20250418_-_CVG_IREP_DWG_CHILLER_IFB_PACKAGE.pdf

PDF 7 MB Posted

Attached to
Furnish & Install Equipment - Industrial HVAC Rehabilitation & Efficiency Program - Phase I
Solicitation number
25-027-ITB
Issued by
Kenton County, Kentucky

About this file

These documents are engineering design drawings for the Cincinnati/Northern Kentucky International Airport (CVG) Chiller Plant Modification Project, prepared by KLH Engineers for the Kenton County Airport Board. The project involves a comprehensive rehabilitation and efficiency upgrade of the airport's HVAC infrastructure, specifically focusing on chiller systems, mechanical equipment, and associated electrical systems in the Terminal and Concourse B areas. The design plans detail mechanical and electrical demolition of existing infrastructure, installation of new chillers, pumps, piping, and electrical disconnects, and a building automation system (BAS) upgrade that will replace existing Honeywell panels and controllers with Automatic Logic Controllers.

The project scope includes replacing condenser water pumps, side stream separators, and upgrading pneumatic control valves to electric actuators across multiple airport buildings. The drawings indicate detailed technical specifications for equipment like chillers (T3-1, T3-2, C-CB-1), pumps (P-T3-1, P-T3-2, P-CE-1 through P-CE-3), and electrical systems with specific voltage, horsepower, and circuit requirements. The chiller plant sequence of operations outlines complex control strategies for managing chiller stages, pump lead/lag sequences, bypass valves, and temperature/pressure maintenance, with provisions for user-adjustable setpoints and rotation mechanisms to balance equipment usage.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in th e p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

FOR KENTON COUNTY AIRPORT BOARD AT

CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

MEP ENGINEER

KLH ENGINEERS

1538 ALEXANDRIA PIKE

SUITE 11

FORT THOMAS, KY 41075

CONTACT: CHRIS MEHAFFIE, PE

PHONE: (859)-442-8050

EMAIL: CMEHAFFIE@KLHENGRS.COM

OWNER

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

PO BOX 752000

CINCINNATI, OH 45275-200C

CONTACT: THAD FOGLE

PHONE: (859) 743-5978

EMAIL: TFOGLE@CVGAIRPORT.COM

2400430

/1

/2

:2 :4

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

CHILLER PLANT MODIFICATION

PROJECT

CHILLER PLANT PROJECT

COVER SHEET

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

C H

IL

L

E R

P L

A N

T M

O D

IF

IC

A T

IO

N

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

H-G0-001

KLH PROJECT # 26944

04/18/25

26944.00

DS KTS

DRAWING INDEX - CHILLER

SHEET NUMBER SHEET NAME CURRENT REVISION ISSUED CURRENT REVISION DATE CURRENT REVISION DESCRIPTION

H-G0-001 CHILLER PLANT PROJECT COVER SHEET No 04/18/25 ISSUE FOR BID

H-T-M1-001 MECHANICAL TERMINAL COVER SHEET No 04/18/25 ISSUE FOR BID

H-T-M1-100 MECHANICAL DEMOLITION TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

H-T-M3-100 MECHANICAL TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

H-T-M3-601 MECHANICAL TERMINAL CHILLERS No 04/18/25 ISSUE FOR BID

H-T-M3-602 MECHANICAL TERMINAL CHILLERS No 04/18/25 ISSUE FOR BID

H-T-M3-603 MECHANICAL TERMINAL CHILLERS No 04/18/25 ISSUE FOR BID

H-B-M1-001 MECHANICAL CONCOURSE B COVER SHEET No 04/18/25 ISSUE FOR BID

H-B-M1-100 MECHANICAL DEMOLITION CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

H-B-M3-100 MECHANICAL CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

H-T-E1-100 ELECTRIC DEMOLITION TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

H-T-E4-100 ELECTRIC POWER TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

H-B-E1-100 ELECTRIC DEMOLITION CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

H-B-E4-100 ELECTRIC POWER CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

FOR KENTON COUNTY AIRPORT BOARD AT

CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

MEP ENGINEER

KLH ENGINEERS

1538 ALEXANDRIA PIKE

SUITE 11

FORT THOMAS, KY 41075

CONTACT: CHRIS MEHAFFIE, PE

PHONE: (859)-442-8050

EMAIL: CMEHAFFIE@KLHENGRS.COM

OWNER

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

PO BOX 752000

CINCINNATI, OH 45275-200C

CONTACT: THAD FOGLE

PHONE: (859) 743-5978

EMAIL: TFOGLE@CVGAIRPORT.COM

2400430

/1

/2

:2 :4

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

CHILLER PLANT MODIFICATION

PROJECT

CHILLER PLANT PROJECT

COVER SHEET

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

C H

IL

L

E R

P L

A N

T M

O D

IF

IC

A T

IO

N

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

H-G0-001

KLH PROJECT # 26944

04/18/25

26944.00

DS KTS

DRAWING INDEX - CHILLER

SHEET NUMBER SHEET NAME CURRENT REVISION ISSUED CURRENT REVISION DATE CURRENT REVISION DESCRIPTION

H-G0-001 CHILLER PLANT PROJECT COVER SHEET No 04/18/25 ISSUE FOR BID

H-T-M1-001 MECHANICAL TERMINAL COVER SHEET No 04/18/25 ISSUE FOR BID

H-T-M1-100 MECHANICAL DEMOLITION TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

H-T-M3-100 MECHANICAL TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

H-T-M3-601 MECHANICAL TERMINAL CHILLERS No 04/18/25 ISSUE FOR BID

H-T-M3-602 MECHANICAL TERMINAL CHILLERS No 04/18/25 ISSUE FOR BID

H-T-M3-603 MECHANICAL TERMINAL CHILLERS No 04/18/25 ISSUE FOR BID

H-B-M1-001 MECHANICAL CONCOURSE B COVER SHEET No 04/18/25 ISSUE FOR BID

H-B-M1-100 MECHANICAL DEMOLITION CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

H-B-M3-100 MECHANICAL CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

H-T-E1-100 ELECTRIC DEMOLITION TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

H-T-E4-100 ELECTRIC POWER TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

H-B-E1-100 ELECTRIC DEMOLITION CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

H-B-E4-100 ELECTRIC POWER CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

STANDARD HVAC ABBREVIATIONS

AAV AUTOMATIC AIR VENT

ACCESS ACCESSORIES

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AMP AMPERE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

BAS BUILDING AUTOMATION SYSTEM

BD BACKDRAFT DAMPER

BHP BRAKE HORSEPOWER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

CD CEILING DIFFUSER

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CLG COOLING

CO CARBON MONOXIDE

CO2 CARBON DIOXODE

COP COEFFICIENT OF PERFORMANCE

CV CONSTANT VOLUME

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

DB DECIBELS

DB DRY-BULB TEMPERATURE

DC DISCONNECT

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE DELTA(CHANGE IN TEMPERATURE)

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DX DIRECT EXPANSION

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EG EXHAUST GRILLE

EMERG EMERGENCY POWER

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EX. EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FA FREE AREA

FD FIRE DAMPER

FLA FULL LOAD AMPERES

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FEET

FURN FURNISHED

GA GAUGE

GAL GALLONS

GPM GALLONS PER MINUTE

HD HEAD

HOA HAND/OFF/AUTOMATIC

HP HORSEPOWER

HPR HIGH PRESSURE RETURN

(STEAM CONDENSATE)

HSTAT HUMIDISTAT

HTG HEATING

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IPLV INTERGRATED PART LOAD VALUE

INST INSTALLED

KW KILOWATT

KWH KILOWATT HOUR

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LPR LOW PRESSURE RETURN

(STEAM CONDENSATE)

LPS LOW PRESSURE STEAM

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MERV MINIMUM EFFICIENCY REPORTING VALUE

MIN MINIMUM

MOD MOTOR OPERATED DAMPER

MPR MEDIUM PRESSURE RETURN

(STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MVD MANUAL VOLUME DAMPER

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OCP OVER CURRENT PROTECTION

PD PRESSURE DROP

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

RA RETURN AIR

RAT RETURN AIR TEMPERATURE

RH RELATIVE HUMIDITY

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

SA SUPPLY AIR

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCD SMOKE CONTROL DAMPER

SD SMOKE DETECTOR

SENS SENSIBLE HEAT

SP STATIC PRESSURE

TAB TESTING, ADJUSTING, BALANCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

UL UNDERWRITERS LABORATORY

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

WB WET-BULB (TEMPERATURE)

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

WIRE WIRED

DESCRIPTION

MECHANICAL LEGEND

SYMBOL

PLAN-VIEW LINE TYPES

WORK SHOWN FADED INDICATES EXISTING WORK TO REMAIN OR NEW WORK BY

OTHERS AS APPLICABLE

WORK SHOWN BOLD-DASHED INDICATES SELECTIVE DEMOLITION WORK

WORK SHOWN BOLD-CONTINUOUS INDICATES NEW WORK

DRAWING SET APPEARANCE

TO BETTER COMMUNICATE SCOPE TO PERMIT AGENCIES AND CONTRACTORS, EACH DRAWING IN THIS DRAWING SET HAS BEEN CREATED IN BOTH "COLOR" AND "BLACK AND WHITE". THERE EXISTS A COLOR LAYER WITHIN EACH DRAWING WHERE VISIBILITY IS CONTROLLED THROUGH THE PDF LAYER MANAGER. THIS LAYER VISIBILITY CAN BE TOGGLED DISPLAYING EITHER "COLOR" OR "BLACK AND WHITE". TO MAINTAIN SCOPE BASED SHADING WHEN PRINTING TO PAPER, BLACK AND WHITE NEEDS TO BE VISIBLE.

FOR FURTHER INSTRUCTIONS, REFER TO CONTRACTOR RESOURCES ON OUR WEBSITE AND DOWNLOAD "DRAWING COLOR

INSTRUCTIONS".

WWW.KLHENGRS.COM - CONTRACTOR RESOURCES (RIGHT HAND SIDE OF PAGE).

PIPING LINE TYPES

HWS

HOT WATER SUPPLY

HWR

HOT WATER RETURN

CHWS

CHILLED WATER SUPPLY

CHWR

CHILLED WATER RETURN

CWS

CONDENSER WATER SUPPLY

CWR

CONDENSER WATER RETURN

RL

REFRIGERANT LIQUID

RS

REFRIGERANT SUCTION

CD

CONDENSATE DRAIN

MECHANICAL PIPING ACCESSORIES

CHECK VALVE (DIRECTION OF FLOW INDICATED)

PRESSURE RELIEF VALVE

PRESSURE REGULATING VALVE

MAN

MANUAL BALANCING VALVE

UNION

TEMPERATURE & PRESSURE TEST PORT

FLOW DIRECTION

FLEX PIPING CONNECTOR

THERMOMETER

PRESSURE GAUGE

SOLENOID VALVE

Y-STRAINER

STRAINER WITH BLOW OFF

DRAIN VALVE (3/4" UNLESS OTHERWISE NOTED)

MANUAL AIR VENT

MECHANICAL DUCTWORK ACCESSORIES

DUCT WITH MANUAL VOLUME DAMPER

MECHANICAL STATS & SENSORS

FLOW SENSORFS

CURRENT SENSORCS

END SWITCHES

LOW VOLTAGE THERMOSTAT WITH LOCKABLE GUARDT

FLUID SENSORFL

VIBRATION SENSORV

REFRIGERANT MONITORRD

NITROGEN DIOXIDE SENSORNO2

MECHANICAL MISCELLANOUS

DI

DIGITAL INPUT

DO

DIGITAL OUTPUT

AI

ANALOG INPUT

AO

ANALOG OUTPUT

I

HARD WIRE INTERLOCK

POINT OF DEMOLITION TO EXISTING (FIELD VERIFY EXISTING UTILITY

SERVICE TYPE, PRIOR TO TERMINATING CONNECTION)

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

2400430

/1

/2

:4

:1

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

1/8" = 1'-0"

MECHANICAL TERMINAL

COVER SHEET

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

C H

IL

L

E R

P L

A N

T M

O D

IF

IC

A T

IO

N

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

H-T-M1-001

KLH PROJECT # 26944

04/18/25

26944.00

DS KTS

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

STANDARD HVAC ABBREVIATIONS

AAV AUTOMATIC AIR VENT

ACCESS ACCESSORIES

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AMP AMPERE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

BAS BUILDING AUTOMATION SYSTEM

BD BACKDRAFT DAMPER

BHP BRAKE HORSEPOWER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

CD CEILING DIFFUSER

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CLG COOLING

CO CARBON MONOXIDE

CO2 CARBON DIOXODE

COP COEFFICIENT OF PERFORMANCE

CV CONSTANT VOLUME

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

DB DECIBELS

DB DRY-BULB TEMPERATURE

DC DISCONNECT

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE DELTA(CHANGE IN TEMPERATURE)

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DX DIRECT EXPANSION

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EG EXHAUST GRILLE

EMERG EMERGENCY POWER

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EX. EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FA FREE AREA

FD FIRE DAMPER

FLA FULL LOAD AMPERES

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FEET

FURN FURNISHED

GA GAUGE

GAL GALLONS

GPM GALLONS PER MINUTE

HD HEAD

HOA HAND/OFF/AUTOMATIC

HP HORSEPOWER

HPR HIGH PRESSURE RETURN

(STEAM CONDENSATE)

HSTAT HUMIDISTAT

HTG HEATING

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IPLV INTERGRATED PART LOAD VALUE

INST INSTALLED

KW KILOWATT

KWH KILOWATT HOUR

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LPR LOW PRESSURE RETURN

(STEAM CONDENSATE)

LPS LOW PRESSURE STEAM

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MERV MINIMUM EFFICIENCY REPORTING VALUE

MIN MINIMUM

MOD MOTOR OPERATED DAMPER

MPR MEDIUM PRESSURE RETURN

(STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MVD MANUAL VOLUME DAMPER

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OCP OVER CURRENT PROTECTION

PD PRESSURE DROP

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

RA RETURN AIR

RAT RETURN AIR TEMPERATURE

RH RELATIVE HUMIDITY

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

SA SUPPLY AIR

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCD SMOKE CONTROL DAMPER

SD SMOKE DETECTOR

SENS SENSIBLE HEAT

SP STATIC PRESSURE

TAB TESTING, ADJUSTING, BALANCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

UL UNDERWRITERS LABORATORY

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

WB WET-BULB (TEMPERATURE)

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

WIRE WIRED

DESCRIPTION

MECHANICAL LEGEND

SYMBOL

PLAN-VIEW LINE TYPES

WORK SHOWN FADED INDICATES EXISTING WORK TO REMAIN OR NEW WORK BY

OTHERS AS APPLICABLE

WORK SHOWN BOLD-DASHED INDICATES SELECTIVE DEMOLITION WORK

WORK SHOWN BOLD-CONTINUOUS INDICATES NEW WORK

DRAWING SET APPEARANCE

TO BETTER COMMUNICATE SCOPE TO PERMIT AGENCIES AND CONTRACTORS, EACH DRAWING IN THIS DRAWING SET HAS BEEN CREATED IN BOTH "COLOR" AND "BLACK AND WHITE". THERE EXISTS A COLOR LAYER WITHIN EACH DRAWING WHERE VISIBILITY IS CONTROLLED THROUGH THE PDF LAYER MANAGER. THIS LAYER VISIBILITY CAN BE TOGGLED DISPLAYING EITHER "COLOR" OR "BLACK AND WHITE". TO MAINTAIN SCOPE BASED SHADING WHEN PRINTING TO PAPER, BLACK AND WHITE NEEDS TO BE VISIBLE.

FOR FURTHER INSTRUCTIONS, REFER TO CONTRACTOR RESOURCES ON OUR WEBSITE AND DOWNLOAD "DRAWING COLOR

INSTRUCTIONS".

WWW.KLHENGRS.COM - CONTRACTOR RESOURCES (RIGHT HAND SIDE OF PAGE).

PIPING LINE TYPES

HWS

HOT WATER SUPPLY

HWR

HOT WATER RETURN

CHWS

CHILLED WATER SUPPLY

CHWR

CHILLED WATER RETURN

CWS

CONDENSER WATER SUPPLY

CWR

CONDENSER WATER RETURN

RL

REFRIGERANT LIQUID

RS

REFRIGERANT SUCTION

CD

CONDENSATE DRAIN

MECHANICAL PIPING ACCESSORIES

CHECK VALVE (DIRECTION OF FLOW INDICATED)

PRESSURE RELIEF VALVE

PRESSURE REGULATING VALVE

MAN

MANUAL BALANCING VALVE

UNION

TEMPERATURE & PRESSURE TEST PORT

FLOW DIRECTION

FLEX PIPING CONNECTOR

THERMOMETER

PRESSURE GAUGE

SOLENOID VALVE

Y-STRAINER

STRAINER WITH BLOW OFF

DRAIN VALVE (3/4" UNLESS OTHERWISE NOTED)

MANUAL AIR VENT

MECHANICAL DUCTWORK ACCESSORIES

DUCT WITH MANUAL VOLUME DAMPER

MECHANICAL STATS & SENSORS

FLOW SENSORFS

CURRENT SENSORCS

END SWITCHES

LOW VOLTAGE THERMOSTAT WITH LOCKABLE GUARDT

FLUID SENSORFL

VIBRATION SENSORV

REFRIGERANT MONITORRD

NITROGEN DIOXIDE SENSORNO2

MECHANICAL MISCELLANOUS

DI

DIGITAL INPUT

DO

DIGITAL OUTPUT

AI

ANALOG INPUT

AO

ANALOG OUTPUT

I

HARD WIRE INTERLOCK

POINT OF DEMOLITION TO EXISTING (FIELD VERIFY EXISTING UTILITY

SERVICE TYPE, PRIOR TO TERMINATING CONNECTION)

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

2400430

/1

/2

:4

:1

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

1/8" = 1'-0"

MECHANICAL TERMINAL

COVER SHEET

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

C H

IL

L

E R

P L

A N

T M

O D

IF

IC

A T

IO

N

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

H-T-M1-001

KLH PROJECT # 26944

04/18/25

26944.00

DS KTS

REVISIONS

10 11 12 13

L

M

N

DEMO.P-T3-7

DEMO.P-T3-1

DEMO.P-T3-2

CHILLER T3-2 CHILLER T3-1

EX. 1" NG

EX. 1" NG

EX. 1" NG

MD3

DEMOLISH EXISTING PUMPS AND PIPING

BACK TO SUPPLY/RETURN MAINS.

HOUSEKEEPING PADS TO BE REMOVED

AND REPLACED IN NEW WORK PHASE.

1/4" = 1'-0"

MECHANICAL DEMOLITION PLAN - TERMINAL - BASEMENT LEVEL - C-T3-01_02

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

2400430

/1

/2

:4

:5

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

1/4" = 1'-0"

MECHANICAL DEMOLITION

TERMINAL - BASEMENT LEVEL

PLAN

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

C H

IL

L

E R

P L

A N

T M

O D

IF

IC

A T

IO

N

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

H-T-M1-100

KLH PROJECT # 26944

04/18/25

26944.00

DS KTS

N

KEYED NOTES

MD3 DEMOLISH EXISTING PIPING CONNECTED TO PUMPS AND BOILERS BACK

TO POINT OF CONNECTIONS.

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

10 11 12 13

L

M

N

DEMO.P-T3-7

DEMO.P-T3-1

DEMO.P-T3-2

CHILLER T3-2 CHILLER T3-1

EX. 1" NG

EX. 1" NG

EX. 1" NG

MD3

DEMOLISH EXISTING PUMPS AND PIPING

BACK TO SUPPLY/RETURN MAINS.

HOUSEKEEPING PADS TO BE REMOVED

AND REPLACED IN NEW WORK PHASE.

1/4" = 1'-0"

MECHANICAL DEMOLITION PLAN - TERMINAL - BASEMENT LEVEL - C-T3-01_02

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

2400430

/1

/2

:4

:0

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

1/4" = 1'-0"

MECHANICAL DEMOLITION

TERMINAL - BASEMENT LEVEL

PLAN

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

C H

IL

L

E R

P L

A N

T M

O D

IF

IC

A T

IO

N

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

H-T-M1-100

KLH PROJECT # 26944

04/18/25

26944.00

DS KTS

N

KEYED NOTES

MD3 DEMOLISH EXISTING PIPING CONNECTED TO PUMPS AND BOILERS BACK

TO POINT OF CONNECTIONS.

REVISIONS

M

N

24" CWS.2

24" CWR.2

PHE-TX-1

CHILLER T3-2 CHILLER T3-1

P-T3-3

P-T3-4

P-T3-8

CS-T3-1

M5

P-T3-1

P-T3-2

P-T3-7

M19

V-T3-HX-1

V-EX-2

V-T3-1

V-T3-CH-2

V-T3-CH-1

16" CWS.2

16" CWS.2

16" CWS.2

4" CWS.2

4" CWS.2

16" CWS.2

16" CWS.2

16" CWS.2 24" CWS.2

C W

S .2

C W

R .2

12" CHWS.2

12" CHWR.2

4" CWS.2 - UP

PROVIDE NEW SIDE STEAM

SEPARATOR AND PUMP SKID

ON HOUSEKEEPING PAD

PROVIDE NEW PUMPS

ON HOUSEKEEPING PAD.

TYP. OF 3

1/4" = 1'-0"

MECHANICAL PLAN - TERMINAL - BASEMENT LEVEL - C-T3-01_02

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

2400430

/1

/2

:4

:0

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

1/4" = 1'-0"

MECHANICAL TERMINAL -

BASEMENT LEVEL PLAN

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

C H

IL

L

E R

P L

A N

T M

O D

IF

IC

A T

IO

N

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

H-T-M3-100

KLH PROJECT # 26944

04/18/25

26944.00

DS KTS

N

KEYED NOTES

M5 INSTALL GAS METER IN NEW PIPING. INSTALL GAS METER LOW ALONG

WALL.

M19 CAP PIPE AT POC.

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

10 11 12 13

L

M

N

24" CWS.2

24" CWR.2

PHE-TX-1

CHILLER T3-2 CHILLER T3-1

P-T3-3

P-T3-4

P-T3-8

CS-T3-1

M5

P-T3-1

P-T3-2

P-T3-7

M19

V-T3-HX-1

V-EX-2

V-T3-1

V-T3-CH-2

V-T3-CH-1

16" CWS.2

16" CWS.2

16" CWS.2

4" CWS.2

4" CWS.2

16" CWS.2

16" CWS.2

16" CWS.2 24" CWS.2

C W

S .2

C W

R .2

12" CHWS.2

12" CHWR.2

4" CWS.2 - UP

PROVIDE NEW SIDE STEAM

SEPARATOR AND PUMP SKID

ON HOUSEKEEPING PAD

PROVIDE NEW PUMPS

ON HOUSEKEEPING PAD.

TYP. OF 3

1/4" = 1'-0"

MECHANICAL PLAN - TERMINAL - BASEMENT LEVEL - C-T3-01_02

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

2400430

/1

/2

:4

:1

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

1/4" = 1'-0"

MECHANICAL TERMINAL -

BASEMENT LEVEL PLAN

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

C H

IL

L

E R

P L

A N

T M

O D

IF

IC

A T

IO

N

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

H-T-M3-100

KLH PROJECT # 26944

04/18/25

26944.00

DS KTS

N

KEYED NOTES

M5 INSTALL GAS METER IN NEW PIPING. INSTALL GAS METER LOW ALONG

WALL.

M19 CAP PIPE AT POC.

REVISIONS

Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

2400430

/1

/2

:4

:3

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

MECHANICAL TERMINAL

CHILLERS

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

C H

IL

L

E R

P L

A N

T M

O D

IF

IC

A T

IO

N

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

H-T-M3-601

KLH PROJECT # 26944

04/18/25

26944.00

DS KTS

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

2400430

/1

/2

:4

:3

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

MECHANICAL TERMINAL

CHILLERS

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

C H

IL

L

E R

P L

A N

T M

O D

IF

IC

A T

IO

N

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

H-T-M3-601

KLH PROJECT # 26944

04/18/25

26944.00

DS KTS

REVISIONS

Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

2400430

/1

/2

:4

:4

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

MECHANICAL TERMINAL

CHILLERS

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

C H

IL

L

E R

P L

A N

T M

O D

IF

IC

A T

IO

N

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

H-T-M3-602

KLH PROJECT # 26944

04/18/25

26944.00

DS KTS

BAS Upgrade General Notes

Upgrade the following Honeywell Panels and Controllers to Automatic Logic Controllers:

Boiler Chiller and Cooling Tower All Air Handlers in the scope of this project Generator Monitoring All Pneumatic Control Valves and Actuators shall be upgraded to electric.

Pneumatic Control Valves and Actuators can be phased in, as the control signal will not change.

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

2400430

/1

/2

:4

:4

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

MECHANICAL TERMINAL

CHILLERS

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

C H

IL

L

E R

P L

A N

T M

O D

IF

IC

A T

IO

N

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

H-T-M3-602

KLH PROJECT # 26944

04/18/25

26944.00

DS KTS

BAS Upgrade General Notes

Upgrade the following Honeywell Panels and Controllers to Automatic Logic Controllers:

Boiler Chiller and Cooling Tower All Air Handlers in the scope of this project Generator Monitoring All Pneumatic Control Valves and Actuators shall be upgraded to electric.

Pneumatic Control Valves and Actuators can be phased in, as the control signal will not change.

REVISIONS

TONS

TONS

HEAT X

N.C.

EXIST. CHILLER

NEW HEAT

EXCHANGER

16" CHWR

EXIST. CHWS&R

10"

8" CHWR

8" CHWS

EXISTING

6" CHWR

EXISTING

6" CHWS

8"

12"

8"

EXISTING 12" CHWSEXISTING 12" CHWR

EXISTING 12" CHWS

EXISTING 12" CHWR

8"

10"

EXISTING 16"

16" CHWS

14" CHWR 14" CHWS

EXISTING CHILLER

N.C.

V-7

Concourse B East

N.O.

N.C. N.O.

V-11

V-10

Concourse B Central

Concourse B West

Concourse "A"

Terminal "3"

5" TO HUB "A"

N.C.

N.O.

N.O.

10" CHWS&R UP TO BLDG.

SEC CHW PUMPS

6" CHWS&R

TO BLDG.

10" AUTO.

BYPASS VA.

EXIST. BF. VA

20" CHWR

20" CHWS

10" B.F. VA. (TYP)

8" B.F. VA.

10" B.F. VA.

(FUTURE)

TO CUSTOMER SERVICE BUILDING

SECONDARY CHILLED

WATER PUMPS

10" AUTO.

BYPASS VA.

N.C.

12"

EXIST 16" B.F. VA.'S

16"

V-9

Concourse "B"

16" CHWR

16" CHWS

EXIST 12" B.F. VA.'S

EXIST. CHILLER

TONS

Chiller Plant Sequence

The Chilller Plant Shall have the following modes

The Chiller Plant shall maintain a Chilled Water Supply Temperature of 42 deg. (adj)

1 Chiller Stage 1 a Terminal 3 Waterside Economizer

1 Shall be enabled when the outside air wetbulb is below the outside air wetbulb setpoint of 40 deg. (adj)

2 Chiller Stage 2 a Terminal 3 Chiller C-T3-1 and Chiller C-T3-2

1 Shall be enabled when the outside air temperature is above the Chiller Stage 3 Setpoint of 70 deg (adj)

2 Chiller C-T3-1 shall be the lead chiller, C-T3-2 shall be the Lag Chiller b Chiller C-T3-1 and Chiller C-T3-2 shall rotate based on the folowing options ( user selectable)

1 Weekly

2 Monthly

3 Manual through a software switch on the BAS graphics

4 Pump Runtime, User adjustable

3 Chiller Stage 3 a Concourse B Chiller C-CB-1

1 Shall be enabled when the outside air temperature is above the Chiller Stage 3 Setpoint of 85 deg (adj)

2 Chiller C-CB-1 shall be enabled

5 Primary PCHWP Lead / Lag / Standby Pumps (Both Terminal 3 and Concourse B) a The BAS shall integrate with the PCHWP VFD b The Primary Chilled Water Pump (PCHWP) shall be enabled by the System Controller c The CHWP (3) shall operate at in a Lead / Lag / Standby sequence, failure of the lead or lag pump for 5 min. (adj) the System Controller will start the standby pump d The System Controller shall enable the Lead PCHWP based on the Mode e The System Controller shall modulate the PCHWP speed thru a VFD to maintain the Chiller Evaporator Pressure Differential Setpoint per Chiller Manufacturer requirements f The System Controller shall start the Lag PCHWP when the Lead CHWP is operating above 95 % and the Chilled Evaporator Differential Pressure is below the Chiller Evaporator Differential Pressure Setpoint for 5 min. The Lead & Lag CHWP shall run in unison g The System Controller shall disable the Lag PCHWP when the VFD speed is below 60% and the Lead CHWP will operate to maintain Chiller Evaporator Differential Pressure Setpoint h The System Controller shall disable the Lead PCHWP based on the mode i The System Controller shall monitor the PCHWP status with a differential pressure switch across the pump j The BAS shall alarm whenever any PCHWP is enabled but the CHWP status is off (PCHWP Fail) k The BAS shall alarm whenever any PCHWP disabled but the CHWP status is on (PCHWP in Hand) l The BAS shall alarm whenever any PCHWP VFD is in Alarm m The designated lead pump will rotate upon on of the following conditions ( user selectable )

1 Daily

2 Weekly

3 Monthly

4 Manual through a software switch on the BAS graphics

5 Pump Runtime, User adjustable

6 Secondary SCHWP Lead / Lag Pumps ( For Terminal 3, Concourse A and Concourse B) a The BAS shall integrate with the SCHWP VFD b The Secondary Chilled Water Pump (SCHWP) shall be enabled based on the mode c The SCHWP (2) shall operate at in a Lead / Lag sequence, failure of the lead pump for 5 min. (adj) the System Controller will start the lag pump d The System Controller shall modulate the SCHWP speed thru a VFD (furnished by others) to maintain the Chilled Water Differential Pressure Setpoint of 10 psi (adj. as determined by the TAB contractor). Failure of the lead pump for 5 min. (adj) the BAS will start the standby pump shall modulate the CHWP speed thru a VFD (furnished by others) to maintain the Chilled Water Differential Pressure Setpoint of 10 psi (adj. as determined by the TAB contractor). Failure of the lead pump for 5 min. (adj) the BAS will start the standby pump e The System Controller shall start the Lag SCHWP when the Lead SCHWP is operating above 95 % and the Chilled Water Differential Pressure is below the Cilled Water Differential Pressure Setpoint for 5 min. The Lead & Lag SCHWP shall run in unison f The System Controller shall disable the Lag SCHWP when the VFD speed is below 60% and the Lead CHWP will operate to maintain Chilled Water differential Pressure setpoint g The System Controller shall disable the Lead SCHWP based on the mode h The System Controller shall monitor the SCHWP status with a differential pressure switch across the pump, minimum differential of 5 psi.

i The BAS shall alarm whenever any SCHWP is enabled but the SCHWP status is off (SCHWP Fail) j The BAS shall alarm whenever the Lead SCHWP disabled but the SCHWP status is on (SCHWP in Hand) k The BAS shall alarm whenever the SCHWP VFD is in Alarm l The designated lead pump will rotate upon on of the following conditions ( user selectable )

1 Daily

2 Weekly

3 Monthly

4 Manual through a software switch on the BAS graphics

5 Pump Runtime, User adjustable

7 Primary Bypass Valves V-3 and V-8 a The System Controller shall modulate the Primary Bypass Valve to maintain the Chiller Evaporator Differential Pressure Setpoint when the PCHWP VFD Speed is at 20%

8 Secondary Bypass Valves a

The System Controller shall modulate the Secondary Bypass Valve to maintain the Secondary Differential Pressure Setpoint when the SCHWP VFD Speed is at 20%

9 Chilled Water BTU Meters a BTU Meters shall be install in the secondary piping where shown on the drawings for the following

1 Terminal 3

2 Concourse A

3 Concourse B

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

2400430

/1

/2

:4

:4

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

1/8" = 1'-0"

MECHANICAL TERMINAL

CHILLERS

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

C H

IL

L

E R

P L

A N

T M

O D

IF

IC

A T

IO

N

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

H-T-M3-603

KLH PROJECT # 26944

04/18/25

26944.00

DS KTS

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

TONS

TONS

HEAT X

N.C.

EXIST. CHILLER

NEW HEAT

EXCHANGER

16" CHWR

EXIST. CHWS&R

10"

8" CHWR

8" CHWS

EXISTING

6" CHWR

EXISTING

6" CHWS

8"

12"

8"

EXISTING 12" CHWSEXISTING 12" CHWR

EXISTING 12" CHWS

EXISTING 12" CHWR

8"

10"

EXISTING 16"

16" CHWS

14" CHWR 14" CHWS

EXISTING CHILLER

N.C.

V-7

Concourse B East

N.O.

N.C. N.O.

V-11

V-10

Concourse B Central

Concourse B West

Concourse "A"

Terminal "3"

5" TO HUB "A"

N.C.

N.O.

N.O.

10" CHWS&R UP TO BLDG.

SEC CHW PUMPS

6" CHWS&R

TO BLDG.

10" AUTO.

BYPASS VA.

EXIST. BF. VA

20" CHWR

20" CHWS

10" B.F. VA. (TYP)

8" B.F. VA.

10" B.F. VA.

(FUTURE)

TO CUSTOMER SERVICE BUILDING

SECONDARY CHILLED

WATER PUMPS

10" AUTO.

BYPASS VA.

N.C.

12"

EXIST 16" B.F. VA.'S

16"

V-9

Concourse "B"

16" CHWR

16" CHWS

EXIST 12" B.F. VA.'S

EXIST. CHILLER

TONS

Chiller Plant Sequence

The Chilller Plant Shall have the following modes

The Chiller Plant shall maintain a Chilled Water Supply Temperature of 42 deg. (adj)

1 Chiller Stage 1 a Terminal 3 Waterside Economizer

1 Shall be enabled when the outside air wetbulb is below the outside air wetbulb setpoint of 40 deg. (adj)

2 Chiller Stage 2 a Terminal 3 Chiller C-T3-1 and Chiller C-T3-2

1 Shall be enabled when the outside air temperature is above the Chiller Stage 3 Setpoint of 70 deg (adj)

2 Chiller C-T3-1 shall be the lead chiller, C-T3-2 shall be the Lag Chiller b Chiller C-T3-1 and Chiller C-T3-2 shall rotate based on the folowing options ( user selectable)

1 Weekly

2 Monthly

3 Manual through a software switch on the BAS graphics

4 Pump Runtime, User adjustable

3 Chiller Stage 3 a Concourse B Chiller C-CB-1

1 Shall be enabled when the outside air temperature is above the Chiller Stage 3 Setpoint of 85 deg (adj)

2 Chiller C-CB-1 shall be enabled

5 Primary PCHWP Lead / Lag / Standby Pumps (Both Terminal 3 and Concourse B) a The BAS shall integrate with the PCHWP VFD b The Primary Chilled Water Pump (PCHWP) shall be enabled by the System Controller c The CHWP (3) shall operate at in a Lead / Lag / Standby sequence, failure of the lead or lag pump for 5 min. (adj) the System Controller will start the standby pump d The System Controller shall enable the Lead PCHWP based on the Mode e The System Controller shall modulate the PCHWP speed thru a VFD to maintain the Chiller Evaporator Pressure Differential Setpoint per Chiller Manufacturer requirements f The System Controller shall start the Lag PCHWP when the Lead CHWP is operating above 95 % and the Chilled Evaporator Differential Pressure is below the Chiller Evaporator Differential Pressure Setpoint for 5 min. The Lead & Lag CHWP shall run in unison g The System Controller shall disable the Lag PCHWP when the VFD speed is below 60% and the Lead CHWP will operate to maintain Chiller Evaporator Differential Pressure Setpoint h The System Controller shall disable the Lead PCHWP based on the mode i The System Controller shall monitor the PCHWP status with a differential pressure switch across the pump j The BAS shall alarm whenever any PCHWP is enabled but the CHWP status is off (PCHWP Fail) k The BAS shall alarm whenever any PCHWP disabled but the CHWP status is on (PCHWP in Hand) l The BAS shall alarm whenever any PCHWP VFD is in Alarm m The designated lead pump will rotate upon on of the following conditions ( user selectable )

1 Daily

2 Weekly

3 Monthly

4 Manual through a software switch on the BAS graphics

5 Pump Runtime, User adjustable

6 Secondary SCHWP Lead / Lag Pumps ( For Terminal 3, Concourse A and Concourse B) a The BAS shall integrate with the SCHWP VFD b The Secondary Chilled Water Pump (SCHWP) shall be enabled based on the mode c The SCHWP (2) shall operate at in a Lead / Lag sequence, failure of the lead pump for 5 min. (adj) the System Controller will start the lag pump d The System Controller shall modulate the SCHWP speed thru a VFD (furnished by others) to maintain the Chilled Water Differential Pressure Setpoint of 10 psi (adj. as determined by the TAB contractor). Failure of the lead pump for 5 min. (adj) the BAS will start the standby pump shall modulate the CHWP speed thru a VFD (furnished by others) to maintain the Chilled Water Differential Pressure Setpoint of 10 psi (adj. as determined by the TAB contractor). Failure of the lead pump for 5 min. (adj) the BAS will start the standby pump e The System Controller shall start the Lag SCHWP when the Lead SCHWP is operating above 95 % and the Chilled Water Differential Pressure is below the Cilled Water Differential Pressure Setpoint for 5 min. The Lead & Lag SCHWP shall run in unison f The System Controller shall disable the Lag SCHWP when the VFD speed is below 60% and the Lead CHWP will operate to maintain Chilled Water differential Pressure setpoint g The System Controller shall disable the Lead SCHWP based on the mode h The System Controller shall monitor the SCHWP status with a differential pressure switch across the pump, minimum differential of 5 psi.

i The BAS shall alarm whenever any SCHWP is enabled but the SCHWP status is off (SCHWP Fail) j The BAS shall alarm whenever the Lead SCHWP disabled but the SCHWP status is on (SCHWP in Hand) k The BAS shall alarm whenever the SCHWP VFD is in Alarm l The designated lead pump will rotate upon on of the following conditions ( user selectable )

1 Daily

2 Weekly

3 Monthly

4 Manual through a software switch on the BAS graphics

5 Pump Runtime, User adjustable

7 Primary Bypass Valves V-3 and V-8 a The System Controller shall modulate the Primary Bypass Valve to maintain the Chiller Evaporator Differential Pressure Setpoint when the PCHWP VFD Speed is at 20%

8 Secondary Bypass Valves a

The System Controller shall modulate the Secondary Bypass Valve to maintain the Secondary Differential Pressure Setpoint when the SCHWP VFD Speed is at 20%

9 Chilled Water BTU Meters a BTU Meters shall be install in the secondary piping where shown on the drawings for the following

1 Terminal 3

2 Concourse A

3 Concourse B

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

2400430

/1

/2

:4

:4

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

1/8" = 1'-0"

MECHANICAL TERMINAL

CHILLERS

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

C H

IL

L

E R

P L

A N

T M

O D

IF

IC

A T

IO

N

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

H-T-M3-603

KLH PROJECT # 26944

04/18/25

26944.00

DS KTS

REVISIONS

STANDARD HVAC ABBREVIATIONS

AAV AUTOMATIC AIR VENT

ACCESS ACCESSORIES

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AMP AMPERE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

BAS BUILDING AUTOMATION SYSTEM

BD BACKDRAFT DAMPER

BHP BRAKE HORSEPOWER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

CD CEILING DIFFUSER

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CLG COOLING

CO CARBON MONOXIDE

CO2 CARBON DIOXODE

COP COEFFICIENT OF PERFORMANCE

CV CONSTANT VOLUME

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

DB DECIBELS

DB DRY-BULB TEMPERATURE

DC DISCONNECT

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE DELTA(CHANGE IN TEMPERATURE)

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DX DIRECT EXPANSION

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EG EXHAUST GRILLE

EMERG EMERGENCY POWER

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EX. EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FA FREE AREA

FD FIRE DAMPER

FLA FULL LOAD AMPERES

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FEET

FURN FURNISHED

GA GAUGE

GAL GALLONS

GPM GALLONS PER MINUTE

HD HEAD

HOA HAND/OFF/AUTOMATIC

HP HORSEPOWER

HPR HIGH PRESSURE RETURN

(STEAM CONDENSATE)

HSTAT HUMIDISTAT

HTG HEATING

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IPLV INTERGRATED PART LOAD VALUE

INST INSTALLED

KW KILOWATT

KWH KILOWATT HOUR

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LPR LOW PRESSURE RETURN

(STEAM CONDENSATE)

LPS LOW PRESSURE STEAM

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MERV MINIMUM EFFICIENCY REPORTING VALUE

MIN MINIMUM

MOD MOTOR OPERATED DAMPER

MPR MEDIUM PRESSURE RETURN

(STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MVD MANUAL VOLUME DAMPER

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OCP OVER CURRENT PROTECTION

PD PRESSURE DROP

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

RA RETURN AIR

RAT RETURN AIR TEMPERATURE

RH RELATIVE HUMIDITY

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

SA SUPPLY AIR

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCD SMOKE CONTROL DAMPER

SD SMOKE DETECTOR

SENS SENSIBLE HEAT

SP STATIC PRESSURE

TAB TESTING, ADJUSTING, BALANCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

UL UNDERWRITERS LABORATORY

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

WB WET-BULB (TEMPERATURE)

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

WIRE WIRED

DESCRIPTION

MECHANICAL LEGEND

SYMBOL

PLAN-VIEW LINE TYPES

WORK SHOWN FADED INDICATES EXISTING WORK TO REMAIN OR NEW WORK BY

OTHERS AS APPLICABLE

WORK SHOWN BOLD-DASHED INDICATES SELECTIVE DEMOLITION WORK

WORK SHOWN BOLD-CONTINUOUS INDICATES NEW WORK

DRAWING SET APPEARANCE

TO BETTER COMMUNICATE SCOPE TO PERMIT AGENCIES AND CONTRACTORS, EACH DRAWING IN THIS DRAWING SET HAS BEEN CREATED IN BOTH "COLOR" AND "BLACK AND WHITE". THERE EXISTS A COLOR LAYER WITHIN EACH DRAWING WHERE VISIBILITY IS CONTROLLED THROUGH THE PDF LAYER MANAGER. THIS LAYER VISIBILITY CAN BE TOGGLED DISPLAYING EITHER "COLOR" OR "BLACK AND WHITE". TO MAINTAIN SCOPE BASED SHADING WHEN PRINTING TO PAPER, BLACK AND WHITE NEEDS TO BE VISIBLE.

FOR FURTHER INSTRUCTIONS, REFER TO CONTRACTOR RESOURCES ON OUR WEBSITE AND DOWNLOAD "DRAWING COLOR

INSTRUCTIONS".

WWW.KLHENGRS.COM - CONTRACTOR RESOURCES (RIGHT HAND SIDE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .