20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf

PDF 96 MB Posted

Attached to
Asset Protection - Landscaping
Solicitation number
911-0213-26
Issued by
Trinity County, California

About this file

This is an approved Intermediate Final Construction (IFC) drawing set for the Asset Protection project in California, prepared by the Building Division. The document provides detailed architectural and engineering drawings for flood protection infrastructure across multiple County properties located at 500, 530, 550, and 600 Union Avenue; 500, 510, 512, 520, and 530 Clay Street; 501 and 509 Delaware Street; and 501 Texas Street, along with adjacent driveways and parking areas. The project scope encompasses barrier walls, berms, landscaping, hardscape, flood gates, underground utility reconfiguration, and pump systems designed to protect County assets from seasonal flooding. The drawing set represents the intermediate final design phase and has received Building Division approval, indicating the project has progressed through design review and is prepared for construction implementation. The landscaping component is being procured separately under a multi-prime procurement method.

The IFC drawing set serves as the technical foundation for bid solicitation and construction execution. These approved plans establish the design specifications, material requirements, and construction methodologies that contractors must follow for all protection measures and site improvements. The drawings coordinate across multiple disciplines including civil engineering, landscape architecture, and utility engineering to ensure comprehensive stormwater protection integration. As an approved intermediate final document, the drawings are sufficiently detailed to allow contractors to submit accurate bids and proceed with construction activities while maintaining the flood protection objectives established for the County properties.

View the file

Other files

File Type Posted
20260304_Asset_Protection_Project_Schedule.pdf PDF
20260311_WRA_Redlined_Volume_1_Drawings.pdf PDF
20260313_WRA_Redlined_Volume_2_Drawings.pdf PDF
20260317_Asset_Protection_Project_-_Landscaping_-_Addendum_5.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20260210_Asset_Protection_Landscaping_-_Project_Manual.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
Access_Requirements.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .