20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf
PDF 2 MB Posted
- Attached to
- Asset Protection - Landscaping
- Solicitation number
- 911-0213-26
- Issued by
- Trinity County, California
About this file
This is a preliminary technical drawing for a temporary sewer bypass plan prepared by the City of Fairfield in collaboration with Solano County for the Downtown Fairfield Justice Campus Asset Protection Project. The drawing, designated as Sheet SS1 and dated February 24, 2026, illustrates sanitary sewer bypass provisions at a horizontal scale of 1 inch equals 30 feet. The document is marked as preliminary and not for construction, indicating it is in the design development phase. The file location references project files within a 2025 project directory (Project 2558-0010), and the drawing was prepared by engineering professionals whose signatures appear in the document's signature block, with the last revision occurring on February 24, 2026 at 8:57 a.m.
The temporary sewer bypass plan is a component of the broader Justice Campus Asset Protection initiative designed to protect county and city properties from seasonal stormwater flooding. This drawing specifically addresses horizontal sanitary sewer bypass provisions required as part of the comprehensive asset protection measures that include barrier walls, berms, landscaping, hardscape, flood gates, and underground utility reconfiguration across multiple county facilities. The preliminary nature of the drawing and its integration with the project's overall design schedule suggest that final construction drawings and specifications would be completed and distributed to bidders in advance of the sealed bid deadline scheduled for March 9, 2026, with a mandatory pre-bid conference on February 19, 2026.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RE
VI
SI
ON
S
DA
TE
DR
AW
N
BY
CH
EC
KE
D
BY
SI
GN
AT
UR
E
BL
OC
K
OF
CE
R, S
EP
FE
BR
UA
RY
FI
LE
L O
C
AT
IO
N
LA
ST
R
EV
IS
IO
N
:S:
\P ro jec ts\
\2
8-
\3_ Dr aw ing s\I mp ro ve m en t P lan
\25
-0
0_ Ov erl an d S S
By pa ss P lan .dw g F eb
4,
- 8 :57 am
SO
LA
NO
C
O
UN
TY
DO
W
NT
O W
N
FA
IR
FI
EL
D
JU
ST
IC
E
CA
M
PU
S
R
EV
D
AT
E
BY
D
ES
C R
IP
TI
O N
PRELIM
INARY
NOT FOR
CONSTRUCTION
JU
ST
IC
E
CA
MP
US
A
SS
ET
P
RO
TE
CT
IO
N
CI
TY
O F
FA
IR
FI
EL
D
- C
OU
NT
Y
OF
S
OL
AN
O
SS1
TE
MP
OR
AR
Y
SE
W
ER
B
YP
AS
S
TEMPORARY SEWER BYPASS PLAN
HORIZONTAL: 1"=30'
SANITARY SEWER BYPASS PROVISIONS
File details come from the government source that posted it. Updated .