Attached to
FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY
Solicitation number
26/27-17
Issued by
Hartford County, Connecticut

About this file

This is a general arrangement drawing document for the Town of Manchester Water and Sewer Department in Connecticut, detailing the furnish and installation of inserts for Siphons 1 and 3 at the Globe Hollow Water Treatment Facility. The project involves replacing the siphon inserts and repairing associated discharge valves in the trough, with finished work to match repairs already completed on Siphons 2 and 4. The work sequence may be adjusted based on operational requirements. Both sedimentation basins housing the siphons will be drained by the Town prior to work commencement. Siphon No. 1 must be completed and returned to service first, followed by Siphon No. 3, while the overall water treatment plant remains operational throughout the project duration.

The general arrangement drawing provides technical specifications and dimensional details necessary for contractors to understand the physical layout and requirements for the siphon insert installation and valve repair work. This document serves as a critical reference for bid preparation, construction planning, and project execution, ensuring that all work is completed to match the existing specifications established during the repairs to Siphons 2 and 4.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .