20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf
PDF 2 MB Posted
- Attached to
- Asset Protection - Landscaping
- Solicitation number
- 911-0213-26
- Issued by
- Trinity County, California
About this file
This is a preliminary technical drawing for a Temporary Sewer Bypass plan prepared for the City of Fairfield and County of Solano in support of the Justice Campus Asset Protection Project. The drawing, created as of February 24, 2026, illustrates sanitary sewer bypass provisions at a horizontal scale of 1 inch equals 30 feet and serves as part of the comprehensive asset protection initiative designed to safeguard county properties from seasonal stormwater flooding. The temporary sewer bypass plan is one of multiple engineering components supporting the broader project scope, which encompasses barrier walls, berms, landscaping, hardscape, flood gates, underground utility reconfiguration, and pump systems across multiple county facility locations. The drawing file is located within the project's CAD management system and is classified as preliminary and not for construction use, indicating it represents an intermediate design phase subject to further revision and finalization before implementation.
This technical drawing supports a federally funded FEMA/OES project requiring compliance with Davis-Bacon Act prevailing wage requirements and Title 2 CFR procurement standards. The landscaping component of the Asset Protection Project requires contractors to achieve substantial completion within 231 calendar days from the Notice to Proceed, with final completion required within 30 days thereafter. A mandatory pre-bid conference is scheduled for February 19, 2026, at 10:00 a.m., with sealed bids due by 2:00 p.m. on March 9, 2026, submitted through the Solano County OpenGov E-Procurement Portal. All contractors and subcontractors must maintain current California contractor licenses, be registered with the California Department of Industrial Relations, and comply with federal procurement requirements. Liquidated damages of $2,000 per calendar day apply for delays beyond the contract completion date, with a 5 percent retainage held from progress payments until 35 days after the Notice of Completion is filed.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RE
VI
SI
ON
S
DA
TE
DR
AW
N
BY
CH
EC
KE
D
BY
SI
GN
AT
UR
E
BL
OC
K
OF
CE
R, S
EP
FE
BR
UA
RY
FI
LE
L O
C
AT
IO
N
LA
ST
R
EV
IS
IO
N
:S:
\P ro jec ts\
\2
8-
\3_ Dr aw ing s\I mp ro ve m en t P lan
\25
-0
0_ Ov erl an d S S
By pa ss P lan .dw g F eb
4,
- 8 :57 am
SO
LA
NO
C
O
UN
TY
DO
W
NT
O W
N
FA
IR
FI
EL
D
JU
ST
IC
E
CA
M
PU
S
R
EV
D
AT
E
BY
D
ES
C R
IP
TI
O N
PRELIM
INARY
NOT FOR
CONSTRUCTION
JU
ST
IC
E
CA
MP
US
A
SS
ET
P
RO
TE
CT
IO
N
CI
TY
O F
FA
IR
FI
EL
D
- C
OU
NT
Y
OF
S
OL
AN
O
SS1
TE
MP
OR
AR
Y
SE
W
ER
B
YP
AS
S
TEMPORARY SEWER BYPASS PLAN
HORIZONTAL: 1"=30'
SANITARY SEWER BYPASS PROVISIONS
File details come from the government source that posted it. Updated .