY INSPECT THAT THESE PROCEDURES ARE FOLLOWED. IF

DEEMED UNACCEPTABLE, THE CONTRACTOR SHALL BE REQUIRED TO CLEAN THE DUCT SYSTEM

UTILIZING A NADCA CERTIFIED CONTRACTOR.

15. THE PERMANENT SYSTEMS, WHEN INSTALLED, MAY BE USED FOR TEMPORARY SERVICES WITH THE

CONSENT OF THE ENGINEER AND IN STRICT ACCORDANCE WITH "GENERAL PROVISIONS -

MECHANICAL - TEMPORARY USE OF EQUIPMENT."

16. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL INCLUDE IN THE BID TO PROVIDE

EQUIPMENT AND CONTROLS STARTUP AND VERIFICATION FOR ALL MECHANICAL SYSTEMS

SPECIFIED FOR THIS PROJECT AND IN STRICT ACCORDANCE WITH "GENERAL PROVISIONS -

MECHANICAL - EQUIPMENT/CONTROLS STARTUP & VERIFICATION."

17. THE CONTRACTOR SHALL DETERMINE FROM THE CONTRACT DOCUMENTS, THE DATE OF

COMPLETION FOR THE PROJECT AND INSURE THAT EQUIPMENT DELIVERY SCHEDULES CAN BE MET

SO AS TO ALLOW THIS COMPLETION TO BE MET.

18. THROUGH COORDINATION WITH OTHER CONTRACTORS, VENDORS, AND SUPPLIERS ASSOCIATED

WITH THIS PROJECT, THIS CONTRACTOR SHALL INSURE, 100% FUNCTIONAL, TESTED, INSPECTED

AND APPROVED SYSTEMS. CLAIMS FOR ADDITIONAL COST OR CHANGE ORDERS WILL BE

REJECTED.

19. PRIOR TO ORDERING ANY MATERIALS OR ROUGH-IN OF ANY KIND, THE MECHANICAL CONTRACTOR

SHALL BE RESPONSIBLE FOR FINAL COORDINATION OF ALL ELECTRICAL REQUIREMENTS (I.E.

VOLTAGE, PHASE, CIRCUIT BREAKER, WIRE SIZING, ETC.) WITH THE ELECTRICAL CONTRACTOR.

THERE WILL BE NO CHANGE IN THE CONTRACT AMOUNT FOR ANY DISCREPANCIES.

20. ALL OFFSETS, TURNS, FITTINGS, TRIM, DETAIL, ETC., MAY NOT BE INDICATED, BUT SHALL BE

PROVIDED AS REQUIRED. ADDITIONAL ALLOWANCES SHALL BE INCLUDED FOR SAME AT EACH

PROPOSERS' DISCRETION.

21. DO NOT SCALE FROM DRAWINGS, PRINTING DISTORTS SCALE. WORK SHALL BE LAID OUT FROM

CONTRACTOR GENERATED DIMENSIONED DRAWINGS.

22. THE CONTRACTOR SHALL ENSURE PROPER COORDINATION BETWEEN ALL TRADES SUCH THAT

CONDUITS, PIPING, DUCTWORK, ETC, DOES NOT BLOCK ACCESS TO VALVES, EQUIPMENT, DUCT

ACCESS DOORS, ETC. ITEMS THAT HAVE BEEN INSTALLED WHERE ACCESS IS COMPROMISED SHALL

BE RELOCATED AT THE CONTRACTOR'S EXPENSE.

23. THESE DRAWINGS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE, HOWEVER LOCATIONS AND

SIZES WERE TAKEN FROM DIFFERENT SOURCES AND ARE SUBJECT TO DEVIATION. THE

CONTRACTOR SHALL ASSUME SOME DEVIATIONS AND INCLUDE OFFSETS, ADDITIONAL PIPING, ETC.

AT THE TIME OF BID.

24. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR

THEIR WORK. ALL CUTTING AND PATCHING SHALL MATCH ADJACENT SURFACES AND PERFORMED

BY SKILLED WORKERS OF THE TRADE. REFER TO SPECIFICATION SECTION "SLEEVING, CUTTING, PATCHING, REPAIRING, ETC." AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

25. ALL SUPPORTS FOR EQUIPMENT, DEVICES OR FIXTURES SHALL BE UNIQUE, FROM THE BUILDING

STRUCTURE. DO NOT SUPPORT WORK FROM OTHER TRADES, EQUIPMENT OR SUPPORTS WITHOUT

WRITTEN PERMISSION FROM THE ENGINEER AND CONSENT OF THE OTHER TRADE, IN WRITING.

26. PRIOR TO PURCHASE OR FABRICATION OF PIPING, THE CONTRACTOR SHALL COORDINATE

INSTALLATION WITH ACTUAL CONDITIONS AND INSTALL ACCORDINGLY.

27. VALVES, BALANCING DAMPERS OR ANY MECHANICAL/ELECTRICAL ITEM SHALL NOT BE LOCATED

ABOVE A HARD CEILING. IF THIS IS NOT POSSIBLE, THEN AN APPROPRIATELY SIZED ACCESS DOOR

SHALL BE PLACED AT NO ADDITIONAL COST UNDER THE ITEM WHETHER SHOWN OR NOT ON THE

PLANS TO ALLOW ACCESS AND ADJUSTMENT.

28. THE CONTRACTOR SHALL VISIT THE SITE FOR EXACT LOCATIONS OF ALL WALL AND CEILING

DEVICES. THIS SHALL INCLUDE PLUMBING FIXTURES, CEILING GRILLES AND DIFFUSERS, ETC.

29. CONTRACTOR SHALL CLEAN UP CONSTRUCTION DEBRIS AT ALL TIMES DURING CONSTRUCTION.

NOTE: NOT ALL SYMBOLS AND ABBREVIATIONS MAY BE USED ON THIS PROJECT

GENERAL NOTES - DEMOLITION

A. THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR AREAS

IN WHICH THE CEILING IS REMAINING. THE CONTRACTOR IS RESPONSIBLE

FOR REMOVING THE EXISTING CEILING AS REQUIRED AND REINSTALLATION.

TEMPORARILY SUPPORT LIGHTS, DIFFUSERS, CEILING ETC. REPLACE BROKEN

CEILING TILES WITH NEW AT NO ADDITIONAL COST TO OWNER. FIELED

VERIFY EXACT REQUIREMENTS.

B. ALL OUTAGES SHALL BE SCHEDULED THROUGH THE PROJECT

REPRESENTATIVE FOR PROPER COORDINATION. A REQUEST FOR AN OUTAGE

SHALL BE SUBMITTED IN WRITING A MINIMUM OF TWO WEEKS IN ADVANCE.

C. DURING SPRINKLER SYSTEM OUTAGES THE CONTRACTORS SHALL PROVIDE

FIRE WATCH OF AREAS WITH OUTAGES.

D. ALL WALLS AND FLOOR SLABS SHALL BE REPAIRED TO MATCH EXISTING AND

TO A LIKE NEW CONDITION. ALL RATED WALLS AND FLOOR SLABS SHALL BE

PATCHED AND REPAIRED TO MAINTAIN RATING.

E. ALL EXISTING BUILDING FINISHES SHALL BE PROTECTED DURING THE

DEMOLITION PHASE.

F. HEAVY DASHED LINES INDICATE ITEMS FOR REMOVAL (U.O.N) AND LIGHT

SOLID LINES INDICATE EXISTING ITEMS TO REMAIN.

G. COORDINATE DISPOSAL OF ALL FIXTURES, DEVICES, ETC. (INDICATED FOR

DEMOLITION) WITH THE OWNER.

PHASING NOTES

A. THIS PROJECT INTERFACES EXTENSIVELY WITH EXISTING BUILDING

SERVICES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO

COORDINATE AND PHASE ALL TIE-INS AND INTERRUPTIONS OF EXISTING

SERVICES TO MINIMIZE OR ELIMINATE DOWNTIME. AS AN EXAMPLE, MAIN

GAS SERVICE, WATER SERVICE, ELECTRICAL SERVICE, HVAC SERVICES,

STEAM GENERATION, ETC., WILL BE AFFECTED AND REPLACED OR MOVED

DURING THIS PROJECT. THE CONTRACTOR SHALL INSTALL ALL NEW

SERVICES AND EQUIPMENT AND HAVE THEM TESTED AND FULLY AND

RELIABLY FUNCTIONAL PRIOR TO INTERRUPTING, RELOCATING OR

REMOVING ANY EXISTING SERVICES. IT SHALL BE THE CONTRACTOR'S

RESPONSIBILITY TO BARE ANY AND ALL COSTS ASSOCIATED WITH THIS

PHASING, INCLUDING TEMPORARY SERVICES, TEMPORARY RELOCATION,

PREMIUM TIME WORK, ETC. CONTRACTOR SHALL COORDINATE ALL SAID

WORK WITH THE OWNER AND APPLICABLE UTILITIES PER THE CONTRACT

DOCUMENTS.

ABBREVIATIONS

TAGGED NOTE DESIGNATOR

GENERAL SYMBOLS

X REVISION TRIANGLE

ROOM NAME

RM # ROOM TAG

AFF ABOVE FINISHED FLOOR

AFR ABOVE FINISHED ROOF

ADJ ADJUSTABLE

APD AIR PRESSURE DROP

HVAC LEGEND

SUPPLY AIR DIFFUSER

TRANSFER AIR GRILLE W/ SOUND ATTENUATING BOOT

POINT OF CONNECTION / CONNECT TO EXISTING

POINT OF DEMOLITION

SIDEWALL DIFFUSER/GRILLE

RETURN AIR GRILLE

EXHAUST AIR DIFFUSER

MECHANICAL PIPING LEGEND

AIR DEVICE TAG (REGISTER, GRILLE, DIFFUSER,LOUVER)

AIRFLOW

TAG

SA AIR DUCT TURNING UP

SA AIR DUCT TURNING DOWN

SUPPLY AIR DUCT

RETURN AIR DUCT

EXHAUST AIR DUCT

OUTSIDE AIR DUCT

TRANSFER AIR DUCT

COMBUSTION AIR EXHAUST DUCT

COMBUSTION AIR INTAKE DUCT

RA AIR DUCT TURNING UP

RA AIR DUCT TURNING DOWN

EA AIR DUCT TURNING UP

EA AIR DUCT TURNING DOWN

DUCT TO BE DEMOLISHED - (XXX) DENOTES SYSTEM

EXISTING DUCT - (XXX) DENOTES SYSTEM

RA

SA

EA

OA

TA

CAE

CAI

SA

SA

RA

RA

EA

EA

D(XXX)

E(XXX)

DUCT TO BE ABANDONED IN PLACE - (XXX) DENOTES SYSTEMA(XXX)

RECTANGULAR DUCT

ROUND/SPIRAL DUCT

FLAT OVAL DUCT

#ø

##x##

PIPE ELBOW TURNING DOWN

PIPE ELBOW TURNING UP

PIPE TEE; CONNECTION ON BOTTOM

PIPE TEE; CONNECTION ON TOP

EXISTING PIPING - (XXX) DENOTES SYSTEM

PIPING TO BE DEMOLISHED - (XXX) DENOTES SYSTEMD(XXX)

E(XXX)

CONDENSATE DRAINCD

CHILLED WATER SUPPLY/RETURNCHWS/R

GEOTHERMAL WATER SUPPLY/RETURN

HEAT PUMP WATER SUPPLY/RETURN

GS/R

HPS/R

CONDENSER WATER SUPPLY/RETURN

DUAL TEMP. WATER SUPPLY/RETURN

CWS/R

DTS/R

HIGH PRESSURE STEAM CONDENSATEHPC

HIGH PRESSURE STEAM; (#) DENOTES PRESSUREHPS(#)

LOW PRESSURE STEAM; (#) DENOTES PRESSURE

LOW PRESSURE STEAM CONDENSATE

LPS(#)

LPC

HEATING WATER SUPPLY/RETURNHWS/R

MPS(#) MEDIUM PRESSURE STEAM; (#) DENOTES PRESSURE

MEDIUM PRESSURE STEAM RETURNMPC

HEAT RECOVERY SUPPLY/RETURN PIPINGHRS/R

STEAM VENT PIPINGSVT

PIPE CAP

FLEXIBLE DUCT

THERMOSTAT

TS

T

C

TEMPERATURE SENSOR

CARBON DIOXIDE SENSOR

TC TEMPERATURE & CARBON DIOXIDE SENSOR

MANUAL BALANCING/VOLUME DAMPER

MOTORIZED DAMPER

H HUMIDITY SENSOR

VERT. HORIZ.

VERT. HORIZ.

MITERED ELBOW WITH TURNING VANES

EQUIPMENT TAG

BAS BUILDING AUTOMATION SYSTEM

AVG AVERAGE

BHP BREAK HORSEPOWER

CAV CONSTANT AIR VOLUME

BTU BRITISH THERMAL UNIT

CFM CUBIC FEET PER MINUTE

CO CARBON MONOXIDE

CO2 CARBON DIOXIDE

DB DRY BULB

ABBREVIATIONS (CONTINUED)

FIRE PROTECTION CONTRACTORFPC

FEET PER MINUTEFPM

FEET PER SECONDFPS

GALLON (-S)GAL

GENERAL CONTRACTORGC

GALLONS PER MINUTEGPM

GRAINSGR

HEADHD

H (-ORSEPOWER, -EAT PUMP)HP

KILOWATTkW

LEAVING AIR TEMPERATURELAT

LEAVING WATER TEMPERATURELWT

BTU PER HOUR [THOUSANDS]MBH

MINIMUM CIRCUIT AMPSMCA

MANUFACTURERMFG

MAXIMUM OVERCURRENT PROTECTION [AMPS]MOCP

ID I (-DENTIFICATION, -NSIDE DIAMETER, -NSIDE DIMENSION)

FIRE DAMPERFD

FULL LOAD AMPSFLA

NOISE CRITERIA OR NORMALLY CLOSEDNC

NORMALLY OPEN OR NUMBERNO

NOT TO SCALENTS

OUTSIDE DI (-AMETER, -MENSION)OD

OWNER FURNISHED, CONTRACTOR INSTALLEDOFCI

OWNER FURNISHED, OWNER INSTALLEDOFOI

PLUMBING CONTRACTORPC

PHASE [ELECTRICAL]PH

PARTS PER MILLIONPPM

PRESSURE DROPPD

PRESSURE REDUCING STATIONPRS

PRESSURE REDUCING VALVE (STEAM, WATER, GAS)PRV

POUNDS PER SQUARE INCHPSI

POUNDS PER SQUARE FOOTPSF

PSI GAUGEPSIG

RELATIVE HUMIDITY [%]RH

REVOLUTIONS PER MINUTERPM

SMOKE DAMPERSD

STATIC PRESSURESP

SQUARE FEET OR FOOTSQ FT

TYPICALTYP

UNLESS NOTED OTHERWISEUNO

TOTAL STATIC PRESSURETSP

VOLT (-AGE, -S)V

VARI (-ABLE, -IES)VAR

VARIABLE AIR VOLUMEVAV

VELOCITYVEL

VARIABLE FEQUENCY DRIVEVFD

WATT (-AGE, -S)W

WET BULBWB

WATER PRESSURE DROPWPD

DIFFERENTIAL PRESSUREΔP

TEMPERATURE DIFFERENCEΔT

℄ CENTERLINE

DDC DIRECT DIGITAL CONTROLS

DN DOWN

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

EWT ENTERING WATER TEMPERATURE

ESP EXTERNAL STATIC PRESSURE

ETR EXISTING TO REMAIN

FREE AREAFA

XXX-X

FSD FIRE SMOKE DAMPER

906 Monmouth Street, Newport, KY 41071

EmbossDesign.com

(859)431-8612

2025-005

Cincinnati/Northern Kentucky International Airport

SOUTH ARFF

FIRE STATION

Phase 4 - Remodel

TH

IS

D O

C U M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

C O

R

PO

R A

TE

D H

ER

EI

N , A

S A N

I N

ST

R U M

EN

T

O F

PR

O

FE

SS

IO

N

A L

SE

R V

IC

E, I S

TH

E

PR

O

PE

R

TY

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D I S

N O

T

TO

B E

U

SE

D I N

W H

O

LE

O R I N

P A R T

FO

R A

N Y

O

TH

ER

P

R O

JE

C T, W

IT

H O

U T

TH

E

W R

IT

TE

N

A U

TH

O R

IZ

A

TI

O N

O F

EM

B O

SS

D

ES

IG

N , P

.S .C

C O

PY

R

IG

H T

-2

5:

E

M B O

SS

D

ES

IG

N , P

.S .C

A

LL

R

IG

H

TS

R

ES

ER

V

ED

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

IS

SU

E DATE DESCRIPTIONNO.

5/7/2025 Bidding and Permit

M E C H A N I C A L L E G E N D

M 0 0 1

T

T

T

T

T

T

T

T

M2

M1

M1 M2

M1

M2

M1

M2

M2

M2

M1

M2 M1

M1

M1

M2

M6

906 Monmouth Street, Newport, KY 41071

EmbossDesign.com

(859)431-8612

N O

T

FO

R C

O N

ST

R U

C

TI

O N

2025-005

Cincinnati/Northern Kentucky International Airport

SOUTH ARFF

FIRE STATION

Phase 4 - Remodel

TH

IS

D O

C U M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

C O

R

PO

R A

TE

D H

ER

EI

N , A

S A N

I N

ST

R U M

EN

T

O F

PR

O

FE

SS

IO

N

A L

SE

R V

IC

E, I S

TH

E

PR

O

PE

R

TY

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D I S

N O

T

TO

B E

U

SE

D I N

W H

O

LE

O R I N

P A R T

FO

R A

N Y

O

TH

ER

P

R O

JE

C T, W

IT

H O

U T

TH

E

W R

IT

TE

N

A U

TH

O R

IZ

A

TI

O N

O F

EM

B O

SS

D

ES

IG

N , P

.S .C

C O

PY

R

IG

H T

-2

5:

E

M B O

SS

D

ES

IG

N , P

.S .C

A

LL

R

IG

H

TS

R

ES

ER

V

ED

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

IS

SU

E DATE DESCRIPTIONNO.

5/7/2025 Bidding and Permit

S C A L E : 1 / 8 " = 1 ' - 0 "

M 1 0 1 M E C H A N I C A L D E M O L I T I O N

M E C H A N I C A L D E M O L I T I O N

M 1 0 1

TAGGED NOTES

M1 REMOVE EXISTING VAV BOX AND ASSOCIATED PIPING, VALVES

AND ACCESSORIES, AND CONTROLS. PIPING TO BE REMOVED

BACK TO EXISTING ISOLATION VALVES. ISOLATION BALL

VALVES TO REMAIN.

M2 REMOVE EXISTING THERMOSTAT CONTROLLING VAV SERVING

THIS ZONE. LOCATION TO BE REUSED FOR NEW THERMOSTAT.

M6 REMOVE EXISTING THERMOSTAT AND 3-WAY CONTROL VALVE

SERVING BASEBOARD HEATERS. LOCATION TO BE REUSED

FOR NEW THERMOSTAT.

T

T

T

T

T

T

T

OFFICE

OFFICE

OFFICE

CORRIDOR

103B

TRAINING

DAY ROOM

OFFICE

STORAGE

STAIR

CORRIDOR

CORRIDOR

103A

UTILITY

VAV1-10

VAV1-11

VAV1-14

VAV1-9

VAV1-5

VAV1-12

VAV1-3

VAV1-6

S-E

S-E

S-E

S-E

S-E

S-E

S-E

S-E

S-E

S-E

S-E

S-E

S-E

145 S-E

S-E

S-E

S-E

S-E

S-E

S-E

S-E

S-E

(TYP)

M5

M3

M3

M3

M3

M3

M3

M3

M3

M4

M4

M4

M4

M4

M4

(TYP)

M5

M5

(TYP)

M5

(TYP)

M5

(TYP)

M5

M5

M5 M5

M5

M5

M4

M7

M4

906 Monmouth Street, Newport, KY 41071

EmbossDesign.com

(859)431-8612

N O

T

FO

R C

O N

ST

R U

C

TI

O N

2025-005

Cincinnati/Northern Kentucky International Airport

SOUTH ARFF

FIRE STATION

Phase 4 - Remodel

TH

IS

D O

C U M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

C O

R

PO

R A

TE

D H

ER

EI

N , A

S A N

I N

ST

R U M

EN

T

O F

PR

O

FE

SS

IO

N

A L

SE

R V

IC

E, I S

TH

E

PR

O

PE

R

TY

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D I S

N O

T

TO

B E

U

SE

D I N

W H

O

LE

O R I N

P A R T

FO

R A

N Y

O

TH

ER

P

R O

JE

C T, W

IT

H O

U T

TH

E

W R

IT

TE

N

A U

TH

O R

IZ

A

TI

O N

O F

EM

B O

SS

D

ES

IG

N , P

.S .C

C O

PY

R

IG

H T

-2

5:

E

M B O

SS

D

ES

IG

N , P

.S .C

A

LL

R

IG

H

TS

R

ES

ER

V

ED

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

IS

SU

E DATE DESCRIPTIONNO.

5/7/2025 Bidding and Permit

S C A L E : 1 / 8 " = 1 ' - 0 "

M 2 0 1 M E C H A N I C A L N E W W O R K

M E C H A N I C A L N E W W O R K

M 2 0 1

TAGGED NOTES

M3 PROVIDE NEW VAV BOX. CONTRACTOR TO COORDINATE

REQUIRED HANDING TO ENSURE PROPER SERVICE

CLEARANCE IS MAINTAINED. PROVIDE DUCT TRANSITIONS AS

REQUIRED TO CONNECT NEW BOX TO EXISTING DUCTWORK.

PROVIDE NEW HOT WATER PIPING, VALVES, AND

ACCESSORIES PER THE VAV PIPING SCHEMATIC

M4 PROVIDE NEW DDC WALL MOUNTED THERMOSTAT AND WIRE

TO NEW VAV BOX. THERMOSTAT LOCATION TO MATCH

EXISTING.

M5 REBALANCE AIR DEVICES IN THIS ROOM TO AIRFLOWS AS

INDICATED ON PLAN

M7 PROVIDE NEW 3-WAY DDC CONTROL VALVE AND THERMOSTAT

TO CONTROL BASEBOARD HEATERS. INTEGRATE NEW

THERMOSTAT AND CONTROL VALVE WITH EXISTING BAS AND

PROVIDE GRAPHICS INDICATING SPACE TEMPERATURE AND

VALVE POSITION.

BALL VALVE

AIR FLOW

HOT WATER COIL

WALL

THERMOSTAT

MANUAL AIR

VENT WITH 12"

OF SOFT

COPPER TUBING

T

UNION

PETES PLUG

HWR

HWS

MODULATING 3-WAY

CONTROL VALVE. INSTALL

MINIMUM OF 6" AWAY FROM

COIL

DUCTWORK

DRAIN VALVE. NORMALLY

CLOSED WITH SCREW CAP.

HOT WATER SUPPLY

& HOT WATER

RETURN MAIN PIPING

BALANCING VALVE (SIMILAR

TO B&G CIRCUIT-SETTER.)

BYPASS BALANCING VALVE - SET TO

MATCH COIL PRESSURE DROP

ALL PIPING AND

VALVES/ACCESSORIES

DOWNSTREAM OF EXISTING

BALL VALVES TO BE

REPLACED. IF CONTRACTOR

DETERMINES EXISTING BALL

VALVES ARE DEFECTIVE,

CONTRACTOR TO REPLACE

% OPEN

DPR CMD

AIRFLOW

AIRFLOW CMD

MAX CFM

MIN CFM

°F

OA T OA H DATE & TIME

%RHLOCATION:

ROOM#:

HOME PAGE LINK

AHU# LINK

FLOOR PLAN LINK

SEQUENCE LINK

OCCUPIED/UNOCCUPIED

ROOM TEMP

°F

ROOM HUMIDITY

% RH

°F

°F

°F

°F

°F

°F

°F

FROM AHU

TO BUILDING

AIR TERMINALS

TO

OCCUPIED

SPACES

UNIT-MOUNTED

CONTROLLER

SA

CONSTANT & VARIABLE AIR VOLUME (CAV/VAV) BOX TERMINAL UNIT

H C

HWR

HWS

Ts

°F

DAT

% OPEN

HW VALVE

CLG OFFSET

UNOCC CLG STPT

HTG OFFSET

UNOCC HTG SETPT

TEMP HL ALARM

TEMP LL ALARM

HTG SETPT

HL HUMIDITY ALARM

SET POINTSCAV/VAV

°F

906 Monmouth Street, Newport, KY 41071

EmbossDesign.com

(859)431-8612

2025-005

Cincinnati/Northern Kentucky International Airport

SOUTH ARFF

FIRE STATION

Phase 4 - Remodel

TH

IS

D O

C U M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

C O

R

PO

R A

TE

D H

ER

EI

N , A

S A N

I N

ST

R U M

EN

T

O F

PR

O

FE

SS

IO

N

A L

SE

R V

IC

E, I S

TH

E

PR

O

PE

R

TY

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D I S

N O

T

TO

B E

U

SE

D I N

W H

O

LE

O R I N

P A R T

FO

R A

N Y

O

TH

ER

P

R O

JE

C T, W

IT

H O

U T

TH

E

W R

IT

TE

N

A U

TH

O R

IZ

A

TI

O N

O F

EM

B O

SS

D

ES

IG

N , P

.S .C

C O

PY

R

IG

H T

-2

5:

E

M B O

SS

D

ES

IG

N , P

.S .C

A

LL

R

IG

H

TS

R

ES

ER

V

ED

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

IS

SU

E DATE DESCRIPTIONNO.

5/7/2025 Bidding and Permit

M E C H A N I C A L S C H E D U L E S , D E T A I L S & C O N T R O L S

M 3 0 1

HOT WATER COIL PIPING SCHEMATIC

VAV TERMINAL UNIT CONTROL SEQUENCE

1. EACH VAV BOX SHALL HAVE A PRESSURE INDEPENDENT CONTROL SYSTEM.

2. THE TCC SHALL PROVIDE AND INSTALL A UNIT MOUNTED DDC CONTROLLER. THE CONTROLLER SHALL BE WIRED INTO A WALL MOUNTED DDC THERMOSTAT

PROVIDED AND INSTALLED BY THE TCC.

3. SPACE TEMPERATURE SETPOINTS SHALL BE ADJUSTABLE FROM THE WALL MOUNTED THERMOSTAT AND FROM THE BAS.

4. EACH VAV BOX SHALL HAVE A MINIMUM AND MAXIMUM AIRFLOW SETPOINT. REFER TO THE VAV SCHEDULE.

5. COOLING CONTROL:

A. THE INLET DAMPER SHALL MODULATE THE AIRFLOW BETWEEN MINIMUM AND MAXIMUM SETPOINTS TO MAINTAIN SPACE TEMPERATURE SETPOINT.

6. HEATING CONTROL:

A. THE INLET DAMPER SHALL MODULATE TO THE HEATING CFM SETPOINT. THE 3-WAY CONTROL VALVE SHALL MODULATE TO MAINTAIN SPACE TEMPERATURE

SETPOINT.

VAV BOX SCHEDULE

MARK MANUFACTURER MODEL # INLET SIZE (IN.) MAX CFM MIN CFM HTG CFM

HOT WATER HEATING COIL

REMARKSCAPACITY (MBH) FLOW (GPM) COIL ROWS EAT (°F) LAT (°F) APD (IN. W.G.) EWT (°F) LWT (°F) FPD (FT. WG.)

VAV1-3 PRICE SDV 16 1800 540 810 35.20 4.00 1 55 95 0.12 180 161.9 2.96 ALL

VAV1-5 PRICE SDV 6 170 55 110 4.90 0.45 1 55 95 0.03 180 157.4 0.15 ALL

VAV1-6 PRICE SDV 8 400 120 225 9.80 1.61 1 55 95 0.08 180 167.4 2.17 ALL

VAV1-9 PRICE SDV 10 500 150 345 15.00 2.35 1 55 95 0.06 180 166.8 0.71 ALL

VAV1-10 PRICE SDV 10 580 145 225 9.90 0.85 1 55 95 0.08 180 156 0.12 ALL

VAV1-11 PRICE SDV 10 660 200 315 13.70 1.77 1 55 95 0.10 180 164.1 0.43 ALL

VAV1-12 PRICE SDV 9 590 180 250 10.9 1.03 1 55 95 0.08 180 158.2 0.16 ALL

VAV1-14 PRICE SDV 6 150 40 150 6.60 0.89 1 55 95 0.02 180 164.8 0.52 ALL

REMARKS:

1. PRESSURE INDEPENDENT CONTROLS.

2. VAV CONTROLLER SHALL BE PROVIDED BY TCC. CONTROLLER SHALL BE

AUTOMATED LOGIC MODEL ZN341A.

3. PROVIDE 3-WAY MODULATING CONTROL VALVE. VALVE TO BE BELIMO 24V

WITH 2-10 VOLT CONTROL. FLOATING VALVES WILL NOT BE ACCEPTED.

4. THERMOSTAT TO BE ALC PART # ZS2P-ALC.

5. VAV TERMINAL SHALL INCLUDE CFM READING WITH +/-5% ACCURACY.

6. PROVIDE WITH VALVES AND PIPING ACCESSORIES PER SCHEMATIC.

7. MAX NC RATING OF 30.

8. CONTRACTOR SHALL COORDINATE REQUIRED HANDING PRIOR TO

PURCHASE.

9. PROVIDE WITH MANUFACTURER ACCESS DOOR FOR ACCESS TO HEATING

COIL.

SD

UON

EM

CFOI

OFOI

CFCI

OFCI

J

DESCRIPTION

S

S

S 3

S D

SK

PC

SOS

OS

GROUND FAULT PROTECTED DUPLEX WITH

WEATHER-PROOF "WHILE IN USE" TYPE DIE-CAST

METAL COVERPLATE WITH LOCKABLE

ENCLOSURE AT OUTLET - SEE SPECIFICATIONS

WP

CDCARBON MONOXIDE DUCT DETECTOR

POWER SUPPLY/CONTROL FOR AUDIO/VISUAL DEVICES

SLASH THROUGH ANY DEVICE INDICATES MOUNTING

ABOVE COUNTERTOP 2" ABOVE BACKSPLASH, OR AT

48" WHERE NO COUNTER IS PRESENT

SVS

VS

LV

FILLED CENTER BAR INDICATES INTEGRAL GROUND

FAULT PROTECTION (GFCI)

NON-REVERSING MOTOR STARTER SNAP SWITCH

CONTRACTOR FURNISHED OWNER INSTALLED

CONTRACTOR FURNISHED CONTRACTOR INSTALLED

OWNER FURNISHED OWNER INSTALLED

OWNER FURNISHED CONTRACTOR INSTALLEDCONNECTION TO SPRINKLER TAMPER

SWITCH WITH ADDRESSABLE MODULE

PHOTO-ELECTRIC SMOKE DETECTOR

MAIN CONTROL PANEL CENTRAL PROCESSING

UNIT (CPU)

DOOR ALARM/POSITION SWITCH

LIGHT SWITCH:GENERAL PURPOSE

AS NOTED

AS NOTED

6'-6'' TO

TOP

46" TO

LEVER

PULL STATION : DOUBLE ACTION

AUDIO-ONLY NOTIFICATION APPLIANCE

VISUAL-ONLY NOTIFICATION APPLIANCE

AUDIO/VISUAL NOTIFICATION APPLIANCE

HEAT DETECTOR

DOOR HOLDER : WALL TYPE

DUCT SMOKE DETECTOR

REMOTE L.C.D. FIRE ALARM ANNUNCIATOR

ISOLATION MODULE

H.V.A.C. SMOKE DAMPER CONNECTION

UNLESS OTHERWISE NOTED

INDICATES EMERGENCY POWER

HD

ABV CLG

DH

ABV CLG DD

FS

46"

I

ZONE ADDRESSABLE MODULE Z

SM

ABBREVIATIONS

STRIP FIXTURE

POWER OUTLETS

SIMPLEX RECEPTACLE

DUPLEX RECEPTACLE-SAFETY TYPE,

TAMPER-RESISTANT

DUPLEX RECEPTACLE

QUADRUPLEX RECEPTACLE

JUNCTION BOX, CEILING OR WALL

VOLTAGE/1PH RECEPTACLE, AS NOTED

VOLTAGE/3PH RECEPTACLE, AS NOTED

DIMMER SWITCH

THREE-WAY SWITCH

KEYED SWITCH

OCCUPANCY OR VACANCY SENSOR SWITCH

OCCUPANCY OR VACANCY SENSOR, CEILING MOUNT

LOW VOLTAGE SWITCH

PHOTO-CELL AS NOTED

EXIT LIGHT (CEILING, END, WALL MOUNT)

LIGHTING

SECURITY ACCESS CONTROL

DOOR RELEASE KEYPAD STATION

DOOR

FRAME

WALL, CLG

CLG

CLG

54"

46"

46"

46"

46"

46"

46"

1'-6"

1'-6"

1'-6"

1'-6"

1'-6"

1'-6"

2'-2"

CLG

AS NOTED

46''

S

S M

M O

U N

T

IN

G H

E

IG

H T

(T O

C E

N T

E R

O F

B O

X

D R

A W

IN

G

S

Y M

B O

L

SURFACE OR SUSPENDED CEILING FIXTURE (SLASH

INDICATES RECESSED)

WALL MOUNT FIXTURE ,

FLOODLIGHT

V

A

F

F

WALL

WALL

ADDRESSABLE RELAY MODULE R

ELECTRONIC LOCK(S)

WP

CONDUIT CONCEALED IN WALLS OR IN CEILING

SPACE: ARROW(S) INDICATE(S) HOME RUN & #

OF CIRCUITS: HASHMARKS INDICATE # OF

CONDUCTORS. DASHED LINE INDICATES

CONDUIT BELOW FLOOR.

PANELBOARD, SURFACE OR FLUSH MOUNTED,

HATCHING INDICATES EMERGENCY

EQUIPMENT TAG, REFER TO EQUIPMENT SCHEDULE

MECHANICAL EQUIPMENT DESIGNATOR

(SEE MECH. SCHEDULES)

EQUIPMENT HARDWIRE CONNECTION (SEE DETAIL)

AS NOTED

MISCELLANEOUS

DISCONNECT SWITCH

MAGNETIC STARTER

MAGNETIC COMBINATION STARTER

ENCLOSED FLUSH MTD. CIRCUIT BREAKER

WEATHERPROOF - NEMA-3R, WET LOCATION LISTED.

PROVIDE COVERS, RATINGS, ETC, AS SUITABLE FOR

OUTDOORS.

PUSHBUTTON STATION

FLEXIBLE CONDUIT

TRANSFORMER

TAGGED NOTE

REVISION TAG

LOW VOLTAGE CABLE PATH

5'-0"

5'-0"

5'-0"

5'-0"

46"

6'-6'' TO TOP

THERMOSTAT PROVIDED BY MECHANICAL

CONTRACTOR, ELECTRICAL CONTRACTOR SHALL

PROVIDE BACK-BOX CONDUIT STUB-UP, REFER TO

MECHANICAL DRAWINGS FOR LOCATIONS

C A

B L

IN

G C

O N

D U

C T

O R

S

O F

O I

C A

B L

IN

G

C O

N D

U C

T O

R S

O

F C

I

C O

N D

U

IT

R

O U

G H

-I N

O

F O

I

IT

E

M U

S E

D O

N P

R O

J E

C T

D E

V

IC

E S

O

F C

I

D E

V

IC

E S

C

F C

I

SYSTEM D

E

V

IC

E S

O

F O

I

SECURITY: ACCESS CONTROL

SYSTEM

RESPONSIBILITY

MATRIX

SYSTEM RESPONSIBILITY GENERAL NOTES:

A. CMTA IS NOT RESPONSIBILE FOR ASSIGNING SCOPE(S) OR WORK. THE INTENT OF

CONTRACTOR IN THIS MATRIX IS TO SEPERATE OWNER PROVIDED ITEMS FROM THE

GENERAL CONTRACTOR / CONSTRUCTION MANAGER. THE GC SHALL BE RESPONSIBLE

FOR A COMPLETE SCOPE OF WORK.

B. REFER TO VENDOR DRAWINGS FOR COMPLETE SCOPE OF WORK RELATING TO

VENDOR-FURNISHED EQUIPMENT. ALL WORK INDICATED ON VENDOR DRAWINGS SHALL

BE INCLUDED BY THE CONTRACTOR.

C. REFER TO ARCHITECTURAL DOOR HARDWARE SPECIFICATIONS FOR ACCESS CONTROL

DEVICE SPECIFICATIONS AND FURTHER REQUIREMENTS.

D. PROVIDE BACKBOXES AND CONDUIT WITH PULL-STRINGS FOR ALL SYSTEMS.

CONTRACTOR SHALL VERIFY BACKBOX SIZES, CONDUIT, ETC. AND EXACT

INSTALLATION LOCATIONS/REQUIREMENTS WITH SUCCESSFUL VENDORS OF ALL

SYSTEMS PRIOR TO CONSTRUCTION.

E. AT ALL SYSTEMS EQUIPMENT CABINET/TERMINAL BOARD LOCATIONS, CONTRACTOR

SHALL PROVIDE SIZE AND NUMBER OF CONDUIT STUB-OUTS TO CABLE PATHS AS

REQUIRED BY SYSTEM VENDORS, TERMINATE CONDUITS AT CABINETS/ON

BACKBOARDS AS REQUIRED. COORDINATE EXACT REQUIREMENTS WITH APPROPRIATE

VENDORS PRIOR TO CONSTRUCTION.

F. REFER TO SPECIFICATIONS FOR REQUIREMENTS APPLICABLE TO ALL SYSTEMS

INCLUDING CABLING, CABLE MANAGEMENT, INSTALLATION, GROUNDING, TESTING,

LABELING, ETC.

SWITCHES

TIMER SWITCH S T46"

FIRE ALARM

SECURITY INTRUSION DETECTION

E,EMINDICATES EMERGENCY POWER

PUSH-TO-EXIT BUTTON 46'' PE

J

EL

NAC

DA

KP

FAA

FACP

T

EQUIP-1

GROUND

NEUTRAL

PHASE

WALL, CLG

WALL, CLG V

A

F

FIRE ALARM CONTROL EXTENDER EXT

FILLED OUTER BARS INDICATES INTEGRAL INTEGRAL

USB OUTLETS IN ADDITION TO POWER RECEPTACLES

1'-6"

, J

VARIABLE FREQUENCY DRIVE 5'-0"

MOTOR CONNECTION, REFER TO EQUIPMENT

CONNECTION SCHEDULE

DUPLEX RECEPTACLE, CEILING MOUNTED CLG

CONDUIT UP

CONDUIT DOWN

GROUND BUS BAR ON INSULATED STANDOFFS 2'-0''

DESCRIPTION M

O

U N

T

IN

G H

E

IG

H T

(T O

C E

N T

E R

O F

B O

X

D R

A W

IN

G

S

Y M

B O

L

REFER TO LUMINAIRE SCHEDULE FOR EXACT FIXTURE

SPECIFICATIONS, MOUNTING HEIGHTS, ETC.

DESCRIPTION

LV#S,

LEGEND

INDICATES SELECTED SYSTEM

INDICATES NOT AVAILALBE

INDICATES NOT SELECTED

C O

N D

U

IT

R

O U

G H

-I N

O

F C

I

C O

N D

U

IT

R

O U

G H

-I N

C

F C

I

C A

B L

IN

G

C O

N D

U C

T O

R S

C

F C

I

P R

O G

R A

M M

IN

G

S

E T

U P

O

F O

I

P R

O G

R A

M M

IN

G

S

E T

U P

O

F C

I

P R

O G

R A

M M

IN

G

S

E T

U P

C

F C

I

906 Monmouth Street, Newport, KY 41071

EmbossDesign.com

(859)431-8612

2025-005

Cincinnati/Northern Kentucky International Airport

SOUTH ARFF

FIRE STATION

Phase 4 - Remodel

TH

IS

D O

C U M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

C O

R

PO

R A

TE

D H

ER

EI

N , A

S A N

I N

ST

R U M

EN

T

O F

PR

O

FE

SS

IO

N

A L

SE

R V

IC

E, I S

TH

E

PR

O

PE

R

TY

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D I S

N O

T

TO

B E

U

SE

D I N

W H

O

LE

O R I N

P A R T

FO

R A

N Y

O

TH

ER

P

R O

JE

C T, W

IT

H O

U T

TH

E

W R

IT

TE

N

A U

TH

O R

IZ

A

TI

O N

O F

EM

B O

SS

D

ES

IG

N , P

.S .C

C O

PY

R

IG

H T

-2

5:

E

M B O

SS

D

ES

IG

N , P

.S .C

A

LL

R

IG

H

TS

R

ES

ER

V

ED

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

IS

SU

E DATE DESCRIPTIONNO.

5/7/2025 Bidding and Permit

S C A L E : 1 2 " = 1 ' - 0 "

E 0 0 1 E L E C T R I C A L L E G E N D

E L E C T R I C A L L E G E N D

E 0 0 1

ELECTRICAL GENERAL NOTES:

A. EACH CONTRACTOR, PROPOSER, SUPPLIER AND/OR MANUFACTURER SHALL REFER TO ALL DOCUMENTS

PERTAINING TO THIS PROJECT AND COORDINATE ACCORDINGLY SO AS TO ENSURE ADEQUACY OF FIT, COMPLIANCE WITH SPECIFICATIONS, PROPER VOLTAGE AND CURRENT CHARACTERISTICS TO AVOID

CONFLICT WITH ANY OTHER BUILDINGS SYSTEMS. VERIFY SAME WITH SHOP DRAWINGS.

B. ADDITIONAL ELECTRICAL REQUIREMENTS MAY BE SHOWN ON PLANS FROM OTHER DISCIPLINES IN THIS SET.

IT IS THE CONTRACTOR’S RESPONSIBILITY TO REVIEW ALL PLANS AND SPECIFICATIONS FOR A COMPLETE

UNDERSTANDING OF THE PROJECT REQUIREMENTS.

C. WORK SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ALL LOCAL, STATE, AND NATIONAL CODES.

INCLUDING BUT NOT LIMITED TO NFPA 70 (NEC), NFPA 72, INTERNATIONAL BUILDING CODES, ETC.

D. CONTRACTOR SHALL FOLLOW SEISMIC RESTRAINT AND DESIGN REQUIREMENTS CONTAINED IN LATEST ADOPTED STATE AND INTERNATIONAL BUILDING CODES, WITH ALL AMENDMENTS AS ADOPTED BY THE CURRENT LEGISLATION. REFER TO ELECTRICAL AND STRUCTURAL SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

E. ALL OFFSETS, TURNS, FITTINGS, TRIM, DETAIL, ETC. MAY NOT BE INDICATED, BUT SHALL BE PROVIDED AS REQUIRED. ADDITIONAL ALLOWANCES SHALL BE INCLUDED FOR SAME AT EACH PROPOSER’S DISCRETION.

F. INSTALL NO PIPING, CONDUIT, DUCTWORK, ETC. IN A LOCATION OR IN A MANNER WHICH WILL ALLOW FREEZING OR THE COLLECTION OF CONDENSATION THEREON. IF IN DOUBT, CONTACT THE ENGINEER.

G. ADVISE THE ENGINEER OF ANY CONFLICTS, ERRORS, OMISSIONS, ETC. AT LEAST TEN DAYS PRIOR TO BID

DATE, TO ALLOW CLARIFICATION BY WRITTEN ADDENDUM.

H. WHERE CONFLICTS ARE FOUND BETWEEN DRAWINGS, DETAILS, OR SPECIFICATIONS, THE MORE STRINGENT

REQUIREMENT SHALL APPLY. NOTIFY ARCHITECT OF DISCREPANCY IN WRITING.

I. DEVIATION FROM SPECIFICATIONS OR PLANS REQUIRES PRIOR WRITTEN APPROVAL FROM THE ENGINEERS

AND MUST BE SUBMITTED IN WRITING NO LATER THAN TEN DAYS PRIOR TO THE BID DATE.

J. OBSERVE ALL APPLICABLE CODES, RULES AND REGULATIONS THAT MAY APPLY TO THE WORK UNDER THIS CONTRACT. (CITY, COUNTY, LOCAL, STATE, FEDERAL, MUNICIPALITY, UTILITY COMPANY, OSHA, ETC.).

K. MOUNTING HEIGHTS FOR WALL MOUNTED DEVICES INDICATED ABOVE FINISHED FLOOR ARE TO CENTER OF DEVICE UNO. MOUNTING HEIGHTS TO CEILING SUSPENDED DEVICES ARE TO BOTTOM OF DEVICE UNO.

L. INSTALL EQUIPMENT, MATERIALS, ETC. IN STRICT ACCORDANCE WITH MANUFACTURER’S

RECOMMENDATIONS AND DIRECTIONS. IF IN CONFLICT WITH THE DESIGN INDICATED IN CONTRACT

DOCUMENTS, ADVISE THE ENGINEER PRIOR TO INSTALLATION FOR CLARIFICATION.

M. THE PURPOSE AND INTENT OF ALL OF THE DOCUMENTS PERTAINING TO THIS PROJECT IS TO PROVIDE A COMPLETE, FUNCTIONAL, SAFE, LIKE-NEW FACILITY. ANYTHING LESS SHALL BE UNACCEPTABLE.

N. ALL SYSTEMS, EQUIPMENT AND MATERIALS ARE TO BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER.

WORK NOT MEETING THIS CRITERION SHALL BE REMOVED AND REINSTALLED SATISFACTORILY. FINAL DETERMINATION OF THE ACCEPTABILITY OF THE QUALITY OF WORK RESIDES WITH THE ENGINEER

O. ALL WORK, MATERIALS, EQUIPMENT, ETC. SHALL BE FULLY GUARANTEED FOR ONE FULL CALENDAR YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION AS DOCUMENTED BY THE ENGINEER, UNLESS LONGER

WARRANTY PERIODS FOR EQUIPMENT ARE SPECIFIED.

P. UNLESS OTHERWISE SPECIFIED OR INDICATED, ALL EQUIPMENT AND/OR MATERIALS WITHIN OCCUPIED SPACES OR EXPOSED TO VIEW ON THE BUILDING EXTERIOR SHALL BE PRIMED AND FINISHED SO AS TO COMPLEMENT ADJACENT SURFACE, UNLESS OTHERWISE NOTED. COORDINATE WORK AND COLORS WITH

ARCHITECT.

Q. WHERE PENETRATING ROOFING MEMBRANE OR OTHER MATERIALS USED FOR WEATHERPROOFING THE BUILDING, MAKE SUCH PENETRATION IN A WAY THAT WILL NOT VOID OR DIMINISH THE ROOFING WARRANTY OR INTEGRITY IN ANYWAY. COORDINATE ALL SUCH PENETRATIONS WITH THE ROOFING MANUFACTURER AND

ARCHITECT.

R. DEVIATIONS IN SIZES, CAPACITIES, FIT, FINISH, ETC. FOR EQUIPMENT FROM THAT PRIME SPECIFIED SHALL BE THE RESPONSIBILITY OF THE PURCHASER OF THAT EQUIPMENT. ANY PROVISIONS REQUIRED TO

ACCOMMODATE A DEVIATION, WHETHER APPROVED BY THE ENGINEER OR NOT, SHALL BE THE

RESPONSIBILITY OF THE PURCHASER.

S. THE CONSTRUCTION MANAGER, GENERAL CONTRACTOR, OR WHOMEVER HOLDS THE PRIME CONTRACT(S) FOR THIS CONSTRUCTION IS RESPONSIBLE FOR THE COORDINATION, APPEARANCE, SCHEDULING AND TIMELINESS OF THE WORK OF ALL TRADES, CONTRACTORS, SUPPLIERS, INSTALLERS, ETC. POOR OR UNTIMELY WORK ON THE PART OF ANY SUBCONTRACTOR SHALL BE RESOLVED BY THE PARTY WHO

ENGAGED THEM ON THIS PROJECT.

T. WHERE MOUNTING HEIGHTS ARE NOT INDICATED OR ARE IN CONFLICT WITH ANY OTHER BUILDING SYSTEM, CONTACT THE ENGINEER BEFORE AFFECTING INSTALLATION. REFER ALSO TO ARCHITECTURAL INTERIOR AND EXTERIOR ELEVATIONS, CEILING HEIGHTS AND OTHER DETAILS OF THESE DOCUMENTS, AS APPLICABLE.

U. WHERE FIRE-RATED CEILING ASSEMBLIES ARE NOTED, PROVIDE UL-LISTED FIRE-RATED GYPSUM BOARD OR PRE-MANUFACTURED ENCLOSURES ABOVE LUMINAIRES, CEILING DEVICES, ETC. IN OR ON CEILING, AS

REQUIRED TO MAINTAIN CEILING RATINGS.

V. ALL ELECTRICAL COMPONENTS OR EQUIPMENT SHALL BE LISTED AND LABELED BY UNDERWRITER'S LABORATORIES OR OTHER APPROVED LISTING AGENCY. APPROVAL AND LABELING OF INDIVIDUAL COMPONENTS ON AN ASSEMBLY IS NOT ACCEPTABLE AS MEETING THIS REQUIREMENT, UNLESS WAIVED BY

THE ENGINEER IN WRITING.

W. ALL WIRING SYSTEMS SHALL BE INSTALLED WITH A MINIMUM OF SPLICES. CONDUCTORS, WHETHER SINGLE OR MULTI-PAIR, SHALL BE INSTALLED CONTINUOUS INSOFAR AS POSSIBLE FROM TERMINAL POINT TO

TERMINAL POINT.

X. NO CONDUIT, SUPPORTS, ETC. SHALL BE RUN THROUGH ACCESS CLEARANCES OF EQUIPMENT BY OTHER

TRADES (I.E. VAV BOXES). COORDINATE WITH ALL TRADES PRIOR TO CONSTRUCTION.

Y. ALL CONTRACTORS SHALL EXERCISE EXTREME CARE IN THE COURSE OF THEIR WORK SO AS TO ENSURE THAT THEY DO NOT INTERRUPT ANY EXISTING SERVICE OR SUB-SERVICE FOR SAFETY PURPOSES. PAY PARTICULAR ATTENTION TO THIS PRECAUTION RELATIVE TO NATURAL GAS AND ELECTRICAL LINES. VERIFY THE LOCATION, SIZE, TYPE, ETC. OF EACH UNDERGROUND OR OVERHEAD UTILITY. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL FEDERAL, STATE AND/OR LOCAL RULES, REGULATIONS, STANDARD AND SAFETY REQUIREMENTS. UTILITIES SHALL BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE MUNICIPALITY OR UTILITY COMPANY STANDARDS. IN ALL CASES, THE MOST STRINGENT REQUIREMENT SHALL

APPLY.

Z. ALL SUPPORTS FOR EQUIPMENT, DEVICES OR FIXTURES SHALL BE UNIQUE, DIRECTLY FROM THE BUILDING STRUCTURE. DO NOT SUPPORT WORK FROM OTHER TRADES EQUIPMENT OR SUPPORTS WITHOUT WRITTEN

PERMISSION FROM THE ENGINEER AND CONSENT OF THE OTHER TRADE, IN WRITING.

AA. WHERE INTERRUPTING AN EXISTING UTILITY OR SERVICE DELIBERATELY OR ACCIDENTALLY, THE RESPONSIBLE CONTRACTOR SHALL WORK CONTINUOUSLY AS NEEDED TO RESTORE SAME, PROVIDING PREMIUM TIME AS NEEDED. ALL ELECTRICAL SHUTDOWNS SHALL BE COORDINATED WITH GC AND

MAINTENANCE IN ADVANCE.

BB. AS APPLICABLE, REFER TO ARCHITECTURAL PHASING PLANS AND PHASING BOUNDARIES ON THESE DRAWINGS FOR SEQUENCING OF WORK, FULL EXTENT OF AREAS INVOLVED, EXTENT OF CEILING WORK, ETC.

PROVIDE TEMPORARY CONNECTIONS FOR CIRCUITS AND WORK AS REQUIRED TO MAINTAIN SEQUENCE OF

THE WORK FROM PHASE TO PHASE.

CC. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR HIS WORK.

ALL CUTTING AND PATCHING SHALL BE IN ACCORDANCE WITH THE ARCHITECT'S STANDARDS FOR SUCH

WORK.

DD. ALL WORK SHALL BE CONCEALED UNLESS SPECIFICALLY INDICATED TO BE EXPOSED, OR REQUIRED TO BE EXPOSED. IF IN DOUBT, CONTACT THE ENGINEER FOR CLARIFICATIONS PRIOR TO INSTALLING ANY SUCH

WORK.

EE. INTERRUPTION OF ANY EXISTING SERVICES SHALL BE COORDINATED WITH THE OWNER, GENERAL CONTRACTOR, UTILITY COMPANY AS NECESSARY, AND THE ARCHITECT, AT LEAST TWO WEEKS IN ADVANCE OF ANTICIPATED INTERRUPTION. A SCHEDULE FOR THESE OUTAGES SHALL BE DEVELOPED AND AGREED UPON BETWEEN THE PARTIES MENTIONED TO AVOID UNNECESSARY INCONVENIENCE TO THE OWNER OR ANY AFFECTED PARTY. NOTIFY THE UTILITY COMPANY OF ANY ANTICIPATED SERVICES REQUIRED TWO WEEKS IN ADVANCE, IN WRITING. IF UTILITY COMPANY REQUIRES A LONGER NOTIFICATION PERIOD, SO

PROVIDE.

FF. JUNCTION BOXES LOCATED ABOVE ACCESSIBLE CEILINGS SHALL BE LOCATED NO MORE THAN 36” ABOVE CEILING LEVEL. LABEL EACH BOX IN AREA OF WORK WITH A PERMANENT MARKER OR IN ACCORDANCE WITH

SPECIFICATIONS, WHICHEVER IS MORE STRINGENT.

GG. ALL MATERIALS FURNISHED AND ALL WORK INSTALLED SHALL COMPLY WITH THE CURRENT EDITION OF THE NATIONAL ELECTRICAL CODES, NATIONAL FIRE CODES OF THE NATIONAL FIRE PROTECTION ASSOCIATION, THE REQUIREMENTS OF LOCAL UTILITY COMPANIES, AND WITH THE REQUIREMENTS OF ALL GOVERNMENTAL AGENCIES OR DEPARTMENTS HAVING JURISDICTION. IF ANY CONFLICTS OR DISCREPANCIES OCCUR THE

MOST STRINGENT SHALL APPLY.

HH. DO NOT SCALE FROM DRAWINGS, AS PRINTING DISTORTS SCALE. WORK SHALL BE LAID OUT FROM

DIMENSIONED DRAWINGS, OR DIMENSIONS SUPPLIED TO THE CONTRACTOR.

II. NOISY WORK, WORK OUTSIDE CONSTRUCTION BARRIERS, WORK IN OCCUPIED AREAS, ETC. SHALL BE PERFORMED AFTER HOURS OR ON WEEKENDS. COORDINATE EXACT SCHEDULING WITH FACILITY PRIOR TO

CONSTRUCTION.

JJ. ALL ITEMS HAVING KEYED LOCKS/OPERATORS SHALL HAVE CORED LOCKS/OPERATORS. ALL KEYING SHALL MATCH THE OWNER'S EXISTING KEY-WAYS. COORDINATE EXACT REQUIREMENTS WITH OWNER PRIOR TO

CONSTRUCTION.

KK. REFER TO ARCHITECTURAL PLANS FOR PHASING REQUIREMENTS. WORK SHALL BE COMPLETED IN PHASES PER THE PHASING PLAN AND AS COORDINATED WITH OWNER AND GENERAL CONTRACTOR. PROVIDE ALL REQUIRED INCREMENTAL INSPECTIONS, CERTIFICATIONS, ETC. AND ALL TEMPORARY SERVICES AS

REQUIRED BY OWNER TO ACCOMPLISH THE PHASING PLAN.

GENERAL NOTES (POWER):

A. REFER TO THE ARCHITECT'S REFLECTED CEILING PLANS, ELEVATIONS, AND

CASEWORK DETAILS FOR EXACT LOCATIONS OF ALL WALL AND CEILING

MOUNTED ELECTRICAL DEVICES.

B. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, AS INDICATED

ON THE FLOOR PLANS, WITH A MAXIMUM OF THREE (3) BRANCH CIRCUITS PER

HOMERUN. EACH BRANCH CIRCUIT SHALL BE PROVIDED WITH A DEDICATED

NEUTRAL CONDUCTOR. DEDICATED NEUTRAL CONDUCTORS SHALL BE

CONSIDERED CURRENT CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN

THE SAME CONDUIT WITH THOSE INDICATED, CONTRACTOR SHALL DERATE

ALL CURRENT CARRYING CONDUCTORS PER NEC 310.15(B)(3), AND UPSIZE

CONDUIT AS REQUIRED PER NEC 300.17 AND ANNEX C. MULTIWIRE BRANCH

CIRCUITS AS…