About this file

This is a construction specification document for plumbing fixtures required for the State University of New York at Buffalo's Biomedical Education Building Science Lab Renovation (Project #2231997.06). The scope of work includes the furnish and installation of emergency eyewash and shower stations, laboratory sinks with specialized components, and associated plumbing trim and accessories across the Third Floor Teaching Lab renovation. The specification identifies basis-of-design products including Guardian Equipment emergency safety stations, Fisherbrand stainless steel and epoxy resin laboratory sinks, Chicago Faucets wall-mounted dual-inlet water faucets, and Watts thermostatic tempering valves with lead-free construction. Installation requirements mandate compliance with accessibility standards per ICC A117.1 and the Americans with Disabilities Act, with fixtures installed at handicapped/elderly mounting heights where applicable. The construction document submission deadline is May 7, 2026, with all plumbing fixtures to be installed level and plumb according to roughing-in drawings, secured with proper supports, and sealed with mildew-resistant silicone sealant matching fixture colors.

The specification requires all fixtures and trim to comply with multiple regulatory standards including NSF 61, NSF 62, NSF 372 for drinking water system components, ASME A112.18.1 for brass and copper supplies, ASSE 1037 for manual-operation flushometers, and ASTM F 446 for grab bars. Contractors must submit product data, shop drawings with power and signal wiring diagrams, cut-out data for countertop fixtures, and operations and maintenance information for each fixture prior to installation. The project requires provision of special tools, wrenches, repair kits, and servicing devices—one device for every five fixtures installed with a minimum of one device. All fixtures must be compatible combinations with properly installed water-supply stops at accessible locations, wall flanges and escutcheons at piping penetrations, and protective shielding on exposed supplies and waste piping for accessible sinks. Post-installation requirements include inspection and repair of damaged finishes, cleaning with manufacturer-recommended methods, protective covering installation, and operational adjustment of all fixtures and controls.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2231997.06 UB Biomedical Ed

Bldg. Science Lab Reno

100% Construction Document Submission

05/07/2026

PLUMBING FIXTURES 224000 - 1

SECTION 224000 - PLUMBING FIXTURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Emergency Eyewash/Shower.

2. Laboratory Sinks.

1.2 BASIS OF DESIGN

A. Plumbing Fixtures listed in “Part 2 – Products” are basis-of-design products subject to compliance with design requirements; provide the product indicated or an approved listed equal.

1.3 ACTION SUBMITTALS

A. Product Data: Submit product data for all fixtures, trim and accessories prior to placing order for fixtures. Submit manufacturer’s color charts for fixture colors.

B. Shop Drawings: Include diagrams for power, signal, and control wiring if applicable.

C. Submit cut out data for countertop fixtures to General Contractor.

1.4 CLOSEOUT SUBMITTALS

A. Submit operations and maintenance information for each fixture, faucet, shower and trim piece.

1.5 FIXTURE MAINTENANCE

A. Provide owner with all special tools, wrenches or devices necessary for servicing plumbing fixtures and trim, as well as shower and faucet repair kits complete with all parts. Provide one

(1) device for each five (5) fixtures installed, if there are less than five (5) devices installed provide a minimum of one (1) device.

1.6 QUALITY ASSURANCE

A. Regulatory Requirements: Comply with requirements in ICC A117.1, "Accessible and Usable

Buildings and Facilities" Public Law 101-336, "Americans with Disabilities Act"; for plumbing fixtures for people with disabilities.

B. Regulatory Requirements: Comply with requirements in Public Law 102-486, "Energy Policy

Act," about water flow and consumption rates for plumbing fixtures.

rbegiers Cloud

100% Construction

PLUMBING FIXTURES 224000 - 2

C. NSF Standard: Comply with NSF 61, NSF 62 and NSF 372, "Drinking Water System

Components--Health Effects," for fixture materials that will be in contact with potable water.

D. Select combinations of fixtures and trim, faucets, fittings, and other components that are compatible.

E. Comply with the following applicable standards and other requirements specified for miscellaneous fittings:

Brass and Copper Supplies: ASME A112.18.1.

2. Manual-Operation Flushometers: ASSE 1037.

3. Brass Waste Fittings: ASME A112.18.2.

F. Comply with the following applicable standards and other requirements specified for miscellaneous components:

Grab Bars: ASTM F 446.

2. Off-Floor Fixture Supports: ASME A112.6.1M.

3. Plastic Toilet Seats: ANSI Z124.5.

4. Supply and Drain Protective Shielding Guards: ICC A117.1.

PART 2 - PRODUCTS

EMERGENCY EYEWASH/SHOWERS

Emergency Eyewash/Shower (EEW-A):

1. SSBF-15* - Barrier Free, combination eye/face wash and shower safety station with ABS plastic shower head (optional stainless steel shower head “SSH”), internal 20 GPM flow control, stainless steel bowl, powder-coated cast aluminum flag handle and floor flange, 1

¼” IPS Schedule 40 galvanized pipe and fittings, 1” IPS and ½” IPS U.S. made chrome-plated brass stay-open ball valves, and polished stainless steel 47 ½” pull rod. Unit shall have (4) polypropylene GS-Plus™ spray heads with integral “flip-top” dust covers, filters, and 1.6 GPM flow control orifices mounted on a chrome-plated brass eyewash assembly.

Unit shall include ANSI compliant sign.

2. Thermostatic mixing valve #G6040 to blend hot and cold water to deliver tepid water.

Valve has flow capacity of 50 gallons (189 liters) per minute at 30 PSI (2.1 bar) pressure drop. Valve can be used to supply emergency shower or combination safety station.

Depending on water supply size and pressure, valve can supply multiple units.

3. Performance: Unit complies with ADA requirements for accessibility by handicapped persons. Unit shall meet or exceed ANSI Z358.1 – 2014, and come with a full 2-year warranty.

4. Fixture: Guardian Equipment GBF1994 and GBF1909SSH

100% Construction

PLUMBING FIXTURES 224000 - 3

2.2 LABORATORY SINKS

A. SINK (SK-A):

1. Fisherbrand 18 gauge 304 Stainless Steel 18.5 inch x 30.5 inch x 10 inch deep undermount sink, polished nonporous interior, fully coated underside insulate for sound and reduced condensation, centered sink outlet and fitted with the following:

a. Watts Blueline Acid Waste Assembly, 2 in. polypropylene assembly, 1-1/2 inch IPS.

b. Watts Blueline FRPP chemical waste no hub schedule 40 adjustable “P” trap 1-1/2 inch x 1.

c. Watts Model No. LFE480 Hydroguard lead-free thermostatic tempering valve constructed with lead-free cast copper silicon alloy material which shall be ASSE

1017, ASSE 1069 and ASSE 1070 certified.

d. McGuire #LF2167 1/2-inch supplies with 3/8 inch flexible risers, loose key stops and metal, chrome plated escutcheons.

e. Chicago Faucets Model No. LWM4-A13-1 wall mounted dual-inlet water faucet with adjustable centers, 5-1/4 inch rigid/swing gooseneck spout, laboratory nozzle with 10 serrations for laboratory hose and vandal proof 4-inch wristblade handle.

f. Two (2) Chicago Faucets 900 Series wall mounted laboratory turret with single ball valve. One (1) for Natural Gas and one (1) for compressed air.

B. SINK (SK-B):

1. Fisherbrand Drop in Epoxy Resin ADA Compliant Sink 25 inch. x 15 inch. x 4.8 inch deep, centered sink outlet and fitted with the following:

a. Watts Blueline Acid Waste Assembly, 2 in. polypropylene assembly, 1-1/2 inch IPS.

b. Watts Blueline FRPP chemical waste no hub schedule 40 adjustable “P” trap 1-1/2 inch x 1.

c. Watts Model No. LFE480 Hydroguard lead-free thermostatic tempering valve constructed with lead-free cast copper silicon alloy material which shall be ASSE

1017, ASSE 1069 and ASSE 1070 certified.

d. McGuire #LF2167 1/2-inch supplies with 3/8 inch flexible risers, loose key stops and metal, chrome plated escutcheons.

e. Chicago Faucets Model No. LWM4-A13-1 wall mounted dual-inlet water faucet with adjustable centers, 5-1/4 inch rigid/swing gooseneck spout, laboratory nozzle with 10 serrations for laboratory hose and vandal proof 4-inch wristblade handle.

f. Two (2) Chicago Faucets 900 Series wall mounted laboratory turret with single ball valve. One (1) for Natural Gas and one (1) for compressed air.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine roughing-in of water supply and sanitary drainage and vent piping systems to verify actual locations of piping connections before fixture installation.

B. Examine walls and floors for suitable conditions where fixture will be installed.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

rbegiers Cloud rbegiers Cloud

100% Construction

PLUMBING FIXTURES 224000 - 4

3.2 INSTALLATION

A. Install fixtures level and plumb according to roughing-in drawings.

B. Install supports, affixed to building substrate, for wall-hung fixtures.

Install accessible wall-mounted fixtures at handicapped/elderly mounting height according to

ICC/ANSI A117.1.

D. Set floor-mounted fixtures in leveling bed of cement grout.

E. Install water-supply piping with stop on each supply to each fixture.

1. Install stops in locations where they can be easily reached for operation.

F. Install wall flanges or escutcheons at piping wall penetrations in exposed, finished locations. Use deep-pattern escutcheons if required to conceal protruding fittings.

G. Seal joints between fixtures and counters, floors, and walls using sanitary-type, one-part, mildew-resistant silicone sealant. Match sealant color to fixture color. Comply with sealant requirements specified in Section 079200 "Joint Sealants."

Install protective shielding pipe covers and enclosures on exposed supplies and waste piping of accessible sinks.

I. Use carrier supports with waste-fitting assembly and seal.

J. Use off-floor carriers with waste fitting and seal for back-outlet urinals.

K. Assemble shower components according to manufacturers' written instructions.

L. Install shower flow-control fittings with specified maximum flow rates in shower arms.

M. Set shower receptors in leveling bed of cement grout.

CONNECTIONS

Connect fixtures with water supplies, stops, risers, traps, soil, waste, and vent piping. Use size fittings required to match fixtures.

B. Comply with water, soil and waste piping requirements.

3.4 ADJUSTING

A. Operate and adjust fixtures and controls. Replace damaged and malfunctioning fixtures, fittings, and controls.

B. Adjust water pressure at flushometer valves and faucets to produce proper flow.

100% Construction

PLUMBING FIXTURES 224000 - 5

3.5 CLEANING AND PROTECTION

A. After completing installation of fixtures, inspect and repair damaged finishes.

B. Clean fixtures and fittings with manufacturers' recommended cleaning methods and materials.

C. Install protective covering for installed fixtures and fittings.

D. Do not allow use of fixtures for temporary facilities unless approved in writing by Owner.

END OF SECTION 224000