This is a plumbing plan drawing for the State University of New York at Buffalo's Biomedical Education Building (BEB) Second Floor renovation project (#2022-109). The drawing, dated May 12, 2026, details comprehensive plumbing infrastructure for the renovation of science teaching laboratories, including specifications for domestic cold and hot water lines, natural gas piping, compressed air systems, acid waste disposal, sanitary sewer connections, and storm drainage. The plan indicates piping sizes ranging from 1/2" to 3" in diameter, serving multiple laboratory fixtures including sinks, eyewash/shower stations, and floor drains across designated zones on the second floor. The drawing references coordination with architectural plans for ceiling removals in work areas and notes that the Division 22 contractor must coordinate piping routing with existing structural construction. The plan references continuation of piping systems on drawing P102 and includes references to detailed specifications in drawing P501 for trap primer installations and floor drain configurations. The permit was issued on June 26, 2026, with an expiration date of February 28, 2027, and includes one revision dated June 28, 2026.
The drawing was prepared by the Office of Facilities Design & Construction and bears the professional stamp requirements mandated by New York State Education Law Section 7209(2) and 7307, which prohibit unauthorized alterations to sealed plans. The plan emphasizes that Division 22 contractors must provide trap primer connections and valves as specified and coordinate all work with the existing building infrastructure to ensure proper integration of mechanical, plumbing, and structural systems throughout the renovation project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2 1/2" 1/2"
3/4"
1" 1/2"
3" 1/2" 1/2"
1"
3/4"
1"
1"
2 1/2"
1"
1"
2 1/2" 3"
3/4"
3/4"
1 1/4"
2 1/2"
1/2"
(E)HWR
(E)DCW
(E)DHW
(E)NG
(E)TW
(E)CA
(E)TWR
K
D
C1
C2
B1
B
13 14 15 16 17 18 19 20
(E)3" ACID WASTE
DOWN TO FLOOR
BELOW
CO
(E)3" ACID WASTE DOWN
(E)3" ACID WASTE DOWN
1 1/2"
3"
AW AW
AW
DHW
D H
W
D C
W
DCW
DHW
DHR
D C
W
D H
W
D H
R
D H
W
D C
W
D H
WD
C
W
DCW
DHW
DHR
1/2"
1/2"
1/2"1/2"
1/2"
1/2"1/2"
1/2"
1/2"
3"
1/2"
1/2" 1/2"
1/2"
1/2"
1/2"
(E)HWR
(E)DCW
(E)DHW
(E)NG
(E)TW
(E)CA
(E)TWR
1 1 1
NG
NG
N G
N G
D H
W
D C
W
N G
CA
C A
C A
C A
C A
C A
C A
1/2"
1/2"
1/2"
1/2" 1/2"
3/4" 1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
CA
1"1"
(E)4" SANITARY SEWER FROM FLOOR
ABOVE AND BELOW
4" STORM CONDUCTOR FROM ABOVE
AW
1 1/2" 3"
CO
(E )D
C W
(E )D
H W
(E )D
H R
DCW
DHW
DHR
(E) 2" ACID WASTE DOWN TO
FLOOR BELOW
(E) 1/2" DOMESTIC COLD WATER AND
(E) DOMESTIC HOT WATER UP TO FLOOR
ABOVE. (E) 1 1/2" ACID WASTE FROM
ABOVE AND DOWN TO FLOOR BELOW
(E) 1/2" COMPRESSED AIR UP TO
FLOOR ABOVE.
1/2"
1"
1"
1/2"
1 1/4"
1 1/4"
2 1/2"
2 1/2"
3/4"
N G
1/2"
N G
N G
D C
W D
H W
1/2" 1/2"
3"
AW5
CO
CO
AW
1 1/2"
M401
1/2" 1"
1/2"
N G
C
A DCW
PLUMBING GENERAL NOTES:
A. DIVISION 22 CONTRACTOR SHALL COORDINATE WORK
WITH ARCHITECTURAL PLANS FOR CEILING REMOVALS IN
AREAS OF WORK ON THE SECOND FLOOR.
N
AS NOTED
PERMIT-NO.
2022-109
DRAWN BY
DRAWING No.
DATE
CHK'D BY
BLDG PERMIT NO.
CAD DWG FILE
SCALE
PROJECT TITLE:
DRAWING TITLE:
KEY PLAN
PROJECT No.
PROFESSIONAL STAMP & SIGNATURE
WARNING: IT IS ILLEGAL FOR ANY PERSON, UNLESS
ACTING UNDER THE DIRECTION OF A LICENSED DESIGN
PROFESSIONAL, TO ALTER, IN ANYWAY, ANY PLANS,
SPECIFICATIONS AND REPORTS TO WHICH THE SEAL
OF A LICENSED DESIGN PROFESSIONAL HAS BEEN
APPLIED, EXCEPT WHEN MADE IN ACCORDANCE WITH
SECTION 7209 (2) OR SECTION 7307 OF THE NEW
YORK STATE EDUCATION LAW.
CONSULTANT PROJECT No.
300 PEARL STREET, SUITE 130
BUFFALO, NY 14202
P: (716) 551-6281 www.labellapc.com
BUILDING AREA
BIOMEDICAL
EDUCATION
BUILDING
119 JOHN BEANE CENTER
BUFFALO, NY 14260
OFFICE OF FACILITIES
DESIGN & CONSTRUCTION
P101
SECOND FLOOR PLAN -
PLUMBING
05.12.2026
REB
CFR
BEB RENOVATION
SCIENCE TEACHING
LABS
2231997.06
1/8" = 1'-0"P101
1 SECOND FLOOR PLAN - PLUMBING
P101 DRAWING NOTES:
1 1/2" DOMESTIC COLD WATER, 1/2" DOMESTIC HOT WATER, 1-1/2" ACID WASTE, 1/2"
NATURAL GAS AND 1/2" COMPRESSED AIR PIPING TO SERVE LABORATORY SINK (SK)
ABOVE. DIVISION 22 SHALL COORDINATE PIPING ROUTING WITH EXISTING STRUCTURAL
CONSTRUCTION. REFER TO DRAWING 1/P102 FOR CONTINUATION OF PIPING.
1" NATURAL GAS UP TO EMERGENCY SHUT-OFF VALVE ON THE FLOOR ABOVE AND DOWN.
REFER TO 1/P102 FOR CONTINUATION OF PIPING.
1/2" COMPRESSED AIR UP TO SHUT-OFF VALVE ON THE FLOOR ABOVE AND DOWN. REFER
TO 1/P102 FOR CONTINUATION OF PIPING.
PLUMBING CONTRACTOR SHALL PROVIDE ACID WASTE CONNECTION TO EXISTING PIPING
AS INDICATED.
1/2" DOMESTIC COLD WATER, 1/2" DOMESTIC HOT WATER AND 1-1/2" ACID WASTE PIPING
SERVING EMERGENCY EYEWASH/SHOWER ABOVE. REFER TO 1/P102 FOR CONTINUATION
OF PIPING.
1/2" DOMESTIC COLD WATER, 1/2" DOMESTIC HOT WATER, 1/2" COMPRESSED AIR, 1/2"
NATURAL GAS, 1-1/2" SANITARY TO SERVE FUTURE FIXTURE ABOVE. REFER TO 1/P102 FOR
CONTINUATION OF PIPING.
3" ACID WASTE WITH P-TRAP SERVING FLOOR DRAIN ABOVE. DIVISION 22 CONTRACTOR
SHALL PROVIDE 1/2" DOMESTIC COLD WATER CONNECTION TO SERVE TRAP PRIMER.
REFER TO DETAIL 2/P501 FOR FURTHER INFORMATION.
DIVISION 22 CONTRACTOR SHALL PROVIDE TRAP PRIMER VALVE AS SPECIFIED. REFER TO
DETAIL 5/P501 FOR FURTHER INFORMATION.
1/2" DOMESTIC COLD WATER, 1/2" DOMESTIC HOT WATER AND 1 1/2" ACID WASTE PIPING
TO SERVING SINK ABOVE.
NO. REVISIONS DATE
1 PERMIT 06/26/2026
06.26.2026
06/28/2026
Expiration Date: 02-28-2027
File details come from the government source that posted it. Updated .