This is a Sanitary Sewer Bypass Specification document prepared for the Solano County Justice Campus Asset Protection project, with KSN, Inc. serving as the Project Manager and Baumbach & Piazza, Inc. as the Project Engineer. The specification outlines requirements for a temporary sewer bypass system designed to maintain sanitary sewer operations during the broader Asset Protection Project, which encompasses flood mitigation infrastructure across multiple county properties in the Union Avenue, Clay Street, Delaware Street, and Texas Street areas. The contractor must furnish all labor, materials, equipment, and incidentals necessary to install, operate, and maintain the bypass pumping system and associated pipelines as detailed on plan sheet SS-1. Work must comply with Fairfield-Suisun Sewer District Standards, applicable City, District, County, State, and Federal environmental regulations and codes. The contractor is responsible for complete site restoration upon completion, including backfilling, grassing, sodding, and routine site restoration, with all costs incorporated into the lump sum bid price. Specific response dates, bidder conferences, and contract award information are not contained within this specification document, as it represents one technical component of the larger multi-prime Asset Protection procurement.
Compensation is provided on a lump sum basis, with the single price covering all aspects of bypass system installation, operation, materials, labor, tools, transportation, disposal, and related incidentals. The specification references additional requirements and detailed provisions shown on plan sheet SS-1, which would contain submittal requirements, preparation procedures, and specific technical standards. As a component of the federally funded FEMA Asset Protection Project, the work must align with prevailing wage requirements and federal compliance standards applicable to the overall Justice Campus Asset Protection initiative in Solano County.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLANO COUNTY
JUSTICE CAMPUS ASSET PROTECTION
SANITARY SEWER BYPASS SPECIFICATION
FEBRUARY 23, 2026
Project Manager KSN, Inc.
1550 Harbor Blvd.
West Sacramento, CA 95691
Project Engineer Baumbach & Piazza, Inc.
323 W. Elm St.
Lodi, CA 95240
Solano County Sanitary Sewer Bypass Justice Campus Asset Protection 02 01 40-1
SECTION 02 01 40
SANITARY SEWER BYPASS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. The Contractor shall furnish all labor, materials, equipment, and incidentals to place and maintain operation of a temporary sewer bypass system as shown on plan sheet SS-1.
1.02 MEASUREMENT AND PAYMENT
A. Full compensation for conforming to the requirements of this Section shall be paid by lump sum price. The lump sum price includes installing and operating bypass pumping (if used) and pipelines, and including furnishing all labor, materials, tools, transportation, disposal, supplies, equipment, appurtenances, and incidentals and for doing all the work involved in sewer bypass, complete as shown on plan sheet SS-1.
1.03 REFERENCES
A. Perform Work in accordance with the Fairfield-Suisun Sewer District (District) Standards, and the Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.
1.04 REGULATORY REQUIREMENTS
A. Conform to applicable City, District, County, State and Federal regulations and/or codes for environmental requirements.
1.05 SUBMITTALS
A. Refer to Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.
PART 2 - PRODUCTS – NOT USED
PART 3 - EXECUTION
3.01 PREPARATION
A. Refer to Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.
3.02 GENERAL
A. Refer to Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.
B. Provide complete restoration including, but not limited to, all backfilling, grassing and sodding, and routine site restoration. Items not covered in the Bid Schedule shall be included in the cost for other items.
END OF SECTION 02 01 40