20260316_FLoating_Syphon.pdf

PDF 5 MB Posted

Attached to
FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY
Solicitation number
26/27-17
Issued by
Hartford County, Connecticut

About this file

This is a technical specification document for the Town of Manchester Water and Sewer Department in Connecticut regarding the furnish and installation of inserts for siphons at the Globe Hollow Water Treatment Facility. The project involves replacing siphon inserts for Siphon Nos. 1 and 3, with finished work required to match repairs already completed on Siphon Nos. 2 and 4. The work includes repair of associated discharge valves in the trough. Both sedimentation basins housing the siphons will be drained by the Town prior to work commencement. Siphon No. 1 must be completed and returned to service first, followed by Siphon No. 3. The water treatment plant will remain operational throughout the project, and work sequence may be adjusted based on operational needs.

The document contains detailed technical specifications for the floating siphon inserts, including materials, dimensions, and installation requirements. The specifications ensure compatibility with existing infrastructure and adherence to the same standards used in the previous repairs of Siphons 2 and 4. No specific pricing information, response deadlines, site visit requirements, or bid submission dates are detailed within this specification document. The project represents maintenance and repair work essential to the continued operation of the water treatment facility's sedimentation process.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .