20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf

PDF 2 MB Posted

Attached to
Asset Protection - Landscaping
Solicitation number
911-0213-26
Issued by
Trinity County, California

About this file

This is a preliminary technical drawing document for the City of Fairfield and County of Solano depicting a temporary sewer bypass plan as part of the Justice Campus Asset Protection project. The drawing, created in February 2026, illustrates sanitary sewer bypass provisions at a horizontal scale of 1 inch equals 30 feet and serves as a component of the broader multi-phase Asset Protection Project designed to protect county properties from seasonal stormwater flooding. The project encompasses barrier walls, berms, landscaping, hardscape, flood gates, underground utility reconfiguration, and pump systems across multiple county facilities. The landscaping scope of work includes planting irrigation systems, planting installations, sod lawn, and demolition of existing irrigation systems, with design specifications established by Mead & Hunt, Inc. and WRA, Inc. Contractors must achieve substantial completion within 231 calendar days from the Notice to Proceed, with final completion required within 30 days thereafter. A mandatory pre-bid conference is scheduled for February 19, 2026, at 10:00 a.m., with sealed bids due by 2:00 p.m. on March 9, 2026, submitted via the Solano County OpenGov E-Procurement Portal.

All contractors and subcontractors must be registered with the California Department of Industrial Relations, maintain current contractor's licenses at the time of bid submission, and comply with Davis-Bacon Act prevailing wage requirements and FEMA compliance measures, as the project is federally funded through OES/FEMA. Bidders must submit a 10 percent bid bond or certified check with their proposal and, upon award, furnish performance and payment bonds equal to 100 percent of the contract amount plus a one-year warranty bond for 10 percent of the final contract price. A 5 percent retainage will be held from progress payments until 35 days after the Notice of Completion is filed, with progress payments made monthly at 95 percent of approved work in place. Liquidated damages of $2,000 per calendar day will apply for delays beyond the contract completion date. The contract does not become effective until all certificates of insurance, business and professional licenses, and applicable certifications are on file with the County, and contractors must maintain Workers' Compensation and Commercial General Liability insurance throughout the contract period.

View the file

Other files

File Type Posted
20260313_WRA_Redlined_Volume_2_Drawings.pdf PDF
20260311_WRA_Redlined_Volume_1_Drawings.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20260210_Asset_Protection_Landscaping_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Landscaping_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Landscaping_-_Project_Manual.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R, S

EP

FE

BR

UA

RY

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ Ov erl an d S S

By pa ss P lan .dw g F eb

4,

- 8 :57 am

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

JU

ST

IC

E

CA

MP

US

A

SS

ET

P

RO

TE

CT

IO

N

CI

TY

O F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

SS1

TE

MP

OR

AR

Y

SE

W

ER

B

YP

AS

S

TEMPORARY SEWER BYPASS PLAN

HORIZONTAL: 1"=30'

SANITARY SEWER BYPASS PROVISIONS

File details come from the government source that posted it. Updated .