This is a pre-bid conference presentation document for Trinity County, California's Asset Protection Project, a comprehensive multi-prime procurement designed to protect county properties from seasonal stormwater flooding. The project encompasses landscaping services along with barrier walls, berms, hardscape, flood gates, underground utility reconfiguration, and pump systems across multiple county facilities located at 500, 530, 550, and 600 Union Avenue; 500, 510, 512, 520, and 530 Clay Street; 501 and 509 Delaware Street; and 501 Texas Street, including adjacent driveways and parking areas. The landscaping scope includes planting irrigation systems, planting installations, sod lawn, and demolition of existing irrigation systems. A mandatory pre-bid conference was held on February 19, 2026, with sealed bids due by 2:00 p.m. on March 9, 2026, submitted via the Solano County OpenGov E-Procurement Portal. Contractors must achieve substantial completion within 231 calendar days from the Notice to Proceed, with final completion required within 30 days thereafter, and must comply with Intermediate Final Construction drawing sets prepared by Mead & Hunt, Inc. and WRA, Inc.

All contractors and subcontractors must be registered with the California Department of Industrial Relations and maintain current California contractor licenses at bid submission. The project is federally funded through OES/FEMA, requiring compliance with Davis-Bacon Act prevailing wage requirements and FEMA compliance measures under Title 2 CFR 200.318-200.326. Bidders must submit a 10 percent bid bond or certified check with their proposal and furnish performance and payment bonds equal to 100 percent of the contract amount plus a one-year warranty bond for 10 percent of the final contract price upon award. Liquidated damages of $2,000 per calendar day apply for delays beyond the contract completion date. A 5 percent retainage will be held from progress payments until 35 days after the Notice of Completion is filed, with monthly progress payments made at 95 percent of approved work in place. Contractors must maintain Workers' Compensation and Commercial General Liability insurance throughout the contract period, and the contract does not become effective until all certificates of insurance, business and professional licenses, and applicable certifications are on file with the County.

View the file

Other files

File Type Posted
20260304_Asset_Protection_Project_Schedule.pdf PDF
20260317_Asset_Protection_Project_-_Landscaping_-_Addendum_5.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20260210_Asset_Protection_Landscaping_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Landscaping_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Landscaping_-_Project_Manual.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASSET PROTECTION

PUMPS & VAULTS

JANUARY 6, 2026

KCONNER

Text Box

FEBRUARY 19, 2026

JGonzal4 Text Box *This is not a contract document. For reference only

KCONNER

Text Box

FEBRUARY 19, 2026

AGENDA

• Asset Protection Project Background

• Pump Station Scope

• Schedule

• Access Requirements

• Bidding Instructions

• Addendum 1

• Questions

JGonzal4 Text Box *This is not a contract document. For reference only

KCONNER

Text Box

KCONNER

Text Box

• Asset Protection Project Background

• Scope Review

• Schedule

• Access Requirements

• Bidding Instructions

• Questions

JGonzal4 Text Box *This is not a contract document. For reference only

Storm Walls

Berms

Raised Access Points

Passive Storm Gates

JGonzal4

PUMPS & VAULTS

JANUARY 6, 2026

JGonzal4 Text Box *This is not a contract document. For reference only

KCONNER

Text Box

SCOPES INCLUDES

1. Fencing and Gates

2. Painting and Coating

3. Electrical

4. Miscellaneous Metals

5. Earthwork and Paving

6. Landscaping

7. Concrete

8. Site Utilities

KCONNER

Image

QUESTIONS?

JGonzal4

File details come from the government source that posted it. Updated .