202603160_Idler_assembly.pdf
PDF 820 KB Posted
- Solicitation number
- 26/27-17
- Issued by
- Hartford County, Connecticut
About this file
This is a technical specification document for an idler assembly component related to the Globe Hollow Water Treatment Facility project in Manchester, Connecticut. The document pertains to the Town of Manchester Water and Sewer Department's contract opportunity to furnish and install inserts for siphons at the water treatment plant.
The idler assembly specification details the mechanical components required for the siphon replacement work. The document provides technical drawings and specifications for the idler assembly, which serves as a support component within the siphon system. The specifications include dimensional requirements, material standards, and installation parameters necessary to match the repairs previously completed on Siphons 2 and 4. The assembly must meet engineering tolerances and quality standards consistent with existing infrastructure at the facility. No specific pricing information, delivery dates, or bidding procedures are contained within this technical specification document; it functions as a reference guide for contractors to ensure proper fabrication and installation of the idler assembly component as part of the overall siphon replacement project.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .