Sanitary Sewer Bypass Specification Summary

This is a sanitary sewer bypass specification document prepared for the Solano County Justice Campus Asset Protection project, with project management oversight by KSN, Inc. and engineering by Baumbach & Piazza, Inc. The specification outlines requirements for a temporary sewer bypass system that the contractor must furnish, install, operate, and maintain during construction activities. The work includes providing all labor, materials, equipment, and incidentals necessary to place and operate the bypass pumping system and associated pipelines as detailed on plan sheet SS-1. All work must be performed in accordance with Fairfield-Suisun Sewer District standards and applicable City, County, State, and Federal environmental regulations and codes. The contractor must provide complete restoration upon project completion, including backfilling, grassing, sodding, and routine site restoration, with all costs incorporated into the lump sum bid price.

Compensation for the sanitary sewer bypass work is established through a single lump sum price that encompasses all labor, materials, tools, transportation, disposal, supplies, equipment, appurtenances, and incidentals required for complete installation and operation of the temporary bypass system. The specification does not address pricing terms, funding sources, or contract award details, as this document serves solely as a technical specification for the bypass component of the broader Justice Campus Asset Protection project. All work must conform to the sanitary sewer bypass provisions established on the design plan sheet SS-1 and be completed in compliance with the District's operational standards.

View the file

Other files

File Type Posted
20260304_Asset_Protection_Project_Schedule.pdf PDF
20260313_WRA_Redlined_Volume_2_Drawings.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20260210_Asset_Protection_Landscaping_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Landscaping_-_Project_Manual.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLANO COUNTY

JUSTICE CAMPUS ASSET PROTECTION

SANITARY SEWER BYPASS SPECIFICATION

FEBRUARY 23, 2026

Project Manager KSN, Inc.

1550 Harbor Blvd.

West Sacramento, CA 95691

Project Engineer Baumbach & Piazza, Inc.

323 W. Elm St.

Lodi, CA 95240

Solano County Sanitary Sewer Bypass Justice Campus Asset Protection 02 01 40-1

SECTION 02 01 40

SANITARY SEWER BYPASS

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. The Contractor shall furnish all labor, materials, equipment, and incidentals to place and maintain operation of a temporary sewer bypass system as shown on plan sheet SS-1.

1.02 MEASUREMENT AND PAYMENT

A. Full compensation for conforming to the requirements of this Section shall be paid by lump sum price. The lump sum price includes installing and operating bypass pumping (if used) and pipelines, and including furnishing all labor, materials, tools, transportation, disposal, supplies, equipment, appurtenances, and incidentals and for doing all the work involved in sewer bypass, complete as shown on plan sheet SS-1.

1.03 REFERENCES

A. Perform Work in accordance with the Fairfield-Suisun Sewer District (District) Standards, and the Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.

1.04 REGULATORY REQUIREMENTS

A. Conform to applicable City, District, County, State and Federal regulations and/or codes for environmental requirements.

1.05 SUBMITTALS

A. Refer to Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.

PART 2 - PRODUCTS – NOT USED

PART 3 - EXECUTION

3.01 PREPARATION

A. Refer to Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.

3.02 GENERAL

A. Refer to Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.

B. Provide complete restoration including, but not limited to, all backfilling, grassing and sodding, and routine site restoration. Items not covered in the Bid Schedule shall be included in the cost for other items.

END OF SECTION 02 01 40