202603160_rename_drive_installation.pdf

PDF 3 MB Posted

Attached to
FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY
Solicitation number
26/27-17
Issued by
Hartford County, Connecticut

About this file

Summary

This is a project description document for the Town of Manchester Water and Sewer Department in Connecticut related to furnishing and installing inserts for Siphons 1 and 3 at the Globe Hollow Water Treatment Facility. The project involves replacing siphon components and repairing associated discharge valves in the trough, with finished work matching repairs already completed on Siphons 2 and 4. Both sedimentation basins housing the siphons will be drained by the Town prior to work commencement. Siphon No. 1 must be completed and returned to service first, followed by Siphon No. 3. The water treatment plant will remain operational throughout the project, and work sequencing may be adjusted based on operational requirements.

The document provides technical specifications and installation requirements for the siphon insert components. Contractors should note that the Town will prepare the work areas by draining the basins, and the project must coordinate with ongoing facility operations. No specific pricing information, contract term, response deadlines, or award dates are detailed within this file.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .