20260316_Parking_stand_install.pdf

PDF 1011 KB Posted

Attached to
FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY
Solicitation number
26/27-17
Issued by
Hartford County, Connecticut

About this file

This is a Scope of Work document for the Town of Manchester Water and Sewer Department in Connecticut related to the furnish and install of inserts for siphons at the Globe Hollow Water Treatment Facility. The project requires replacement of Siphon No. 1 and Siphon No. 3, along with repair of associated discharge valves in the trough, with finished work matching repairs previously completed on Siphon Nos. 2 and 4. The Town will drain both sedimentation basins housing the siphons prior to work commencement. Siphon No. 1 must be completed and returned to service first, followed by Siphon No. 3, with the plant remaining operational throughout the project. The work sequence may be adjusted based on operational needs.

The document specifies technical requirements and performance standards for the contractor work but does not contain information regarding pricing terms, bid response dates, contract award dates, or contract duration in the available content. Interested bidders should contact the Town of Manchester Water and Sewer Department directly for complete project specifications, bidding procedures, timeline requirements, and pricing information related to this water treatment facility improvement project.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .