This is an Intermediate Final Construction (IFC) drawing set prepared by the Building Division for Trinity County's Asset Protection Project, a comprehensive flood mitigation initiative designed to protect county properties across multiple locations in California. The project encompasses barrier walls, berms, landscaping, hardscape, flood gates, underground utility reconfiguration, and pump systems across eight properties spanning Union Avenue, Clay Street, Delaware Street, and Texas Street, along with adjacent driveways and parking areas. The landscaping scope of work includes planting irrigation systems, planting installations, sod lawn work, and demolition of existing irrigation systems. Contractors must achieve substantial completion within 231 calendar days from the Notice to Proceed, with final completion required within an additional 30 days. A mandatory pre-bid conference is scheduled for February 19, 2026, at 10:00 a.m. at the County Administration Center, with sealed bids due by 2:00 p.m. on March 9, 2026, submitted through the Solano County OpenGov E-Procurement Portal. The multi-phase construction schedule extends from March 2026 through November 2026.

The project is federally funded through OES/FEMA, requiring compliance with Davis-Bacon Act prevailing wage requirements and FEMA compliance measures under Title 2 CFR 200.318-200.326. All contractors and subcontractors must be registered with the California Department of Industrial Relations and maintain current California contractor licenses at the time of bid submission. Bidders must submit a 10 percent bid bond or certified check with their proposal, and upon award, furnish performance and payment bonds equal to 100 percent of the contract amount plus a one-year warranty bond for 10 percent of the final contract price. Liquidated damages of $2,000 per calendar day apply for delays beyond the contract completion date. A 5 percent retainage will be held from progress payments until 35 days after the Notice of Completion is filed, with monthly progress payments made at 95 percent of approved work in place. Contractors must maintain Workers' Compensation and Commercial General Liability insurance throughout the contract period, with the contract becoming effective only after all certificates of insurance, business and professional licenses, and applicable certifications are on file with the County.

View the file

Other files

File Type Posted
20260304_Asset_Protection_Project_Schedule.pdf PDF
20260311_WRA_Redlined_Volume_1_Drawings.pdf PDF
20260313_WRA_Redlined_Volume_2_Drawings.pdf PDF
20260317_Asset_Protection_Project_-_Landscaping_-_Addendum_5.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20260210_Asset_Protection_Landscaping_-_Project_Manual.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
Access_Requirements.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .