This additional information document supports Rhode Island College's request for HVAC improvements at the Murray Center Gym in Providence, submitted through the State of Rhode Island Division of Purchases. The project encompasses replacement of two existing air handling units with new units connected to dedicated outdoor 80-ton air-cooled condensers featuring aluminum enclosure screening, along with new and reused ductwork, modification and reuse of the existing heating system, and all associated piping, insulation, electrical components, and controls integration. The scope also includes a new concrete pad for exterior condenser installation, interior selective ceiling demolition, and electrical panel upgrades involving replacement of the existing 200A panel and automatic transfer switch with 400A equipment, plus structural reinforcing as required. A non-mandatory pre-bid meeting is scheduled for September 17, 2026 at 9:00 a.m. at Rhode Island College's Forman Center Room 130, with vendor questions due September 23, 2026 at 2:00 p.m. EDT and proposals due October 1, 2026 at 11:00 a.m. EDT. The initial contract period begins approximately December 1, 2027, with substantial completion required within 254 days of Purchase Order issuance and final completion within 12 days thereafter, with interior gym work allocated a six-week window from April 19, 2027 to May 28, 2027.

Vendors must be prequalified as Tier 1 public works contractors and maintain valid Rhode Island Contractors' Registration Board certification throughout the contract term. The contractor must provide shop drawings, as-built AutoCAD drawings upon completion, and commissioning procedures, and is responsible for obtaining all permits and inspections with permit fees at the contractor's expense. Work must comply with 2021 Rhode Island Building, Mechanical, and Electrical Codes and 2024 Rhode Island Energy Code, with a one-year warranty required on all materials, equipment, and installations. Contractors must demonstrate experience on at least three comparable projects. Liquidated damages are $250 per day for delays beyond substantial completion. Two allowances are included: $20,000 for unforeseen excavation conditions and $10,000 for planting and landscaping. Unit prices are required for structural fill, loam and topsoil, gravel, and air-entrained concrete pads. Bid surety bonds or certified checks equal to five percent of cost are required at submission; 100% payment and performance bonds are required before Purchase Order issuance. Insurance requirements include General Liability $1,000,000 per occurrence, Workers Compensation $100,000 each accident, and Automobile Liability $1,000,000 per occurrence. A 0.33% contract administrative fee will be withheld from invoices. All proposals must be submitted electronically through Ocean State Procures; mail, hand delivery, fax, and email submissions will not be accepted. Prevailing wage requirements apply under Rhode Island General Laws.

View the file

Other files

File Type Posted
RFQ27006992_Nov_20_26_solicitation_doc.pdf PDF
RFQ27006992_Nov_6_26_solicitation_doc.pdf PDF
RFQ27006992_Oct_28_26_solicitation_doc.pdf PDF
RFQ27006992_Oct_27_26_solicitation_doc.pdf PDF
RFQ27006992_Nov_4_26_solicitation_doc.pdf PDF
RFQ27006992_Nov_3_26_solicitation_doc.pdf PDF
RFQ27006992_Nov_19_26_solicitation_doc.pdf PDF
RFQ27006992_Oct_5_26_solicitation_doc.pdf PDF
RFQ27006992_Nov_18_26_solicitation_doc.pdf PDF
RFQ27006992_Nov_12_26_solicitation_doc.pdf PDF
RFQ27006992 Murray Center HVAC Project Manual.pdf PDF
RFQ27006992_Oct_26_26_solicitation_doc.pdf PDF
RFQ27006992_Sep_4_26_solicitation_doc.pdf PDF
RFQ27006992_Nov_17_26_solicitation_doc.pdf PDF
RFQ27006992_Nov_5_26_solicitation_doc.pdf PDF
RFQ27006912 A1.pdf PDF
RFQ27006992 Murray Center HVAC Drawings.pdf PDF
RFP27007020 Solicitation Specifications.pdf PDF
RFQ27006992_Oct_23_26_solicitation_doc.pdf PDF
RFQ27006992_Nov_11_26_solicitation_doc.pdf PDF
RFQ27006992 Scope of work addendum 2.pdf PDF
RFQ27006992_Oct_21_26_solicitation_doc.pdf PDF
RFQ27006992_Oct_13_26_solicitation_doc.pdf PDF
RFQ27006992 Scope of work.pdf PDF
RFQ27006992_Nov_10_26_solicitation_doc.pdf PDF
RFQ27006992 Drawing Upgrades Addendum 2.pdf PDF
RFQ27006992_Sep_7_26_solicitation_doc.pdf PDF
RFQ27006992_Nov_13_26_solicitation_doc.pdf PDF
RFQ27006992_Oct_22_26_solicitation_doc.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .