20260317_Asset_Protection_Project_-_Landscaping_-_Addendum_5.pdf

PDF 277 KB Posted

Attached to
Asset Protection - Landscaping
Solicitation number
911-0213-26
Issued by
Trinity County, California

About this file

This is Addendum 5 to the landscaping component of the Asset Protection Project issued by the Solano County Department of General Services, Capital Projects Management Division. The addendum modifies the original bid documents dated February 10, 2026, for landscaping work at the Asset Protection Project located at 550/600 Union Avenue, Fairfield, California 94533. The project scope includes planting, irrigation systems, sod lawn installation, and demolition of existing irrigation systems designed to protect county properties from seasonal stormwater flooding. The addendum revises the project completion timeline to 314 calendar days from the Notice to Proceed and extends the bid submission deadline to 2:00 PM local time on March 20, 2026, via the Solano County OpenGov E-Procurement Portal. A mandatory pre-bid conference was previously held on February 19, 2026. Bidders are required to acknowledge receipt of all five addenda issued for this procurement on either the Bid Form or through OpenGov to be considered responsive.

The addendum incorporates revised landscape drawings by WRA Environmental Consultants with redlined revisions marked up on March 11, 2026 (Volume 1) and March 13, 2026 (Volume 2), establishes a revised Project Schedule dated March 4, 2026, and removes the planting window restriction of October 15th through December 31st from the specifications. Liquidated damages are assessed at $2,000 per calendar day for delays beyond the 314-calendar-day contract completion period. Bidders must submit a 10 percent bid bond or certified check with their proposal, and upon award, furnish performance and payment bonds equal to 100 percent of the contract amount plus a one-year warranty bond for 10 percent of the final contract price. All contractors and subcontractors must be registered with the California Department of Industrial Relations, maintain current California contractor's licenses, and comply with Davis-Bacon Act prevailing wage requirements, as the project is federally funded through OES/FEMA.

View the file

Other files

File Type Posted
20260304_Asset_Protection_Project_Schedule.pdf PDF
20260313_WRA_Redlined_Volume_2_Drawings.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20260210_Asset_Protection_Landscaping_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Landscaping_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Landscaping_-_Project_Manual.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

March 17, 2026

Asset Protection Project – Landscaping

Addendum 5 Page 1

DEPARTMENT OF GENERAL SERVICES

Capital Projects Management Division

MARK A. HUMMEL, AIA

Capital Projects Manager MAHummel@SolanoCounty.gov

(707) 784-7908

675 Texas Street, Suite 2500 Fairfield, CA 94533-6342 707-784-7900 www.solanocounty.gov

ANTHONY L. TAVE, P.E.

Director General Services ALTave@SolanoCounty.gov

(707) 784-7902

DUSTIN D. LENO, MBA, A.A.E.

Assistant Director DDLeno@SolanoCounty.gov

(707) 784-2781

DATE: March 17, 2026

TO: All Interested Bidders

SUBJECT: Addendum 5

Additional Documents to be Included in Contract Documents for:

located at 550/600 Union Avenue, Fairfield, CA 94533

This ADDENDUM shall be considered part of the bid documents for the above-mentioned project as though it had been issued at the same time and shall be incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original bid documents, this ADDENDUM shall govern and take precedence.

Bidders are notified that they shall make any necessary adjustment(s) in their estimates on account of this ADDENDUM.

It will be construed that each bidder’s proposal is submitted with full knowledge of all modifications and supplemental data specified herein.

The clarifications and/or additions and/or deletions that are described in this ADDENDUM shall be included in the

Specifications and/or Drawings.

This ADDENDUM supersedes the original PROJECT MANUAL dated February 10, 2026, where it contradicts them; all other conditions remain unchanged.

The bid date has changed; bids are now due by 2:00 PM local time, March 20, 2026, via OpenGov.

Acknowledgment of receipt of this ADDENDUM is required on the Bid Form. The Acknowledgment Form is included in

SECTION 00 41 00 – BID FORM, which is included in the PROJECT MANUAL dated February 10, 2026.

ADDENDUM NO. 5

Addendum No. 5 is being issued to the Contract Bid Documents for the above-referenced project.

I. The PROJECT MANUAL dated February 10, 2026, is amended as follows:

A. In SECTION 01 11 00 - NOTICE TO BIDDERS, paragraph III is revised to read:

Sealed bid will be accepted until 2:00 p.m., local time, March 20, 2026, via OpenGov.

B. In SECTION 00 41 00 - BID FORM, paragraph H is revised to read:

LUMP SUM BASE BID for work included in this Contract necessary to complete the Asset

Protection Project located at 550/600 Union Avenue, Fairfield, California 94533 as shown in the drawings and specifications. Contractor shall Substantially Complete the Project within 314 calendar days from the Notice to Proceed. The undersigned is aware the Agreement includes provisions for Liquidated Damages as specified in Section 00 73 00 of the Bidding and Contract

Requirements if the Project is not completed within the agreed time of completion.

Addendum 5 Page 2

C. In SECTION 00 52 00 - AGREEMENT BETWEEN OWNER AND CONTRACTOR, the second paragraph of Article 3, “TIME OF COMMENCEMENT AND SUBSTANTIAL COMPLETION,” is revised to read:

The Contractor agrees that the Work will be substantially completed in 314 calendar days from the

Notice to Proceed. The Contractor agrees that the County will suffer economic damages, which may be difficult to quantify, in the event that the Work is not completed within this time period and therefore, Contractor agrees to pay the County liquidated damages in the amount outlined in

Document 00 73 00/ Supplementary Conditions, Article 1.4, Liquidated Damages for each and every calendar day of delay beyond the 314 calendar days provided above.

D. In SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS, under paragraph 1.3, “ARTICLE 8

– TIME,” the definition of “CONTRACT TIME” is revised to read:

8.1.5 CONTRACT TIME: The Contractor shall substantially complete the Work of the Contract within 314 CALENDAR DAYS from the NOTICE TO PROCEED.

E. In SECTION 01 11 00 - SUMMARY OF WORK, under paragraph 1.04 “SPECIFICATIONS,” new paragraph D is inserted and reads as follows:

D. The documents released for bid also include the Project Schedule dated March 4, 2026.

F. In SECTION 01 11 00 - SUMMARY OF WORK, under paragraph 1.05 “DRAWINGS,” new paragraph D is inserted and reads as follows:

D. For additional clarification: notwithstanding paragraph 1.05.B, the documents released for bid also include landscape drawings by WRA Environmental Consultants with redlined revisions for Volume 1 marked up on March 11, 2026 and Volume 2 marked up on March

13, 2026:

1. Volume 1, Sheet L-201, “LANDSCAPE PLAN - NORTHEAST ENTRY.”

2. Volume 1, Sheet L-204, “PLANTING LEGEND, DETAILS AND NOTES.”

3. Volume 1, Sheet L-205, “LANDSCAPE DETAILS.”

4. Volume 1, Sheet L-301, “IRRIGATION PLAN - NORTHEAST ENTRY.”

5. Volume 1, Sheet L-304, “IRRIGATION NOTES AND LEGEND.”

6. Volume 1, Sheet L-305, “IRRIGATION DETAILS.”

7. Volume 1, Sheet L-307, “IRRIGATION DETAILS.”

8. Volume 1, Sheet L-308, “WATER USE CALCULATIONS.”

9. Volume 2, Sheet L-201, “LANDSCAPE PLAN - NORTHEAST CORNER.”

10. Volume 2, Sheet L-202, “LANDSCAPE PLAN- NORTHEAST ENTRY.”

11. Volume 2, Sheet L-203, “LANDSCAPE DETAILS, TYPICAL LAYOUTS, AND

NOTES.”

Addendum 5 Page 3

12. Volume 2, Sheet L-302, “IRRIGATION NOTES AND LEGEND.”

13. Volume 2, Sheet L-303, “IRRIGATION DETAILS.”

G. In SECTION 32 90 00 - PLANTING, paragraph 3.1.B “Planting Window,” the sentence “Trees and shrubs shall be planted between October 15th and December 31st or as approved by the

Landscape Architect” is deleted.

II. The OpenGov portal for this project is revised as follows:

A. The following documents are added:

1. This ADDENDUM 5 dated March 17, 2026.

2. Revised Project Schedule dated March 4, 2026.

3. Landscape drawings by WRA Environmental Consultants with redlined revisions for

Volume 1 marked up on March 11, 2026.

4. Landscape drawings by WRA Environmental Consultants with redlined revisions for

Volume 2 marked up on March 13, 2026.

III. Clarifications:

A. Since there are five (5) Addenda for this bid package, and SECTION 00 41 00 - BID FORM only has slots for acknowledgment of three (3) Addenda, the acknowledgement of Addenda 4 and 5 can be written anywhere on the BID FORM. That said, as long as all five (5) Addenda are acknowledged on either OpenGov, SECTION 00 41 00 - BID FORM, or both, the bid will be considered responsive with respect to addenda acknowledgments.

END OF ADDENDUM 5