25-0011 SID.pdf

PDF 5 MB Posted

Attached to
Repair BEQ HP135
Solicitation number
N4008526R9044
Issued by

About this file

This is a Structural Interior Design (SID) Package for the HP135 BEQ (Bachelor Enlisted Quarters) Renovation at Marine Corps Base Camp Lejeune, North Carolina, submitted as a sealed final submittal in May 2026.

The design package establishes comprehensive interior finish standards for the barracks renovation project, with finishes selected for high durability and low maintenance requirements. Flooring specifications include luxury vinyl tile (LVT-1, Mannington Crisscross in Charcoal) for sleeping quarters and office spaces; epoxy resinous flooring (RES-1, Sherwin Williams Deco Quartz in Caterpillar) for common lounge areas; porcelain tile (T-1, Crossville Shade 2.0 in Thunder) for bathroom and janitor floors; quarry tile (T-4, Daltile Arid Flash) for kitchen areas; and sealed concrete for laundry rooms, corridors, and utility spaces. Wall finishes consist of painted CMU and drywall (PNT-1, Benjamin Moore Classic Grey) with accent walls in sleeping rooms (PNT-2, Benjamin Moore River Reflections), bathroom wall tile (T-2 and T-3, Atlas Concorde Element Gray), and porcelain tile accent bands in toilet rooms. Additional specifications include rubber base trim (RB-1, Tarkett Mink WG), solid surface countertops and window sills (SS-1 and SS-2, Corian Neutral Aggregate), solid surface shower surrounds (SS-3, Corian Glacier White), fiberglass reinforced plastic (FRP-1, Marlite Pebbled Light Grey), casework in plastic laminate (PLAM-1, Formica Blackened Legno), and window shades (WS-1 and WS-2, Read Window Products). Interior signage utilizes 2/90 Sign Systems with tactile lettering and Grade 2 Braille throughout the facility. The project complies with FC 1-300-09N Navy & Marine Corps Design Requirements, UFC 1-200-01 DoD Building Code, UFC 3-120-01 Design Sign Standards, UFC 3-120-10 Interior Design, and UFC 3-190-06 Protective Coatings and Paints. The design underwent 50% and 95% review phases with final submission scheduled for April 2, 2026.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

interior design within

HP135 BEQ Renovation CL Marine Corps Base, Camp Lejeune, NC

Structural Interior Design Package Sealed Final Submittal May 2026

HP135 BEQ Renovation CL Marine Corps Base, Camp Lejeune, NC Structural Interior Design Package interior design within

Table of Contents

1. Point of Contact List

2. Narrative of Interior Design Objectives

3. Meeting Minutes

4. Finish Plans & Schedules

5. Finish Boards

Structural Interior Design Package interior design within

Point of Contact List A&E Architect John Schmied, AIA, LEED AP BD+C MBF Architects 317-C Pollock Street New Bern, NC 28560

(252) 637-6373 schmied@mbfarchitects.com

A&E Interior Designer Jamie Kissel, NCIDQ, CID Within Interior Design 1008 Granby Street Norfolk, VA 23510

(757) 224-0489 jkissel@withindesigns.com

Base Architectural Supervisor Cathy Martin Architectural Design Branch/Public Works Division 1005 Michael Road Camp Lejeune, North Carolina 28547

(910) 451-0394 catherine.martin@usmc.mil

Structural Interior Design Package interior design within

SID Narrative

INTERIOR DESIGN CRITERIA

Interior Design work will comply with the latest edition of the following codes and standards:

FC 1-300-09N Navy & Marine Corps Design Requirements UFC 1-200-01 DoD Building Code UFC 3-120-01 Design: Sign Standards UFC 3-120-10 Interior Design UFC 3-190-06 Protective Coatings and Paints

INTERIOR BASIS OF DESIGN

This Basis of Design Narrative outlines the proposed Structural Interior Design requirements for Repairs to BEQ HP135 at United States Marine Corps Base, Camp Lejeune. The interior finishes are the most exposed interior elements in a building and must be durable to withstand the daily traffic and demands of the environment. To meet these objectives, the SID package will use all the general requirements for interior finishes that have been applied in similar facilities recently constructed at MCB Camp Lejeune, as well as best practices recommended by manufacturers for areas requiring enhanced durability. Structural finishes in accordance with the following guidelines will provide longevity and timeless aesthetics without compromising the functional integrity of the facility.

Finishes will be selected because of their high durability and low maintenance requirements.

Luxury vinyl tile flooring will be used in sleeping quarters and office spaces, while common lounge areas will receive epoxy resinous flooring. Porcelain tile will cover the floors in the head/ shower rooms. The laundry rooms corridors and utility spaces on all floors will receive sealed concrete floors.

Interior partitions will be painted CMU & drywall. Accent walls will be painted in sleeping rooms to provide visual variety. Offices will recieve a solid accent wall while toilet rooms will recieve porcelain tile with a porcelain tile accent band. All wall finishes will be cohesive to adjacent spaces and provide a fresh and upgraded look. Drywall and exposed ceilings will also have a painted finish.

Interior signage will be provided throughout the facility to form a well-organized, comprehensive interior environment that guides users and visitors through the building. Interior Signage will include identification, directional, and informational systems utilizing permanent and changeable signage.

Structural Interior Design Package interior design

Meeting Minutes

1 | P a g e

1008 Granby Street | Norfolk, VA 23510 | 757.224.0489

MEETING MINUTES

Project: Repair BEQ HP135 Meeting: 50% Review Meeting Date: December 18th, 2025 Location: Microsoft Teams Meeting

PROJECT TEAM IN ATTENDANCE:

Architecture MBF Architects (252) 637-6373 Civil Engineer Avolis Engineering (252) 633-0068 Structural Engineer Kaydos-Daniels Engineers (919) 828-4966 Mechanical/Electrical/Plumbing Crenshaw Consulting (919) 871-1070 Fire Protection Jensen Hughes (757) 213-6856 Cost Estimating Aiken Cost Consultants (864) 232-9342 Geotechnical ECS Southeast (919) 861-9910 Interior Design Within Interior Design (757) 224-0489

Below are the items that were addressed at the 50% Review Meeting.

50% REVIEW COMMENTS

REVIEWER: TREAVOR STREETER

Item #13 I-501: Reflect the accessible sign design, layout, and fonts as additional typical signage details.

Response: Clarify during review meeting.

Clarify with John from MBF.

Item #18 Overall Note: Ensure sleeping rooms are outfitted for 2 occupants, not 3. Double-check furniture and life safety layouts reflect this.

Response: Furniture is not part of the interiors scope. MBF to coordinate.

Item #58 I-101: Grid linetype bleeds into the closet in sleeping room 101. Linetype is trimmed in a couple closets but not the others. Come up with a standard for showing different materials through linetypes and weights, they should all be consistently marked/displayed.

Response: Concur. Line weights will be edited.

Item #59 I-101: Trim additional lines bleeding into surfaces and furniture.

Response: Concur. Drawings will be cleaned up.

2 | P a g e

Item #60 I-111 – I-113: Include stairwell sign locations for interior stairwells on these sheets. I see they are added later, but to keep it consistent, add to overall plans, not just the enlarged ones.

Response: Concur. Stairwell signage will be added to overall furniture plans on each floor.

Item #61 I-202: Label grout joint thickness. Also, include callout for silicone caulk for interior transitions from tile to tile (Like at the base of detail A1). Grout will crack and separate, caulking will last much longer and be better for long-term water proofing.

Response: Concur. Annotations will be added.

Item #62 I-601: Pnt-3 is called out for Duty room 146 and all typical sleeping rooms, but there is no

Pnt-3 listed on the finish legend. Coordinate interior design selections to room usage and rectify this discrepancy.

Response: Concur. Correction will be made to PNT-3.

ACTION ITEMS

1. 95% Submittal due to government on 2/9/26.

INTERIOR DESIGN

1 | P a g e

1008 Granby Street | Norfolk, VA 23510 | 757.224.0489

MEETING MINUTES

Project: Repair BEQ HP135 Meeting: Pre-Final Review Meeting Date: March 4th, 2026 Location: 1005 Michael Road

PROJECT TEAM IN ATTENDANCE:

Architecture MBF Architects (252) 637-6373 Civil Engineer Avolis Engineering (252) 633-0068 Structural Engineer Kaydos-Daniels Engineers (919) 828-4966 Mechanical/Electrical/Plumbing Crenshaw Consulting (919) 871-1070 Fire Protection Jensen Hughes (757) 213-6856 Cost Estimating Aiken Cost Consultants (864) 232-9342 Geotechnical ECS Southeast (919) 861-9910 Interior Design Within Interior Design (757) 224-0489

Below are the items that were addressed at the 95% Review Meeting.

95% REVIEW COMMENTS

REVIEWER: TREAVOR STREETER

Item #11 A-601/I-101: Include sill for door 138, concrete flooring in the vending/corridor area changes to Resilient flooring in the kitchen and is not "technically" combustible-proof.

Response: Kitchen flooring will be changed to quarry tile (WID)

Item #12 I-102: Missing linework for the wall between 240 and 248 + 340 and 348.

Response: Concur. Graphics will be reviewed.

Item #18 I-101: Closets in rooms 100 and 102 have no lineweights under the shelving, add the lvt floor hatching there.

Response: Concur. Graphics will be reviewed.

Item #19 I-202: Grout joint thickness was not called out for, which was confirmed in the 50% comments.

Response: Concur. 1/8" grout thickness has been added to detail A1 and A3 on I-202.

Item #22 I-101: Laundry Room 148 has diagonal lines notating (I assume) the dropped ceiling, but if we're just showing the flooring, can we omit the lines so as not to confuse the flooring sub?

2 | P a g e

Response: Concur. Ceiling has been hidden in the view

Item #23 SID: I-103: For room 305, Have the shower surround touch the north of the sleeping room bathroom. There's a small gap showing the tile floor as opposed to being only the shower enclosure.

Response: Concur. To be coordinated with Architecture.

Item #24 SID: I-101/102/103: Missing door cutouts in the lounge (348) room, and linen storage (346), Mechanical Corridor 350 near the exit stairwell, Mechanical Corridor 349 near the exit stairwell, Mechanical Corridor (249), Lounge (248), Laundry (242), Mechanical Corridor (250) near the exit stairwell, Mechanical Corridor (149) both sides of entry/exit of the corridor, Laundry (148), Stair (141), Laundry (142), Duty (146), Electrical (144), Mechanical Corridor

(150) both sides of entry/exit of corridor. Just looking for similar programmed materials to be shown the same way throughout the drawing documents.

Response: Concur. Cut planes will be reviewed and corrected.

Item #25 SID: I-101: Inconsistent portrayal of bathroom fixtures, ensure all toilet rooms and sleeping rooms have the same fixtures detailed. For example, toilet 143 shows all fixtures needed in the bathroom, toilet 243 only shows a toilet and sink, toilet 343 also only shows sink and toilet.

Response: Concur. To be coordinated with Architecture.

Item #26 SID: I-201: Add additional Finish Note: "LVT flooring coverage includes the entirety of the sleeping room, and continues into the wardrobes of each sleeping room."

Response: Concur. Note has been added.

Item #27 SID: I-202: Are we going to have a schleuter or quarter-round for the top edge of the janitor room tile where it meets the drywall? (A3), it'll be an unfinished edge with a caulking seam covering a 2-tone porcelain tile. Call out the transition strip (preferable), or call out the caulking/grout seam. If using a metal transition strip, match the color/finish to the Satin Anodized that the other tile-to-tile, tile-to-finished surfaces are calling for.

Response: A3/I-202 references detail A4/I-502 which is a schluter strip transition at janitor walls.

Item #28 SID: Sheet A-601/I-101: Include sill for door 138, concrete flooring in the vending/corridor area changes to Resilient flooring in the kitchen and is not "technically" combustible-proof.

Recently, this comment has inspired a change to quarry tile in the kitchen. Let's reflect this so as to keep some consistent design elements. 8"x8" throughbody, unglazed quarry tile in a medium/light grey tone. Cove base and inside cove corners included too.

Response: Concur. Kitchen flooring will be changed to quarry tile

Item #29 SID: Sheet I-102: Missing linework for the wall between 240 and 248 + 340 and 348.

Response: Concur. Concur. Graphics will be reviewed.

Item #30 SID: Sheet I-101: Closets in room 100 and 102 have no lineweights under the shelving, add the lvt floor hatching there.

3 | P a g e

Response: Concur. Graphics will be reviewed.

Item #31 SID: Sheet I-202: Grout joint thickness was not called out for, which was confirmed in the 50% comments. Please include proposed grout thickness on detail A1, I-202 (hopefully 1/8"). I see it is included in the finish notes on I-601, but I'd like it visually noted on A1, I-

202. This is where the sub will probably stop, look, and start installing. Let's get it noted earlier.

Response: Concur. 1/8" grout thickness has been added to detail A1 and A3 on I-202.

Item #32 SID: Sheet I-501: Drop the "2" on sign S3 a few ticks so that the number is fully legible.

Center it vertically between "Floor" and "Rooms 230-240"

Response: Concur. Concur. 5" tactile number has been adjusted.

Item #33 SID: Sheet I-501: Drop the "A" on sign S8 a few ticks so that the letter is inside of the 8" delineation. Consider dropping the stair and the letter by a few ticks so as to make things fit without squeezing the white space.

Response: Concur. This is a result of some graphics issue when printing. The A sits beside STAIR. Grapchics will be reviewed before printing again.

Item #34 SID: Sheet I-601: There is a size listed on the grout choice for Floor tile TL-1 (GR-1) as "3?1"...

change GR-1 and GR-2 to reflect the grout joint thickness for the appropriate surrounding tile.

Response: Concur. Typo has been corrected.

Item #35 SID: GR-1 Epoxy grout looks a touch more brown than the more mauve/grey flooring.

Could we switch the grout color to something that's closer to the hue of the floor while being a touch darker to help hide stains and grime?

Response: Concur. A darker grout will be selected.

Item #36 SID: The base RB-1 "toast 289" also seems to be a touch more mocha than the flooring, could we get something tinted just a touch more grey?

Response: Concur.

Item #37 SID: There are no products shown for the wall tile or the accent tile, cannot give a review on the colors or selections on this or the grout wall tile without having product to compare it to.

Response: Concur. Wall tile imagery will be added to the SID binder.

Item #38 SID: RES-1 should be reselected to coordinate with the accent wall. A few lighter grey/rosewater tones can help make-up the color to transition to the exterior walkways, but I'd like to see a color closer to oatmeals/soft whites/warm greys. -To confirm with Base housing rep Kara Wagner. While awaiting a response, please mock up what this would look like to not have wasted time during selections and the iterative design process.

Response: Concur. Reselection sample will be sent to Kara. Will coordinate address for shipping.

4 | P a g e

ACTION ITEMS

1. Confirm that all 50% and 95% changes are captured in the drawings and SID binder.

SCHEDULE

1. 4/2 is the Final submission to the Govt.

Structural Interior Design Package interior design

Finish Plans & Schedules

FLOOR FINISH KEY

LVT-1

T-1

RES-1

SC-1

RES-2

T-4

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECHANICAL

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

KITCHEN

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECHANICAL

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECH

STAIR

LAUNDRY

TOILET

ELECTRICAL

VENDING

DUTY

CORRIDOR

LAUNDRY

MECHANICAL

MECHANICAL

I-401 B1 I-401

B3 I-401 B6

A B

C D

Fi le

P at h:

P rin t D at e:

E

SYM. DESCRIPTION DATE APP.

REVISIONS

M

A.

P.

STCETIHCRA

FB

BERN N.C.NEW

CERT. NO.

UTCETIHCRA

DERETSIG E R NOI

TA

RO

PR

OC

LAR

CAROLINANORTH

50679

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

CAMP LEJEUNE, NORTH CAROLINA

MARINE CORPS BASE

SIZE CODE IDENT. NO. NAVFAC DRAWING NO.

E1 80091 CONSTR. CONTR. NO.

AS NOTEDSCALE SHEET

M

BF

A N

O

SPEC.

2 3 4 5 6

A B

C D

E

1 2 3 4 5 6

1008 GRANBY STREET

NORFOLK, VA 23510

757.224.0489

05-25-0011

CHRIS MAAS

W :\2

H P1

B

EQ

R en ov at io n C

L\ R ev it\

B C

ID

3-

H P1

.rv t 5/

/2

6:

:4

PM

I-101

APG

JDK

JDK REPAIR BEQ HP135

FIRST FLOOR FINISH PLAN

60042869 N40085-25-B-0011

15 MAY 2026

SCALE: 1/8" = 1'-0"B1 1ST FLOOR FINISH PLAN

4' 8' 16'0' 1/8" =1'-0"

GRAPHIC SCALE:

FINISH NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF

DESIGN TO CONVEY COLOR, PATTERN, TEXTURE AND

SALIENT CHARACTERISTICS ONLY. THE LISTING OF

MANUFACTURER INFORMATION IS NOT INTENDED TO LIMIT

THE SELECTION OF PRODUCTS PROVIDED BY OTHER

MANUFACTURERS. PRODUCTS MEETING THESE CRITERIA

WILL BE CONSIDERED AND MUST BE REVIEWED BY THE

INTERIOR DESIGNER OF RECORD (IDOR) AND THE NAVFAC

INTERIOR DESIGNER AND APPROVED BY THE

CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR ’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO

AVOID DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY

LIGHT SWITCHES. DO NOT INSTALL THERMOSTATS IN THE

CENTER OF A WALL.

D. ALL INTERIOR FINISHES IN VERTICAL EXIT WAYS, EXIT

LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM

CLASS A RATING.

E. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS

F. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL

COLOR. PANELS PAINTED BY BRUSH ARE NOT

ACCEPTABLE

FINISH NOTES

G. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE

CORNERS. INSTALL END WALL PROTECTORS AT OPEN

ENDED WALLS. CORNER GUARDS AND END CAPS MUST BE

FULL HEIGHT AND SHOULD NOT BE USED ON CMU WALLS,

TILED WALLS, OR MANUFACTURED STONE WALLS.

I. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST

INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE

CORNERS AS WELL AS THE INTERSECTION BETWEEN

FLOOR AND WALL TILE WHERE APPLICABLE FOR A

COMPLETE INSTALLATION.

J. ALL AREAS TO RECEIVE RESILIENT BASE (RB-1) WITH THE

EXCEPTION OF AREAS RECEIVING FLOOR TILE OR EPOXY

RESINOUS FLOORING.

K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL HOLLOW METAL DOORS AND DOOR

FRAMES TO BE PAINTED (PNT-5). ALL GWB & EXPOSED

CEILINGS TO BE PAINTED (PNT-6).

L. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).

M. ALL SHOWER FLOORS AND SHOWER WALLS TO BE SOLID

SURFACE (SS-3).

N. ALL TILE TO RECEIVE GROUT FINISH (GR-1).

O. LVT FLOORING COVERAGE INCLUDES THE ENTIRETY OF

EACH SLEEPING ROOM ALL THE WAY UP TO THE DOORWAY

INTO THE TOILET/SHOWER COMPARTMENT. SEE

ENLARGED PLAN VIEW B1/I-401.

P. SEE I-601 FOR FINISH LEGEND.

I G

IV

R

FOHT

I

NO

M N

EW

A

OM

L

C

C

A

Cert. 001152

JAMIE D. KISSEL RER

T

IFIED

INTERIOR DES

IG

N E No.

T-1

RES-1

SC-1

RES-2

T-4

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECHANICAL

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECHANICAL

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECH

STAIR

LAUNDRY

TOILET

ELECTRICAL

STORAGE

COMM

CORRIDOR

LOUNGE

MECHANICAL

MECHANICAL

I-401 B5

A B

C D

Fi le

P at h:

P rin t D at e:

E

SYM. DESCRIPTION DATE APP.

REVISIONS

M

A.

P.

STCETIHCRA

FB

BERN N.C.NEW

CERT. NO.

UTCETIHCRA

DERETSIG E R NOI

TA

RO

PR

OC

LAR

CAROLINANORTH

50679

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

CAMP LEJEUNE, NORTH CAROLINA

MARINE CORPS BASE

SIZE CODE IDENT. NO. NAVFAC DRAWING NO.

E1 80091 CONSTR. CONTR. NO.

AS NOTEDSCALE SHEET

M

BF

A N

O

SPEC.

2 3 4 5 6

A B

C D

E

1 2 3 4 5 6

1008 GRANBY STREET

NORFOLK, VA 23510

757.224.0489

05-25-0011

CHRIS MAAS

W :\2

H P1

B

EQ

R en ov at io n C

L\ R ev it\

B C

ID

3-

H P1

.rv t 5/

/2

6:

:4

PM

I-102

APG

JDK

JDK REPAIR BEQ HP135

SECOND FLOOR FINISH PLAN

60042870 N40085-25-B-0011

15 MAY 2026

4' 8' 16'0' 1/8" =1'-0"

GRAPHIC SCALE:

SCALE: 1/8" = 1'-0"B1 2ND FLOOR FINISH PLAN

FINISH NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF

DESIGN TO CONVEY COLOR, PATTERN, TEXTURE AND

SALIENT CHARACTERISTICS ONLY. THE LISTING OF

MANUFACTURER INFORMATION IS NOT INTENDED TO LIMIT

THE SELECTION OF PRODUCTS PROVIDED BY OTHER

MANUFACTURERS. PRODUCTS MEETING THESE CRITERIA

WILL BE CONSIDERED AND MUST BE REVIEWED BY THE

INTERIOR DESIGNER OF RECORD (IDOR) AND THE NAVFAC

INTERIOR DESIGNER AND APPROVED BY THE

CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR ’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO

AVOID DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY

LIGHT SWITCHES. DO NOT INSTALL THERMOSTATS IN THE

CENTER OF A WALL.

D. ALL INTERIOR FINISHES IN VERTICAL EXIT WAYS, EXIT

LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM

CLASS A RATING.

E. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS

F. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL

COLOR. PANELS PAINTED BY BRUSH ARE NOT

ACCEPTABLE

FINISH NOTES

G. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE

CORNERS. INSTALL END WALL PROTECTORS AT OPEN

ENDED WALLS. CORNER GUARDS AND END CAPS MUST BE

FULL HEIGHT AND SHOULD NOT BE USED ON CMU WALLS,

TILED WALLS, OR MANUFACTURED STONE WALLS.

I. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST

INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE

CORNERS AS WELL AS THE INTERSECTION BETWEEN

FLOOR AND WALL TILE WHERE APPLICABLE FOR A

COMPLETE INSTALLATION.

J. ALL AREAS TO RECEIVE RESILIENT BASE (RB-1) WITH THE

EXCEPTION OF AREAS RECEIVING FLOOR TILE OR EPOXY

RESINOUS FLOORING.

K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL HOLLOW METAL DOORS AND DOOR

FRAMES TO BE PAINTED (PNT-5). ALL GWB & EXPOSED

CEILINGS TO BE PAINTED (PNT-6).

L. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).

M. ALL SHOWER FLOORS AND SHOWER WALLS TO BE SOLID

SURFACE (SS-3).

N. ALL TILE TO RECEIVE GROUT FINISH (GR-1).

O. LVT FLOORING COVERAGE INCLUDES THE ENTIRETY OF

EACH SLEEPING ROOM ALL THE WAY UP TO THE DOORWAY

INTO THE TOILET/SHOWER COMPARTMENT. SEE

ENLARGED PLAN VIEW B1/I-401.

P. SEE I-601 FOR FINISH LEGEND.

I G

IV

R

FOHT

I

NO

M N

EW

A

OM

L

C

C

A

Cert. 001152

JAMIE D. KISSEL RER

T

IFIED

INTERIOR DES

IG

T-1

RES-1

SC-1

RES-2

T-4

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECHANICAL

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECHCANIAL

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECHANICAL

MECHANICAL

MECH

STAIR

LAUNDRY

TOILET

ELECTRICAL

STORAGE

OFFICE

CORRIDOR

LOUNGE

I-401 B5

Sim

A B

C D

Fi le

P at h:

P rin t D at e:

E

SYM. DESCRIPTION DATE APP.

REVISIONS

M

A.

P.

STCETIHCRA

FB

BERN N.C.NEW

CERT. NO.

UTCETIHCRA

DERETSIG E R NOI

TA

RO

PR

OC

LAR

CAROLINANORTH

50679

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

CAMP LEJEUNE, NORTH CAROLINA

MARINE CORPS BASE

SIZE CODE IDENT. NO. NAVFAC DRAWING NO.

E1 80091 CONSTR. CONTR. NO.

AS NOTEDSCALE SHEET

M

BF

A N

O

SPEC.

2 3 4 5 6

A B

C D

E

1 2 3 4 5 6

1008 GRANBY STREET

NORFOLK, VA 23510

757.224.0489

05-25-0011

CHRIS MAAS

W :\2

H P1

B

EQ

R en ov at io n C

L\ R ev it\

B C

ID

3-

H P1

.rv t 5/

/2

6:

:4

PM

I-103

APG

JDK

JDK REPAIR BEQ HP135

THIRD FLOOR FINISH PLAN

60042871 N40085-25-B-0011

15 MAY 2026

4' 8' 16'0' 1/8" =1'-0"

GRAPHIC SCALE:

SCALE: 1/8" = 1'-0"B1 3RD FLOOR FINISH PLAN

FINISH NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF

DESIGN TO CONVEY COLOR, PATTERN, TEXTURE AND

SALIENT CHARACTERISTICS ONLY. THE LISTING OF

MANUFACTURER INFORMATION IS NOT INTENDED TO LIMIT

THE SELECTION OF PRODUCTS PROVIDED BY OTHER

MANUFACTURERS. PRODUCTS MEETING THESE CRITERIA

WILL BE CONSIDERED AND MUST BE REVIEWED BY THE

INTERIOR DESIGNER OF RECORD (IDOR) AND THE NAVFAC

INTERIOR DESIGNER AND APPROVED BY THE

CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR ’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO

AVOID DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY

LIGHT SWITCHES. DO NOT INSTALL THERMOSTATS IN THE

CENTER OF A WALL.

D. ALL INTERIOR FINISHES IN VERTICAL EXIT WAYS, EXIT

LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM

CLASS A RATING.

E. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS

F. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL

COLOR. PANELS PAINTED BY BRUSH ARE NOT

ACCEPTABLE

FINISH NOTES

G. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE

CORNERS. INSTALL END WALL PROTECTORS AT OPEN

ENDED WALLS. CORNER GUARDS AND END CAPS MUST BE

FULL HEIGHT AND SHOULD NOT BE USED ON CMU WALLS,

TILED WALLS, OR MANUFACTURED STONE WALLS.

I. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST

INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE

CORNERS AS WELL AS THE INTERSECTION BETWEEN

FLOOR AND WALL TILE WHERE APPLICABLE FOR A

COMPLETE INSTALLATION.

J. ALL AREAS TO RECEIVE RESILIENT BASE (RB-1) WITH THE

EXCEPTION OF AREAS RECEIVING FLOOR TILE OR EPOXY

RESINOUS FLOORING.

K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL HOLLOW METAL DOORS AND DOOR

FRAMES TO BE PAINTED (PNT-5). ALL GWB & EXPOSED

CEILINGS TO BE PAINTED (PNT-6).

L. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).

M. ALL SHOWER FLOORS AND SHOWER WALLS TO BE SOLID

SURFACE (SS-3).

N. ALL TILE TO RECEIVE GROUT FINISH (GR-1).

O. LVT FLOORING COVERAGE INCLUDES THE ENTIRETY OF

EACH SLEEPING ROOM ALL THE WAY UP TO THE DOORWAY

INTO THE TOILET/SHOWER COMPARTMENT. SEE

ENLARGED PLAN VIEW B1/I-401.

P. SEE I-601 FOR FINISH LEGEND.

I G

IV

R

FOHT

I

NO

M N

EW

A

OM

L

C

C

A

Cert. 001152

JAMIE D. KISSEL RER

T

IFIED

INTERIOR DES

IG

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECHANICAL

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

KITCHEN

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECHANICAL

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECHANICAL

MECHANICAL

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

S3

S6

S8

S3

S6

S8

S1S6

S6S7 S7S7

S1

I-402 B1

MECH

STAIR

LAUNDRY

TOILET

ELECTRICAL

VENDING

DUTY

CORRIDOR

LAUNDRY

S3

S8

A B

C D

Fi le

P at h:

P rin t D at e:

E

SYM. DESCRIPTION DATE APP.

REVISIONS

M

A.

P.

STCETIHCRA

FB

BERN N.C.NEW

CERT. NO.

UTCETIHCRA

DERETSIG E R NOI

TA

RO

PR

OC

LAR

CAROLINANORTH

50679

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

CAMP LEJEUNE, NORTH CAROLINA

MARINE CORPS BASE

SIZE CODE IDENT. NO. NAVFAC DRAWING NO.

E1 80091 CONSTR. CONTR. NO.

AS NOTEDSCALE SHEET

M

BF

A N

O

SPEC.

2 3 4 5 6

A B

C D

E

1 2 3 4 5 6

1008 GRANBY STREET

NORFOLK, VA 23510

757.224.0489

05-25-0011

CHRIS MAAS

W :\2

H P1

B

EQ

R en ov at io n C

L\ R ev it\

B C

ID

3-

H P1

.rv t 5/

/2

6:

:4

PM

I-111

APG

JDK

JDK REPAIR BEQ HP135

FIRST FLOOR SIGNAGE PLAN

60042872 N40085-25-B-0011

15 MAY 2026

SIGNAGE SCHEDULE

TYPE DESCRIPTION QTY

S1 SLEEPING QUARTERS IDENTIFICATION SIGN 90

S2 PERMANENT ROOM IDENTIFICATION SIGN 20

S3 STAIRWELL LEVEL INDICATOR 15

S5 UNISEX RESTROOM IDENTIFICATION SIGN 3

S6 SMALL DIRECTIONAL SIGN 20

S7 EXTERIOR ROOM SIGN 13

S8 STAIRWELL IDENTIFICATION SIGN 18

SIGNAGE NOTES

A. ALL SIGNAGE TO COMPLY WITH UFC 3 120 01.

B. ALL SIGN TYPES, TEXT WORDING, AND ROOM NUMBERS TO

BE VERIFIED WITH END USER AND REVIEWED BY NAVFAC

INTERIOR DESIGNER PRIOR TO FABRICATION.

C. ALL GRADE 2 BRAILLE TO BE TACTILE RAISED 0.8 MM FROM

THE SURFACE WITH ROUNDED DOTS.

D. SIGNS MUST USE HIGH CONTRAST, NON-GLARE FINISHES.

CHARACTERS MUST BE UPPER CASE AND USE SANS SERIF

FONTS.

E. SIGNS MUST INCLUDE CLEAR VISUAL ELEMENTS FOR

INDIVIDUALS WITH LOW VISION, BLINDNESS AND COGNITIVE

DISABILITIES.

F. REFER TO SHEET I-501 FOR SIGNAGE DETAILS.

G. SEE ELEVATIONS B5/I-501 & C5/I-501 FOR MOUNTING HEIGHT

OF ACRYLIC SIGNAGE.

H. REFER TO SHEET I-601 FINISH LEGEND FOR SIGNAGE

FINISHES.

I. MOUNTING OF SIGNAGE SYSTEM SHALL INCLUDE SURFACE

MOUNTING WITH SCREW-ON APPLICATION FOR INTERIOR

WALLS.

J. SIGNS THAT MOUNT TO GLASS SHALL INCLUDE AN EQUALLY

SIZED BLANK SIGN PANEL ALIGNED TO OPPOSITE SIDE OF

THE GLASS.

4' 8' 16'0' 1/8" =1'-0"

GRAPHIC SCALE:

SCALE: 1/8" = 1'-0"B1 1ST FLOOR SIGNAGE PLAN

I G

IV

R

FOHT

I

NO

M N

EW

A

OM

L

C

C

A

Cert. 001152

JAMIE D. KISSEL RER

T

IFIED

INTERIOR DES

IG

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECHANICAL

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECHANICAL

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECH

STAIR

LAUNDRY

TOILET

ELECTRICAL

STORAGE

COMM

CORRIDOR

LOUNGE

MECHANICAL

MECHANICAL

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

S3

S6

S8

S3

S6

S8

S1

S3S7 S7S7

S1

I-402 B3

S3

S8

S6

A B

C D

Fi le

P at h:

P rin t D at e:

E

SYM. DESCRIPTION DATE APP.

REVISIONS

M

A.

P.

STCETIHCRA

FB

BERN N.C.NEW

CERT. NO.

UTCETIHCRA

DERETSIG E R NOI

TA

RO

PR

OC

LAR

CAROLINANORTH

50679

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

CAMP LEJEUNE, NORTH CAROLINA

MARINE CORPS BASE

SIZE CODE IDENT. NO. NAVFAC DRAWING NO.

E1 80091 CONSTR. CONTR. NO.

AS NOTEDSCALE SHEET

M

BF

A N

O

SPEC.

2 3 4 5 6

A B

C D

E

1 2 3 4 5 6

1008 GRANBY STREET

NORFOLK, VA 23510

757.224.0489

05-25-0011

CHRIS MAAS

W :\2

H P1

B

EQ

R en ov at io n C

L\ R ev it\

B C

ID

3-

H P1

.rv t 5/

/2

6:

:4

PM

I-112

APG

JDK

JDK REPAIR BEQ HP135

SECOND FLOOR SIGNAGE PLAN

60042873 N40085-25-B-0011

15 MAY 2026

SIGNAGE SCHEDULE

TYPE DESCRIPTION QTY

S1 SLEEPING QUARTERS IDENTIFICATION SIGN 90

S2 PERMANENT ROOM IDENTIFICATION SIGN 20

S3 STAIRWELL LEVEL INDICATOR 15

S5 UNISEX RESTROOM IDENTIFICATION SIGN 3

S6 SMALL DIRECTIONAL SIGN 20

S7 EXTERIOR ROOM SIGN 13

S8 STAIRWELL IDENTIFICATION SIGN 18

SIGNAGE NOTES

A. ALL SIGNAGE TO COMPLY WITH UFC 3 120 01.

B. ALL SIGN TYPES, TEXT WORDING, AND ROOM NUMBERS TO

BE VERIFIED WITH END USER AND REVIEWED BY NAVFAC

INTERIOR DESIGNER PRIOR TO FABRICATION.

C. ALL GRADE 2 BRAILLE TO BE TACTILE RAISED 0.8 MM FROM

THE SURFACE WITH ROUNDED DOTS.

D. SIGNS MUST USE HIGH CONTRAST, NON-GLARE FINISHES.

CHARACTERS MUST BE UPPER CASE AND USE SANS SERIF

FONTS.

E. SIGNS MUST INCLUDE CLEAR VISUAL ELEMENTS FOR

INDIVIDUALS WITH LOW VISION, BLINDNESS AND COGNITIVE

DISABILITIES.

F. REFER TO SHEET I-501 FOR SIGNAGE DETAILS.

G. SEE ELEVATIONS B5/I-501 & C5/I-501 FOR MOUNTING HEIGHT

OF ACRYLIC SIGNAGE.

H. REFER TO SHEET I-601 FINISH LEGEND FOR SIGNAGE

FINISHES.

I. MOUNTING OF SIGNAGE SYSTEM SHALL INCLUDE SURFACE

MOUNTING WITH SCREW-ON APPLICATION FOR INTERIOR

WALLS.

J. SIGNS THAT MOUNT TO GLASS SHALL INCLUDE AN EQUALLY

SIZED BLANK SIGN PANEL ALIGNED TO OPPOSITE SIDE OF

THE GLASS.

4' 8' 16'0' 1/8" =1'-0"

GRAPHIC SCALE:

SCALE: 1/8" = 1'-0"B1 2ND FLOOR SIGNAGE PLAN

I G

IV

R

FOHT

I

NO

M N

EW

A

OM

L

C

C

A

Cert. 001152

JAMIE D. KISSEL RER

T

IFIED

INTERIOR DES

IG

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECHANICAL

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECHCANIAL

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

SLEEPING

ROOM

MECHANICAL

MECHANICAL

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

S3

S6

S8

S3

S6

S8

S1

S3S7 S7S7

S1

I-402 B5

MECH

STAIR

LAUNDRY

TOILET

ELECTRICAL

STORAGE

OFFICE

CORRIDOR

LOUNGE

S3

S8

S6

A B

C D

Fi le

P at h:

P rin t D at e:

E

SYM. DESCRIPTION DATE APP.

REVISIONS

M

A.

P.

STCETIHCRA

FB

BERN N.C.NEW

CERT. NO.

UTCETIHCRA

DERETSIG E R NOI

TA

RO

PR

OC

LAR

CAROLINANORTH

50679

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

CAMP LEJEUNE, NORTH CAROLINA

MARINE CORPS BASE

SIZE CODE IDENT. NO. NAVFAC DRAWING NO.

E1 80091 CONSTR. CONTR. NO.

AS NOTEDSCALE SHEET

M

BF

A N

O

SPEC.

2 3 4 5 6

A B

C D

E

1 2 3 4 5 6

1008 GRANBY STREET

NORFOLK, VA 23510

757.224.0489

05-25-0011

CHRIS MAAS

W :\2

H P1

B

EQ

R en ov at io n C

L\ R ev it\

B C

ID

3-

H P1

.rv t 5/

/2

6:

:4

PM

I-113

APG

JDK

JDK REPAIR BEQ HP135

THIRD FLOOR SIGNAGE PLAN

60042874 N40085-25-B-0011

15 MAY 2026

SIGNAGE SCHEDULE

TYPE DESCRIPTION QTY

S1 SLEEPING QUARTERS IDENTIFICATION SIGN 90

S2 PERMANENT ROOM IDENTIFICATION SIGN 20

S3 STAIRWELL LEVEL INDICATOR 15

S5 UNISEX RESTROOM IDENTIFICATION SIGN 3

S6 SMALL DIRECTIONAL SIGN 20

S7 EXTERIOR ROOM SIGN 13

S8 STAIRWELL IDENTIFICATION SIGN 18

SIGNAGE NOTES

A. ALL SIGNAGE TO COMPLY WITH UFC 3 120 01.

B. ALL SIGN TYPES, TEXT WORDING, AND ROOM NUMBERS TO

BE VERIFIED WITH END USER AND REVIEWED BY NAVFAC

INTERIOR DESIGNER PRIOR TO FABRICATION.

C. ALL GRADE 2 BRAILLE TO BE TACTILE RAISED 0.8 MM FROM

THE SURFACE WITH ROUNDED DOTS.

D. SIGNS MUST USE HIGH CONTRAST, NON-GLARE FINISHES.

CHARACTERS MUST BE UPPER CASE AND USE SANS SERIF

FONTS.

E. SIGNS MUST INCLUDE CLEAR VISUAL ELEMENTS FOR

INDIVIDUALS WITH LOW VISION, BLINDNESS AND COGNITIVE

DISABILITIES.

F. REFER TO SHEET I-501 FOR SIGNAGE DETAILS.

G. SEE ELEVATIONS B5/I-501 & C5/I-501 FOR MOUNTING HEIGHT

OF ACRYLIC SIGNAGE.

H. REFER TO SHEET I-601 FINISH LEGEND FOR SIGNAGE

FINISHES.

I. MOUNTING OF SIGNAGE SYSTEM SHALL INCLUDE SURFACE

MOUNTING WITH SCREW-ON APPLICATION FOR INTERIOR

WALLS.

J. SIGNS THAT MOUNT TO GLASS SHALL INCLUDE AN EQUALLY

SIZED BLANK SIGN PANEL ALIGNED TO OPPOSITE SIDE OF

THE GLASS.

4' 8' 16'0' 1/8" =1'-0"

GRAPHIC SCALE:

SCALE: 1/8" = 1'-0"B1 3RD FLOOR SIGNAGE PLAN

I G

IV

R

FOHT

I

NO

M N

EW

A

OM

L

C

C

A

Cert. 001152

JAMIE D. KISSEL RER

T

IFIED

INTERIOR DES

IG

SS-1

PLAM-1

CABINETS

RB-1

TOE KICK

GFGI MICRO-

FRIDGE UNIT

PNT-1

PLAM-1

CABINETS

12"

ANGLED

12" 15"

FIELD VERIFY

25" 14" 2" 24"

SCRIBE TO

CEILING

D4 I-301

A2 I-301

_______SS-1

PLAM-1

FILLER STRIPS

PLAM-1

CABINETS

RB-1

TOE KICK

PLAM-1

CABINETS

CFCI SINKS CENTERED

ON CASEWORK

SCRIBE TO

CEILING

PLAM-1

FILLER STRIP

MIRROR

24" 2" 28" 1" 1"30"1"

SS-1

1"26"12"15"

PNT-1

D3 I-301

D1 I-301

_______A1 I-301

1" 28" 2" 24" 1"

30" 1"

1" 26"

ANGLED

12" 15"

SS-1

PLAM-1

FILLER STRIPS

PLAM-1

CABINETS

RB-1

TOE KICK

PLAM-1

CABINETS

CFCI SINKS CENTERED

ON CASEWORK

SCRIBE TO

CEILING

PLAM-1

FILLER STRIP

PNT-1

D1 I-301

_______ A1 I-301

D3 I-301

24" 2" 14"

FIELD VERIFY

25"

15"

ANGLED

12" 12"

SS-1

PLAM-1

CABINETS

RB-1

TOE KICK

GFGI MICRO-

FRIDGE UNIT

PNT-1

PLAM-1

CABINETS

SCRIBE TO

CEILING

D4 I-301

A2 I-301

36" 12"

3/4" PLYWOOD SHELF WITH

3/4"X1-1/2" HARDWOOD

NOSING. STAIN

1"X6" HARDWOOD CLEAT,

CONTINUOUS 3 SIDES

CLOSET ROD AS SPECIFIED

SECURE CASEWORK TO

WALL WITH MASONARY

ANCHOR , 10" O.C.

3/4" PLYWOOD SHEVES WITH

3/4"X1-1/2" HARDWOOD

NOSING. STAIN

RB-1

WALL BASE

A4 I-301

18" 30"

3/4" PLYWOOD SHELF WITH

3/4"X1-1/2" HARDWOOD

NOSING. STAIN

1"X6" HARDWOOD CLEAT,

CONTINUOUS 3 SIDES

CLOSET ROD AS SPECIFIED

SECURE CASEWORK TO

WALL WITH MASONARY

ANCHOR , 10" O.C.

3/4" PLYWOOD SHELVES WITH

3/4"X1-1/2" HARDWOOD

NOSING. STAIN

RB-1

WALL BASE

A3 I-301

12" 36"

3/4" PLYWOOD SHELF WITH

3/4"X1-1/2" HARDWOOD

NOSING. STAIN

1"X6" HARDWOOD CLEAT,

CONTINUOUS 3 SIDES

CLOSET ROD AS SPECIFIED

SECURE CASEWORK TO

WALL WITH MASONARY

ANCHOR , 10" O.C.

3/4" PLYWOOD SHELVES WITH

3/4"X1-1/2" HARDWOOD

NOSING. STAIN

RB-1

WALL BASE

A4 I-301

30" 18"

3/4" PLYWOOD SHELF WITH

3/4"X1-1/2" HARDWOOD

NOSING. STAIN

1"X6" HARDWOOD CLEAT,

CONTINUOUS 3 SIDES

CLOSET ROD AS SPECIFIED

SECURE CASEWORK TO

WALL WITH MASONARY

ANCHOR , 10" O.C.

3/4" PLYWOOD SHELVES WITH

3/4"X1-1/2" HARDWOOD

NOSING. STAIN

RB-1

WALL BASE

A3 I-301

A B

C D

Fi le

P at h:

P rin t D at e:

E

SYM. DESCRIPTION DATE APP.

REVISIONS

M

A.

P.

STCETIHCRA

FB

BERN N.C.NEW

CERT. NO.

UTCETIHCRA

DERETSIG E R NOI

TA

RO

PR

OC

LAR

CAROLINANORTH

50679

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

CAMP LEJEUNE, NORTH CAROLINA

MARINE CORPS BASE

SIZE CODE IDENT. NO. NAVFAC DRAWING NO.

E1 80091 CONSTR. CONTR. NO.

AS NOTEDSCALE SHEET

M

BF

A N

O

SPEC.

2 3 4 5 6

A B

C D

E

1 2 3 4 5 6

1008 GRANBY STREET

NORFOLK, VA 23510

757.224.0489

05-25-0011

CHRIS MAAS

W :\2

H P1

B

EQ

R en ov at io n C

L\ R ev it\

B C

ID

3-

H P1

.rv t 5/

/2

6:

:4

PM

I-201

APG

JDK

JDK REPAIR BEQ HP135

INTERIOR ELEVATIONS

60042875 N40085-25-B-0011

15 MAY 2026

CASEWORK NOTES

1. CASEWORK CONSTRUCTION AS INDICATED IN THE

DOCUMENTS MUST BE IN ACCORDANCE WITH A.W.I. QUALITY

STANDARDS FOR FLUSH OVERLAY CONSTRUCTION.

SEMI-EXPOSED SURFACES TO BE CONSTRUCTED USING

CUSTOM GRADE STANDARDS

2. ALL CASEWORK MUST BE IN COMPLIANCE WITH UFGS

SECTION 06 41 16.0 AND SECTION 06 61 1.

3. ALL COUNTERTOP AND BACK/SIDE SPLASHES TO BE SOLID

SURFACE (SS-1). BACK/SIDE SPLASHES ARE ONLY TO BE

APPLIED AT WALLS WITHOUT FULL HEIGHT SPLASH OR TILE.

4. ALL BASE CABINETS, WALL CABINETS, APRONS AND

SHROUDS WILL BE PLASTIC LAMINATE (PLAM-1).

5. ALL BASE CABINET TOE KICKS WILL BE RUBBER BASE (RB-1).

6. SEE SHEET I-601 FOR FINISH LEGEND.

SCALE: 3/4" = 1'-0"A2 TYP. KITCHENETTE

SCALE: 3/4" = 1'-0"A1 TYP. BATHROOM VANITY & KITCHENETTE

SCALE: 3/4" = 1'-0"C1 TYP. BATHROOM VANITY & KITCHENETTE

SCALE: 3/4" = 1'-0"C2 TYP. KITCHENETTE

SCALE: 3/4" = 1'-0"C3 TYP. CLOSET ROD

SCALE: 3/4" = 1'-0"C4 TYP. CLOSET CASEWORK

SCALE: 3/4" = 1'-0"A3 TYP. CLOSET ROD

SCALE: 3/4" = 1'-0"A4 TYP. CLOSET CASEWORK

FINISH NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF

DESIGN TO CONVEY COLOR, PATTERN, TEXTURE AND

SALIENT CHARACTERISTICS ONLY. THE LISTING OF

MANUFACTURER INFORMATION IS NOT INTENDED TO LIMIT

THE SELECTION OF PRODUCTS PROVIDED BY OTHER

MANUFACTURERS. PRODUCTS MEETING THESE CRITERIA

WILL BE CONSIDERED AND MUST BE REVIEWED BY THE

INTERIOR DESIGNER OF RECORD (IDOR) AND THE NAVFAC

INTERIOR DESIGNER AND APPROVED BY THE

CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR ’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO

AVOID DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY

LIGHT SWITCHES. DO NOT INSTALL THERMOSTATS IN THE

CENTER OF A WALL.

D. ALL INTERIOR FINISHES IN VERTICAL EXIT WAYS, EXIT

LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM

CLASS A RATING.

E. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS

F. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL

COLOR. PANELS PAINTED BY BRUSH ARE NOT

ACCEPTABLE

FINISH NOTES

G. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE

CORNERS. INSTALL END WALL PROTECTORS AT OPEN

ENDED WALLS. CORNER GUARDS AND END CAPS MUST BE

FULL HEIGHT AND SHOULD NOT BE USED ON CMU WALLS,

TILED WALLS, OR MANUFACTURED STONE WALLS.

I. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST

INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE

CORNERS AS WELL AS THE INTERSECTION BETWEEN

FLOOR AND WALL TILE WHERE APPLICABLE FOR A

COMPLETE INSTALLATION.

J. ALL AREAS TO RECEIVE RESILIENT BASE (RB-1) WITH THE

EXCEPTION OF AREAS RECEIVING FLOOR TILE OR EPOXY

RESINOUS FLOORING.

K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL HOLLOW METAL DOORS AND DOOR

FRAMES TO BE PAINTED (PNT-5). ALL GWB & EXPOSED

CEILINGS TO BE PAINTED (PNT-6).

L. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).

M. ALL SHOWER FLOORS AND SHOWER WALLS TO BE SOLID

SURFACE (SS-3).

N. ALL TILE TO RECEIVE GROUT FINISH (GR-1).

O. LVT FLOORING COVERAGE INCLUDES THE ENTIRETY OF

EACH SLEEPING ROOM ALL THE WAY UP TO THE DOORWAY

INTO THE TOILET/SHOWER COMPARTMENT. SEE

ENLARGED PLAN VIEW B1/I-401.

P. SEE I-601 FOR FINISH LEGEND.

0' 1' 2' 3' 3/4" =1'-0"

GRAPHIC SCALE:

I G

IV

R

FOHT

I

NO

M N

EW

A

OM

L

C

C

A

Cert. 001152

JAMIE D. KISSEL RER

T

IFIED

INTERIOR DES

IG

36" 36" 36" 4" 24"

36" 36" 36"

ANGLED

12" 15"

SS-1

PLAM-1

FILLER STRIP

PLAM-1

CABINETS

RB-1

TOE KICK

PLAM-1

CABINETS

CFCI SINK CENTERED

ON CASEWORK

PNT-1

CP-1

CABINET PULLS

GFGI ICE

MACHINE

D4 I-301

D3

I-301

D2 I-301

_______ A1 I-301

SS-1

PLAM-1

CABINETS

RB-1

TOE KICK

PLAM-1

CABINETS

PNT-1

CP-1

CABINET PULLS

GFGI

APPLIANCES

24" 4" 18" 18"

VERIFY W/ EQUIP.

30" 18" 18"

15"

ANGLED

12" 36"

VERIFY W/ EQUIP.

30" 36"

GFGI

APPLIANCE

A2 I-301

D4 I-301

D2 I-301

D3 I-301

SIM.

CFCI

APPLIANCE

C

O U

R

SE

S

C O

U R

SE

S

TO

C

EI

LI

N G

T-3

T-2

TS-5

T-2

B2 I-502

1/8" GROUT LINES

U P

TO

C

EI

LI

N G

FRP-1

RB-2C6

I-502

A B

C D

Fi le

P at h:

P rin t D at e:

E

SYM. DESCRIPTION DATE APP.

REVISIONS

M

A.

P.

STCETIHCRA

FB

BERN N.C.NEW

CERT. NO.

UTCETIHCRA

DERETSIG E R NOI

TA

RO

PR

OC

LAR

CAROLINANORTH

50679

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

CAMP LEJEUNE, NORTH CAROLINA

MARINE CORPS BASE

SIZE CODE IDENT. NO. NAVFAC DRAWING NO.

E1 80091 CONSTR. CONTR. NO.

AS NOTEDSCALE SHEET

M

BF

A N

O

SPEC.

2 3 4 5 6

A B

C D

E

1 2 3 4 5 6

1008 GRANBY STREET

NORFOLK, VA 23510

757.224.0489

05-25-0011

CHRIS MAAS

W :\2

H P1

B

EQ

R en ov at io n C

L\ R ev it\

B C

ID

3-

H P1

.rv t 5/

/2

6:

:4

PM

I-202

APG

JDK

JDK REPAIR BEQ HP135

INTERIOR ELEVATIONS

60042876 N40085-25-B-0011

15 MAY 2026

0' 1' 2' 3' 3/4" =1'-0"

GRAPHIC SCALE:

SCALE: 3/4" = 1'-0"C1 LOUNGE/COMMON KITCHEN

SCALE: 3/4" = 1'-0"C3 LOUNGE/COMMON KITCHEN

SCALE: 3/4" = 1'-0"A1 TYP. RESTROOM TILE ELEVATION

CASEWORK NOTES

1. CASEWORK CONSTRUCTION AS INDICATED IN THE

DOCUMENTS MUST BE IN ACCORDANCE WITH A.W.I. QUALITY

STANDARDS FOR FLUSH OVERLAY CONSTRUCTION.

SEMI-EXPOSED SURFACES TO BE CONSTRUCTED USING

CUSTOM GRADE STANDARDS

2. ALL CASEWORK MUST BE IN COMPLIANCE WITH UFGS

SECTION 06 41 16.0 AND SECTION 06 61 1.

3. ALL COUNTERTOP AND BACK/SIDE SPLASHES TO BE SOLID

SURFACE (SS-1). BACK/SIDE SPLASHES ARE ONLY TO BE

APPLIED AT WALLS WITHOUT FULL HEIGHT SPLASH OR TILE.

4. ALL BASE CABINETS, WALL CABINETS, APRONS AND

SHROUDS WILL BE PLASTIC LAMINATE (PLAM-1).

5. ALL BASE CABINET TOE KICKS WILL BE RUBBER BASE (RB-1).

6. SEE SHEET I-601 FOR FINISH LEGEND.

FINISH NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF

DESIGN TO CONVEY COLOR, PATTERN, TEXTURE AND

SALIENT CHARACTERISTICS ONLY. THE LISTING OF

MANUFACTURER INFORMATION IS NOT INTENDED TO LIMIT

THE SELECTION OF PRODUCTS PROVIDED BY OTHER

MANUFACTURERS. PRODUCTS MEETING THESE CRITERIA

WILL BE CONSIDERED AND MUST BE REVIEWED BY THE

INTERIOR DESIGNER OF RECORD (IDOR) AND THE NAVFAC

INTERIOR DESIGNER AND APPROVED BY THE

CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR ’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO

AVOID DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY

LIGHT SWITCHES. DO NOT INSTALL THERMOSTATS IN THE

CENTER OF A WALL.

D. ALL INTERIOR FINISHES IN VERTICAL EXIT WAYS, EXIT

LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM

CLASS A RATING.

E. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS

F. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL

COLOR. PANELS PAINTED BY BRUSH ARE NOT

ACCEPTABLE

FINISH NOTES

G. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE

CORNERS. INSTALL END WALL PROTECTORS AT OPEN

ENDED WALLS. CORNER GUARDS AND END CAPS MUST BE

FULL HEIGHT AND SHOULD NOT BE USED ON CMU WALLS,

TILED WALLS, OR MANUFACTURED STONE WALLS.

I. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST

INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE

CORNERS AS WELL AS THE INTERSECTION BETWEEN

FLOOR AND WALL TILE WHERE APPLICABLE FOR A

COMPLETE INSTALLATION.

J. ALL AREAS TO RECEIVE RESILIENT BASE (RB-1) WITH THE

EXCEPTION OF AREAS RECEIVING FLOOR TILE OR EPOXY

RESINOUS FLOORING.

K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL HOLLOW METAL DOORS AND DOOR

FRAMES TO BE PAINTED (PNT-5). ALL GWB & EXPOSED

CEILINGS TO BE PAINTED (PNT-6).

L. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).

M. ALL SHOWER FLOORS AND SHOWER WALLS TO BE SOLID

SURFACE (SS-3).

N. ALL TILE TO RECEIVE GROUT FINISH (GR-1).

O. LVT FLOORING COVERAGE INCLUDES THE ENTIRETY OF

EACH SLEEPING ROOM ALL THE WAY UP TO THE DOORWAY

INTO THE TOILET/SHOWER COMPARTMENT. SEE

ENLARGED PLAN VIEW B1/I-401.

P. SEE I-601 FOR FINISH LEGEND.

SCALE: 3/4" = 1'-0"A2 TYP.DRYER CHASE ELEVATION I

G

IV

R

FOHT

I

NO

M N

EW

A

OM

L

C

C

A

Cert. 001152

JAMIE D. KISSEL RER

T

IFIED

INTERIOR DES

IG

SOLID SURFACE

COUNTERTOP WITH

EASED EDGE

HPL OVER 3/4"

PLYWOOD ON ALL

EXPOSED SURFACES

24"

HPL

INTERIOR

1/

2"

1/ 2"

4"

3" 21"

STAINLESS STEEL

BAR PULL

RUBBER BASE

AT TOE KICK

SOLID SURFACE

BACKSPLASH

WITH CLEAR SEALANT

APPLIED AT TRANSITION

24"

3/ 4"

4" 3/

4"

UNDERMOUNT STAINLESS

STEEL SINK

SOLID SURFACE

COUNTERTOP

1/4" DRAWER

BOTTOM - DADO INTO

DRAWER BACK &

FRONT

INTERIOR

DRAWER BOXES

FINISHED IN HPL

1/4" CABINET BACK

DRAWER FRONTS

FINISHED IN HPL

W/ MATCHING PVC

EDGEBAND

RUBBER BASE

AT TOE KICK

FULL EXTENSION

DRAWER SLIDES

3" 21"

24"

1/

2"

3/ 8"

3/

4"

1/ 8"

1/

2"

1/ 8"

1/

2"

1/ 8"

9" 4"

FULL HEIGHT SOLID

SURFACE BACKSPLASH

24"

HPL ADJUSTABLE

SHELVES W/ 1-1/4"

LINE BORE

3/4" X 1-1/2"

HARDWOOD NOSING.

STAIN

SECURE

CASEOWORK W/

MASONRY ANCHOR,

10" O.C.

12"

1/

2"

1/ 2"

1/

2"

1/ 2"

1/

2"

1/ 2"

1X6 PLYWOOD CLEAT,

CONTINUOUS 3 SIDES

CLOSET ROD AS

SPECIFIED

HPL FIXED SHELF W/ 3/4"

PLYWOOD SUBSTRATE

3/4" X 1-1/2"

HARDWOOD NOSING.

STAIN TO MATCH HPL.

6"

18"

1/

2"

15"

FULL OVERLAY

FLUSH DOOR

FINISHED IN HPL

W/ MATCHING PVC

EDGEBAND

1/4" CABINET BACK

HPL INTERIOR

15"

FULL OVERLAY

FLUSH DOOR

FINISHED IN HPL

W/ MATCHING PVC

EDGEBAND

1/4" CABINET BACK

3/4" HPL ADJUSTABLE

SHELF

HPL INTERIOR

RECESSED STANDARDS

SOLID SURFACE

COUNTERTOP WITH

EASED EDGE

HPL OVER 3/4"

PLYWOOD ON ALL

EXPOSED INTERIOR &

EXTERIOR SURFACES

24"

2" 6"

4"

3" 21"

STAINLESS STEEL

BAR PULLS

RUBBER BASE

AT TOE KICK

24"

1" 4"

1"

INTERIOR DRAWER

BOX FINISHED IN HPL

FULL EXTENSION

DRAWER SLIDES

FULL HEIGHT SOLID

SURFACE BACKSPLASH

3/4" HPL ADJUSTABLE

SHELF

RECESSED STANDARDS

HPL ON 3/4"

PLYWOOD

REMOVABLE PANEL

SOLID SURFACE

COUNTERTOP W/

WATER RESISTANT

SUBSTRATE

FALSE FRONT

4" INTEGRAL

BACKSPLASH (FULL

HEIGHT SPLASH AT

KITCHENETTE)

2" 1"

4" 1"

4"

INTEGRAL SOLID

SURFACE SINK

HPL

INTERIOR

RUBBER BASE

AT TOE KICK

A B

C D

Fi le

P at h:

P rin t D at e:

E

SYM. DESCRIPTION DATE APP.

REVISIONS

M

A.

P.

STCETIHCRA

FB

BERN N.C.NEW

CERT. NO.

UTCETIHCRA

DERETSIG E R NOI

TA

RO

PR

OC

LAR

CAROLINANORTH

50679

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

CAMP LEJEUNE, NORTH CAROLINA

MARINE CORPS BASE

SIZE CODE IDENT. NO. NAVFAC DRAWING NO.

E1 80091 CONSTR. CONTR. NO.

AS NOTEDSCALE SHEET

M

BF

A N

O

SPEC.

2 3 4 5 6

A B

C D

E

1 2 3 4 5 6

1008 GRANBY STREET

NORFOLK, VA 23510

757.224.0489

05-25-0011

CHRIS MAAS

W :\2

H P1

B

EQ

R en ov at io n C

L\ R ev it\

B C

ID

3-

H P1

.rv t 5/

/2

6:

:4

PM

I-301

APG

JDK

JDK REPAIR BEQ HP135

CASEWORK SECTIONS

60042877 N40085-25-B-0011

15 MAY 2026

CASEWORK NOTES

1. CASEWORK CONSTRUCTION AS INDICATED IN THE

DOCUMENTS MUST BE IN ACCORDANCE WITH A.W.I. QUALITY

STANDARDS FOR FLUSH OVERLAY CONSTRUCTION.

SEMI-EXPOSED SURFACES TO BE CONSTRUCTED USING

CUSTOM GRADE STANDARDS

2. ALL CASEWORK MUST BE IN COMPLIANCE WITH UFGS

SECTION 06 41 16.0 AND SECTION 06 61 1.

3. ALL COUNTERTOP AND BACK/SIDE SPLASHES TO BE SOLID

SURFACE (SS-1). BACK/SIDE SPLASHES ARE ONLY TO BE

APPLIED AT WALLS WITHOUT FULL HEIGHT SPLASH OR TILE.

4. ALL BASE CABINETS, WALL CABINETS, APRONS AND

SHROUDS WILL BE PLASTIC LAMINATE (PLAM-1).

5. ALL BASE CABINET TOE KICKS WILL BE RUBBER BASE (RB-1).

6. SEE SHEET I-601 FOR FINISH LEGEND.

4"0' 1 1/2" =1'-0"

GRAPHIC SCALE:

8" 1'-4"

SCALE: 1 1/2" = 1'-0"A1 SECTION - SINK CABINET

SCALE: 1 1/2" = 1'-0"A2 SECTION - 4 DRAWER BASE CAB.

SCALE: 1 1/2" = 1'-0"A3 SECTION - CLOSET SHELVING

SCALE: 1 1/2" = 1'-0"A4 SECTION - CLOSET HANGING ROD

SCALE: 1 1/2" = 1'-0"D3 SECTION - UPPER CABINET 18"H

SCALE: 1 1/2" = 1'-0"D4 SECTION - UPPER CABINET 30"H

SCALE: 1 1/2" = 1'-0"D2 SECTION - DOOR/DRAWER BASE CAB.

SCALE: 1 1/2" = 1'-0"D1 SECTION - RESTROOM SINK CABINET

I G

IV

R

FOHT

I

NO

M N

EW

A

OM

L

C

C

A

Cert. 001152

JAMIE D. KISSEL RER

T

IFIED

INTERIOR DES

IG

T-1

RES-1

SC-1

RES-2

T-4

SLEEPING

ROOM

SLEEPING

ROOM

I-201

A1

I-201

C1

A2 C2

I-201C3 I-201 A3

C4 A4

I-201

C4

C3 I-201

A4

A3

PN

T-

PN

T-

KITCHEN

I-202

C1

C3

PNT-2

LOUNGE

WG-1

WG-1

MECHANICAL

BUILDING

I-202A2 A2

A B

C D

Fi le

P at h:

P rin t D at e:

E

SYM. DESCRIPTION DATE APP.

REVISIONS

M

A.

P.

STCETIHCRA

FB

BERN N.C.NEW

CERT. NO.

UTCETIHCRA

DERETSIG E R NOI

TA

RO

PR

OC

LAR

CAROLINANORTH

50679

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

CAMP LEJEUNE, NORTH CAROLINA

MARINE CORPS BASE

SIZE CODE IDENT. NO. NAVFAC DRAWING NO.

E1 80091 CONSTR. CONTR. NO.

AS NOTEDSCALE SHEET

M

BF

A N

O

SPEC.

2 3 4 5 6

A B

C D

E

1 2 3 4 5 6

1008 GRANBY STREET

NORFOLK, VA 23510

757.224.0489

05-25-0011

CHRIS MAAS

W :\2

H P1

B

EQ

R en ov at io n C

L\ R ev it\

B C

ID

3-

H P1

.rv t 5/

/2

6:

:4

PM

I-401

APG

JDK

JDK REPAIR BEQ HP135

ENLARGED FINISH PLANS

60042878 N40085-25-B-0011

15 MAY 2026

0' 2' 4' 6' 3/8" =1'-0"

GRAPHIC SCALE:

SCALE: 3/8" = 1'-0"B1 ENLARGED SLEEPING ROOMS FINISH PLAN

SCALE: 3/8" = 1'-0"B3 ENLARGED KITCHEN FLOOR FINISH PLAN

FINISH NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF

DESIGN TO CONVEY COLOR, PATTERN, TEXTURE AND

SALIENT CHARACTERISTICS ONLY. THE LISTING OF

MANUFACTURER INFORMATION IS NOT INTENDED TO LIMIT

THE SELECTION OF PRODUCTS PROVIDED BY OTHER

MANUFACTURERS. PRODUCTS MEETING THESE CRITERIA

WILL BE CONSIDERED AND MUST BE REVIEWED BY THE

INTERIOR DESIGNER OF RECORD (IDOR) AND THE NAVFAC

INTERIOR DESIGNER AND APPROVED BY THE

CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR ’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO

AVOID DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY

LIGHT SWITCHES. DO NOT INSTALL THERMOSTATS IN THE

CENTER OF A WALL.

D. ALL INTERIOR FINISHES IN VERTICAL EXIT WAYS, EXIT

LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM

CLASS A RATING.

E. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS

F. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL

COLOR. PANELS PAINTED BY BRUSH ARE NOT

ACCEPTABLE

FINISH NOTES

G. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE

CORNERS. INSTALL END WALL PROTECTORS AT OPEN

ENDED WALLS. CORNER GUARDS AND END CAPS MUST BE

FULL HEIGHT AND SHOULD NOT BE USED ON CMU WALLS,

TILED WALLS, OR MANUFACTURED STONE WALLS.

I. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST

INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE

CORNERS AS WELL AS THE INTERSECTION BETWEEN

FLOOR AND WALL TILE WHERE APPLICABLE FOR A

COMPLETE INSTALLATION.

J. ALL AREAS TO RECEIVE RESILIENT BASE (RB-1) WITH THE

EXCEPTION OF AREAS RECEIVING FLOOR TILE OR EPOXY

RESINOUS FLOORING.

K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL HOLLOW METAL DOORS AND DOOR

FRAMES TO BE PAINTED (PNT-5). ALL GWB & EXPOSED

CEILINGS TO BE PAINTED (PNT-6).

L. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).

M. ALL SHOWER FLOORS AND SHOWER WALLS TO BE SOLID

SURFACE (SS-3).

N. ALL TILE TO RECEIVE GROUT FINISH (GR-1).

O. LVT FLOORING COVERAGE INCLUDES THE ENTIRETY OF

EACH SLEEPING ROOM ALL THE WAY UP TO THE DOORWAY

INTO THE TOILET/SHOWER COMPARTMENT. SEE

ENLARGED PLAN VIEW B1/I-401.

P. SEE I-601 FOR FINISH LEGEND.

SCALE: 1/4" = 1'-0"B5 TYP. LOUNGE FINISH PLAN

2' 4' 8'0' 1/4" =1'-0"

SCALE: 1/4" = 1'-0"D3 ENLARGED MECHANICAL BLDG. FINISH PLAN

SCALE: 1/4" = 1'-0"B6 ENLARGED LAUNDRY CHASE FINISH PLAN

I G

IV

R

FOHT

I

NO

M N

EW

A

OM

L

C

C

A

Cert. 001152

JAMIE D. KISSEL RER

T

IFIED

INTERIOR DES

IG

MECH

STAIR

LAUNDRY

TOILET

ELECTRICAL

VENDING

DUTY

CORRIDOR

LAUNDRY

S7 S8S6

S3

S2

S2

S2

S2

S2

S5

S6

S2

S8

MECH

240 STAIR

LAUNDRY

TOILET

ELECTRICAL

STORAGE

COMM

CORRIDOR

LOUNGE

S7 S8S6

S3

S2

S2 S2

S2

S2

S5

S2

S6

S2

S8

MECH

STAIR

LAUNDRY

TOILET

ELECTRICAL

STORAGE

OFFICE

CORRIDOR

LOUNGE

S7 S8S6

S3

S2

S2

S2 S2

S2

S2

S5

S2

S6

S8

MECHANICAL

BUILDING

S7

2' 4' 8'0' 1/4" =1'-0"

GRAPHIC SCALE:

SCALE: 1/4" = 1'-0"B1 ENLARGED 1ST FLOOR SIGNAGE PLAN

SCAL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .