Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in th e p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

FOR KENTON COUNTY AIRPORT BOARD AT

CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

MEP ENGINEER

KLH ENGINEERS

1538 ALEXANDRIA PIKE

SUITE 11

FORT THOMAS, KY 41075

CONTACT: CHRIS MEHAFFIE, PE

PHONE: (859)-442-8050

EMAIL: CMEHAFFIE@KLHENGRS.COM

OWNER

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

PO BOX 752000

CINCINNATI, OH 45275-200C

CONTACT: THAD FOGLE

PHONE: (859) 743-5978

EMAIL: TFOGLE@CVGAIRPORT.COM

2400430

/1

/2

:4

:0

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

COOLING TOWER REPLACEMENT

PROJECT

COOLING TOWER PROJECT

COVER SHEET

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

C O

O L

IN

G

T O

W E

R R

E P

L A

C E

M E

N T

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

C-G0-001

KLH PROJECT # 26944

04/18/25

26944.00

DS KTS

DRAWING INDEX - COOLING TOWER

SHEET NUMBER SHEET NAME CURRENT REVISION ISSUED CURRENT REVISION DATE CURRENT REVISION DESCRIPTION

C-G0-001 COOLING TOWER PROJECT COVER SHEET No 04/18/25 ISSUE FOR BID

C-T-A1-101 ARCHITECTURAL - TERMINAL MECHANICAL BASEMENT PLANS AND DETAILS No 04/18/25 ISSUE FOR BID

C-O-S2-001 GENERAL NOTES AND DESIGN CRITERIA No 04/18/25 ISSUE FOR BID

C-O-S2-002 SPECIAL INSPECTIONS AND QUALITY ASSURANCES No 04/18/25 ISSUE FOR BID

C-O-S2-501 SECTIONS AND DETAILS No 04/18/25 ISSUE FOR BID

C-T-S2-101 TERMINAL COOLING TOWERS FRAMING PLAN No 04/18/25 ISSUE FOR BID

C-B-S2-102 CONCOURSE B COOLING TOWERS FRAMING PLAN No 04/18/25 ISSUE FOR BID

C-T-M1-001 MECHANICAL TERMINAL COVER SHEET No 04/18/25 ISSUE FOR BID

H-T-M1-001 MECHANICAL TERMINAL COVER SHEET No 04/18/25 ISSUE FOR BID

H-T-M1-100 MECHANICAL DEMOLITION TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-T-M1-101 MECHANICAL DEMOLITION TERMINAL - BAGGAGE CLAIM LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-T-M1-601 MECHANICAL DEMOLITION TERMINAL COOLING TOWER No 04/18/25 ISSUE FOR BID

H-T-M3-100 MECHANICAL TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-T-M3-101 MECHANICAL TERMINAL - BAGGAGE CLAIM LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-T-M3-201 MECHANICAL TERMINAL - TOWER ISOMETRIC VIEWS No 04/18/25 ISSUE FOR BID

C-T-M3-601 MECHANICAL TERMINAL SCHEDULES No 04/18/25 ISSUE FOR BID

C-T-M3-604 MECHANICAL TERMINAL COOLING TOWER No 04/18/25 ISSUE FOR BID

C-T-M3-605 MECHANICAL TERMINAL COOLING TOWER No 04/18/25 ISSUE FOR BID

H-T-M3-601 MECHANICAL TERMINAL CHILLERS No 04/18/25 ISSUE FOR BID

H-T-M3-602 MECHANICAL TERMINAL CHILLERS No 04/18/25 ISSUE FOR BID

H-T-M3-603 MECHANICAL TERMINAL CHILLERS No 04/18/25 ISSUE FOR BID

C-B-M1-001 MECHANICAL CONCOURSE B COVER SHEET No 04/18/25 ISSUE FOR BID

H-B-M1-001 MECHANICAL CONCOURSE B COVER SHEET No 04/18/25 ISSUE FOR BID

H-B-M1-100 MECHANICAL DEMOLITION CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-B-M1-103 MECHANICAL DEMOLITION CONCOURSE B - CLUB LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-B-M1-601 MECHANICAL DEMOLITION CONCOURSE B COOLING TOWER No 04/18/25 ISSUE FOR BID

H-B-M3-100 MECHANICAL CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-B-M3-103 MECHANICAL NEW WORK CONCOURSE B - CLUB LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-B-M3-201 MECHANICAL CONCOURSE B - TOWER ISOMETRIC VIEWS No 04/18/25 ISSUE FOR BID

C-B-M3-601 MECHANICAL CONCOURSE B SCHEDULES No 04/18/25 ISSUE FOR BID

C-B-M3-603 MECHANICAL CONCOURSE B COOLING TOWER No 04/18/25 ISSUE FOR BID

C-B-M3-604 MECHANICAL CONCOURSE B COOLING TOWER No 04/18/25 ISSUE FOR BID

C-B-E0-000 ELECTRIC GENERAL INFORMATION No 04/18/25 ISSUE FOR BID

H-T-E1-100 ELECTRIC DEMOLITION TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-T-E1-101 ELECTRIC DEMOLITION TERMINAL - COOLING TOWERS PLAN No 04/18/25 ISSUE FOR BID

H-T-E4-100 ELECTRIC POWER TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-T-E4-101 ELECTRIC POWER TERMINAL - COOLING TOWERS PLAN No 04/18/25 ISSUE FOR BID

C-T-E4-700 ELECTRIC POWER TERMINAL - PANEL SCHEDULES No 04/18/25 ISSUE FOR BID

H-B-E1-100 ELECTRIC DEMOLITION CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-B-E1-103 ELECTRIC DEMOLITION CONCOURSE B - COOLING TOWERS PLAN No 04/18/25 ISSUE FOR BID

H-B-E4-100 ELECTRIC POWER CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-B-E4-103 ELECTRIC POWER CONCOURSE B - COOLING TOWERS PLAN No 04/18/25 ISSUE FOR BID

C-B-E4-700 ELECTRIC POWER CONCOURSE B - PANEL SCHEDULES No 04/18/25 ISSUE FOR BID

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

FOR KENTON COUNTY AIRPORT BOARD AT

CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

MEP ENGINEER

KLH ENGINEERS

1538 ALEXANDRIA PIKE

SUITE 11

FORT THOMAS, KY 41075

CONTACT: CHRIS MEHAFFIE, PE

PHONE: (859)-442-8050

EMAIL: CMEHAFFIE@KLHENGRS.COM

OWNER

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

PO BOX 752000

CINCINNATI, OH 45275-200C

CONTACT: THAD FOGLE

PHONE: (859) 743-5978

EMAIL: TFOGLE@CVGAIRPORT.COM

2400430

/1

/2

:4

:0

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

COOLING TOWER REPLACEMENT

PROJECT

COOLING TOWER PROJECT

COVER SHEET

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

C O

O L

IN

G

T O

W E

R R

E P

L A

C E

M E

N T

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

C-G0-001

KLH PROJECT # 26944

04/18/25

26944.00

DS KTS

DRAWING INDEX - COOLING TOWER

SHEET NUMBER SHEET NAME CURRENT REVISION ISSUED CURRENT REVISION DATE CURRENT REVISION DESCRIPTION

C-G0-001 COOLING TOWER PROJECT COVER SHEET No 04/18/25 ISSUE FOR BID

C-T-A1-101 ARCHITECTURAL - TERMINAL MECHANICAL BASEMENT PLANS AND DETAILS No 04/18/25 ISSUE FOR BID

C-O-S2-001 GENERAL NOTES AND DESIGN CRITERIA No 04/18/25 ISSUE FOR BID

C-O-S2-002 SPECIAL INSPECTIONS AND QUALITY ASSURANCES No 04/18/25 ISSUE FOR BID

C-O-S2-501 SECTIONS AND DETAILS No 04/18/25 ISSUE FOR BID

C-T-S2-101 TERMINAL COOLING TOWERS FRAMING PLAN No 04/18/25 ISSUE FOR BID

C-B-S2-102 CONCOURSE B COOLING TOWERS FRAMING PLAN No 04/18/25 ISSUE FOR BID

C-T-M1-001 MECHANICAL TERMINAL COVER SHEET No 04/18/25 ISSUE FOR BID

H-T-M1-001 MECHANICAL TERMINAL COVER SHEET No 04/18/25 ISSUE FOR BID

H-T-M1-100 MECHANICAL DEMOLITION TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-T-M1-101 MECHANICAL DEMOLITION TERMINAL - BAGGAGE CLAIM LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-T-M1-601 MECHANICAL DEMOLITION TERMINAL COOLING TOWER No 04/18/25 ISSUE FOR BID

H-T-M3-100 MECHANICAL TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-T-M3-101 MECHANICAL TERMINAL - BAGGAGE CLAIM LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-T-M3-201 MECHANICAL TERMINAL - TOWER ISOMETRIC VIEWS No 04/18/25 ISSUE FOR BID

C-T-M3-601 MECHANICAL TERMINAL SCHEDULES No 04/18/25 ISSUE FOR BID

C-T-M3-604 MECHANICAL TERMINAL COOLING TOWER No 04/18/25 ISSUE FOR BID

C-T-M3-605 MECHANICAL TERMINAL COOLING TOWER No 04/18/25 ISSUE FOR BID

H-T-M3-601 MECHANICAL TERMINAL CHILLERS No 04/18/25 ISSUE FOR BID

H-T-M3-602 MECHANICAL TERMINAL CHILLERS No 04/18/25 ISSUE FOR BID

H-T-M3-603 MECHANICAL TERMINAL CHILLERS No 04/18/25 ISSUE FOR BID

C-B-M1-001 MECHANICAL CONCOURSE B COVER SHEET No 04/18/25 ISSUE FOR BID

H-B-M1-001 MECHANICAL CONCOURSE B COVER SHEET No 04/18/25 ISSUE FOR BID

H-B-M1-100 MECHANICAL DEMOLITION CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-B-M1-103 MECHANICAL DEMOLITION CONCOURSE B - CLUB LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-B-M1-601 MECHANICAL DEMOLITION CONCOURSE B COOLING TOWER No 04/18/25 ISSUE FOR BID

H-B-M3-100 MECHANICAL CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-B-M3-103 MECHANICAL NEW WORK CONCOURSE B - CLUB LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-B-M3-201 MECHANICAL CONCOURSE B - TOWER ISOMETRIC VIEWS No 04/18/25 ISSUE FOR BID

C-B-M3-601 MECHANICAL CONCOURSE B SCHEDULES No 04/18/25 ISSUE FOR BID

C-B-M3-603 MECHANICAL CONCOURSE B COOLING TOWER No 04/18/25 ISSUE FOR BID

C-B-M3-604 MECHANICAL CONCOURSE B COOLING TOWER No 04/18/25 ISSUE FOR BID

C-B-E0-000 ELECTRIC GENERAL INFORMATION No 04/18/25 ISSUE FOR BID

H-T-E1-100 ELECTRIC DEMOLITION TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-T-E1-101 ELECTRIC DEMOLITION TERMINAL - COOLING TOWERS PLAN No 04/18/25 ISSUE FOR BID

H-T-E4-100 ELECTRIC POWER TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-T-E4-101 ELECTRIC POWER TERMINAL - COOLING TOWERS PLAN No 04/18/25 ISSUE FOR BID

C-T-E4-700 ELECTRIC POWER TERMINAL - PANEL SCHEDULES No 04/18/25 ISSUE FOR BID

H-B-E1-100 ELECTRIC DEMOLITION CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-B-E1-103 ELECTRIC DEMOLITION CONCOURSE B - COOLING TOWERS PLAN No 04/18/25 ISSUE FOR BID

H-B-E4-100 ELECTRIC POWER CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

C-B-E4-103 ELECTRIC POWER CONCOURSE B - COOLING TOWERS PLAN No 04/18/25 ISSUE FOR BID

C-B-E4-700 ELECTRIC POWER CONCOURSE B - PANEL SCHEDULES No 04/18/25 ISSUE FOR BID

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

L

M

L.9

L.4

K.5

14.6 14.8 15.2 15.4

C-T-A1-101

C-T-A1-101C-T-A1-101

C-T-A1-101

BASEMENT

MAIN TERMINAL

N

15.2

E X

IS

T

IN

G

W A

L L

P E

N E

T R

A T

IO

N

M

IN

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E A ll re p o rt s p la n s s p e c ifi c a ti o n s c o m p u te r fi le s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w it h o u t lim it a ti o n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

2400430

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

/1

/2

:5

:0

P

M A u to d e s k D o c s /C

V G

R e h a b a n d

E ff ic ie n c y P ro g ra m /A

R C

H -G re s h a m

S m it h

-T e rm in a l_

R

.r v t

As indicated

ARCHITECTURAL - TERMINAL

MECHANICAL BASEMENT

PLANS AND DETAILS

C-T-A1-101

KLH PROJECT # 26944

04/18/2025

26944.00

MH DH

C V

G I

N D

U S

T R

IA

L R

E H

A B

IL

IT

A T

IO

N

A N

D E

F F

IC

IE

N C

Y P

R O

G R

A M

C

O O

L

IN

G T

O W

E R

R E

P L

A C

E M

E N

T P

R O

J E

C T

T e rm in a l D r H e b ro n

K Y

0' 12'8'4'2'3/16" = 1'-0"

COOLING TOWER EAST

0' 6" 1 1/2'1'1 1/2" = 1'-0"

TYPICAL PIPE PENTRATION

0' 6" 1 1/2'1'1 1/2" = 1'-0"

PIPE PENETRATION ELEVATION DETAIL

Keynote Legend

Key Value Keynote Text

240 SELF-ADHERING MODIFIED BITUMEN

SHEET WATERPROOFING

MEMBRANE. COORDINATE OVERLAP

OF NEW WATERPROOF BARRIER

PRODUCT AND EXISTING

WATERPROOF BARRIER WITH

MANUFACTURER. VERIFY

COMPATIBILITY OF SPECIFIED

PRODUCT WITH EXISTING SYSTEM

AFTER EXCAVATION.

241 DRAINAGE PROTECTION BOARD.

242 GROUT INFILL.

243 NEW PIPE.

244 EXISTING WALL PENETRATION.

245 GRAVEL BACKFILL TO MATCH

EXISTING.

247 CONTINUOUS SEALANT AROUND

FULL PERIMETER OF PIPE AT WALL

PENETRATION.

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

I

S

EAN M. BOGAR

T

R

EG STER

DNO.

COMMONWEALTH

OFK

N U C K

RC H T CT

Y

I E

E T

A E bogarts Date 04/17/2025

DESIGN LOADS AND CRITERIA

ALL DESIGN AND CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE INTERNATIONAL

BUILDING CODE (IBC), 2015 EDITION, AS AMENDED BY THE CITY OF HEBRON.

SNOW LOADS

THE FOLLOWING SNOW LOAD FACTORS WERE DETERMINED USING ASCE 7 CHAPTER 7 IN ACCORDANCE

WITH IBC SECTION 1608.

Pg = 20 PSF Ce = 1.0 Is = 1.1 Ct = 1.2 Pf = 18.5 PSF

WIND LOADS

THE FOLLOWING WIND LOAD FACTORS WERE DETERMINED USING ASCE 7 CHAPTERS 26-31 IN

ACCORDANCE WITH IBC SECTION 1609.

ULTIMATE DESIGN WIND SPEED (Vult): 115 MPH NOMINAL DESIGN WIND SPEED (Vasd): 89 MPH

RISK CATEGORY: III

WIND EXPOSURE CATEGORY: B

UNLESS NOTED OTHERWISE, COMPONENT AND CLADDING DESIGN WIND PRESSURES SHALL BE

DETERMINED USING ASCE 7 CHAPTER 30 BY THE REGISTERED PROFESSIONAL ENGINEER LICENSED IN

THE PROJECT STATE WHO IS RESPONSIBLE FOR THE DESIGN OF SUCH ELEMENTS.

SEISMIC LOADS

THE FOLLOWING SEISMIC LOAD FACTORS WERE DETERMINED USING ASCE 7 CHAPTERS 11-23 IN

ACCORDANCE WITH IBC SECTION 1613.

SEISMIC DESIGN CATEGORY: B

RISK CATEGORY: III

IMPORTANCE FACTOR (Ie): 1.3

SITE CLASS: D

Ss = 0.146 g Sds = 0.155 g S1 = 0.08 g Sd1 = 0.128 g

ANALYSIS PROCEDURE:

ASCE 7-10: CHAPTER 13

R = 3

1) GENERAL NOTES

a) SUBMITTALS

i) SHOP DRAWINGS SHALL BE SUBMITTED TO THE ARCHITECT PRIOR TO ANY FABRICATION OR

CONSTRUCTION FOR ALL STRUCTURAL ITEMS, INCLUDING THE FOLLOWING: STRUCTURAL

STEEL

ii) IF THE SHOP DRAWINGS DIFFER FROM OR ADD TO THE DESIGN OF THE STRUCTURAL

DRAWINGS, THEY SHALL BEAR THE SEAL AND SIGNATURE OF THE REGISTERED PROFESSIONAL

ENGINEER LICENSED IN THE PROJECT STATE WHO IS RESPONSIBLE FOR THE DESIGN.

b) COMPONENTS DESIGNED BY OTHERS (DEFERRED SUBMITTALS)

i) PER IBC SECTION 107.3.4.1, DRAWINGS AND CALCULATIONS FOR THE DESIGN AND

FABRICATION OF THE ITEMS THAT ARE DESIGNED BY OTHERS SHALL BEAR THE SEAL AND

SIGNATURE OF THE REGISTERED PROFESSIONAL ENGINEER LICENSED IN THE PROJECT STATE

WHO IS RESPONSIBLE FOR THE DESIGN AND SHALL BE SUBMITTED TO THE ARCHITECT AND

THE BUILDING DEPARTMENT FOR REVIEW PRIOR TO FABRICATION.

ii) DEFERRED SUBMITTALS INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING:

(1) EQUIPMENT ANCHORAGE

(2) SEISMIC DESIGN OF NONSTRUCTURAL COMPONENTS

(3) UNISTRUT

c) NONSTRUCTURAL COMPONENTS

i) DESIGN, DETAILING, AND ANCHORAGE OF ALL NONSTRUCTURAL COMPONENTS SHALL BE IN

ACCORDANCE WITH IBC SECTION 1613, ASCE 7 CHAPTER 13, AND THE PROJECT

SPECIFICATIONS. NONSTRUCTURAL COMPONENTS DESIGNED BY OTHERS SHALL NOT INDUCE

TORSIONAL LOADING INTO SUPPORTING STEEL STRUCTURAL MEMBERS WITHOUT ADDITIONAL

BRACING OF THOSE MEMBERS TO ELIMINATE TORSIONAL FORCES. TORSIONAL BRACING

SHALL BE DESIGNED BY THE NONSTRUCTURAL COMPONENT DESIGNER AND APPROVED BY THE

ENGINEER.

ii) DESIGN, DETAILING, AND CONSTRUCTION OF ALL NONSTRUCTURAL COMPONENTS WHICH

ATTACH TO STRUCTURE SHALL ACCOMMODATE CONSTRUCTION TOLERANCES AS

ESTABLISHED BY SPECIFICATIONS.

d) SPECIAL INSPECTIONS PER IBC CHAPTER 17 SHALL BE PERFORMED BY AN APPROVED TESTING

AGENCY AS INDICATED IN THE STATEMENT OF SPECIAL INSPECTIONS AND TESTING. ALL

PREPARED SOIL-BEARING SURFACES SHALL BE INSPECTED BY THE GEOTECHNICAL ENGINEER

PRIOR TO PLACEMENT OF REINFORCING STEEL. SOIL COMPACTION SHALL BE SUPERVISED BY AN

APPROVED TESTING AGENCY OR GEOTECHNICAL ENGINEER.

e) ALL FRAMING MEMBERS SHALL BE EQUALLY SPACED BETWEEN GRID LINES, COLUMNS, AND

DIMENSIONED FRAMING UNLESS NOTED OTHERWISE.

2) FOUNDATIONS

a) THE FOUNDATION DESIGN VALUES ARE BASED ON ALLOWABLE PRESUMPTIVE VALUES IN CHAPTER 18 OF THE BUILDING CODE. SPECIAL INSPECTOR TO CONFIRM THAT SOILS ENCOUNTERED IN THE

FIELD ARE CONSISTENT WITH THESE ASSUMPTIONS AND THAT THEY ARE PROPERLY PREPARED

AND COMPACTED TO RECEIVE FOUNDATIONS SHOWN HEREIN.

b) THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE THEMSELVES WITH THE FINDINGS AND

RECOMMENDATIONS OF THE BUILDING CODE AND SHALL PERFORM ALL EARTHWORK OPERATIONS

AND FOUNDATION INSTALLATION OPERATIONS IN ACCORDANCE WITH THESE

RECOMMENDATIONS.

c) THE OWNER WILL RETAIN A QUALIFIED GEOTECHNICAL ENGINEER TO INSPECT ALL BEARING

SURFACES AND EARTHWORK OPERATIONS.

d) SITE PREPARATION ACTIVITIES WITHIN THE BUILDING LIMITS AND EXTENDING 10 FEET BEYOND SHALL BE MONITORED AND VERIFIED BY A REGISTERED GEOTECHNICAL ENGINEER LICENSED IN

THE PROJECT STATE. THE GEOTECHNICAL ENGINEER SHALL VERIFY THAT ACTUAL SITE

CONDITIONS ARE CONSISTENT WITH THE GEOTECHNICAL REPORT, THAT FILL PLACEMENT AND

COMPACTION, UNDERCUTTING, PROOFROLLING, SCARIFICATION, ETC., IS IN GENERAL

CONFORMANCE WITH THE BUILDING CODE AND THAT THE DESIGN PARAMETERS ARE OBTAINED.

e) ENGINEERED FILL & BACKFILL SHALL BE PLACED AND COMPACTED ACCORDING TO THE

RECOMMENDATIONS OF THE BUILDING CODE.

f) SLAB ON GRADE SUPPORT SHALL BEAR ON PROPERLY COMPACTED ENGINEERED FILL PER THE

GEOTECHNICAL REPORT AND TYPICAL DETAILS IN THE CONSTRUCTION DOCUMENTS.

g) THE DESIGN ADEQUACY AND SAFETY OF TEMPORARY RETAINING STRUCTURES, SHORING OF

TRENCHES, ETC., REQUIRED TO CONSTRUCT THE FOUNDATION SYSTEM IS THE SOLE

RESPONSIBILITY OF THE CONTRACTOR.

h) CONTRACTOR TO PROVIDE FOR DESIGN AND INSTALLATION OF ALL CRIBBING, SHEATHING, AND

SHORING REQUIRED AND SHALL BE SOLELY RESPONSIBLE FOR ALL EXCAVATION PROCEDURES

INCLUDING LAGGING, SHORING, AND PROTECTION OF ADJACENT PROPERTY, STRUCTURES,

STREETS, AND UTILITIES IN ACCORDANCE WITH ALL NATIONAL, STATE, AND LOCAL SAFETY

ORDINANCES.

i) CONTRACTOR TO PROVIDE FOR DE-WATERING OF EXCAVATIONS FROM SURFACE WATER, GROUND

WATER, AND/OR SEEPAGE.

3) CAST-IN-PLACE CONCRETE

a) CONCRETE WORK SHALL CONFORM TO ALL REQUIREMENTS OF IBC CHAPTER 19 AND ACI 318.

b) CONCRETE MIXTURES

i) NORMAL WEIGHT CONCRETE MIXTURES SHALL CONFORM TO THE FOLLOWING REQUIREMENTS:

CONCRETE MIXTURES

f’c

(PSI)

TEST AGE

(DAYS) EXPOSURE CLASS USE

4,500 28 F2 S0 W0 C1 SLAB-ON-GRADE, SLAB ON METAL

DECK, CURBS, PADS

ii) CONCRETE MIXTURES SHALL CONFORM TO THE MOST STRINGENT REQUIREMENTS FOR

EXPOSURE CLASSES SPECIFIED IN THE TABLE ABOVE AND ACI 318 TABLE 19.3.2.1.

iii) WATER-REDUCING ADMIXTURES MAY BE INCORPORATED IN CONCRETE MIX DESIGNS BUT

SHALL CONFORM TO ASTM C494 AND BE USED IN STRICT ACCORDANCE WITH THE

MANUFACTURER’S RECOMMENDATIONS. CaCl2 OR OTHER WATER-SOLUBLE CHLORIDE

ADMIXTURES SHALL NOT BE USED.

iv) WATER/CEMENTITIOUS MATERIALS RATIO SHALL BE MEASURED BY WEIGHT AND SHALL BE

BASED ON TOTAL CEMENTITIOUS MATERIAL. WATER/CEMENTITIOUS MATERIALS RATIO AND

WATER CONTENT SHALL BE DETERMINED BY THE SUPPLIER BASED ON STRENGTH

REQUIREMENTS AND SHALL NOT EXCEED THE MAXIMUM WATER/CEMENTITIOUS MATERIAL

RATIO AND/OR WATER CONTENT IF SHOWN ABOVE OR IN ACI 318 TABLE 19.3.2.1 FOR THE

EXPOSURE CLASSES LISTED.

v) FIELD-MEASURED SLUMP SHALL CONFORM TO THE SUBMITTED CONCRETE MIX DESIGN.

TOLERANCE OF SLUMP SHALL CONFORM TO ASTM C94.

vi) ALL CONCRETE SUBJECT TO EXPOSURE CLASSES F1, F2, OR F3 SHALL BE AIR ENTRAINED. AIR-

ENTRAINING AGENTS SHALL CONFORM TO ASTM C260. THE AMOUNT OF ENTRAINED AIR

SHALL BE ACCORDING TO ACI 318 TABLE 19.3.3.1 WITH A FIELD TOLERANCE OF ±1.5

PERCENT BY VOLUME. THE AMOUNT OF ENTRAINED AIR SHALL BE MEASURED IN THE FIELD AT

THE DISCHARGE FROM THE TRUCK.

vii) MAXIMUM CONCRETE SLUMP SHALL BE 4” WITHOUT A HIGH-RANGE WATER REDUCING

ADMIXTURE (HRWR) OR 8” WITH A HRWR ADMIXTURE AT POINT OR DEPOSIT. SIZE OF

AGGREGATE AND GRADATION SHALL CONFORM TO ASTM C33 FOR NORMAL WEIGHT

CONCRETE. THE COMBINED TOTAL MASS PERCENT OF DELETERIOUS SUBSTANCES,

INCLUDING, BUT NOT LIMITED TO, COAL AND LIGNITE, FOR BOTH COARSE AND FINE

AGGREGATES SHALL BE LIMITED TO 0.5% AS DETERMINED BY ASTM C123.

viii) PORTLAND CEMENT SHALL CONFORM TO ASTM C150, TYPE I/II FOR ALL CONCRETE.

ix) AGGREGATE FOR LIGHTWEIGHT (115 PCF) CONCRETE SHALL BE EXPANDED SHALE

CONFORMING TO ASTM A330 AND PROJECT SPECIFICATIONS.

c) MEASURING, MIXING, TRANSPORTING, AND PLACING OF CONCRETE SHALL BE IN ACCORDANCE

WITH ACI 304R. CONCRETE SHALL BE MECHANICALLY VIBRATED.

i) SURFACES OF CONCRETE SLABS ON GRADE SHALL BE KEPT CONTINUOUSLY MOIST FOR NOT

LESS THAN SEVEN DAYS WITH WATER, CONTINUOUS WATER-FOG SPRAY, OR WATER-

SATURATED ABSORPTIVE COVER.

ii) IF THE AIR TEMPERATURE WILL EXCEED 75° F WITHIN 48 HOURS OF PLACING CONCRETE, A

MOIST CURE SHALL BE APPLIED TO THE CONCRETE FOR A PERIOD OF 36 HOURS AFTER

FINISHING CONCRETE SURFACES. REFER TO THE SPECIFICATIONS FOR CURING

REQUIREMENTS.

d) CURING COMPOUND SHALL CONFORM TO FEDERAL SPECIFICATION TT-C800A, AND ASTM C309.

THE MATERIAL SHALL BE EQUAL TO SONNEBORN KURE-N-SEAL, BASF MASTERSEAL, BY BASF, OR

W.R. GRACE CLEAR SEAL.

e) BEFORE PLACING CONCRETE, THE CONTRACTOR SHALL NOTIFY ALL SUBCONTRACTORS TO BE SURE ALL SLEEVES, CONDUIT, CHASES, ETC. ARE PROPERLY INSTALLED. THE CONTRACTOR SHALL

NOTIFY THE ARCHITECT/EOR/SPECIAL INSPECTOR AS SOON AS PRACTICAL, BUT AT LEAST 24

HOURS PRIOR TO PLACING CONCRETE TO ALLOW FOR INSPECTION OF REINFORCING AND

EMBEDDED ITEMS.

f) PROVIDE SLEEVES FOR MECHANICAL, PLUMBING, AND ELECTRICAL OPENINGS IN CONCRETE BEFORE PLACING. DO NOT CUT ANY REINFORCING WHICH MAY CONFLICT. CORING IN CONCRETE

IS PERMITTED WITH APPROVAL OF EOR. NOTIFY THE EOR IN ADVANCE OF CONDITIONS NOT

SHOWN ON THE DRAWINGS. SEE THESE DRAWINGS FOR ADDITIONAL RESTRICTIONS ON THE

PLACEMENTS OF OPENINGS IN SLABS AND WALLS.

g) CONCRETE SLABS ON GRADE SHALL RECEIVE CONTROL JOINTS PLACED AT A MAXIMUM SPACING OF 10’-0” OC. THE JOINTS SHALL BE IN A PATTERN THAT IS NEARLY AS SQUARE AS POSSIBLE

WITH A MAXIMUM LENGTH TO WIDTH RATIO OF 1.25:1. JOINTS RUNNING PARALLEL TO LOAD

BEARING WALLS MUST MAINTAIN 2’-0” MINIMUM CLEARANCE FROM THE WALL. SAW-CUT JOINTS

SHALL BE INSTALLED AS SOON AS THE CONCRETE IS HARD ENOUGH TO WITHSTAND SAWING

WITHOUT RAVELING JOINT EDGES OR DISLODGING COARSE AGGREGATE PARTICLES.

LIGHTWEIGHT EARLY-CUT SAWS SHALL BE USED. CONTRACTOR SHALL SUBMIT A SLAB JOINT

PLAN FOR APPROVAL PRIOR TO PLACING CONCRETE FOR FLOOR SLAB.

h) INTERIOR SLABS SHALL RECEIVE A HARD-TROWELED FINISH. EXTERIOR SLABS SHALL RECEIVE A

LIGHT BROOM FINISH.

i) EXPOSED EDGES AND CORNERS OF THE CONCRETE SHALL HAVE A 3/4” CHAMFER AT 45° UNLESS

NOTED OTHERWISE.

j) REMOVE ANY LAITANCE, ROUGHEN TO 1/4” AMPLITUDE AND CLEAN ALL CONCRETE SURFACES

AGAINST WHICH NEW CONCRETE IS TO BE PLACED.

4) STRUCTURAL STEEL

a) STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED, AND ERECTED BY AN APPROVED AND LICENSED FABRICATOR IN ACCORDANCE WITH IBC CHAPTER 22, AISC 360, AISC 303, AND AWS.

b) STRUCTURAL STEEL SHALL CONFORM TO THE ASTM DESIGNATIONS INDICATED BELOW (UNO):

W SHAPES A992

ANGLES, CHANNELS, WT SHAPES A36

PLATES, UNO A36

PLATES (50 KSI WHERE NOTED) A572 GR50

CONNECTION PLATES AND MISC., UNO A36

ROUND HSS A500 GR C

SQUARE AND RECTANGULAR HSS A500 GR C

PIPE A53 GR B

HIGH STRENGTH CONVENTIONAL BOLTS F3125: GR A325

(GR A490 WHERE NOTED)

HIGH STRENGTH TENSION-CONTROL (TC) BOLTS F3125: GR F1852

(GR F2280 WHERE NOTED)

THREADED ROD A36

HEAVY HEX NUTS A563

HARDENED STEEL WASHER F436

ANCHOR RODS F1554: GR 36

(GR 55 WHERE NOTED)

PLAIN WASHER F844

HEADED STUDS ANCHORS AND SHEAR STUDS A108

DEFORMED BAR ANCHOR STUDS A706

c) CONNECTIONS NOT INDICATED ON THE CONTRACT DRAWINGS SHALL BE DESIGNED BY A STRUCTURAL ENGINEER LICENSED IN THE PROJECT STATE, RETAINED BY THE STEEL FABRICATOR.

ALL CALCULATIONS AND SHOP DRAWINGS SHALL HAVE A COVER SHEET DULY STAMPED AND

SIGNED BY THE REGISTERED STRUCTURAL ENGINEER LICENSED IN THE PROJECT STATE AND

SUBMITTED FOR REVIEW TO THE ARCHITECT/ENGINEER. STAMPING AND SIGNING OF SHOP

DRAWINGS SHALL BE FOR THE EXCLUSIVE PURPOSE OF CERTIFYING THAT THE CONNECTIONS ARE

DETAILED AS PER THE DESIGN PERFORMED BY THE REGISTERED STRUCTURAL ENGINEER.

FAILURE TO SUBMIT STAMPED AND SIGNED CALCULATIONS AND STAMPED AND SIGNED SHOP

DRAWINGS SHALL BE SUFFICIENT CAUSE FOR REJECTION OF SHOP DRAWINGS.

d) THE CONTRACTOR SHALL BE LIABLE FOR DIMENSIONS, FIT, TOLERANCES, FABRICATION, AND

ERECTION.

e) BEAM CONNECTIONS SHALL BE DESIGNED FOR THE REACTIONS INDICATED ON THE FRAMING

PLANS.

i) WHERE REACTIONS ARE NOT SHOWN ON THE FRAMING PLANS, CONNECTIONS FOR

NONCOMPOSITE SIMPLE SPAN BEAMS SHALL BE DESIGNED FOR 50% OF THE BEAM LOAD

CAPACITY AS GIVEN IN TABLE 3-6 OF THE AISC STEEL CONSTRUCTION MANUAL.

f) LENGTH OF CONNECTION ANGLES FOR BEAM-TO-COLUMN OR BEAM-TO-BEAM CONNECTIONS SHALL BE THE LARGEST STANDARD LENGTH LESS THAN OR EQUAL TO THE “T” DIMENSION OF THE

BEAM. STANDARD LENGTHS AND AVAILABLE STRENGTH OF CONNECTION ANGLES ARE FOUND IN

TABLES 10-1 THRU 10-3 OF THE AISC STEEL CONSTRUCTION MANUAL.

g) BOLTS SHALL BE MINIMUM 3/4" DIAMETER ASTM A325-N (UNO), TIGHTENED BY AN APPROVED

AISC METHOD. BOLT HOLES IN STEEL FOR HIGH STRENGTH BOLTED CONNECTIONS SHALL BE

1/16” LARGER IN DIAMETER THAN BOLT DIAMETER.

h) TENSION CONTROL (TC) BOLTS MAY BE USED AT CONTRACTOR’S OPTION WHERE PRETENSIONED

BOLTS ARE REQUIRED PER RCSC.

i) REENTRANT CORNERS SHALL HAVE 3/4" MINIMUM RADIUS.

j) WELDING IS TO BE DONE BY AWS CERTIFIED WELDERS USING E70XX ELECTRODES (UNO). WELDS

SHALL BE PREQUALIFIED BY AWS. WELDING SHALL BE IN STRICT ADHERENCE TO A WRITTEN

WELDING PROCEDURE SPECIFICATION (WPS) PER AWS D1.1. WELDING PARAMETERS SHALL BE

WITHIN THE ELECTRODE MANUFACTURER’S RECOMMENDATIONS. WELDING PROCEDURES SHALL

BE SUBMITTED TO THE OWNER’S TESTING AGENCY FOR REVIEW BEFORE STARTING FABRICATION

OR ERECTION. FIELD WELDING SYMBOLS HAVE NOT NECESSARILY BEEN INDICATED ON THE

DRAWINGS. WHERE SHOWN, PROPER FIELD WELDING PER AWS D1.1 SHALL BE USED. WHERE NO

FIELD WELDING SYMBOLS ARE SHOWN, IT IS THE CONTRACTOR’S RESPONSIBILITY TO

COORDINATE THE USE OF SHOP AND FIELD WELDS TO FACILITATE THE STRUCTURAL STEEL

ERECTION.

k) PARTIAL PENETRATION GROOVE WELD SIZES SHOWN ON THE DRAWINGS REFER TO EFFECTIVE THROAT THICKNESS, SHOWN AS (E). SHOP WELDS SHALL BE MADE USING GMAW, FCAW, OR SAW

WELDING PROCESSES. FIELD WELDS SHALL BE MADE USING EITHER FCAW OR THE SMAW

WELDING PROCESSES. FILLER METALS SHALL COMPLY WITH THE AWS D1.1, TABLE 3.1, “PRE-

QUALIFIED BASE METAL-FILLER METAL COMBINATIONS FOR MATCHING STRENGTH”.

l) SHOP DRAWINGS SHALL SHOW ALL WELDING WITH AWS A2.4 SYMBOLS. WELDS SHOWN ON THE

CONTRACT DRAWINGS ARE MINIMUM SIZES FOR STRENGTH. INCREASE WELD SIZE TO AWS

MINIMUM SIZE BASED ON THICKNESS OF THE MATERIAL BEING WELDED. MINIMUM WELD SIZE

SHALL BE 3/16” FOR MATERIAL THICKNESS 3/16” AND GREATER.

m) BACKUP BARS MAY REMAIN IN PLACE UNLESS NOTED ON PLANS, OR WHEN ULTRASONIC TEST

INDICATES A POSSIBLE WELD DEFECT. IF DEFECTS ARE INDICATED, BACKUP BAR IS TO BE

REMOVED AND ROOT INSPECTED. IF DEFECTS ARE FOUND, THEY ARE TO BE REMOVED BY

BACKGOUGING TO SOUND MATERIAL. CLEAN AND REPAIR WELD TO SPECIFIED SIZE PER AWS.

n) THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE JOINT PREPARATIONS AND WELDING PROCEDURES THAT INCLUDE BUT ARE NOT LIMITED TO: REQUIRED ROOT OPENINGS, ROOT FACE

DIMENSIONS, GROOVE ANGLES, BACKING BARS, COPES, SURFACE ROUGHNESS VALUES, AND

TAPERS OF UNEQUAL PARTS.

o) STRUCTURAL STEEL DESIGN, FABRICATION, AND ERECTION SHALL CONFORM TO THE REQUIREMENTS OF IBC CHAPTER 22. MEMBERS ARE TO BE ERECTED WITH NATURAL MILL CAMBER

OR INDUCED CAMBER UP, UNLESS OTHERWISE NOTED ON PLANS. SUBSTITUTION OF MEMBER

SIZES OR STEEL GRADED IS NOT ALLOWED WITHOUT PRIOR APPROVAL BY THE ENGINEER OF

RECORD. A MINIMUM OF TWO BOLTS IS REQUIRED FOR ALL BEAM CONNECTIONS. ALTERNATIVE

CONNECTIONS TO THOSE SHOWN ON THESE DRAWINGS REQUIRE PRIOR APPROVAL BY THE

ENGINEER OF RECORD.

p) WELDING OF DESIGNATED LATERAL FORCE RESISTING SYSTEM MEMBERS (INCLUDING DRAG AND

CHORD BEAMS) IS TO BE PERFORMED AND INSPECTED IN ACCORDANCE WITH AISC 341

CHAPTERS I AND J, IN ADDITION TO ALL OTHER REQUIREMENTS NOTED IN THIS SECTION.

q) WELD LENGTHS CALLED FOR ON PLANS ARE THE NET EFFECTIVE LENGTH REQUIRED. WHERE FILLET WELD SYMBOL IS GIVEN WITHOUT INDICATION OF SIZE, USE MINIMUM SIZE WELDS AS

SPECIFIED IN AISC 360-10 TABLE J2.4.

r) THE USE OF E70-T4 WELDING WIRE IS NOT ALLOWED FOR ANY APPLICATION.

s) ALL WELD FILLER MATERIAL SHALL HAVE A MINIMUM CHARPY V-NOTCH (CVN) VALUE OF 20 FT-LB

AT A TEMPERATURE OF 0° F.

t) WELDING OF THE SEISMIC FORCE-RESISTING SYSTEM SHALL BE EXECUTED IN ACCORDANCE

WITH THE PROVISIONS OF AWS D1.8 “STRUCTURAL WELDING CODE — SEISMIC SUPPLEMENT”.

WELDS ASSOCIATED WITH THE SEISMIC FORCE-RESISTING SYSTEM ARE IDENTIFIED WITHIN

THESE DRAWINGS AS FOLLOWS:

i) NOTE WITHIN WELD TAIL

(1) D1.8 INDICATES WELDS SUBJECT TO REQUIREMENTS OF D1.8

(2) D1.8-DCW INDICATES DEMAND CRITICAL WELDS SUBJECT TO ADDITIONAL SPECIFIC

REQUIREMENTS WITHIN D1.8

u) WELDED FILLER MATERIAL SPECIFIED AS “DEMAND CRITICAL WELD” OR “DCW” ON THE

STRUCTURAL DETAILS SHALL HAVE A MINIMUM CHARPY V-NOTCH (CVN) TOUGHNESS OF 20 FT-

LBS AT A TEMPERATURE OF -20° F, AS DETERMINED BY AWS CLASSIFICATION TEST METHOD OR MANUFACTURER CERTIFICATION, AND 40 FT-LBS AT A TEMPERATURE OF 70° F, AS DETERMINED

BY AWS D1.1 AND D1.8 LATEST EDITION.

v) STEEL FRAMEWORK SHALL NOT BE ASSUMED STRUCTURALLY STABLE UNTIL ALL MEMBERS ARE IN

PLACE AND CONNECTIONS ARE INSTALLED. ANY USE OF THE PARTIALLY ERECTED FRAMEWORK

FOR TEMPORARY SUPPORT OF ANY KIND SHALL BE DONE ONLY AT THE CONTRACTOR’S RISK.

w) PROVIDE VERTICAL WEB STIFFENERS ON EACH SIDE OF WEB BEAM AT ALL POINTS SUBJECTED TO

CONCENTRATED LOADS, SUCH AS COLUMN RESTING ON BEAM. THE STIFFENERS SHALL EXTEND

TO FULL DEPTH OF BEAM AND THE BOUNDARY OF FLANGE WITH MINIMUM THICKNESS OF 3/8”.

x) BURNING OF HOLES IN STRUCTURAL STEEL IS NOT PERMITTED WITHOUT PRIOR APPROVAL OF

THE ENGINEER OR RECORD.

y) MAINTAIN WORK IN A SAFE A STABLE CONDITION DURING ERECTION. PROVIDE TEMPORARY

SHORING AND BRACING MEMBERS AS REQUIRED, WITH CONNECTIONS OF SUFFICIENT STRENGTH

TO BEAR IMPOSED LOADS. REMOVE TEMPORARY MEMBERS AND CONNECTIONS WHEN PERMANENT

MEMBERS ARE IN PLACE AND FINAL CONNECTIONS ARE MADE. PROVIDE TEMPORARY GUY LINES

TO ACHIEVE PROPER ALIGNMENT AND STABILITY OF THE STRUCTURE AS ERECTION PROCEEDS.

z) HIGH STRENGTH BOLTED CONNECTIONS AND WELDED CONNECTIONS SHALL BE INSPECTED BY

THE SPECIAL STRUCTURAL INSPECTOR. ALL COMPLETE-PENETRATION WELDS SHALL BE

ULTRASONICALLY TESTED BY A QUALIFIED INSPECTOR. INSPECTION AND TESTING WILL BE PAID

FOR BY THE OWNER.

aa) ALL EXTERIOR EXPOSED STRUCTURAL STEEL SHALL BE HOT-DIPPED GALVANIZED PER ASTM A123, UNO. FIELD WELDS AND DAMAGED GALVANIZING SHALL BE COATED WITH A ZINC-RICH PAINT, MINIMUM 2 MIL THICK, APPLIED TO A CLEAN, DRY STEEL SURFACE BY EITHER A BRUSH OR SPRAY.

ZINC-RICH PAINTS MUST CONTAIN EITHER BETWEEN 65% TO 69% METALLIC ZINC BY WEIGHT OR

GREATER THAN 92% METALLIC ZINC BY WEIGHT IN THE DRY FILM.

bb) AFTER MATERIAL HAS BEEN PROPERLY CLEANED AND TREATED, APPLY SHOP PRIME COAT TO ALL

SURFACES, EXCEPT THOSE INTENDED FOR EMBEDMENT INTO CONCRETE OR TO RECEIVE FIELD

WELDING, SLIP CRITICAL BOLTS, OR CEMENTITIOUS FIREPROOFING. PROVIDE “TOUCH-UP” AT

SITE. MINIMUM DRY FILM THICKNESS SHALL BE 1.5 MIL.

cc) MOMENT CONNECTIONS DESIGNATED BY ◄ SHALL BE DESIGNED BY THE STEEL SUPPLIER IN

ACCORDANCE WITH AISC “MANUAL FOR STEEL CONSTRUCTION”. THE CONNECTION SHALL BE

DESIGNED FOR THE MOMENT CAPACITY AND VERTICAL LOAD CAPACITY OF THE BEAM.

5) STEEL JOISTS

a) PROVIDE ADDITIONAL ANGLES FROM THE POINT OF CONCENTRATED LOAD APPLICATION TO THE

CLOSEST PANEL POINT IN THE OPPOSITE CHORD MEMBER. SEE TYPICAL DETAIL.

b) PROVIDE MISCELLANEOUS ANGLE FRAMING BETWEEN JOISTS AS REQUIRED AT ALL ROOF DRAINS

AND FLOOR AND ROOF PENETRATIONS. SEE TYPICAL DETAIL.

c) DO NOT ATTACH ANY ITEMS TO JOIST BRIDGING.

d) WEIGHT AND LOCATION OF ROOFTOP AND HANGING EQUIPMENT TO BE CONFIRMED AND

COORDINATED BY THE CONTRACTOR PRIOR TO FABRICATION.

6) MISCELLANEOUS

a) NO CHANGE IN SIZE OF STRUCTURAL ELEMENTS OR MODIFICATION THEREOF SHALL BE MADE, NOR ARE ANY OPENINGS OR SLEEVES THROUGH ANY STRUCTURAL ELEMENTS PERMITTED, UNLESS DETAILED ON THE STRUCTURAL DRAWINGS.

b) CONSULT ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR LOCATION, SIZES, AND EXTENT OF CHASES.

c) NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND

TYPICAL DETAILS. WHERE NO DETAILS ARE GIVEN, CONSTRUCTION SHALL BE SHOWN FOR

SIMILAR WORK.

d) SEE CIVIL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR THE FOLLOWING:

i) PIPE RUNS, SLEEVES, HANGERS, TRENCHES, WALL, AND SLAB OPENINGS, ETC., EXCEPT AS

SHOWN OR NOTED.

ii) ELECTRICAL CONDUIT RUNS, BOXES, AND OUTLETS IN WALLS AND SLABS

iii) CONCRETE INSERTS FOR ELECTRICAL, MECHANICAL, OR PLUMBING FIXTURES.

iv) SIZE AND LOCATION OF MACHINE OR EQUIPMENT BASES, ANCHOR BOLTS FOR MOTOR

MOUNTS, EQUIPMENT PADS, AND UNDERGROUND UTILITIES.

v) FINISHED GRADE, SITE PAVING, AND ELEVATIONS

e) CONSTRUCTION MATERIAL SHALL BE SPREAD OUT IF PLACED ON FRAMED ROOF OR FLOOR. LOAD

SHALL NOT EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT. PROVIDE ADEQUATE SHORING

AND/OR BRACING WHERE STRUCTURE HAS NOT ATTAINED DESIGN STRENGTH.

f) SPECIAL STRUCTURAL TESTS AND SPECIAL INSPECTIONS ARE REQUIRED ON THIS PROJECT IN

ACCORDANCE WITH THE BUILDING CODE. THE OWNER WILL BEAR THE COSTS OF THE SPECIAL

STRUCTURAL TESTS AND SPECIAL INSPECTIONS. THE CONTRACTOR SHALL COORDINATE AND

SCHEDULE THE INSPECTIONS AND TESTING ALONG WITH THE CONSTRUCTION AND COORDINATE

AND SCHEDULE THE INSPECTIONS AND TESTING ALONG WITH THE CONSTRUCTION AND

COOPERATE FULLY WITH THE AGENCIES PERFORMING THE SPECIAL STRUCTURAL TESTS AND

SPECIAL INSPECTIONS.

7) CONTRACTOR RESPONSIBILITIES

a) MATERIAL, WORKMANSHIP, AND DESIGN SHALL CONFORM TO THE BUILDING CODE.

b) CONTRACTOR SHALL INVESTIGATE SITE DURING CLEARING AND EARTHWORK OPERATIONS FOR FILLED EXCAVATIONS OR BURIED STRUCTURES, SUCH AS CESSPOOLS, CISTERNS, FOUNDATIONS, ETC. IF ANY SUCH STRUCTURES ARE FOUND, ARCHITECT/ENGINEER SHALL BE NOTIFIED

IMMEDIATELY.

c) CONTRACT DRAWINGS ARE CONSIDERED TO BE PART OF THE CONTRACT DOCUMENTS. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW AND COORDINATION OF ALL THE

DRAWINGS AND SPECIFICATIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES

THAT OCCUR SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER PRIOR TO

THE START OF CONSTRUCTION SO THAT A CLARIFICATION CAN BE ISSUED. ANY WORK

PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY CODE REQUIREMENTS

SHALL BE CORRECTED BY THE CONTRACTOR AT THEIR OWN EXPENSE AND AT NO EXPENSE TO

THE OWNER OR ARCHITECT/ENGINEER.

d) VERIFY THE DIMENSIONS, ELEVATIONS, AND SITE CONDITIONS BEFORE STARTING WORK. ANY

DISCREPANCY BETWEEN SUCH DETAILS AND DIMENSIONS AS MAY OCCUR SHALL BE REPORTED

TO THE ARCHITECT/EOR FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.

e) DUE TO THE NATURE OF THE WORK, ALL DIMENSIONS AND/OR EXISTING DETAILS SHOWN ON THE DRAWINGS THAT WILL IN ANY WAY AFFECT THE WORK SHALL BE FIELD-VERIFIED PRIOR TO FABRICATION OF ANY MATERIALS. FIELD-VERIFICATION SHALL BE THE RESPONSIBILITY OF THE

CONTRACTOR. IF THERE IS ANY QUESTION TO THE INTENT OF THE WORK INDICATED, THE

CONTRACTOR SHALL CLEAR THE QUESTION WITH THE ARCHITECT/EOR. FIELD-VERIFY TOP OF

EXISTING CONCRETE AND TOP OF EXISTING STEEL AT LOCATIONS WHERE NEW STRUCTURE

CONNECTS TO EXISTING STRUCTURE.

f) THE CONTRACTOR SHALL BE AWARE THAT THE WORK INVOLVES ADDITIONS TO AN EXISTING

FACILITY THAT WILL REMAIN IN OPERATION DURING CONSTRUCTION. IT IS THEREFORE

MANDATORY FOR WORK THAT WILL IN ANY WAY AFFECT THE NORMAL OPERATION OF THE

FACILITY BE COORDINATED WITH THE OWNER.

g) NOTIFY, IN WRITING, THE EOR OF CONDITIONS ENCOUNTERED IN THE FIELD DIFFERENT FROM

THOSE SHOWN IN THE STRUCTURAL DOCUMENTS.

h) THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED

STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL

PROVIDE ALL MEASURES NECESSARY SHALL INCLUDE, BUT NOT BE LIMITED TO, BRACING,

SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC. OBSERVATION VISITS TO THE

SITE BY THE EOR SHALL NOT INCLUDE INSPECTION OF THE ABOVE ITEMS.

i) HEAVY EQUIPMENT, CRANES, AND MATERIAL STOCKPILES SHALL NOT BE LOCATED ON OR

ADJACENT TO SHORING OR RETAINING WALLS UNLESS ACCEPTED BY THE EOR. ACCEPTANCE

SHALL BE BASED ON ANALYSIS AND EVALUATION PERFORMED BY THE CONTRACTOR AND

REVIEWED BY THE EOR.

j) AN UNDERGROUND SERVICE ALERT INQUIRY IDENTIFICATION NUMBER MUST BE OBTAINED AT

LEAST TWO WORKING DAYS BEFORE STARTING EXCAVATION WORK.

k) CONTRACTOR HAS SOLE RESPONSIBILITY FOR THE DESIGN, ADEQUACY, AND SAFETY OF

ERECTION BRACING, SHORING, TEMPORARY SUPPORTS, ETC.

l) CONTRACTOR HAS SOLE RESPONSIBILITY TO COMPLY WITH ALL OSHA SAFETY REGULATIONS.

m) CONTRACTOR SUBMITTALS/SHOP DRAWINGS

i) SUBMITTALS FOR REINFORCING STEEL AND STRUCTURAL STEEL SHALL BE SUBMITTED FOR

REVIEW PRIOR TO FABRICATION OF THESE ITEMS.

ii) DIMENSIONS AND QUANTITIES ARE NOT REVIEWED BY THE EOR; THEREFORE, THEY SHALL BE

VERIFIED BY THE CONTRACTOR. CONTRACTOR SHALL REVIEW AND STAMP THE DRAWINGS

FOR CONFORMANCE WITH THE MEANS, METHODS, TECHNIQUES, SEQUENCES, AND

OPERATIONS OF CONSTRUCTION, AND ALL SAFETY PRECAUTIONS AND PROGRAMS

INCIDENTAL THERETO.

iii) SHOP DRAWINGS SUBMITTALS PROCESSED BY THE ENGINEER ARE NOT CHANGE ORDERS. THE

PURPOSE OF SHOP DRAWINGS SUBMITTALS IS TO DEMONSTRATE TO THE ENGINEER THAT THE

CONTRACTOR UNDERSTANDS THE DESIGN CONCEPT, BY INDICATING WHICH MATERIAL IS

INTENDED TO BE FURNISHED AND INSTALLED, AND BY DETAILING THE INTENDED

FABRICATION AND INSTALLATION METHOD. IF ANY DEVIATIONS, DISCREPANCIES, OR

CONFLICTS BETWEEN SHOP DRAWINGS AND THE CONTRACT DOCUMENTS ARE DISCOVERED

EITHER PRIOR TO OR AFTER SHOP DRAWING SUBMITTALS ARE PROCESSED BY THE EOR, THE

CONTRACT DRAWINGS AND SPECIFICATIONS SHALL CONTROL AND SHALL BE FOLLOWED.

iv) SHOP DRAWINGS OF DESIGN-BUILD COMPONENTS INCLUDING STAIRS BY OTHERS SHALL

INCLUDE THE DESIGNING PROFESSIONAL ENGINEER’S STAMP, FROM THE PROJECT STATE AND

SHALL BE APPROVED BY THE COMPONENT DESIGNER PRIOR TO CURSORY REVIEW BY THE EOR

FOR LOADS IMPOSED ON THE BASIC STRUCTURE. THE COMPONENT DESIGNER IS

RESPONSIBLE FOR CODE CONFORMANCE AND ALL NECESSARY CONNECTIONS NOT

SPECIFICALLY CALLED OUT ON ARCHITECTURAL OR STRUCTURAL DRAWINGS. SHOP

DRAWINGS SHALL INDICATE MAGNITUDE AND DIRECTION OF ALL LOADS IMPOSED ON THE

BASIC STRUCTURE. DESIGN CALCULATIONS SHALL BE INCLUDED IN THE SUBMITTAL.

v) REVIEW OF SUBMITTALS OR SHOP DRAWINGS BY THE EOR DOES NOT RELIEVE THE

CONTRACTOR OF THE SOLE RESPONSIBILITY TO REVIEW AND CHECK ALL SUBMITTALS AND

SHOP DRAWINGS BEFORE SUBMITTING TO THE STRUCTURAL ENGINEER. CONTRACTOR

REMAINS SOLELY RESPONSIBLE FOR THE ERRORS AND OMISSIONS ASSOCIATED WITH THE

PREPARATION OF SHOP DRAWINGS AS THEY PERTAIN TO MEMBER SIZES, DETAILS, AND

DIMENSIONS SPECIFIED IN THE CONTRACT DOCUMENT.

vi) DIMENSIONS NOTED AS PLUS OR MINUS (±) INDICATE UNVERIFIED DIMENSIONS AND ARE

APPROXIMATE. NOTIFY ARCHITECT IMMEDIATELY OF CONFLICTS OR EXCESSIVE VARIATIONS

FROM INDICATED DIMENSIONS. NOTED DIMENSIONS TAKE PRECEDENCE OVER SCALED

DIMENSIONS–DO NOT SCALE DRAWINGS. DIMENSIONS OF EXISTING CONDITIONS MAY BE

BASED ON RECORD DRAWINGS AND ARE TO BE FIELD-VERIFIED BY THE CONTRACTOR.

vii) CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS BEFORE COMMENCING ANY

DEMOLITIONS. CONTRACTOR SHALL PROVIDE ADEQUATE SHORING AND BRACING OF ALL

STRUCTURAL MEMBERS, EXISTING CONSTRUCTION AND SOIL EXCAVATIONS, AS REQUIRED,

AND IN A MANNER SUITABLE TO THE WORK SEQUENCE. TEMPORARY SHORING AND BRACING

SHALL NOT BE REMOVED UNTIL ALL FINAL CONNECTIONS HAVE BEEN COMPLETED IN

ACCORDANCE WITH THE DRAWINGS AND MATERIALS HAVE ACHIEVED DESIGN STRENGTH. NO

REINFORCING BAR IN EXISTING CONSTRUCTION SHALL BE CUT UNLESS DIRECTED TO BY THE

ARCHITECT OR AS SHOWN ON THE DRAWINGS.

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting EngineersO

W N

ER

SH

IP

O

F

IN

ST

R

U M

EN

TS

O F

SE

R

VI

C

E A ll re po rts

, p la ns , s pe ci fic at io ns

, c om pu te r f ile s, fi el d da ta

, n ot es a nd o th er d oc um en ts a nd in st ru m en ts p re pa re d by th e C on su lta nt a s in st ru m en ts o f s er vi ce s ha ll re m ai n th e pr op er ty o f t he C on su lta nt

. T he

C on su lta nt s ha ll re ta in a ll co m m on la w , s ta tu to ry a nd o th er re se rv ed ri gh ts

, i nc lu di ng , w ith ou t l im ita tio n, th e co py rig ht th er et o.

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

PR

O

JE

C

T

AD

D R

ES

S:

PR

O

JE

C

T

TI

TL

E:

2400430

4/

/2

5:

:2

PMA

ut od es k

D oc s:

//C

VG

R eh ab a nd E ffi ci en cy

P ro gr am

/S

TR

U C

T-kp ff- C

VG

_R

.rv t

12" = 1'-0"

GENERAL NOTES AND DESIGN

CRITERIA

C

VG

IN

D

U

ST

R

IA

L R

EH

AB

IL

IT

AT

IO

N

AN

D E

FF

IC

IE

N

C Y

PR

O

G R

AM

<N on e>

T er m in al D r H eb ro n, K

Y

C-O-S2-001

KLH PROJECT # 26944

04/18/25

26944.00

SS RW

REVISIONS

04/18/25 ISSUE FOR BID

REQUIRED GEOTECHNICAL SPECIAL INSPECTIONS

SYSTEM OR MATERIAL

INSPECTION

REMARKS

IB

C

R

EF

ER

EN

C E

C O

D E

O R

S

TA

N

D A

D

EF

ER

EN

C

E

C O

N

TI

N U

O U

S

P

ER

IO

D

IC

SOILS

VERIFY EXCAVATIONS ARE

EXTENDED TO PROPER DEPTH

AND HAVE REACHED PROPER

MATERIAL.

-- X

PERFORM CLASSIFICATION AND

TESTING OF COMPACTED FILL

MATERIALS.

-- X

VERIFY USE OF PROPER

MATERIALS, DENSITIES AND LIFT

THICKNESSES DURING

PLACEMENT AND COMPACTION

OF COMPACTED FILL.

X --

PRIOR TO PLACEMENT OF

COMPACTED FILL, INSPECT

SUBGRADE AND VERIFY THAT

SITE HAS BEEN PREPARED

PROPERLY.

-- X

REQUIRED FABRICATION SPECIAL INSPECTIONS

SYSTEM OR MATERIAL

INSPECTION

REMARKS

IB

C

R

EF

ER

EN

C E

C O

D E

N

D A

ER

EN

C

E

C O

N

TI

N U

O U

S

P

ER

IO

D

IC

INSPECTION IN FABRICATION

SHOP

.2 .5

WHERE FABRICATION OF

STRUCTURAL, LOAD-BEARING OR

LATERAL LOAD-RESISTING

MEMBERS OR ASSEMBLIES IS

BEING PERFORMED ON THE

PREMISES OF A FABRICATOR'S

SHOP, SPECIAL INSPECTION OF

THE FABRICATED ITEMS SHALL

BE AS REQUIRED BY TABLE 2

AND AS REQUIRED ELSEWHERE

IN THE STATEMENT OF SPECIAL

INSPECTIONS. REFERENCE

SECTION 1704.2.5.1 FOR

APPROVED FABRICATOR

EXCEPTION.

REQUIRED STRUCTURAL STEEL SPECIAL INSPECTIONS

SYSTEM OR MATERIAL

INSPECTION

REMARKS

IB

C

R

EF

ER

EN

C E

C O

D E

N

D A

ER

EN

C

E

C O

N

TI

N U

O U

S

P

ER

IO

D

IC

INSPECTION TASKS PRIOR TO WELDING:

WELDING PROCEDURE

SPECIFICATIONS (WPS)

AVAILABLE

1705.2

A

IS

C

TB

N

5.

4-

A

IS

C

N 5.

-- X --

MANUFACTURER CERTIFICATIONS

FOR WELDING CONSUMABLES

AVAILABLE

-- X --

MATERIAL IDENTIFICATION

(TYPE/GRADE) X -- --

WELDER IDENTIFICATION

SYSTEM X -- --

FIT-UP OF GROOVE WELDS

(INCLUDING JOINT GEOMETRY):

JOINT PREPARATION,

DIMENSIONS (ALIGNMENT, ROOT

OPENING, ROOT FACE, BEVEL),

CLEANLINESS (CONDITION OF

STEEL SURFACES), TACKING

(TACK WELD QUALITY AND

LOCATION), BACKING TYPE AND

FIT (IF APPLICABLE)

X -- --

CONFIGURATION AND FINISH OF

ACCESS HOLES X -- --

FIT-UP OF FILLET WELDS:

DIMENSIONS (ALIGNMENT, GAPS

AT ROOT), CLEANLINESS

(CONDITION OF STEEL

SURFACES), TACKING (TACK

WELD QUALITY AND LOCATION),

BACKING TYPE AND FIT (IF

APPLICABLE)

X -- --

CHECK WELDING EQUIPMENT -- -- FABRICATOR OR ERECTOR SHALL

OBSERVE

INSPECTION TASKS DURING WELDING:

USE OF QUALIFIED WELDERS

1705.2

A

IS

C

TB

N

5.

4-

A

IS

C

N 5.

X -- --

CONTROL AND HANDLING OF

WELDING CONSUMABLES:

PACKAGING, EXPOSURE

CONTROL

X -- --

NO WELDING OVER CRACKED

TACK WELDS X -- --

ENVIRONMENTAL CONDITIONS:

WIND SPEED WITHIN LIMITS,

PRECIPITATION AND

TEMPERATURE

X -- --

WPS FOLLOWED: SETTINGS ON

WELDING EQUIPMENT, TRAVEL

SPEED, SELECTED WELDING

MATERIALS, SHIELDING GAS

TYPE/FLOW RATE, PREHEAT

APPLIED, INTERPASS

TEMPERATURE MAINTAINED

(MIN./MAX.), PROPER POSITION

(F, V, H, OH)

X -- --

WELDING TECHNIQUES:

INTERPASS AND FINAL

CLEANING, EACH PASS WITHIN

PROFILE LIMITATIONS, EACH

PASS MEETS QUALITY

REQUIREMENTS

X -- --

INSPECTION TASKS AFTER WELDING:

WELDS CLEANED

1705.2

A

IS

C

TB

N

5.

4-

A

IS

C

N 5.

X -- --

SIZE, LENGTH AND LOCATION OF

WELDS -- X --

WELDS MEET VISUAL

ACCEPTANCE CRITERIA: CRACK

PROHIBITION, WELD/BASE-

METAL FUSION, CRATER CROSS

SECTION, WELD PROFILES, WELD

SIZE, UNDERCUT, POROSITY

-- X --

ARC STRIKES -- X --

K-AREA -- X --

BACKING REMOVED AND WELD

TABS REMOVED (IF REQUIRED) -- X --

REPAIR ACTIVITIES -- X --

DOCUMENT ACCEPTANCE OR

REJECTION OF WELDED JOINT OR

MEMBER

-- X --

INSPECTION TASKS PRIOR TO BOLTING:

MANUFACTURER'S

CERTIFICATIONS AVAILABLE FOR

FASTENER MATERIALS

1705.2

A

IS

C

TB

N

5.

6-

A

IS

C

N 5.

-- X --

FASTENERS MARKED IN

ACCORDANCE WITH ASTM

REQUIREMENTS

X -- --

PROPER FASTENERS SELECTED

FOR THE JOINT DETAIL (GRADE,

TYPE, BOLT LENGTH IF THREADS

ARE TO BE EXCLUDED FROM

SHEAR PLANE)

X -- --

PROPER BOLTING PROCEDURE

FOR JOINT DETAIL X -- --

CONNECTING ELEMENTS,

INCLUDING THE APPROPRIATE

FAYING SURFACE CONDITION

AND HOLE PREPARATION, IF

SPECIFIED, MEET APPLICABLE

REQUIREMENTS

X -- --

PRE-INSTALLATION

VERIFICATION TESTING BY

INSTALLATION PERSONNEL

OBSERVED AND DOCUMENTED

FOR FASTENER ASSEMBLIES AND

METHODS USED

X -- --

PROPER STORAGE PROVIDED FOR

BOLTS, NUTS, WASHERS AND

OTHER FASTENER COMPONENTS X -- --

INSPECTION TASKS DURRING BOLTING:

FASTENER ASSEMBLIES, OF

SUITABLE CONDITION, PLACED

IN ALL HOLES AND WASHERS (IF

REQUIRED) ARE POSITIONED AS

REQUIRED

1705.2

A

IS

C

TB

N

5.

6-

A

IS

C

N 5.

X -- --

JOINT BROUGHT TO SNUG-TIGHT

CONDITION PRIOR TO THE

PRETENSIONING OPERATION

X -- --

FASTENER COMPONENT NOT

TURNED BY THE WRENCH

PREVENTED FROM ROTATING

X -- --

FASTENERS ARE PRETENSIONED

IN ACCORDANCE WITH THE RCSC

SPECIFICATION, PROGRESSING

SYSTEMATICALLY FROM THE

MOST RIGID POINT TOWARD THE

FREE EDGES

X -- --

INSPECTION TASKS AFTER BOLTING:

DOCUMENT ACCEPTANCE OR

REJECTION OF BOLTED

CONNECTIONS

1705.2

A

IS

C

0:

T B

N 5.

6-

-- X --

REQUIRED GEOTECHNICAL TESTING

SYSTEM OR MATERIAL

INSPECTION

REMARKS

IB

C

R

EF

ER

EN

C E

C O

D E

N

D A

ER

EN

C

E

C O

N

TI

N U

O U

S

P

ER

IO

D

IC

FILL IN-PLACE DENSITY OR

PREPARED SUBGRADE DENSITY

1705.6

V A R

IE

S

M

IN

IM

U

M P

ER

I

B C

A

PP

EN

D

IX

J

7.

-- X PER THE GEOTECHNICAL

ENGINEER

MATERIAL VERIFICATION

V A R

IE

S

C

LA

S S

IF

IC

A

TI

O N

A N

D T

ES

TI

N G

F C O

N

TR

O

LL

ED

F

IL

L

M A

TE

R

IA

LS

-- X PER THE GEOTECHNICAL

ENGINEER

REQUIRED STRUCTURAL STEEL TESTING

SYSTEM OR MATERIAL

INSPECTION

REMARKS

IB

C

R

EF

ER

EN

C E

C O

D E

N

D A

ER

EN

C

E

C O

N

TI

N U

O U

S

P

ER

IO

D

IC

RADIOGRAPHIC (RT) MAGNETIC

PARTICLE (MT) AND ULTRASONIC

(UT) TESTING OF WELDS

AISC 360

N5.5

R T-

A W

S D

1.

1:

.1

M

T- A

W S D

1.

1:

6.

.4 U

T- A

W S D

1.

1:

.1

.1

4.

PE

R D

R A W

IN

G

S

ALL CJP WELDS IN MATERIALS

5/16" OR GREATER REQUIRE UT

TESTING

PRE-INSTALLATION

VERIFICATION OF

PRETENSIONED HIGH STRENGTH

BOLTS

1705.2.1

AISC 360:

TB N5.6-1

R C S C S

PE

C

IF

IC

A

TI

O N

F O

R S

TR

U

C

TU

R A L

JO

IN

TS

U

IN

G H

IG

H

-S

TR

EN

G

TH

B O

LT

S

S

EC

TI

O

N

EA

C H

C O

M B

IN

A

TI

O N

O F

D

IA

M

ET

ER

LE

N

G

TH

G

R A D

E A N

D L

O T

TO

B

E U

S

ED

I N

T H

E W

O R K

STATEMENT OF SPECIAL INSPECTION AND TESTING NOTES:

1. SPECIAL INSPECTIONS SHALL CONFORM TO CHAPTER 17 OF THE INTERNATIONAL BUILDING

CODE (IBC) AND THE REFERENCE CODES AND STANDARDS LISTED IN CHAPTER 35.

2. INSPECTIONS AND ASSOCIATED TESTING SHALL BE PERFORMED BY AN APPROVED QUALIFIED

TESTING AND INSPECTING AGENCY MEETING THE REQUIREMENTS OF ASTM E329 (MATERIALS),

ASTM D3740 (SOILS), ASTM C1077 (CONCRETE), ASTM A880 (STEEL), AND ASTM E543 (NON-

DESTRUCTIVE). THE TESTING AND INSPECTING AGENCY SHALL FURNISH TO THE

ARCHITECT/ENGINEER A COPY OF THEIR SCOPE OF ACCREDITATION. SPECIAL INSPECTORS

SHALL BE CERTIFIED BY THE BUILDING OFFICIAL. WELDING INSPECTORS SHALL BE QUALIFIED

PER SECTION 6.1.4.1.1 OF AWS D1.1.

3. THE SPECIAL INSPECTOR SHALL OBSERVE THE INDICATED WORK FOR COMPLIANCE WITH THE

APPROVED CONSTRUCTION DOCUMENTS. ALL DISCREPANCIES SHALL BE BROUGHT TO THE

ATTENTION OF THE CONTRACTOR FOR CORRECTION AND NOTED IN THE INSPECTION REPORTS.

ISSUES REQUIRING IMMEDIATE CORRECTIVE ACTIONS OR ENGINEERING INPUT ARE TO BE

BROUGHT TO THE ENGINEER'S ATTENTION IMMEDIATELY UPON DISCOVERY.

4. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS FOR EACH INSPECTION TO

THE BUILDING OFFICIAL, ARCHITECT/ENGINEER, CONTRACTOR, AND OWNER. THE TESTING

AND INSPECTING AGENCY SHALL SUBMIT A FINAL REPORT STATING THAT THE WORK

REQUIRING SPECIAL INSPECTION WAS INSPECTED AND IS IN CONFORMANCE WITH THE

APPROVED CONSTRUCTION DOCUMENTS AND THAT ALL DISCREPANCIES NOTED IN THE

INSPECTION REPORTS HAVE BEEN CORRECTED.

5. CONTINUOUS SPECIAL INSPECTION: SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS

PRESENT WHEN AND WHERE THE WORK TO BE INSPECTED IS BEING PERFORMED. PERIODIC

SPECIAL INSPECTION: SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS

INTERMITTENTLY PRESENT WHERE THE WORK TO BE INSPECTED HAS BEEN OR IS BEING

PERFORMED.

6. WHERE PERIODIC INSPECTION IS ALLOWED IN ACCORDANCE WITH THE ANCHOR ICC/IAPMO

EVALUATION REPORT, INSPECTIONS SHALL BE AS FOLLOWS:

- FOR ALL ANCHORS, PRIOR TO CONCEALMENT, VERIFY:ANCHOR TYPE, ANCHOR

DIMENSIONS, ANCHOR SPACING AND EDGE DISTANCE.

- FOR EACH ANCHOR TYPE AND SIZE, INSPECTOR SHALL BE ONSITE TO CONTINUOUSLY

INSPECT A MINIMUM OF THE FIRST 10 ANCHORS INSTALLED BY EACH INSTALLER FOR

CONFORMANCE WITH ICC/IAPMO EVALUATION REPORT. PROVIDED ALL ANCHORS ARE

INSTALLED CORRECTLY PER MANUFACTURER'S INSTRUCTIONS, PROVIDE PERIODIC

INSPECTION ON A MINIMUM OF 10% OF THE NEXT 1000 ANCHORS BY EACH INSTALLER AND

A MINIMUM OF 5% OF THE REMAINING ANCHORS BY EACH INSTALLER. INSPECTIONS

SHALL OCCUR A MINIMUM OF ONCE PER WEEK AT A RANDOM TIME WHILE ANCHOR

INSTALLATION IS ONGOING. ANY NON-COMPLIANCE ISSUES SHALL RESET THE INSPECTION

REQUIREMENTS TO TEN (10) CONTINUOUS INSPECTIONS. NON-COMPLIANT ANCHORS

SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF RECORD FOR REVIEW AND

SHALL BE BROUGHT INTO COMPLIANCE BY EITHER TESTING OR RE-INSTALLATION.

7. OBSERVE: OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED

PENDING THESE INSPECTIONS.

PERFORM: PERFORM THESE TASKS FOR EACH ELEMENT.

8. INDICATED CONCRETE TESTING MEETS MINIMUM REQUIREMENTS FOR STRUCTURAL TESTING

TO BE PROVIDED BY THE APPROVED QUALIFIED TESTING AND INSPECTING AGENCY.

ADDITIONAL TESTING FOR CONSTRUCTION CONSIDERATIONS ARE NOT INDICATED AND SHALL

BE DETERMINED BY THE CONTRACTOR AND PROVIDED AT CONTRACTOR'S EXPENSE.

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting EngineersO

W N

ER

SH

IP

O

F

IN

ST

R

U M

EN

TS

O F

SE

R

VI

C

E A ll re po rts

, p la ns , s pe ci fic at io ns

, c om pu te r f ile s, fi el d da ta

, n ot es a nd o th er d oc um en ts a nd in st ru m en ts p re pa re d by th e C on su lta nt a s in st ru m en ts o f s er vi ce s ha ll re m ai n th e pr op er ty o f t he C on su lta nt

. T he

C on su lta nt s ha ll re ta in a ll co m m on la w , s ta tu to ry a nd o th er re se rv ed ri gh ts

, i nc lu di ng , w ith ou t l im ita tio n, th e co py rig ht th er et o.

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .