20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf

PDF 18 MB Posted

Attached to
Asset Protection - Landscaping
Solicitation number
911-0213-26
Issued by
Trinity County, California

About this file

This document is a Pre-Bid Conference Sign-In Sheet for Trinity County's Asset Protection - Landscaping project, a federally funded flood mitigation initiative managed by the County to protect multiple municipal properties from seasonal stormwater flooding. The landscaping scope encompasses planting irrigation systems, planting installations, sod lawn work, and demolition of existing irrigation systems across eight separate county facility locations totaling multiple address points along Union Avenue, Clay Street, Delaware Street, and Texas Street, along with adjacent driveways and parking areas. A mandatory pre-bid conference was held on February 19, 2026, at 10:00 a.m. at the County Administration Center, with sealed bids due by 2:00 p.m. on March 9, 2026, submitted through the Solano County OpenGov E-Procurement Portal. Contractors must achieve substantial completion within 231 calendar days from the Notice to Proceed, with final completion required within 30 days thereafter. The project design was established by Mead & Hunt, Inc. (engineers) and WRA, Inc. (landscaping specialist), with construction drawings prepared by the County Building Division.

Bidders must submit a 10 percent bid bond or certified check with their proposal and furnish performance and payment bonds equal to 100 percent of the contract amount upon award, plus a one-year warranty bond for 10 percent of the final contract price. All contractors and subcontractors must be registered with the California Department of Industrial Relations, maintain current California contractor licenses at time of bid submission, and comply with Davis-Bacon Act prevailing wage requirements. The project is federally funded through OES/FEMA, requiring compliance with federal procurement standards under Title 2 CFR 200.318-200.326. A 5 percent retainage will be held from monthly progress payments (made at 95 percent of approved work in place) until 35 days after the Notice of Completion is filed. Liquidated damages of $2,000 per calendar day apply for delays beyond the contract completion date. Evaluation criteria include technical capability, cost, and compliance with federal and state requirements. Contractors must maintain Workers' Compensation and Commercial General Liability insurance throughout the contract period, with all certificates of insurance, licenses, and certifications required on file before the contract becomes effective.

View the file

Other files

File Type Posted
20260304_Asset_Protection_Project_Schedule.pdf PDF
20260311_WRA_Redlined_Volume_1_Drawings.pdf PDF
20260313_WRA_Redlined_Volume_2_Drawings.pdf PDF
20260317_Asset_Protection_Project_-_Landscaping_-_Addendum_5.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20260210_Asset_Protection_Landscaping_-_Project_Manual.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
Access_Requirements.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .