20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf
PDF 16 MB Posted
- Attached to
- Asset Protection - Landscaping
- Solicitation number
- 911-0213-26
- Issued by
- Trinity County, California
About this file
This is a 100% design submittal drawing set for sanitary sewer improvements prepared for the City of Fairfield and County of Solano as part of the Downtown Fairfield Justice Campus Asset Protection Project. The project encompasses Phase 1 of offsite sanitary sewer improvements across four streets: Washington Street (approximately 506 linear feet of new 15-inch VCP sewer line), Texas Street (318 linear feet of new 15-inch VCP sewer line), Clay Street, and Union Avenue with adjacent alley improvements. The design includes installation of multiple new sanitary sewer manholes (ranging from 48-inch to 60-inch diameters), abandonment of existing sewer infrastructure, and coordination with the concurrent Solano County Downtown Fairfield Justice Campus Asset Protection Project. The drawings indicate this is preliminary documentation not for construction and were last revised February 23, 2026. The design incorporates utility trench excavation and backfill specifications, erosion and sediment control measures, sewer bypass operations, and dewatering requirements, with separate traffic control plans referenced by construction work phase.
The technical documentation establishes construction standards through typical FSSD (Fairfield-Suisun Sewer District) details for pipes 12 inches in diameter or larger and typical Fairfield details for pipes less than 12 inches, including precast manhole specifications, flow channel configurations, and trench zone requirements. The drawing set references coordination with existing infrastructure including water lines, storm drains, hydrants, gas lines, electrical lines, and crossing details for multiple utility types. Erosion and sediment control details specify fiber roll installations, temporary storm drain inlet filters, and concrete washout areas with minimum setback requirements. The design documentation does not establish contract pricing, schedules, or award information, serving instead as the technical basis for construction bidding and contract administration for the sewer improvement phase of the larger flood mitigation project.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UTILITY TRENCH EXCAVATION AND BACKFILL
EROSION AND SEDIMENT CONTROL NOTES
SEWER ABANDONMENT NOTES
SURVEY NOTES
DEWATERING NOTES
SEWER BYPASS NOTES
FAIRFIELD-SUISIUN SEWER DISTRICT NOTES
SHEET INDEX
SHEET NUMBER SHEET TITLE
SHEET FILES:GENERAL
G-001 COVER SHEET
G-002 GENERAL NOTES AND SHEET INDEX
G-003 SHEET INDEX KEY MAP, LEGENDS, SYMBOLS, AND
ABBREVIATIONS
G-004 ALIGNMENTS AND CONTROL
G-101 ACCESS AND STAGING PLAN
SHEET FILES: CIVIL
C-101 WASHINGTON STREET PLAN AND PROFILE
C-102 TEXAS STREET PLAN AND PROFILE
C-103 CLAY STREET PLAN AND PROFILE
C-104 UNION AVENUE AND ALLEY PLAN AND PROFILE
C-501 TYPICAL FSSD DETAILS
(FOR PIPES 12" DIAMETER OR LARGER)
C-502 TYPICAL FAIRFIELD DETAILS
(FOR PIPES LESS THAN 12" DIAMETER)
SHEET FILES: CIVIL EROSION
CE101 EROSION AND SEDIMENT CONTROL PLANS
CE501 EROSION AND SEDIMENT CONTROL DETAILS
SHEET FILES: TRAFFIC CONTROL SEE SEPARATE TRAFFIC CONTROL PLANS BY AWP SAFETY
RE
VI
SI
ON
S
DA
TE
DR
AW
N
BY
CH
EC
KE
D
BY
SI
GN
AT
UR
E
BL
OC
K
OF
CE
R
NO
VE
M
BE
R
FI
LE
L O
C
AT
IO
N
LA
ST
R
EV
IS
IO
N
:S:
\P ro jec ts\
\2
8-
\3_ Dr aw ing s\I mp ro ve m en t P lan
\25
-0
0_ G0
.dw g F eb
3,
- 1 :39 pm
SO
LA
NO
C
O
UN
TY
DO
W
NT
O W
N
FA
IR
FI
EL
D
JU
ST
IC
E
CA
M
PU
S
FA
IR
FI
EL
D L
AW
a nd J
U
ST
IC
E
CA
M
PU
S
SE
CU
RI
TY
P
RO
JE
CT
R
EV
D
AT
E
BY
D
ES
C R
IP
TI
O N
PRELIM
INARY
NOT FOR
CONSTRUCTION
PH
AS
E
OF
FS
IT
E
SA
NI
TA
RY
S
EW
ER
IM
PR
OV
EM
EN
TS
CI
TY
O
F
FA
IR
FI
EL
D
- C
OU
NT
Y
OF
S
OL
AN
O
G-002
GE
NE
RA
L N
OT
E
AN
D
SH
EE
T
IN
DE
X
GENERAL NOTES
1.
1.
TRAFFIC CONTROL
RE
VI
SI
ON
S
DA
TE
DR
AW
N
BY
CH
EC
KE
D
BY
SI
GN
AT
UR
E
BL
OC
K
OF
CE
R
NO
VE
M
BE
R
FI
LE
L O
C
AT
IO
N
LA
ST
R
EV
IS
IO
N
:S:
\P ro jec ts\
\2
8-
\3_ Dr aw ing s\I mp ro ve m en t P lan
\25
-0
0_ G-
1_
Ac ce ss S tag ing
.dw g
F eb
3,
- 1
:43 pm
SO
LA
NO
C
O
UN
TY
DO
W
NT
O W
N
FA
IR
FI
EL
D
JU
ST
IC
E
CA
M
PU
S
FA
IR
FI
EL
D L
AW
a nd J
U
ST
IC
E
CA
M
PU
S
SE
CU
RI
TY
P
RO
JE
CT
R
EV
D
AT
E
BY
D
ES
C R
IP
TI
O N
PRELIM
INARY
NOT FOR
CONSTRUCTION
PH
AS
E
OF
FS
IT
E
SA
NI
TA
RY
S
EW
ER
IM
PR
OV
EM
EN
TS
CI
TY
O
F
FA
IR
FI
EL
D
- C
OU
NT
Y
OF
S
OL
AN
O
G-101
AC
CE
SS
A
ND
S
TA
GI
NG
P
LA
N
CALLOUT NOTES
POTENTIAL STAGING AREA. CONTRACTOR TO
COORDINATE WITH CONTRACTOR FOR THE SOLANO
COUNTY DOWNTOWN FAIRFIELD JUSTICE CAMPUS ASSET
PROTECTION PROJECT, AND VERIFY LOCATION IN FIELD.
STAGING/LAYDOWN AREA TO BE REMOVED AFTER
CONSTRUCTON.
A
WASHINGTON STREET PLAN STA. 19+00 TO 25+00
HORIZONTAL:1"=30'
WASHINGTON STREET SANITARY SEWER PROFILE
HORIZONTAL:1"=30'; VERTICAL:1"=3'
20+00 21+00 22+00 23+00 24+00 25+00
(NIC)
BY OTHERS
36" SD
@ 0.50%
IN
V
: 5 .8
4'
6" (S
IN
V : 5
.8 4'
6"
(E
(N
IC
)S D
M H
; S
TA
: 1 9+
.0
R
IM
: 1
3.
IN
V
: 3 .2
4'
8" (N
IN
V : 5
.1 9'
W
IN
V
: 3 .2
2'
8" (S
(E X
)S S
M H
8-
2;
S
TA
: 2
1+
.3
R
IM
: 1 3.
IN
V
: 3 .7
7'
8" (N
IN
V : 1
.3 7'
2"
(W
(E X
)S S
M H
8-
1;
S
TA
: 2
3+
.4
R
IM
: 1 5.
(EX)16' of 18" SS @ 1.65%
IN
V
: 7 .3
1'
2" (W
IN
V : 4
.2 4'
8"
(N
IN
V
: 4 .0
3'
8" (S
(E X
)S S
M H
8-
0;
S
TA
: 2
4+
.2
R
IM
: 1 5.
(ABANDON EX)398' of
18" SS @ 0.25%
INV:5.84(S)
INV:3.77(N)
INV:4.03(S)
INV:3.22(S)
EX. GROUND @ ALIGNMENT CENTERLINE
APPROXIMATE DEPTH OF EX 8" WTR
ST
A:
+9
7.
E X
W
TR
T
EE
ST
A:
+0
5.
E X
W
TR
T
EE
ST
A:
+1
9.
E X
W
TR
T
EE
INV:3.24(N)
INV:3.77(S)(PLUGGED)
INV: 1.37 EX.42" SS (W)
IN
V
: 7 .8
5'
E)
IN
V
: 7 .7
3'
N
IN
V : 7
.7 4'
S)
(E X
)S S
M H
; S
TA
: 2 0+
.6
R
IM
: 1
3.
INV:7.73(N)INV:7.74(S)
INV:3.71-NEW 15" SS(N)
INV:3.60-NEW 15" SS(S)
INV:3.60-NEW 15" SS(N)
INV:3.20-NEW 15" SS(S)
IN
V
: 3 .3
7'
8" (S
IN
V : 4
.2 0'
N W
IN
V : 1
.3 7'
2"
(E &W
(N E
W )6
0' ' S
S M
H
; S
TA
: 2 3+
.4
R
IM
: 1
5.
IN
V
: 3 .6
0'
5" (S
IN
V : 5
.1 9'
W
IN
V
: 3 .6
0'
5" (N
(N E
W )4
8' ' S
S M
H
; S
TA
: 2 1+
.1
R
IM
: 1
3.
IN
V
: 3 .7
9'
5" (E
IN
V : 3
.7 9'
5"
(N
(N E
W )4
8' ' S
S M
H
; S
TA
: 2 0+
.2
R
IM
: 1
3.
(ABANDON EX) 395' of 6" SS(APPROXIMATE DEPTH)
INSTALL 266 LF of 15" SS VCP @ 0.15%
(ABANDON EX)263' of 18" SS @ 0.20%
INSTALL 70 LF of
15" SS VCP @ 0.15%
(EX)18" SS
INV: 5.19' - EX 4" SS(W)
INV: 3.79-NEW 15" SS(E)
INV:3.71-NEW 15" SS(S)
INV:3.79-NEW 15" SS(N)
INSTALL 55 LF of
15" SS VCP @ 0.15%
IN
V
: 3 .7
1'
5" (S
IN
V : 4
.9 6'
E)
IN
V : 3
.7 1'
5"
(N
(N E
W )4
8' ' S
S M
H
; S
TA
: 2 0+
.6
R
IM
: 1
3.
IN
V
: 8 .9
N
IN
V : 7
.4 5'
2"
(E E)
(N E
W )4
8' ' S
S M
H
; S
TA
: 2 4+
.1
R
IM
: 1
5.
(ABANDON EX)
116 LF of 6" SS
INV: 9.0±-EX 6" SS
IN
V
: 6 .0
0'
0" (W
IN
V : 6
.0 0'
6"
(N
(N
IC
)C B
- 9 2;
S
TA
: 1 9+
.3
R
IM
: 1
3.
IN
V
: 7 .2
0'
S)
(N E
W )S
S C
O
0;
S
TA
: 1
9+
.8
R
IM
: 1 3.
S
S
S
S
S
S
S
S
IN
D
U C
TI
O
N L
O O
P(
TY
P)
S S
S
S
S
S
ST
A:
+9
8.
EX
. S
SM
H
ST
A:
+3
2.
EX
S
SM
H
ST
A:
+6
1.
EX
S
SM
H
ST
A:
+8
0.
N
IC
S D
M H
ST
A:
+3
2.
N
EW
8"
S
SM
H
ST
A:
+9
8.
N
EW
0"
S
SM
H
ST
A:
+1
1.
N
EW
8"
S
SM
H
ST
A:
+1
4.
EX
. S
SM
H
ST
A:
+3
1.
EX
S
SC
O
EM
PI
R E
AV
E.
TE
X A S S
TR
EE
T
20+00 21+00 22+00 23+00 24+00
C -5
16'
C -1
C -5
01 2 C -5
ST
A:
+6
1.
N
EW
8"
S
SM
H
C -5
C -5
WASHINGTON STREET
WASHINGTON STREET
ST
A:
+1
4.
N
EW
8"
S
SM
H
CALLOUT NOTES
RE
VI
SI
ON
S
DA
TE
DR
AW
N
BY
CH
EC
KE
D
BY
SI
GN
AT
UR
E
BL
OC
K
OF
CE
R
NO
VE
M
BE
R
FI
LE
L O
C
AT
IO
N
LA
ST
R
EV
IS
IO
N
:S:
\P ro jec ts\
\2
8-
\3_ Dr aw ing s\I mp ro ve m en t P lan
\2
8-
_P lan Pr ofi le_
W as hin gto n_ C-
1.d wg F eb
3,
- 1 :46 pm
SO
LA
NO
C
O
UN
TY
DO
W
NT
O W
N
FA
IR
FI
EL
D
JU
ST
IC
E
CA
M
PU
S
FA
IR
FI
EL
D L
AW
a nd J
U
ST
IC
E
CA
M
PU
S
SE
CU
RI
TY
P
RO
JE
CT
R
EV
D
AT
E
BY
D
ES
C R
IP
TI
O N
PRELIM
INARY
NOT FOR
CONSTRUCTION
PH
AS
E
OF
FS
IT
E
SA
NI
TA
RY
S
EW
ER
IM
PR
OV
EM
EN
TS
CI
TY
O
F
FA
IR
FI
EL
D
- C
OU
NT
Y
OF
S
OL
AN
O
C-101
W
AS
HI
NG
TO
N
ST
RE
ET
PL
AN
A
ND
P
RO
FI
LE
TEXAS STREET PLAN STA. 15+50 TO 20+50
HORIZONTAL:1"=30'
TEXAS STREET SANITARY SEWER PROFILE
HORIZONTAL:1"=30'; VERTICAL:1"=3'
16+00 17+00 18+00 19+00 20+00 20+50
EX. GROUND @ ALIGNMENT CENTERLINE
(NIC)-BY OTHERS
36" SD @ 0.50%
IN
V
: 5 .8
4'
6" (S
IN
V : 5
.8 4'
6"
(E
(N
IC
)S D
M H
; S
TA
: 1 6+
.7
R
IM
: 1
3.
IN
V
: 4 .0
8'
6" (W
IN
V : 4
.0 8'
2"
(S
(N
IC
)S D
M H
; S
TA
: 1 9+
.3
R
IM
: 1
2.
INV:5.84(E)
INV:4.08(W)
ST
A:
+5
8.
E X
W
TR
T
EE
ST
A:
+1
6.
E X
W
TR
T
EE
ST
A:
+1
4.
E X
W
TR
T
EE
ST
A:
+6
1.
E X
W
TR
T
EE
ST
A:
+4
7.
E X
W
TR
T
EE
ST
A:
+9
7.
E X
W
TR
T
EE
ST
A:
+9
6.
E X
W
TR
T
EE
APPROXIMATE DEPTH OF 8" WTR
INSTALL 318 LF of 15" SS VCP @ 0.15%
IN
V
: 4 .2
6'
5" (S
E)
IN
V : 4
.2 6'
5"
(W
(N E
W )4
8' ' S
S M
H
; S
TA
: 1 9+
.7
R
IM
: 1
2.
INV:3.79-NEW 15" SS(E)
IN
V
: 3 .7
9'
5" (E
IN
V : 3
.7 9'
5"
(N
(N E
W )4
8' ' S
S M
H
; S
TA
: 1 6+
.0
R
IM
: 1
3.
INV:2.93±- EX 18" SS
IN
V
: 7 .8
6'
0" (E
IN
V : 7
.9 0'
0"
(S
(E X
) S S
M H
; S
TA
: 1 9+
.4
R
IM
: 1
3.
INV:7.86(E)
INV:4.26-NEW 15" SS(W)
EX SSMH - SEE NOTE
IN
V
: 3 .7
1'
5" (S
IN
V : 4
.9 6'
E)
IN
V : 3
.7 1'
5"
(N
(N E
W )4
8' ' S
S M
H
; S
TA
: 1 6+
.9
R
IM
: 1
3.
INSTALL 55 LF of
15" SS VCP @ 0.15%
INV:3.71-NEW 15" SS(S) INV:3.79-NEW 15" SS(N)
INSTALL 38 LF of
15" SS VCP @ 0.15%
INV:4.26-NEW 15" SS(SE) INV:4.32-NEW 15" SS(NW)
IN
V
: 4 .9
0'
S)
IN
V
: 7 .8
0'
0" (E
IN
V : 4
.3 2'
5"
(N W
(N E
W )4
8' ' S
S M
H
; S
TA
: 1 9+
.2
R
IM
: 1
3.
INV: 4.90-NEW 8" SS(S)
CALLOUT NOTES
RE
VI
SI
ON
S
DA
TE
DR
AW
N
BY
CH
EC
KE
D
BY
SI
GN
AT
UR
E
BL
OC
K
OF
CE
R
NO
VE
M
BE
R
FI
LE
L O
C
AT
IO
N
LA
ST
R
EV
IS
IO
N
:S:
\P ro jec ts\
\2
8-
\3_ Dr aw ing s\I mp ro ve m en t P lan
\2
8-
_P lan Pr ofi le_
Te xa s.d wg
F eb
3,
- 1
:47 pm
SO
LA
NO
C
O
UN
TY
DO
W
NT
O W
N
FA
IR
FI
EL
D
JU
ST
IC
E
CA
M
PU
S
FA
IR
FI
EL
D L
AW
a nd J
U
ST
IC
E
CA
M
PU
S
SE
CU
RI
TY
P
RO
JE
CT
R
EV
D
AT
E
BY
D
ES
C R
IP
TI
O N
PRELIM
INARY
NOT FOR
CONSTRUCTION
PH
AS
E
OF
FS
IT
E
SA
NI
TA
RY
S
EW
ER
IM
PR
OV
EM
EN
TS
CI
TY
O
F
FA
IR
FI
EL
D
- C
OU
NT
Y
OF
S
OL
AN
O
C-102
TE
XA
S
ST
RE
ET
PL
AN
A
ND
P
RO
SI
ON
S
DA
TE
DR
AW
N
BY
CH
EC
KE
D
BY
SI
GN
AT
UR
E
BL
OC
K
OF
CE
R
NO
VE
M
BE
R
FI
LE
L O
C
AT
IO
N
LA
ST
R
EV
IS
IO
N
:S:
\P ro jec ts\
\2
8-
\3_ Dr aw ing s\I mp ro ve m en t P lan
\2
8-
_P lan Pr ofi le_
Cl ay
.dw g
F eb
3,
- 1
:49 pm
SO
LA
NO
C
O
UN
TY
DO
W
NT
O W
N
FA
IR
FI
EL
D
JU
ST
IC
E
CA
M
PU
S
FA
IR
FI
EL
D L
AW
a nd J
U
ST
IC
E
CA
M
PU
S
SE
CU
RI
TY
P
RO
JE
CT
R
EV
D
AT
E
BY
D
ES
C R
IP
TI
O N
PRELIM
INARY
NOT FOR
CONSTRUCTION
PH
AS
E
OF
FS
IT
E
SA
NI
TA
RY
S
EW
ER
IM
PR
OV
EM
EN
TS
CI
TY
O
F
FA
IR
FI
EL
D
- C
OU
NT
Y
OF
S
OL
AN
O
C-103
CL
AY
S
TR
EE
T
PL
AN
A
ND
P
RO
10+00 11+00 12+00
EX. VAULT
SS
S
EX
S
S S
ST
A:
9+
.2
EX
S
SM
H
ST
A:
+7
5.
EX
S
SM
H
ST
A:
+8
5.
EX
S
SM
H
ST
A:
+7
5.
N
EW
4"
S
SM
H
ST
A:
9+
.0
N
EW
4"
S
SM
H
NO
PA
RK
ING
C -5
S S
C -5
11LF OF NEW 10"SS @7.4%
22'
18'
PLUG
IN MH
x x x x x x x x x x x x x x x x
10+00 11+00 12+00 13+00 14+00
EX
V A U
LT
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
EX CURBEX CURB EX CURB
S S
ST
A:
9+
.3
EX
S
SM
H
ST
A:
+8
1.
EX
S
SM
H
ST
A:
+9
8.
EX
S
SM
H
ST
A:
+2
0.
EX
S
SC
O
ST
A:
+0
1.
EX
S
SC
O
ST
A:
+7
9.
EX
S
SC
O
ST
A:
+2
8.
EX
S
SC
O
ST
A:
+4
3.
EX
S
SC
O
ST
A:
9+
.6
N
EW
4"
S
SM
H
ST
A:
+9
2.
EX
S
SM
H
2.
4'
C C
ST
A:
9+
.0
IN
ST
AL
L
SS
M
H
NO
PARKING
NO
PARKING
C -5
C -5
21 214.
0' C
C
RADIUS=4500'
UNION AVENUE PLAN STA. 9+50 TO 12+50
HORIZONTAL:1"=30'
UNION AVENUE SANITARY SEWER PROFILE
HORIZONTAL:1"=30'; VERTICAL:1"=3'
10+00 11+00 12+00 12+50
IN
V
: 4 .8
3'
0" (W
IN
V : 4
.5 4'
0"
(N
IN
V
: 4 .8
4'
0" (S
(E X
)S S
M H
; S
TA
: 1 1+
.1
R
IM
: 1
1.
SU
M P:
4.
N
EW
IN
V:
.4
' 1 0"
(S W
SE
E N
O
TE
EX. GROUND @ ALIGNMENT CENTERLINE
IN
V
: 4 .5
5'
W
IN
V : 4
.7 4'
E)
(E X
)S S
M H
; S
TA
: 9 +9
4.
-3 0±
W
ES
T R
IM
: 9
.5 3'
IN
V
: 4 .7
7'
0" (N
IN
V : 4
.8 1'
0"
(E
(E X
)S S
M H
; S
TA
: 1 1+
.3
R
IM
: 1
1.
IN
V
: 4 .8
3'
0" (W
IN
V : 4
.5 4'
0"
(N
IN
V
: 4 .8
4'
0" (S
(E X
)S S
M H
; S
TA
: 1 1+
.1
R
IM
: 1
1.
(EX)10LF of 10" SS @ 0.71%, APPROXIMATE DEPTH OF EX 8" WTR
ST
A:
+1
1.
E X
W
TR
T
EE
APPROXIMATE DEPTH OF EX 12" HYDR
IN
V
: 2 .1
9'
0" (N
IN
V : 3
.5 0'
N W
IN
V : 2
.0 9'
0"
(E
(N E
W )5
4' ' S
S M
H
3;
S
TA
: 9
+9 0.
R
IM
: 1
0.
INV:2.70(S)-NEW 10"SS
INV:2.19(N)-NEW 10"SS
INV: 2.09
NEW 10" SS(E)
INSTALL 185LF of 10" SS @ 0.28% INSTALL 11LF of 10" SS @ 6.42%, SEE NOTE 10
IN
V
: 3 .7
0'
0" (N
E)
IN
V : 2
.7 0'
0"
(S
(N E
W )5
4' ' S
S M
H
1;
S
TA
: 1
1+
.2
R
IM
: 1 1.
INV:3.70- NEW 10"SS(NE)
INV:4.4±-NEW 10" SS(SW)
ST
A:
+5
3.
E X
S D
C R
O
SS
IN
G
ST
A:
+3
0.
E X
2"
H Y
D R
(E &W
IN
V
: 3 .7
0'
SE
IN
V : 4
.6 9'
"(W
(N E
W )5
4' ' S
S M
H
2;
S
TA
: 9
+9 4.
R
IM
: 1
0.
PLUG AND ABANDON, SEE 16
ALLEY PLAN STA. 9+50 TO 14+50
HORIZONTAL:1"=30'
ALLEY SANITARY SEWER PROFILE
HORIZONTAL:1"=30'; VERTICAL:1"=3'
10+00 11+00 12+00 13+00 14+00 14+50
IN
V
0.
' 2
4" (N
E)
IN
V
0.
' 1 8"
(N
IN
V
0.
' 2
4" (S
(E X
)S S
M H
8-
5;
S
TA
: 1
3+
.5
R
IM
: 1 1.
SU
M
P:
-0
.2 8'
N
EW
IN
V:
.8
9'
0" (W
EX. GROUND @ ALIGNMENT CENTERLINE
(EX)413LF of 8" SS @ 0.26%
IN
V
: 4 .5
5'
W
IN
V : 4
.7 4'
E)
(E X
)S S
M H
; S
TA
: 9 +6
8.
R
IM
: 9 .5
3' IN
V
: 3 .0
7'
W
IN
V : 4
.4 0'
N W
IN
V : 0
.9 0'
8"
(S
(E X
)S S
M H
8-
1;
S
TA
: 1
3+
.0
R
IM
: 1 1.
(EX)10LF of 8" @ 5.47%
INV:3.65(W)INV:4.74(E)
IN
V : 2
.1 9'
0"
(N
IN
V
: 3 .5
0'
N
W
IN
V
: 2 .0
9'
0" (E
(N E
W )5
4' ' S
S M
H
3;
S
TA
: 9
+9 6.
R
IM
: 1
0.
IN
V
0.
' 2
4" (N
E)
IN
V
0.
' 1 8"
(N
IN
V
0.
' 2
4" (S
(E X
)S S
M H
8-
5;
S
TA
: 1
3+
.5
R
IM
: 1 1.
INV: -0.28
EX 24" (S)
INV:-0.13-24"(NE)
INV: 2.19
NEW 10" SS(N)
IN
V
: 3 .6
5'
W
IN
V : 3
.6 4'
E)
(E X
)S S
M H
8-
2;
S
TA
: 1
3+
.6
R
IM
: 1 1.
ST
A:
+4
3.
E X
S S
L A
TE
R
AL
ST
A:
+0
1.
E X
S S
L A
TE
R
AL
ST
A:
+2
8.
E X
S S
L A
TE
R
AL
ST
A:
+7
9.
E X
S S
L A
TE
R
AL
ST
A:
+2
0.
E X
S S
L A
TE
R
AL
IN
V
: 3 .7
0'
SE
IN
V : 4
.6 9'
"(W
(N E
W )5
4' ' S
S M
H
2;
S
TA
: 9
+8 9.
R
IM
: 1
0.
INSTALL 9LF of
8" SS @ 2.29%
E X
" S
S C
R O
SS
IN
G A
P P
R O
X . D
EP
TH
E X
" S
ID
W
C R
O
SS
IN
G
A P
P R
O X
. D
EP
TH
E
X S
D C
R O
SS
IN
G A
P P
R O
X . D
EP
TH
E X
" W
C R
O
SS
IN
G
A P
P R
O X
. D
EP
TH
E
X.
G
A S
C R
O
SS
IN
G
A P
P R
O X
. D
EP
TH
E X
E
LE
C C
R O
SS
IN
G A
P P
R O
X . D
EP
TH
E X
" W
C R
O
SS
IN
G
A P
P R
O X
. D
EP
TH
INV:3.50 NEW 8"SS(NW)
INV:3.70 NEW 8"SS(SE) INV:2.09(E)-NEW 10"SS
INV:0.89(W)-NEW 10"SS
INSTALL 396 LF of 10" SS @ R=4500' @ 0.30%
20 20 20 20 20
CALLOUT NOTES
CALLOUT NOTES
CALLOUT NOTES
RE
VI
SI
ON
S
DA
TE
DR
AW
N
BY
CH
EC
KE
D
BY
SI
GN
AT
UR
E
BL
OC
K
OF
CE
R
NO
VE
M
BE
R
FI
LE
L O
C
AT
IO
N
LA
ST
R
EV
IS
IO
N
:S:
\P ro jec ts\
\2
8-
\3_ Dr aw ing s\I mp ro ve m en t P lan
\2
8-
_P lan Pr ofi le_
Un ion
Al ley
.dw g
F eb
3,
- 1
:51 pm
SO
LA
NO
C
O
UN
TY
DO
W
NT
O W
N
FA
IR
FI
EL
D
JU
ST
IC
E
CA
M
PU
S
FA
IR
FI
EL
D L
AW
a nd J
U
ST
IC
E
CA
M
PU
S
SE
CU
RI
TY
P
RO
JE
CT
R
EV
D
AT
E
BY
D
ES
C R
IP
TI
O N
PRELIM
INARY
NOT FOR
CONSTRUCTION
PH
AS
E
OF
FS
IT
E
SA
NI
TA
RY
S
EW
ER
IM
PR
OV
EM
EN
TS
CI
TY
O
F
FA
IR
FI
EL
D
- C
OU
NT
Y
OF
S
OL
AN
O
C-104
UN
IO
N
AV
EN
UE
A
ND
A
LL
EY
PL
AN
A
ND
P
RO
FI
LE
D
EL
AW
AR
E
ST
R
EE
T
A
LL
EY
U N
IO
N
A
VE
N U
E C -1
C -1
(ID/12)SEE NOTE 7
3"
3' -0
" F O
R
' I D
M H
UNDISTURBED EARTH
(M
IN
6"
(T
YP
(M
AX
FL
O
W
M
AX
PIPE ID
5'-8" (MIN) FOR 4'-0"Ø MH
6'-10" (MIN) FOR 5'-0"Ø MH
4"
3" (M
IN
(T
YP
6"
(TYP)
(MIN)
PR
EC
AS
T
EC
C
EN
TR
IC
C
O N
E
3' -0
" M
IN
F O
R
' I D
M H
4' -0
" M
IN
F O
R
' I D
M H
6" 9"
" M
IN
" M
AX
24"
D
IR
EC
TI
O N
FL
O
W D
IR
EC
TI
O
N
PRECAST FLOW
CHANNEL
PRECAST MANHOLE
BASE
SPIGOT X SPIGOT STICK
CAST IN BELLS
(TYP EACH PIPE)
PRECAST BASE RING
ALL SHELF AREAS
SHALL BE SLOPED
TOWARDS THE
FLOW CHANNEL
CAST IN BELL FOR
INCOMING PIPE
BELL X SPIGOT STICK
SLOPE
(ID/12)
(MIN)
GROUT AROUND
BELLS (TYP)
MANHOLE THROAT
LOCATION OR AS
DIRECTED BY DISTRICT
2 TYPICAL MANHOLE DETAILS
N.T.S.
TEXAS STREET
C
LA
Y
ST
R
EE
T TE
MP.
B
YP
AS
S
NIC 36"SD
N
IC
2"
S D
PR
"S S
EX
0" S S
EX 10"SS
REMOVE EX SSMH
PR 15"SS
NEW 48" SSMH 3
NEW SDMH(NIC)
EX
PL
U
G G
ED
S
S
4 MANHOLE 3 LAYOUT
N.T.S.
PLAN VIEW
PROFILE VIEW
5 MANHOLE 6 DETAIL
N.T.S.
(NEW) 60" SSMH
(EX) SSMH U18-403
TO BE ABANDONED
3 MANHOLE 7 DETAIL
N.T.S.
(NEW) 60" SSMH TO BE ABANDONED
PI
PE
Z O
N E
3 4" C
LE
AN
C R
U
SH
ED
R
O C
K
PI
PE
O D
6"
PIPE OD+24" (MAX)
12" (MIN)
TR
EN
C H
Z O
N E
COARSE BEDDING MATERIAL
WRAPPED IN GEOTEXTILE
FABRIC, PER GEOTECHNICAL
ENGINEER'S RECOMMENDATION
OVER-EXCAVATION,
SEE NOTE 8
1 SEWER DISTRICT TRENCH DETAIL
N.T.S.
RE
VI
SI
ON
S
DA
TE
DR
AW
N
BY
CH
EC
KE
D
BY
SI
GN
AT
UR
E
BL
OC
K
OF
CE
R
NO
VE
M
BE
R
FI
LE
L O
C
AT
IO
N
LA
ST
R
EV
IS
IO
N
:S:
\P ro jec ts\
\2
8-
\3_ Dr aw ing s\I mp ro ve m en t P lan
\25
-0
0_ De tai ls.
dw g
F eb
3,
- 1
:52 pm
SO
LA
NO
C
O
UN
TY
DO
W
NT
O W
N
FA
IR
FI
EL
D
JU
ST
IC
E
CA
M
PU
S
FA
IR
FI
EL
D L
AW
a nd J
U
ST
IC
E
CA
M
PU
S
SE
CU
RI
TY
P
RO
JE
CT
R
EV
D
AT
E
BY
D
ES
C R
IP
TI
O N
PRELIM
INARY
NOT FOR
CONSTRUCTION
PH
AS
E
OF
FS
IT
E
SA
NI
TA
RY
S
EW
ER
IM
PR
OV
EM
EN
TS
CI
TY
O
F
FA
IR
FI
EL
D
- C
OU
NT
Y
OF
S
OL
AN
O
C-501
TY
PI
CA
L F
SS
D
DE
TA
ILS
FO
R
PI
PE
S
" D
IA
M
ET
ER
O R
GR
EA
TE
R
6 LEVEE MANHOLE DETAIL
N.T.S.
9 SSMH 12 &13 TIE-IN DETAIL
N.T.S.8 SSMH 11 TIE-IN DETAIL
N.T.S.7 SSMH 4848-155 TIE-IN DETAIL
N.T.S.
RE
VI
SI
ON
S
DA
TE
DR
AW
N
BY
CH
EC
KE
D
BY
SI
GN
AT
UR
E
BL
OC
K
OF
CE
R
NO
VE
M
BE
R
FI
LE
L O
C
AT
IO
N
LA
ST
R
EV
IS
IO
N
:S:
\P ro jec ts\
\2
8-
\3_ Dr aw ing s\I mp ro ve m en t P lan
\25
-0
0_ De tai ls.
dw g
F eb
3,
- 1
:53 pm
SO
LA
NO
C
O
UN
TY
DO
W
NT
O W
N
FA
IR
FI
EL
D
JU
ST
IC
E
CA
M
PU
S
FA
IR
FI
EL
D L
AW
a nd J
U
ST
IC
E
CA
M
PU
S
SE
CU
RI
TY
P
RO
JE
CT
R
EV
D
AT
E
BY
D
ES
C R
IP
TI
O N
PRELIM
INARY
NOT FOR
CONSTRUCTION
PH
AS
E
OF
FS
IT
E
SA
NI
TA
RY
S
EW
ER
IM
PR
OV
EM
EN
TS
CI
TY
O
F
FA
IR
FI
EL
D
- C
OU
NT
Y
OF
S
OL
AN
O
C-502
TY
PI
CA
L F
AI
RF
IE
LD
D
ET
AI
LS
FO
R
PI
PE
S
LE
SS
T
HA
N
" D
IA
ME
TE
R
SI
ON
S
DA
TE
DR
AW
N
BY
CH
EC
KE
D
BY
SI
GN
AT
UR
E
BL
OC
K
OF
CE
R
NO
VE
M
BE
R
FI
LE
L O
C
AT
IO
N
LA
ST
R
EV
IS
IO
N
:S:
\P ro jec ts\
\2
8-
\3_ Dr aw ing s\I mp ro ve m en t P lan
\25
-0
0_ Er os ion
C on tro l.d wg F eb
3,
- 1 :55 pm
SO
LA
NO
C
O
UN
TY
DO
W
NT
O W
N
FA
IR
FI
EL
D
JU
ST
IC
E
CA
M
PU
S
FA
IR
FI
EL
D L
AW
a nd J
U
ST
IC
E
CA
M
PU
S
SE
CU
RI
TY
P
RO
JE
CT
R
EV
D
AT
E
BY
D
ES
C R
IP
TI
O N
PRELIM
INARY
NOT FOR
CONSTRUCTION
PH
AS
E
OF
FS
IT
E
SA
NI
TA
RY
S
EW
ER
IM
PR
OV
EM
EN
TS
CI
TY
O
F
FA
IR
FI
EL
D
- C
OU
NT
Y
OF
S
OL
AN
O
EROSION & SEDIMENT CONTROL NOTES
CE101
ER
OS
IO
N
AN
D
SE
DI
ME
NT
C
ON
TR
OL
P
LA
N
A A
4 F
EE
T
MA
X.
4 F
EE
T
MA
X.
IN
CH
M
AX
IN
CH
M
IN
IN
CH
MI
N.
SECTION A-A
TYPICAL FIBER ROLL INSTALLATION
CONSTRUCTION
SITE
OFF-SITE
NOTES:
1. INSTALL FIBER ROLLS IN A ROW ALONG A LEVEL
CONTOUR.
2. AT ENDS OF A ROW TURN THE LAST TWO FEET UP
SLOPE SLIGHTLY.
3. FIBER ROLLS SHALL BE BUTTED TIGHTLY AT THE
JOINTS.
4. DO NOT OVERLAP JOINTS.
FLOW
FIBER ROLL
8 INCH MIN.
SLOPEVARIES
INSTALL A FIBER ROLL
NEAR SLOPE WHERE
IT TRANSITIONS INTO A
STEEPER SLOPE
3/4 IN. X 3/4 IN.
WOOD STAKES MAX.
4 FT. SPACING
1 TEMPORARY STORM DRAIN INLET FILTERS
N.T.S.
2 TEMPORARY FIBER ROLLS
N.T.S.
THIS SECTION REMOVED FOR
GRAPHICAL REPRESENTATION
ONLY. STRAW BALE PERIMETER
SHALL BE CONTINUOUS.
BALE CONFIGURATION
SECTION A - A
NOTES:
1. FACE SIGN TOWARD NEAREST
STREET OR ACCESS POINT.
2. CONCRETE WASHOUT SHALL BE
LOCATED BEHIND THE CURB
AND 50 FT. MINIMUM FROM
DRAINAGE INLETS OR
WATERCOURSES.
14" MIN
' M
IN
TY
P
OF
S
ID
ES
1" M
IN
A
" M
IN
A
" M
IN
STRAW BALES
60 MIL
POLYETHYLENE
2" X 2"
STAKES OF #4 J-BARS
2 PER BALE TYPE
STRAW BALES
3 CONCRETE WASHOUT
N.T.S.
RE
VI
SI
ON
S
DA
TE
DR
AW
N
BY
CH
EC
KE
D
BY
SI
GN
AT
UR
E
BL
OC
K
OF
CE
R
NO
VE
M
BE
R
FI
LE
L O
C
AT
IO
N
LA
ST
R
EV
IS
IO
N
:S:
\P ro jec ts\
\2
8-
\3_ Dr aw ing s\I mp ro ve m en t P lan
\25
-0
0_ Er os ion
C on tro l.d wg F eb
3,
- 1 :55 pm
SO
LA
NO
C
O
UN
TY
DO
W
NT
O W
N
FA
IR
FI
EL
D
JU
ST
IC
E
CA
M
PU
S
FA
IR
FI
EL
D L
AW
a nd J
U
ST
IC
E
CA
M
PU
S
SE
CU
RI
TY
P
RO
JE
CT
R
EV
D
AT
E
BY
D
ES
C R
IP
TI
O N
PRELIM
INARY
NOT FOR
CONSTRUCTION
PH
AS
E
OF
FS
IT
E
SA
NI
TA
RY
S
EW
ER
IM
PR
OV
EM
EN
TS
CI
TY
O
F
FA
IR
FI
EL
D
- C
OU
NT
Y
OF
S
OL
AN
O
CE501
ER
OS
IO
N
AN
D
SE
DI
ME
NT
C
ON
TR
OL
D
ET
AI
LS
File details come from the government source that posted it. Updated .