20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf

PDF 16 MB Posted

Attached to
Asset Protection - Landscaping
Solicitation number
911-0213-26
Issued by
Trinity County, California

About this file

This document comprises the 100% Submittal construction drawings for Phase 1 of the Fairfield-Suisun Sewer District (FSSD) Offsite Sanitary Sewer Improvements project located in the City of Fairfield, County of Solano, California, prepared as part of the Downtown Fairfield Justice Campus and Fairfield Law and Justice Campus Security Project. The drawings encompass sanitary sewer infrastructure improvements across four primary street segments: Washington Street (STA 19+00 to 25+00), Texas Street (STA 15+50 to 20+50), Clay Street, and Union Avenue/Alley (STA 9+50 to 14+50). The project scope includes installation of approximately 266 linear feet of 15-inch VCP sanitary sewer pipe on Washington Street at 0.15% grade, 318 linear feet of 15-inch VCP on Texas Street at 0.15% grade, and 185-396 linear feet of 10-inch sanitary sewer pipe on Union Avenue and the alley at varying grades. The work involves construction of nine new sanitary sewer manholes (48-60 inches in diameter), abandonment of existing 6-18 inch diameter sanitary sewer lines, installation of sewer bypass and dewatering systems, and comprehensive erosion and sediment control measures including temporary storm drain inlet filters, fiber rolls, and concrete washout areas. The drawing set includes general notes and sheet index (G-002, G-003, G-004), civil plans and profiles for each street segment (C-101 through C-104), typical construction details for pipes 12 inches and larger (C-501) and smaller pipes (C-502), and erosion/sediment control plans and details (CE-101, CE-501). Site access and staging areas are designated with contractor coordination required with concurrent Justice Campus Asset Protection Project operations. The document is marked as preliminary and not for construction as of February 23, 2026.

The drawings specify standard FSSD and City of Fairfield construction details and requirements, including utility trench excavation and backfill specifications, sewer abandonment procedures, and dewatering protocols. Traffic control plans are referenced separately by architectural work package (AWP). All work relates to Phase 1 of the FSSD sanitary sewer improvements and must comply with applicable utility crossing protocols for existing 8-inch water lines, 12-inch hydrants, 36-inch storm drains, and other underground utilities identified on the plan and profile sheets. The project involves multiple tie-in points to existing sanitary sewer infrastructure, including connections to existing storm drain systems and sanitary sewer systems operated by FSSD. No contract pricing, timeline, or award information is contained within these technical drawings; they serve exclusively as the design basis for construction bidding and execution.

View the file

Other files

File Type Posted
20260304_Asset_Protection_Project_Schedule.pdf PDF
20260311_WRA_Redlined_Volume_1_Drawings.pdf PDF
20260313_WRA_Redlined_Volume_2_Drawings.pdf PDF
20260317_Asset_Protection_Project_-_Landscaping_-_Addendum_5.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20260210_Asset_Protection_Landscaping_-_Project_Manual.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
Access_Requirements.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UTILITY TRENCH EXCAVATION AND BACKFILL

EROSION AND SEDIMENT CONTROL NOTES

SEWER ABANDONMENT NOTES

SURVEY NOTES

DEWATERING NOTES

SEWER BYPASS NOTES

FAIRFIELD-SUISIUN SEWER DISTRICT NOTES

SHEET INDEX

SHEET NUMBER SHEET TITLE

SHEET FILES:GENERAL

G-001 COVER SHEET

G-002 GENERAL NOTES AND SHEET INDEX

G-003 SHEET INDEX KEY MAP, LEGENDS, SYMBOLS, AND

ABBREVIATIONS

G-004 ALIGNMENTS AND CONTROL

G-101 ACCESS AND STAGING PLAN

SHEET FILES: CIVIL

C-101 WASHINGTON STREET PLAN AND PROFILE

C-102 TEXAS STREET PLAN AND PROFILE

C-103 CLAY STREET PLAN AND PROFILE

C-104 UNION AVENUE AND ALLEY PLAN AND PROFILE

C-501 TYPICAL FSSD DETAILS

(FOR PIPES 12" DIAMETER OR LARGER)

C-502 TYPICAL FAIRFIELD DETAILS

(FOR PIPES LESS THAN 12" DIAMETER)

SHEET FILES: CIVIL EROSION

CE101 EROSION AND SEDIMENT CONTROL PLANS

CE501 EROSION AND SEDIMENT CONTROL DETAILS

SHEET FILES: TRAFFIC CONTROL SEE SEPARATE TRAFFIC CONTROL PLANS BY AWP SAFETY

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ G0

.dw g F eb

3,

- 1 :39 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

G-002

GE

NE

RA

L N

OT

E

AN

D

SH

EE

T

IN

DE

X

GENERAL NOTES

1.

1.

TRAFFIC CONTROL

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ G-

1_

Ac ce ss S tag ing

.dw g

F eb

3,

- 1

:43 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

G-101

AC

CE

SS

A

ND

S

TA

GI

NG

P

LA

N

CALLOUT NOTES

POTENTIAL STAGING AREA. CONTRACTOR TO

COORDINATE WITH CONTRACTOR FOR THE SOLANO

COUNTY DOWNTOWN FAIRFIELD JUSTICE CAMPUS ASSET

PROTECTION PROJECT, AND VERIFY LOCATION IN FIELD.

STAGING/LAYDOWN AREA TO BE REMOVED AFTER

CONSTRUCTON.

A

WASHINGTON STREET PLAN STA. 19+00 TO 25+00

HORIZONTAL:1"=30'

WASHINGTON STREET SANITARY SEWER PROFILE

HORIZONTAL:1"=30'; VERTICAL:1"=3'

20+00 21+00 22+00 23+00 24+00 25+00

(NIC)

BY OTHERS

36" SD

@ 0.50%

IN

V

: 5 .8

4'

6" (S

IN

V : 5

.8 4'

6"

(E

(N

IC

)S D

M H

; S

TA

: 1 9+

.0

R

IM

: 1

3.

IN

V

: 3 .2

4'

8" (N

IN

V : 5

.1 9'

W

IN

V

: 3 .2

2'

8" (S

(E X

)S S

M H

8-

2;

S

TA

: 2

1+

.3

R

IM

: 1 3.

IN

V

: 3 .7

7'

8" (N

IN

V : 1

.3 7'

2"

(W

(E X

)S S

M H

8-

1;

S

TA

: 2

3+

.4

R

IM

: 1 5.

(EX)16' of 18" SS @ 1.65%

IN

V

: 7 .3

1'

2" (W

IN

V : 4

.2 4'

8"

(N

IN

V

: 4 .0

3'

8" (S

(E X

)S S

M H

8-

0;

S

TA

: 2

4+

.2

R

IM

: 1 5.

(ABANDON EX)398' of

18" SS @ 0.25%

INV:5.84(S)

INV:3.77(N)

INV:4.03(S)

INV:3.22(S)

EX. GROUND @ ALIGNMENT CENTERLINE

APPROXIMATE DEPTH OF EX 8" WTR

ST

A:

+9

7.

E X

W

TR

T

EE

ST

A:

+0

5.

E X

W

TR

T

EE

ST

A:

+1

9.

E X

W

TR

T

EE

INV:3.24(N)

INV:3.77(S)(PLUGGED)

INV: 1.37 EX.42" SS (W)

IN

V

: 7 .8

5'

E)

IN

V

: 7 .7

3'

N

IN

V : 7

.7 4'

S)

(E X

)S S

M H

; S

TA

: 2 0+

.6

R

IM

: 1

3.

INV:7.73(N)INV:7.74(S)

INV:3.71-NEW 15" SS(N)

INV:3.60-NEW 15" SS(S)

INV:3.60-NEW 15" SS(N)

INV:3.20-NEW 15" SS(S)

IN

V

: 3 .3

7'

8" (S

IN

V : 4

.2 0'

N W

IN

V : 1

.3 7'

2"

(E &W

(N E

W )6

0' ' S

S M

H

; S

TA

: 2 3+

.4

R

IM

: 1

5.

IN

V

: 3 .6

0'

5" (S

IN

V : 5

.1 9'

W

IN

V

: 3 .6

0'

5" (N

(N E

W )4

8' ' S

S M

H

; S

TA

: 2 1+

.1

R

IM

: 1

3.

IN

V

: 3 .7

9'

5" (E

IN

V : 3

.7 9'

5"

(N

(N E

W )4

8' ' S

S M

H

; S

TA

: 2 0+

.2

R

IM

: 1

3.

(ABANDON EX) 395' of 6" SS(APPROXIMATE DEPTH)

INSTALL 266 LF of 15" SS VCP @ 0.15%

(ABANDON EX)263' of 18" SS @ 0.20%

INSTALL 70 LF of

15" SS VCP @ 0.15%

(EX)18" SS

INV: 5.19' - EX 4" SS(W)

INV: 3.79-NEW 15" SS(E)

INV:3.71-NEW 15" SS(S)

INV:3.79-NEW 15" SS(N)

INSTALL 55 LF of

15" SS VCP @ 0.15%

IN

V

: 3 .7

1'

5" (S

IN

V : 4

.9 6'

E)

IN

V : 3

.7 1'

5"

(N

(N E

W )4

8' ' S

S M

H

; S

TA

: 2 0+

.6

R

IM

: 1

3.

IN

V

: 8 .9

N

IN

V : 7

.4 5'

2"

(E E)

(N E

W )4

8' ' S

S M

H

; S

TA

: 2 4+

.1

R

IM

: 1

5.

(ABANDON EX)

116 LF of 6" SS

INV: 9.0±-EX 6" SS

IN

V

: 6 .0

0'

0" (W

IN

V : 6

.0 0'

6"

(N

(N

IC

)C B

- 9 2;

S

TA

: 1 9+

.3

R

IM

: 1

3.

IN

V

: 7 .2

0'

S)

(N E

W )S

S C

O

0;

S

TA

: 1

9+

.8

R

IM

: 1 3.

S

S

S

S

S

S

S

S

IN

D

U C

TI

O

N L

O O

P(

TY

P)

S S

S

S

S

S

ST

A:

+9

8.

EX

. S

SM

H

ST

A:

+3

2.

EX

S

SM

H

ST

A:

+6

1.

EX

S

SM

H

ST

A:

+8

0.

N

IC

S D

M H

ST

A:

+3

2.

N

EW

8"

S

SM

H

ST

A:

+9

8.

N

EW

0"

S

SM

H

ST

A:

+1

1.

N

EW

8"

S

SM

H

ST

A:

+1

4.

EX

. S

SM

H

ST

A:

+3

1.

EX

S

SC

O

EM

PI

R E

AV

E.

TE

X A S S

TR

EE

T

20+00 21+00 22+00 23+00 24+00

C -5

16'

C -1

C -5

01 2 C -5

ST

A:

+6

1.

N

EW

8"

S

SM

H

C -5

C -5

WASHINGTON STREET

WASHINGTON STREET

ST

A:

+1

4.

N

EW

8"

S

SM

H

CALLOUT NOTES

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\2

8-

_P lan Pr ofi le_

W as hin gto n_ C-

1.d wg F eb

3,

- 1 :46 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

C-101

W

AS

HI

NG

TO

N

ST

RE

ET

PL

AN

A

ND

P

RO

FI

LE

TEXAS STREET PLAN STA. 15+50 TO 20+50

HORIZONTAL:1"=30'

TEXAS STREET SANITARY SEWER PROFILE

HORIZONTAL:1"=30'; VERTICAL:1"=3'

16+00 17+00 18+00 19+00 20+00 20+50

EX. GROUND @ ALIGNMENT CENTERLINE

(NIC)-BY OTHERS

36" SD @ 0.50%

IN

V

: 5 .8

4'

6" (S

IN

V : 5

.8 4'

6"

(E

(N

IC

)S D

M H

; S

TA

: 1 6+

.7

R

IM

: 1

3.

IN

V

: 4 .0

8'

6" (W

IN

V : 4

.0 8'

2"

(S

(N

IC

)S D

M H

; S

TA

: 1 9+

.3

R

IM

: 1

2.

INV:5.84(E)

INV:4.08(W)

ST

A:

+5

8.

E X

W

TR

T

EE

ST

A:

+1

6.

E X

W

TR

T

EE

ST

A:

+1

4.

E X

W

TR

T

EE

ST

A:

+6

1.

E X

W

TR

T

EE

ST

A:

+4

7.

E X

W

TR

T

EE

ST

A:

+9

7.

E X

W

TR

T

EE

ST

A:

+9

6.

E X

W

TR

T

EE

APPROXIMATE DEPTH OF 8" WTR

INSTALL 318 LF of 15" SS VCP @ 0.15%

IN

V

: 4 .2

6'

5" (S

E)

IN

V : 4

.2 6'

5"

(W

(N E

W )4

8' ' S

S M

H

; S

TA

: 1 9+

.7

R

IM

: 1

2.

INV:3.79-NEW 15" SS(E)

IN

V

: 3 .7

9'

5" (E

IN

V : 3

.7 9'

5"

(N

(N E

W )4

8' ' S

S M

H

; S

TA

: 1 6+

.0

R

IM

: 1

3.

INV:2.93±- EX 18" SS

IN

V

: 7 .8

6'

0" (E

IN

V : 7

.9 0'

0"

(S

(E X

) S S

M H

; S

TA

: 1 9+

.4

R

IM

: 1

3.

INV:7.86(E)

INV:4.26-NEW 15" SS(W)

EX SSMH - SEE NOTE

IN

V

: 3 .7

1'

5" (S

IN

V : 4

.9 6'

E)

IN

V : 3

.7 1'

5"

(N

(N E

W )4

8' ' S

S M

H

; S

TA

: 1 6+

.9

R

IM

: 1

3.

INSTALL 55 LF of

15" SS VCP @ 0.15%

INV:3.71-NEW 15" SS(S) INV:3.79-NEW 15" SS(N)

INSTALL 38 LF of

15" SS VCP @ 0.15%

INV:4.26-NEW 15" SS(SE) INV:4.32-NEW 15" SS(NW)

IN

V

: 4 .9

0'

S)

IN

V

: 7 .8

0'

0" (E

IN

V : 4

.3 2'

5"

(N W

(N E

W )4

8' ' S

S M

H

; S

TA

: 1 9+

.2

R

IM

: 1

3.

INV: 4.90-NEW 8" SS(S)

CALLOUT NOTES

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\2

8-

_P lan Pr ofi le_

Te xa s.d wg

F eb

3,

- 1

:47 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

C-102

TE

XA

S

ST

RE

ET

PL

AN

A

ND

P

RO

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\2

8-

_P lan Pr ofi le_

Cl ay

.dw g

F eb

3,

- 1

:49 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

C-103

CL

AY

S

TR

EE

T

PL

AN

A

ND

P

RO

10+00 11+00 12+00

EX. VAULT

SS

S

EX

S

S S

ST

A:

9+

.2

EX

S

SM

H

ST

A:

+7

5.

EX

S

SM

H

ST

A:

+8

5.

EX

S

SM

H

ST

A:

+7

5.

N

EW

4"

S

SM

H

ST

A:

9+

.0

N

EW

4"

S

SM

H

NO

PA

RK

ING

C -5

S S

C -5

11LF OF NEW 10"SS @7.4%

22'

18'

PLUG

IN MH

x x x x x x x x x x x x x x x x

10+00 11+00 12+00 13+00 14+00

EX

V A U

LT

S

S

S

S

S

S

S

S

S

S

S

S S

S

S

S

S

S

EX CURBEX CURB EX CURB

S S

ST

A:

9+

.3

EX

S

SM

H

ST

A:

+8

1.

EX

S

SM

H

ST

A:

+9

8.

EX

S

SM

H

ST

A:

+2

0.

EX

S

SC

O

ST

A:

+0

1.

EX

S

SC

O

ST

A:

+7

9.

EX

S

SC

O

ST

A:

+2

8.

EX

S

SC

O

ST

A:

+4

3.

EX

S

SC

O

ST

A:

9+

.6

N

EW

4"

S

SM

H

ST

A:

+9

2.

EX

S

SM

H

2.

4'

C C

ST

A:

9+

.0

IN

ST

AL

L

SS

M

H

NO

PARKING

NO

PARKING

C -5

C -5

21 214.

0' C

C

RADIUS=4500'

UNION AVENUE PLAN STA. 9+50 TO 12+50

HORIZONTAL:1"=30'

UNION AVENUE SANITARY SEWER PROFILE

HORIZONTAL:1"=30'; VERTICAL:1"=3'

10+00 11+00 12+00 12+50

IN

V

: 4 .8

3'

0" (W

IN

V : 4

.5 4'

0"

(N

IN

V

: 4 .8

4'

0" (S

(E X

)S S

M H

; S

TA

: 1 1+

.1

R

IM

: 1

1.

SU

M P:

4.

N

EW

IN

V:

.4

' 1 0"

(S W

SE

E N

O

TE

EX. GROUND @ ALIGNMENT CENTERLINE

IN

V

: 4 .5

5'

W

IN

V : 4

.7 4'

E)

(E X

)S S

M H

; S

TA

: 9 +9

4.

-3 0±

W

ES

T R

IM

: 9

.5 3'

IN

V

: 4 .7

7'

0" (N

IN

V : 4

.8 1'

0"

(E

(E X

)S S

M H

; S

TA

: 1 1+

.3

R

IM

: 1

1.

IN

V

: 4 .8

3'

0" (W

IN

V : 4

.5 4'

0"

(N

IN

V

: 4 .8

4'

0" (S

(E X

)S S

M H

; S

TA

: 1 1+

.1

R

IM

: 1

1.

(EX)10LF of 10" SS @ 0.71%, APPROXIMATE DEPTH OF EX 8" WTR

ST

A:

+1

1.

E X

W

TR

T

EE

APPROXIMATE DEPTH OF EX 12" HYDR

IN

V

: 2 .1

9'

0" (N

IN

V : 3

.5 0'

N W

IN

V : 2

.0 9'

0"

(E

(N E

W )5

4' ' S

S M

H

3;

S

TA

: 9

+9 0.

R

IM

: 1

0.

INV:2.70(S)-NEW 10"SS

INV:2.19(N)-NEW 10"SS

INV: 2.09

NEW 10" SS(E)

INSTALL 185LF of 10" SS @ 0.28% INSTALL 11LF of 10" SS @ 6.42%, SEE NOTE 10

IN

V

: 3 .7

0'

0" (N

E)

IN

V : 2

.7 0'

0"

(S

(N E

W )5

4' ' S

S M

H

1;

S

TA

: 1

1+

.2

R

IM

: 1 1.

INV:3.70- NEW 10"SS(NE)

INV:4.4±-NEW 10" SS(SW)

ST

A:

+5

3.

E X

S D

C R

O

SS

IN

G

ST

A:

+3

0.

E X

2"

H Y

D R

(E &W

IN

V

: 3 .7

0'

SE

IN

V : 4

.6 9'

"(W

(N E

W )5

4' ' S

S M

H

2;

S

TA

: 9

+9 4.

R

IM

: 1

0.

PLUG AND ABANDON, SEE 16

ALLEY PLAN STA. 9+50 TO 14+50

HORIZONTAL:1"=30'

ALLEY SANITARY SEWER PROFILE

HORIZONTAL:1"=30'; VERTICAL:1"=3'

10+00 11+00 12+00 13+00 14+00 14+50

IN

V

0.

' 2

4" (N

E)

IN

V

0.

' 1 8"

(N

IN

V

0.

' 2

4" (S

(E X

)S S

M H

8-

5;

S

TA

: 1

3+

.5

R

IM

: 1 1.

SU

M

P:

-0

.2 8'

N

EW

IN

V:

.8

9'

0" (W

EX. GROUND @ ALIGNMENT CENTERLINE

(EX)413LF of 8" SS @ 0.26%

IN

V

: 4 .5

5'

W

IN

V : 4

.7 4'

E)

(E X

)S S

M H

; S

TA

: 9 +6

8.

R

IM

: 9 .5

3' IN

V

: 3 .0

7'

W

IN

V : 4

.4 0'

N W

IN

V : 0

.9 0'

8"

(S

(E X

)S S

M H

8-

1;

S

TA

: 1

3+

.0

R

IM

: 1 1.

(EX)10LF of 8" @ 5.47%

INV:3.65(W)INV:4.74(E)

IN

V : 2

.1 9'

0"

(N

IN

V

: 3 .5

0'

N

W

IN

V

: 2 .0

9'

0" (E

(N E

W )5

4' ' S

S M

H

3;

S

TA

: 9

+9 6.

R

IM

: 1

0.

IN

V

0.

' 2

4" (N

E)

IN

V

0.

' 1 8"

(N

IN

V

0.

' 2

4" (S

(E X

)S S

M H

8-

5;

S

TA

: 1

3+

.5

R

IM

: 1 1.

INV: -0.28

EX 24" (S)

INV:-0.13-24"(NE)

INV: 2.19

NEW 10" SS(N)

IN

V

: 3 .6

5'

W

IN

V : 3

.6 4'

E)

(E X

)S S

M H

8-

2;

S

TA

: 1

3+

.6

R

IM

: 1 1.

ST

A:

+4

3.

E X

S S

L A

TE

R

AL

ST

A:

+0

1.

E X

S S

L A

TE

R

AL

ST

A:

+2

8.

E X

S S

L A

TE

R

AL

ST

A:

+7

9.

E X

S S

L A

TE

R

AL

ST

A:

+2

0.

E X

S S

L A

TE

R

AL

IN

V

: 3 .7

0'

SE

IN

V : 4

.6 9'

"(W

(N E

W )5

4' ' S

S M

H

2;

S

TA

: 9

+8 9.

R

IM

: 1

0.

INSTALL 9LF of

8" SS @ 2.29%

E X

" S

S C

R O

SS

IN

G A

P P

R O

X . D

EP

TH

E X

" S

ID

W

C R

O

SS

IN

G

A P

P R

O X

. D

EP

TH

E

X S

D C

R O

SS

IN

G A

P P

R O

X . D

EP

TH

E X

" W

C R

O

SS

IN

G

A P

P R

O X

. D

EP

TH

E

X.

G

A S

C R

O

SS

IN

G

A P

P R

O X

. D

EP

TH

E X

E

LE

C C

R O

SS

IN

G A

P P

R O

X . D

EP

TH

E X

" W

C R

O

SS

IN

G

A P

P R

O X

. D

EP

TH

INV:3.50 NEW 8"SS(NW)

INV:3.70 NEW 8"SS(SE) INV:2.09(E)-NEW 10"SS

INV:0.89(W)-NEW 10"SS

INSTALL 396 LF of 10" SS @ R=4500' @ 0.30%

20 20 20 20 20

CALLOUT NOTES

CALLOUT NOTES

CALLOUT NOTES

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\2

8-

_P lan Pr ofi le_

Un ion

Al ley

.dw g

F eb

3,

- 1

:51 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

C-104

UN

IO

N

AV

EN

UE

A

ND

A

LL

EY

PL

AN

A

ND

P

RO

FI

LE

D

EL

AW

AR

E

ST

R

EE

T

A

LL

EY

U N

IO

N

A

VE

N U

E C -1

C -1

(ID/12)SEE NOTE 7

3"

3' -0

" F O

R

' I D

M H

UNDISTURBED EARTH

(M

IN

6"

(T

YP

(M

AX

FL

O

W

M

AX

PIPE ID

5'-8" (MIN) FOR 4'-0"Ø MH

6'-10" (MIN) FOR 5'-0"Ø MH

4"

3" (M

IN

(T

YP

6"

(TYP)

(MIN)

PR

EC

AS

T

EC

C

EN

TR

IC

C

O N

E

3' -0

" M

IN

F O

R

' I D

M H

4' -0

" M

IN

F O

R

' I D

M H

6" 9"

" M

IN

" M

AX

24"

D

IR

EC

TI

O N

FL

O

W D

IR

EC

TI

O

N

PRECAST FLOW

CHANNEL

PRECAST MANHOLE

BASE

SPIGOT X SPIGOT STICK

CAST IN BELLS

(TYP EACH PIPE)

PRECAST BASE RING

ALL SHELF AREAS

SHALL BE SLOPED

TOWARDS THE

FLOW CHANNEL

CAST IN BELL FOR

INCOMING PIPE

BELL X SPIGOT STICK

SLOPE

(ID/12)

(MIN)

GROUT AROUND

BELLS (TYP)

MANHOLE THROAT

LOCATION OR AS

DIRECTED BY DISTRICT

2 TYPICAL MANHOLE DETAILS

N.T.S.

TEXAS STREET

C

LA

Y

ST

R

EE

T TE

MP.

B

YP

AS

S

NIC 36"SD

N

IC

2"

S D

PR

"S S

EX

0" S S

EX 10"SS

REMOVE EX SSMH

PR 15"SS

NEW 48" SSMH 3

NEW SDMH(NIC)

EX

PL

U

G G

ED

S

S

4 MANHOLE 3 LAYOUT

N.T.S.

PLAN VIEW

PROFILE VIEW

5 MANHOLE 6 DETAIL

N.T.S.

(NEW) 60" SSMH

(EX) SSMH U18-403

TO BE ABANDONED

3 MANHOLE 7 DETAIL

N.T.S.

(NEW) 60" SSMH TO BE ABANDONED

PI

PE

Z O

N E

3 4" C

LE

AN

C R

U

SH

ED

R

O C

K

PI

PE

O D

6"

PIPE OD+24" (MAX)

12" (MIN)

TR

EN

C H

Z O

N E

COARSE BEDDING MATERIAL

WRAPPED IN GEOTEXTILE

FABRIC, PER GEOTECHNICAL

ENGINEER'S RECOMMENDATION

OVER-EXCAVATION,

SEE NOTE 8

1 SEWER DISTRICT TRENCH DETAIL

N.T.S.

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ De tai ls.

dw g

F eb

3,

- 1

:52 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

C-501

TY

PI

CA

L F

SS

D

DE

TA

ILS

FO

R

PI

PE

S

" D

IA

M

ET

ER

O R

GR

EA

TE

R

6 LEVEE MANHOLE DETAIL

N.T.S.

9 SSMH 12 &13 TIE-IN DETAIL

N.T.S.8 SSMH 11 TIE-IN DETAIL

N.T.S.7 SSMH 4848-155 TIE-IN DETAIL

N.T.S.

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ De tai ls.

dw g

F eb

3,

- 1

:53 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

C-502

TY

PI

CA

L F

AI

RF

IE

LD

D

ET

AI

LS

FO

R

PI

PE

S

LE

SS

T

HA

N

" D

IA

ME

TE

R

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ Er os ion

C on tro l.d wg F eb

3,

- 1 :55 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

EROSION & SEDIMENT CONTROL NOTES

CE101

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

P

LA

N

A A

4 F

EE

T

MA

X.

4 F

EE

T

MA

X.

IN

CH

M

AX

IN

CH

M

IN

IN

CH

MI

N.

SECTION A-A

TYPICAL FIBER ROLL INSTALLATION

CONSTRUCTION

SITE

OFF-SITE

NOTES:

1. INSTALL FIBER ROLLS IN A ROW ALONG A LEVEL

CONTOUR.

2. AT ENDS OF A ROW TURN THE LAST TWO FEET UP

SLOPE SLIGHTLY.

3. FIBER ROLLS SHALL BE BUTTED TIGHTLY AT THE

JOINTS.

4. DO NOT OVERLAP JOINTS.

FLOW

FIBER ROLL

8 INCH MIN.

SLOPEVARIES

INSTALL A FIBER ROLL

NEAR SLOPE WHERE

IT TRANSITIONS INTO A

STEEPER SLOPE

3/4 IN. X 3/4 IN.

WOOD STAKES MAX.

4 FT. SPACING

1 TEMPORARY STORM DRAIN INLET FILTERS

N.T.S.

2 TEMPORARY FIBER ROLLS

N.T.S.

THIS SECTION REMOVED FOR

GRAPHICAL REPRESENTATION

ONLY. STRAW BALE PERIMETER

SHALL BE CONTINUOUS.

BALE CONFIGURATION

SECTION A - A

NOTES:

1. FACE SIGN TOWARD NEAREST

STREET OR ACCESS POINT.

2. CONCRETE WASHOUT SHALL BE

LOCATED BEHIND THE CURB

AND 50 FT. MINIMUM FROM

DRAINAGE INLETS OR

WATERCOURSES.

14" MIN

' M

IN

TY

P

OF

S

ID

ES

1" M

IN

A

" M

IN

A

" M

IN

STRAW BALES

60 MIL

POLYETHYLENE

2" X 2"

STAKES OF #4 J-BARS

2 PER BALE TYPE

STRAW BALES

3 CONCRETE WASHOUT

N.T.S.

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ Er os ion

C on tro l.d wg F eb

3,

- 1 :55 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

CE501

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

D

ET

AI

LS

File details come from the government source that posted it. Updated .