These documents represent a comprehensive set of mechanical, electrical, and architectural drawings for the Boiler Replacement Project at Cincinnati/Northern Kentucky International Airport (CVG), prepared by KLH Engineers for the Kenton County Airport Board. The project involves replacing boiler systems in the Terminal and Concourse B areas, with design documents dated April 18, 2025, and marked as "Issue for Bid". The drawings cover detailed plans for mechanical demolition, new mechanical installations, electrical power configurations, and architectural modifications across multiple building levels, including basement and roof areas.

The project scope includes replacing multiple boilers in both the Terminal and Concourse B locations, with six condensing boilers planned (four in Terminal, six in Concourse B), each with 480V electrical connections and varying power requirements. The boilers are manufactured by Cleaver Brooks, with models SFC-E, and feature high efficiency ratings of 92% with 10:1 turn-down ratios. Accompanying infrastructure upgrades include new hot water pumps, fans, expansion tanks, and air separators, with comprehensive electrical disconnect schedules and power plans detailing the integration of new equipment into the existing airport systems. The electrical drawings also outline careful demolition and replacement strategies to minimize disruption to airport operations.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in th e p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

FOR KENTON COUNTY AIRPORT BOARD AT

CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

MEP ENGINEER

KLH ENGINEERS

1538 ALEXANDRIA PIKE

SUITE 11

FORT THOMAS, KY 41075

CONTACT: CHRIS MEHAFFIE, PE

PHONE: (859)-442-8050

EMAIL: CMEHAFFIE@KLHENGRS.COM

OWNER

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

PO BOX 752000

CINCINNATI, OH 45275-200C

CONTACT: THAD FOGLE

PHONE: (859) 743-5978

EMAIL: TFOGLE@CVGAIRPORT.COM

2400430

/1

/2

:4

:5

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

BOILER REPLACEMENT PROJECT

BOILER PROJECT COVER

SHEET

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

B O

IL

E

R R

E P

L A

C E

M E

N T

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

B-G0-001

KLH PROJECT # 26944

04/18/25

26944.00

CAM CAM

DRAWING INDEX - BOILER

SHEET NUMBER SHEET NAME CURRENT REVISION ISSUED CURRENT REVISION DATE CURRENT REVISION DESCRIPTION

B-G0-001 BOILER PROJECT COVER SHEET No 04/18/25 ISSUE FOR BID

B-T-A1-101 ARCHITECTURAL - TERMINAL ROOF PLANS & DETAILS No 04/18/25 ISSUE FOR BID

B-T-A1-102 ARCHITECTURAL - TERMINAL BASEMENT PLANS & DETAILS No 04/18/25 ISSUE FOR BID

B-B-A1-101 ARCHITECTURAL - CONCOURSE B ROOF PLANS & DETAILS No 04/18/25 ISSUE FOR BID

B-T-M1-001 MECHANICAL TERMINAL COVER SHEET No 04/18/25 ISSUE FOR BID

B-T-M1-100 MECHANICAL DEMOLITION TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-T-M3-100 MECHANICAL TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-T-M3-501 MECHANICAL TERMINAL SCHEMATIC No 04/18/25 ISSUE FOR BID

B-T-M3-601 MECHANICAL TERMINAL SCHEDULES No 04/18/25 ISSUE FOR BID

B-B-M1-001 MECHANICAL CONCOURSE B COVER SHEET No 04/18/25 ISSUE FOR BID

B-B-M1-100 MECHANICAL DEMOLITION CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-B-M3-100 MECHANICAL CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-B-M3-101 MECHANICAL CONCOURSE B - CLUB LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-B-M3-501 MECHANICAL CONCOURSE B SCHEMATIC No 04/18/25 ISSUE FOR BID

B-B-M3-601 MECHANICAL CONCOURSE B SCHEDULES No 04/18/25 ISSUE FOR BID

B-B-M3-602 MECHANICAL CONCOURSE B DETAILS No 04/18/25 ISSUE FOR BID

B-T-M3-602 MECHANICAL TERMINAL DETAILS No 04/18/25 ISSUE FOR BID

B-B-E0-000 ELECTRIC GENERAL INFORMATION No 04/18/25 ISSUE FOR BID

B-T-E1-100 ELECTRIC DEMOLITION TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-T-E4-100 ELECTRIC POWER TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-T-E4-700 ELECTRIC POWER TERMINAL - PANEL SCHEDULES No 04/18/25 ISSUE FOR BID

B-B-E1-100 ELECTRIC DEMOLITION CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-B-E4-100 ELECTRIC POWER CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-B-E4-101 ELECTRIC POWER CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-B-E4-700 ELECTRIC POWER CONCOURSE B - PANEL SCHEDULES No 04/18/25 ISSUE FOR BID

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

FOR KENTON COUNTY AIRPORT BOARD AT

CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT

MEP ENGINEER

KLH ENGINEERS

1538 ALEXANDRIA PIKE

SUITE 11

FORT THOMAS, KY 41075

CONTACT: CHRIS MEHAFFIE, PE

PHONE: (859)-442-8050

EMAIL: CMEHAFFIE@KLHENGRS.COM

OWNER

CINCINNATI/NORTHERN KENTUCKY

INTERNATIONAL AIRPORT

PO BOX 752000

CINCINNATI, OH 45275-200C

CONTACT: THAD FOGLE

PHONE: (859) 743-5978

EMAIL: TFOGLE@CVGAIRPORT.COM

2400430

/1

/2

:4

:5

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

BOILER REPLACEMENT PROJECT

BOILER PROJECT COVER

SHEET

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

B O

IL

E

R R

E P

L A

C E

M E

N T

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

B-G0-001

KLH PROJECT # 26944

04/18/25

26944.00

CAM CAM

DRAWING INDEX - BOILER

SHEET NUMBER SHEET NAME CURRENT REVISION ISSUED CURRENT REVISION DATE CURRENT REVISION DESCRIPTION

B-G0-001 BOILER PROJECT COVER SHEET No 04/18/25 ISSUE FOR BID

B-T-A1-101 ARCHITECTURAL - TERMINAL ROOF PLANS & DETAILS No 04/18/25 ISSUE FOR BID

B-T-A1-102 ARCHITECTURAL - TERMINAL BASEMENT PLANS & DETAILS No 04/18/25 ISSUE FOR BID

B-B-A1-101 ARCHITECTURAL - CONCOURSE B ROOF PLANS & DETAILS No 04/18/25 ISSUE FOR BID

B-T-M1-001 MECHANICAL TERMINAL COVER SHEET No 04/18/25 ISSUE FOR BID

B-T-M1-100 MECHANICAL DEMOLITION TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-T-M3-100 MECHANICAL TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-T-M3-501 MECHANICAL TERMINAL SCHEMATIC No 04/18/25 ISSUE FOR BID

B-T-M3-601 MECHANICAL TERMINAL SCHEDULES No 04/18/25 ISSUE FOR BID

B-B-M1-001 MECHANICAL CONCOURSE B COVER SHEET No 04/18/25 ISSUE FOR BID

B-B-M1-100 MECHANICAL DEMOLITION CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-B-M3-100 MECHANICAL CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-B-M3-101 MECHANICAL CONCOURSE B - CLUB LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-B-M3-501 MECHANICAL CONCOURSE B SCHEMATIC No 04/18/25 ISSUE FOR BID

B-B-M3-601 MECHANICAL CONCOURSE B SCHEDULES No 04/18/25 ISSUE FOR BID

B-B-M3-602 MECHANICAL CONCOURSE B DETAILS No 04/18/25 ISSUE FOR BID

B-T-M3-602 MECHANICAL TERMINAL DETAILS No 04/18/25 ISSUE FOR BID

B-B-E0-000 ELECTRIC GENERAL INFORMATION No 04/18/25 ISSUE FOR BID

B-T-E1-100 ELECTRIC DEMOLITION TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-T-E4-100 ELECTRIC POWER TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-T-E4-700 ELECTRIC POWER TERMINAL - PANEL SCHEDULES No 04/18/25 ISSUE FOR BID

B-B-E1-100 ELECTRIC DEMOLITION CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-B-E4-100 ELECTRIC POWER CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-B-E4-101 ELECTRIC POWER CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID

B-B-E4-700 ELECTRIC POWER CONCOURSE B - PANEL SCHEDULES No 04/18/25 ISSUE FOR BID

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

H

J

J.3

J.2

H.5

11.3 11.4 11.8

J.4

226226

B-T-A1-101B-T-A1-101

MAIN TERMINAL

N

EXHUAST FLUE AS SCHEDULED

TEMPERATURE APPROPRIATE

SEALANT: TOOL TO FACILITATE

WATER RUN OFF

DRAW BAND

PREFABRICATED STAINLESS STEEL

COVER

REGLET AND COUNTERFLASHING

TERMINATION BAR

ROOFING MEMBRANE

METAL STUD AND SHEATHING KNEE WALL

ROOF DECK

ROOF ASSEMBLY; TIE-IN TO

EXISTING ROOF ASSEMBLY

PER MANUFACTURE'S

REQUIREMENTS FOR

APPROPRIATE WATER-TIGHT

OVERLAP

CONTINUOUS 12" WIDE GALVANIZED

SHEET METAL BACKER PLATE

WIND CLIPS

AT EACH

CORNER

GALVANIZED

PLATE

/8

GASKETED FASTENERS

CONTINUOUS STRIPS

OF SELF-ADHERING

UNDERLAYMENT

GENERAL NOTE:

VERIFY DIAMETER AND HEIGHT OF PIPE ABOVE ROOF WITH EQUIPMENT AND ADJACENT ROOF REQUIREMENTS.

H

J

J.3

J.2

H.5

11.3 11.4 11.8

J.4

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E A ll re p o rt s p la n s s p e c ifi c a ti o n s c o m p u te r fi le s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w it h o u t lim it a ti o n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

2400430

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

/1

/2

:5

:5

P

M A u to d e s k D o c s /C

V G

R e h a b a n d

E ff ic ie n c y P ro g ra m /A

R C

H -G re s h a m

S m it h

-T e rm in a l_

R

.r v t

As indicated

ARCHITECTURAL - TERMINAL

ROOF PLANS & DETAILS

B-T-A1-101

KLH PROJECT # 26944

04/18/2025

26944.00

MH DH

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

B O

IL

E

R R

E P

L A

C E

M E

N T

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

0' 12'8'4'2'3/16" = 1'-0"

BOILER FLUE TERMINAL NEW CONSTRUCTION PLAN

NOT TO SCALE

EXHAUST DETAIL

Keynote Legend

Key Value Keynote Text

126 EXISTING ROOF PENETRATION.

VERIFY EXTENTS IN FIELD.

127 DEMOLISH EXISTING ROOFING AS

REQUIRED; SEE DETAIL THIS SHEET.

VERIFY EXTENTS OF DEMOLITION IN

FIELD.

225 PENETRATION COVERING; SEE

DETAIL THIS SHEET.

226 NEW EXHAUST FLUES THROUGH

EXISTING OPENING IN ROOF SLAB.

0' 12'8'4'2'3/16" = 1'-0"

BOILER FLUE TERMINAL DEMOLITION PLAN

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

I

S

EAN M. BOGAR

T

R

EG STER

DNO.

COMMONWEALTH

OFK

N U C K

RC H T CT

Y

I E

E T

A E bogarts Date 04/17/2025

12 13

H

J

J.3

J.2

H.5

11.8 12.6 12.8

J.4

VENTILATION VAULT

BOILER ROOM

TU12

TOILET

TU15

B-T-A1-102

B-T-A1-102

B-T-A1-102

B-T-A1-102B-T-A1-102

OH

220220

B-T-A1-102

B-T-A1-102

B-T-A1-102

B-T-A1-102

MAIN TERMINAL

N

J

EXISTING EXTERIOR

WALL

EXISTING LOUVERED

WALL PANEL

INSTALL BACKER ROD

AND APPLY CAULK

AROUND THE ENTIRE

PERIMETER OF THE

LOUVER PANELS;

SEALANT COLOR TO

MATCH LOUVER FINISH

EXISTING STRUCTURE

OVERHEAD

EXISTING LOUVERED

WALL PANEL

INSTALL BACKER ROD

AND APPLY CAULK

AROUND THE ENTIRE

PERIMETER OF THE

LOUVER PANELS;

SEALANT COLOR TO

MATCH LOUVER FINISH

EXISTING CONCRETE

KNEE WALL

EXISTING LOUVERED

WALL PANEL

INSTALL BACKER ROD

AND APPLY CAULK

AROUND THE ENTIRE

PERIMETER OF THE

LOUVER PANELS;

SEALANT COLOR TO

MATCH LOUVER FINISH

CONTINUOUS

FLASHING SET IN

FULL LENGHT

BACKBEAD WITH END

DAM AT EACH END;

FINISH TO MATCH

LOUVER FINISH

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E A ll re p o rt s p la n s s p e c ifi c a ti o n s c o m p u te r fi le s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w it h o u t lim it a ti o n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

2400430

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

/1

/2

:5

:0

P

M A u to d e s k D o c s /C

V G

R e h a b a n d

E ff ic ie n c y P ro g ra m /A

R C

H -G re s h a m

S m it h

-T e rm in a l_

R

.r v t

As indicated

ARCHITECTURAL - TERMINAL

BASEMENT PLANS & DETAILS

B-T-A1-102

KLH PROJECT # 26944

04/18/2025

26944.00

MH DH

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

B O

IL

E

R R

E P

L A

C E

M E

N T

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

0' 12'8'4'2'3/16" = 1'-0"

BOILER TERMINAL NEW CONSTRUCTION PLAN

0' 12'8'4'2'1/4" = 1'-0"

EAST LOUVER NEW CONSTRUCTION ELEVATION

0' 6" 1 1/2'1'1 1/2" = 1'-0"

JAMB DETAIL

0' 6" 1 1/2'1'1 1/2" = 1'-0"

HEADER DETAIL

0' 6" 1 1/2'1'1 1/2" = 1'-0"

SILL DETAIL

Keynote Legend

Key Value Keynote Text

120 CAREFULLY REMOVE SHEET METAL

PANEL WALL AND ASSOCIATED

STRUCTURAL FRAME BRACING AS

REQUIRED FOR REMOVAL OF

BOILERS AND INSTALLATION OF

NEW BOILERS. STORE AND

PROTECT FOR REINSTALLATION.

DOCUMENT EXISTING ANCHORING

PRIOR TO REMOVAL. REFER TO

MECHANICAL DRAWINGS FOR

MODIFICATIONS TO PANEL WALL

LOUVERS.

121 REMOVABLE METAL GRATE

OVERHEAD AT GRADE.

220 REINSTALL SHEET METAL PANEL

WALL SYSTEM AND ASSOCIATED

STRUCTURAL FRAME BRACING AS

PREVIOUSLY INSTALLED. REFER TO

MECHANICAL DRAWINGS FOR

LOUVERS REPLACEMENTS WITHIN

WALL.

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

I

S

EAN M. BOGAR

T

R

EG STER

DNO.

COMMONWEALTH

OFK

N U C K

RC H T CT

Y

I E

E T

A E bogarts

37 38

F

E

B-B-A1-101B-B-A1-101

CONCOURSE B

N

EXHUAST FLUE AS SCHEDULED

TEMPERATURE APPROPRIATE

SEALANT: TOOL TO FACILITATE

WATER RUN OFF

DRAW BAND

PREFABRICATED STAINLESS STEEL

COVER

REGLET AND COUNTERFLASHING

TERMINATION BAR

ROOFING MEMBRANE

CONTINUOUS 12" WIDE GALVANIZED

SHEET METAL BACKER PLATE

WIND CLIPS

AT EACH

CORNER

GALVANIZED

PLATE

/8

GASKETED FASTENERS

CONTINUOUS STRIPS

OF SELF-ADHERING

UNDERLAYMENT

GENERAL NOTE:

VERIFY DIAMETER AND HEIGHT OF PIPE ABOVE ROOF WITH EQUIPMENT AND ADJACENT ROOF REQUIREMENTS.

B-B-A1-101

TERMINATION BAR

B-B-A1-101

METAL STUD AND SHEATHING KNEE WALL

ROOF DECK

ROOF ASSEMBLY; TIE-IN TO

EXISTING ROOF ASSEMBLY

PER MANUFACTURE'S

REQUIREMENTS FOR

APPROPRIATE WATER-TIGHT

OVERLAP

PREFABRICATED

STAINLESS STEEL

COVER

DOUBLE BAND OF

SILICONE EACH SIDE

SHEET METAL FASTENER

B-T-A1-101B-B-A1-101

37 38

F

E

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E A ll re p o rt s p la n s s p e c ifi c a ti o n s c o m p u te r fi le s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w it h o u t lim it a ti o n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

2400430

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

/1

/2

:5

:5

P

M A u to d e s k D o c s /C

V G

R e h a b a n d

E ff ic ie n c y P ro g ra m /A

R C

H -G re s h a m

S m it h

-T e rm in a l_

R

.r v t

As indicated

ARCHITECTURAL -

CONCOURSE B ROOF PLANS &

DETAILS

B-B-A1-101

KLH PROJECT # 26944

04/18/2025

26944.00

MH DH

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

B O

IL

E

R R

E P

L A

C E

M E

N T

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

0' 12'8'4'2'3/16" = 1'-0"

BOILER FLUE CONCOURSE B NEW CONSTRUCTION ROOF PLAN

NOT TO SCALE

ROOF PENETRATION COVER PLAN

0' 6" 1 1/2'1'1 1/2" = 1'-0"

EXHAUST DETAIL

Keynote Legend

Key Value Keynote Text

125 EXISTING EXPANSION LOOPS.

126 EXISTING ROOF PENETRATION.

VERIFY EXTENTS IN FIELD.

127 DEMOLISH EXISTING ROOFING AS

REQUIRED; SEE DETAIL THIS SHEET.

VERIFY EXTENTS OF DEMOLITION IN

FIELD.

225 PENETRATION COVERING; SEE

DETAIL THIS SHEET.

226 NEW EXHAUST FLUES THROUGH

EXISTING OPENING IN ROOF SLAB.

0' 12'8'4'2'3/16" = 1'-0"

BOILER FLUE CONCOURSE B DEMOLITION PLAN

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

I

S

EAN M. BOGAR

T

R

EG STER

DNO.

COMMONWEALTH

OFK

N U C K

RC H T CT

Y

I E

E T

A E bogarts

GENERAL NOTES (DEMOLITION): GENERAL NOTES (NEW):

GENERAL ABBREVIATIONS

MECHANICAL SYMBOLS

CONTROL SYMBOL LEGEND

BALANCING VALVE

A=AUTOMATIC M=MANUAL CALIBRATED

CIRCUIT SENSOR (VENTURI)

GATE VALUE

BUTTERFLY VALVE

GLOBE VALVE

BALL VALVE

CHECK VALVE

GAS COCK

TEMPERATURE REGULATING VALVE

PRESSUR RELIEF VALVE

RELEIF VALVE

STRAINER

3-WAY VALVE

VALVE AND END CAP

UNION

FLANGED CONNECTION

REDUCER

ELBOW UP

PIPE TEE DOWN

ELBOW DOWN

INSERTION TYPE FLOW METER

STRAP-ON TYPE FLOW METER

PRESSURE TEMPERATURE

TEST STATION (PTTS)

THERMOMETER

MANUAL AIR VENT (A=AUTOMATIC)

WATER FLOW TRANSMITTER

SUPPLY DIFFUSER

RETURN DIFFUSER

EXHAUST DIFFUSER

PLENUM SLOT DIFFUSER

DUCT TAP LEFT

DUCT TAP RIGHT

AIR FLOW DIRECTION

OPPOSED BLADE DAMPER

PARALLEL BLADE DAMPER

FIRE DAMPER (HORIZONTAL OR VERTICAL)

SMOKE DAMPER (HORIZONTAL OR VERTICAL)

COMBINATION SMOKE FIRE DAMPER

TEMPERATURE TRANSMITTER

BALANCED BACKDRAFT DAMPER

AUTOMATIC AIR DAMPER

MANUAL DAMPER

THERMOSTAT OR TEMPERATURE SENSOR

STATIC PRESSURE TRANSMITTER

POINT OF CONNECTION

POINT OF REMOVAL

DUCT SMOKE DETECTOR

HUMIDITY TRANSMITTER

CARBON MONOXIDE SENSOR

CARBON DIOXIDE SENSOR

FLEXIBLE CONNECTION

FLEXIBLE CONNECTION

SQUARE ELBOW WITH TURNING VAINS

DUCT RISE IN DIRECTION OF AIR FLOW

DUCT DROP IN DIRECTION OF AIR FLOW

RECTANGULAR DUCT TO ROUND DUCT TRANSITION

SUPPLY AIR (RECTANGULAR DUCT)

R=RETURN, E=EXHAUST, OA=OUTSIDE AIR

SUPPLY AIR (ROUND DUCT)

R=RETURN, E=EXHAUST, OA=OUTSIDE AIR

AIR DEVICE TYPE - DEVICE WIDTH (IN) - NECK SIZE (IN)

CFM INDICATED

CD=LAY-IN CEILING DIFFUSER, PD=PERFORATED DIFFUSER,

LD=LINEAR DIFFUSER, RD=ROUND DIFFUSER, RG=RETURN GRILLE

DUCT TURN DOWN

DUCT TURN UP

INTERNALLY LINED DUCTWORK

(DIMENSIONS INDICATED ARE OUTSIDE

SHEET METAL DIMENSIONS)

MANUFACTURED DOUBLE WALL DUCTWORK

(DIMENSIONS INDICATED ARE INSIDE

SHEET METAL DIMENSIONS)

ANALOG INPUT SIGNAL

ANALOG OUTPUT SIGNAL

DIGITAL INPUT SIGNAL

DIGITAL OUTPUT SIGNAL

END SWITCH

DIFFERENTIAL PRESSURE TRANSMITTER

STATIC PRESSURE TRANSMITTER

LOW TEMPERATURE SWITCH

AIR FLOW TRANSMITTER

END SWITCH

NORMALLY OPEN

NORMALLY CLOSED

TEMPERATURE TRANSMITTER

ROOM TEMPERATURE SENSOR

RELATIVE HUMIDITY SENSOR

CARBON DIOXIDE SENSOR

DIFFERENTIAL PRESSURE SWITCH

HUMIDITY TRANSMITTER

DUCT MOUNTED SMOKE DETECTOR

CURRENT TRANSFORMER SWITCH

MECHANICAL LEGEND (not all may apply)

BBD

AAD

EQUIP. #

POC

POR

S

EQUIP. #

EQUIP. #

EQUIP. #

H

S

CO

CO2

S-12X8

S-12

CD-24-10

100 CFM

CTS

SD

HT

DPS

S

H

T

TT

LTS

AFT

ES

NO

NC

SPT

DPT

ES

DO

DI

AO

AI

CO2

FM

FM TT

C

S

F

M

P

T

DN

UP

A. UNLESS OTHERWISE NOTED, ALL DUCTWORK AND PIPING SHOWN DARK IS NEW.

B. ALL WORK SHALL BE INSTALLED PER THE STATE BUILDING CODE, STATE

MECHANICAL CODE AND ALL LOCAL APPLICABLE CODES.

C. VERIFY CONDITIONS IN THE FIELD PRIOR TO BID AND CONSTRUCTION.

D. WHERE CONFLICTS EXIST AMONG DRAWINGS, SPECIFICATIONS AND EQUIPMENT

SCHEDULES, THE MORE STRINGENT SHALL APPLY.

E. REFER TO DRAWINGS B-T-M3-501, AND B-T-M3-601 FOR MECHANICAL DETAILS,

DIAGRAMS AND SCHEDULES.

F. CONTRACTOR SHALL CAREFULLY COORDINATE DUCTWORK AND PIPING

PATHWAY / LOCATIONS WITH OTHER TRADES AND EXISTING CONDITIONS. ALL

DUCTWORK AND PIPING SHALL BE INSTALLED AS TIGHT TO THE STRUCTURE AS

POSSIBLE. CONNECTIONS TO THE SUPPLY AIR DEVICES MAY BE MADE WITH

FLEXIBLE DUCTWORK. ALL CONDITIONS SHALL BE FIELD VERIFIED BEFORE

ORDERING EQUIPMENT OR FABRICATED MATERIAL.

G. CONTRACTOR SHALL PROVIDE ALL ROOF OR WALL NON-COMBUSTIBLE FRAMING

AS REQUIRED TO INSTALL EQUIPMENT, DUCTWORK, AND PIPING. COORDINATE

NEW WORK WITH OTHER TRADES PRIOR TO BEGINNING CONSTRUCTION. NO

WORK IS TO BE INSTALLED OR FABRICATED UNTIL AFTER THE PROJECT

COORDINATION HAS BEEN APPROVED BY THE OWNER'S REPRESENTATIVE.

H. INSTALL A MANUAL BALANCE DAMPER IN ALL BRANCH DUCTS, INCLUDING ALL

SUPPLY, RETURN, AND EXHAUST GRILLES.

I. INSTALL A SHUT-OFF VALVE IN ALL PIPING BRANCHES.

J. ALL SQUARE THROATED ELBOWS SHALL HAVE AIRFOIL TURNING VANES AND

SHALL ONLY BE USED WHEN RADIUS ELBOWS WILL NOT FIT.

K. ALL ROUND BRANCH DUCT CONNECTIONS SHALL BE MADE WITH BELLMOUTH

FITTINGS OR ANGLED TEES. STRAIGHT SPIN-IN TAP COLLARS SHALL NOT BE

ACCEPTABLE.

L. ALL DAMPERS, VALVES, AND CONTROL COMPONENTS THAT ARE LOCATED ABOVE

CEILINGS SHALL BE INSTALLED WHERE COMPLETELY ACCESSIBLE. CONTRACTOR

SHALL PROVIDE ACCESS PANELS AS REQUIRED.

M. ALL NEW VARIABLE AIR VOLUME TERMINAL UNITS ARE TO BE INSTALLED WHERE

COMPONENTS ARE COMPLETELY ACCESSIBLE. CONTRACTOR SHALL

COORDINATE TO PROVIDE THE VAV UNIT WITH A CONTROL ENCLOSURE AND PIPE

CONNECTIONS ON THE MOST ACCESSIBLE SIDE OF THE UNIT. THE CONTRACTOR

SHALL BE RESPONSIBLE FOR PROVIDING THE CORRECT LEFT OR RIGHT HAND

CONFIGURATION.

N. DUCTWORK CONNECTION TO DIFFUSER / VAV TO BE THE SAME SIZE AS THE

NECK SIZE UNLESS OTHERWISE NOTED.

O. UNLESS OTHERWISE NOTED, ALL DUCTWORK SHALL BE FABRICATED FROM

GALVANIZED STEEL METAL, INSTALLED IN ACCORDANCE WITH SMACNA DUCT

CONSTRUCTION STANDARDS FOR GAUGE, REINFORCEMENT, AND SUPPORT; 2"

W.G. PRESSURE CLASS FOR ALL DUCTWORK, UNLESS NOTED OTHERWISE. ALL

JOINTS AND SEAMS SHALL BE SEALED AND FASTENED AND MADE AIRTIGHT IN

ACCORDANCE OF CHAPTER 13 OF THE STATE BUILDING CODE.

P. CONTRACTOR SHALL TAKE OVERALL CFM MEASUREMENTS ON ALL EXISTING

DUCTWORK TO REMAIN PRIOR TO COMMENCING ANY WORK. INFORMATION

GATHERED SHALL BE UTILIZED FOR REBALANCING SYSTEM. CONTRACTOR SHALL

REBALANCE ALL SYSTEMS AT THE CONCLUSION OF THE PROJECT.

Q. UL LISTED FIRESTOPPING SHALL BE USED AT ANY PENETRATION THROUGH A

FIRE RATED ASSEMBLY. REFER TO ARCHITECTURAL CONSTRUCTION

DOCUMENTS FOR LOCATIONS OR RATED ASSEMBLIES. CONTRACTOR SHALL USE

UL LISTED FIRESTOP SYSTEM METHODS FOR "THROUGH-PENETRATION

ASSEMBLIES." TYPICAL OF ALL FIRE RATED WALLS.

R. DUCTWORK AND PIPING SHALL BE SUPPORTED INDEPENDENT OF CEILING,

CONDUIT, OTHER DUCTWORK, OTHER PIPING,ETC.

S. IN AREAS WHERE CEILINGS ARE NOT BEING REPLACED, AND CONTRACTOR HAS

WORK ABOVE CEILINGS, CONTRACTOR SHALL PATCH AND REPAIR CEILINGS TO

MATCH EXISTING.

T. CONTRACTOR SHALL COORDINATE ALL REQUIRED WALL PENETRATIONS FOR

DUCT OR PIPING WITH GENERAL CONTRACTOR PRIOR TO CONSTRUCTION OF

NEW WALLS. ALL DUCT PENETRATIONS SHALL BE IN COMPLIANCE WITH THE

PROJECT SPECIFICATIONS. CONTRACTOR SHALL PERFORM ALL CUTTING AND

PATCHING REQUIRED FOR DUCT PENETRATIONS THROUGH WALLS.

U. CONTRACTOR SHALL COORDINATE ALL REQUIRED ROOF OPENINGS FOR

DUCTWORK WITH THE GENERAL CONTRACTOR.

V. CONTRACTOR SHALL PROVIDE ALL ADDITIONAL STEEL FRAMING AS REQUIRED TO

INSTALL ROOF MOUNTED EQUIPMENT CURBS.

W. CONTRACTOR SHALL INSTALL ALL EQUIPMENT, DUCTWORK, PIPING, VALVES,

INSULATION, SUPPORTS ETC. AS INDICATED OR AS REQUIRED TO ALLOW

OPERATION AND USE OF ALL AREAS AND ALL SYSTEMS REQUIRED FOR

OCCUPIED USE DURING CONSTRUCTION.

X. CONTRACTOR TO VERIFY EXISTING DUCTWORK / PIPING SUPPLY AND RETURN

SYSTEM, SIZE, AND TYPE PRIOR TO MAKING CONNECTIONS.

A. UNLESS OTHERWISE NOTED, ALL DUCTWORK AND PIPING SHOWN DASHED AND

DARK IS TO BE REMOVED.

B. CONTRACTOR TO COORDINATE DEMOLITION WITH OTHER TRADES BEFORE

BEGINNING WORK.

C. REFER TO B-T-M1-001 OR GENERAL NOTES AND ABBREVIATIONS.

D. CONTRACTOR SHALL TAKE OVERALL CFM MEASUREMENTS ON ALL EXISTING TO

REMAIN EQUIPMENT PRIOR TO COMMENCING ANY DEMOLITION WORK.

INFORMATION GATHERED SHALL BE UTILIZED FOR RE-BALANCING SYSTEM.

CONTRACTOR SHALL RE-BALANCE ALL SYSTEMS AT THE CONCLUSION OF THE

PROJECT.

E. THIS CONTRACTOR SHALL PATCH AND REPAIR ALL HOLES, DAMAGE OR

MODIFICATIONS LEFT BY REMOVAL OF DUCTWORK AND REPAIR WALLS,

FLOORS, CEILINGS, ETC. TO MATCH EXISTING. ALL PATCHING AND FINISHING

SHALL BE PERFORMED BY A QUALIFIED TRADESPERSONS. ALL DEMOLITION

WORK AND INSTALLATION SHALL BE COORDINATED WITH OWNER PRIOR TO

STARTING.

F. ALL REMOVED EQUIPMENT IN WORKING ORDER SHALL BE REVIEWED BY THE

OWNER'S REPRESENTATIVE. IF OWNER'S REPRESENTATIVE WISHES TO RETAIN

THE EQUIPMENT, CONTRACTOR REMOVING EQUIPMENT SHALL DELIVER

EQUIPMENT TO LOCATION AS DIRECTED BY THE OWNER'S REPRESENTATIVE. IF

THE OWNER'S REPRESENTATIVE WISHES THE EQUIPMENT TO BE DISPOSED OF,

THE CONTRACTOR REMOVING THE EQUIPMENT SHALL DISPOSE OF EQUIPMENT

WITH NO ADDITIONAL COST TO THE OWNER.

S

AAD AUTOMATIC AIR DAMPER

AAV AUTOMATIC AIR VENT

AB AIR BLENDER

AC-* AIR CONDITIONING UNIT

ACC AIR COOLED CONDENSER

ACCU AIR COOLED CONDENSING UNIT

AD ACCESS DOOR

ADD'L ADDITIONAL

ADJ ADJUSTABLE

AF AFTER FILTER

AFF ABOVE FINISHED FLOOR

ALT ALTERNATE

ALUM ALUMINUM

AP ACCESS PANEL

APPROX APPROXIMATE

ARCH ARCHITECT(URAL)

AUTO AUTOMATIC

AVG AVERAGE

BAS BUILDING AUTOMATION SYSTEM

BBD BALANCED BACKDRAFT DAMPER

BE BOTTOM ELEVATION

BF BUTTERFLY

BFP BACKFLOW PREVENTER

BLDG BUILDING

BLR BOILER

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BOT BOTTOM

BP BOOSTER PUMP

BTU BRITISH THERMAL UNIT

BTUH BTU'S PER HOUR

BV BALL VALVE

CA COMPRESSED AIR

CAF COMBUSTION AIR FAN

CCW COUNTER CLOCKWISE

CD CEILING DIFFUSER

CFM CUBIC FEET PER MINUTE

CHV CHECK VALVE

CH CHILLER

CHWP CHILLED WATER PUMP

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

COL COLUMN

CONN CONNECTION

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CU FT CUBIC FEET

CU IN CUBIC INCH

CW CITY WATER

CWP CONDENSING WATER PUMP

CWS CONDENSING WATER SUPPLY

CWR CONDENSING WATER RETURN

DB DRY BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROL

DET DETAIL

DIA DIAMETER

DN DOWN

DPR DAMPER

DPT DEW POINT TEMPERATURE

DR DRAIN

DTS DUAL TEMPERATURE SUPPLY

DTR DUAL TEMPERATURE RETURN

DWG DRAWING

EA EACH / EXHAUST AIR

EAH EXHAUST AIR HOOD

EAL EXHAUST AIR LOUVER

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

EF EXHAUST FAN

EG EXHAUST GRILLE

EL ELEVATION

ELEC ELECTRIC/ELECTRICAL

EQ EQUAL

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ER EXHAUST REGISTER

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

EUH ELECTRIC UNIT HEATER

EWH ELECTRIC WATER HEATER

EWT ENTERING WATER TEMPERATURE

EXCL EXCLUDING

EXIST EXISTING

EXP EXPANSION

°F DEGREE FAHRENHEIT

FD FLAT DRAIN

FF FINISHED FLOOR

FH FIRE HYDRANT

FL FLOOR

FOB FLAT ON BOTTOM

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOT FLAT ON TOP

FPC FIRE PROTECTION CONTRACTOR

FPM FEET PER MINUTE

FPVAV FAN POWERED VAV

FS FLOOR SINK

GA GAUGE

GALV GALVANIZED

GC GENERAL CONTRACTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HEX HEAT EXCHANGER

HORIZ HORIZONTAL

HR HOUR

HT HEAT TRACE

HVAC HEATING, VENTILATING AND AIR CONDITIONING

HWP HOT WATER PUMP

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HX HEAT EXCHANGER

IA INSTRUMENT AIR

IE INVERT ELEVATION

IN INCH

INV INVERT

KEC KITCHEN EQUIPMENT CONTRACTOR

KH KITCHEN HOOD

KV KITCHEN VENT

LAT LEAVING AIR TEMPERATURE

LB POUND

LD LINEAR DIFFUSER

LWT LEAVING WATER TEMPERATURE

MAT'L MATERIAL

MAV MANUAL AIR VENT

MAX MAXIMUM

MBH BTU'S PER HOUR, THOUSAND

MC MECHANICAL CONTRACTOR

MCW MECHANICAL CITY WATER

MECH MECHANICAL

MFG/MFGR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MSW MECHANICAL SOFT WATER

NA NOT APPLICABLE

NC NORMALLY CLOSED/NOISE CRITERIA

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NTS NOT TO SCALE

OA OUTSIDE AIR

OAH OUTSIDE AIR HOOD

OAL OUTSIDE AIR LOUVER

OC ON CENTER

OC OCCUPANCY SENSOR

OPG OPENING

OS&Y OUTSIDE SCREW AND YOKE

OZ OUNCE

PC PLUMBING CONTRACTOR

PCHWP PRIMARY CHILLED WATER PUMP

PERIM PERIMETER

PF PRE FILTER

PH PHASE

PHWP PRIMARY HOT WATER PUMP

PI PRESSURE INDICATOR

PLBG PLUMBING

PRESS PRESSURE

PRV PRESSURE REDUCING VALVE

PS PRESSURE SWITCH

PSD PLENUM SLOT DIFFUSER

PSI POUND PER SQUARE INCH

PSIA POUND PER SQUARE INCH ABSOLUTE

PSIG POUND PER SQUARE INCH GAUGE

PVC POLYVINYL CHLORIDE

RCP RECIRCULATION PUMP

REF REFERENCE

REQ'D REQUIRED

REV REVISE(D)

RG RETURN GRILLE

RH RELATIVE HUMIDITY/ROOF

RV RELIEF VENT

RM ROOM

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

SA SUPPLY AIR

SCHED SCHEDULE

SCHWP SECONDARY CHILLED WATER PUMP

SD SUCTION DIFFUSER

SECT SECTION

SG SUPPLY GRILLE

SHWP SECONDARY HOT WATER PUMP

SHT SHEET

SL SOUND LINING

SM SURFACE MOUNT

SPEC SPECIFICATIONS

SPT STATIC PRESSURE TRANSMITTER

SQ SQUARE

SQ FT/SF SQUARE FOOT (FEET)

SQ IN SQUARE INCHES

SR SUPPLY REGISTER

SS STAINLESS STEEL

STD STANDARD

STL STEEL

STRUCT STRUCTURAL

TCC TEMPERATURE CONTROL CONTRACTOR

TCV TEMPERATURE CONTROL VALVE

TE TOP ELEVATION

TI TEMPERATURE INDICATOR

TMV THERMOSTATIC MIXING VALVE

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TXV THERMAL EXPANSION VALVE

TYP TYPICAL

TW TEMPERED WATER

UG UNDERGROUND

UH UNIT HEATER

UON UNLESS OTHERWISE NOTED

UNO UNLESS NOTED OTHERWISE

VAC VACUUM

VA VALVE

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

W/ WITH

W/O WITHOUT

WB WET BULB TEMPERATURE

WG WATER GAUGE

WP WEATHER PROOF

XP EXPLOSION PROOF

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CONDENSING WATER SUPPLY

CONDENSING WATER RETURN

HOT WATER SUPPLY

HOT WATER RETURN

DRAIN

REFRIGERANT HOT GAS

REFRIGERANT LIQUID

REFRIGERANT SUCTION

NEW DUCT OR PIPING

EXISTING DUCT OR PIPING

EXISTING DUCT OR PIPING TO BE REMOVED

RS

RL

RHG

DR

HWS

CWR

CWS

CHWR

CHWS

HWR

DUAL TEMPERATURE SUPPLY

DUAL TEMPERATURE RETURN

DTS

DTR

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

2400430

/1

/2

:4

:0

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

12" = 1'-0"

MECHANICAL TERMINAL

COVER SHEET

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

B O

IL

E

R R

E P

L A

C E

M E

N T

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

B-T-M1-001

KLH PROJECT # 26944

04/18/25

26944.00

AB BG

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

GENERAL NOTES (DEMOLITION): GENERAL NOTES (NEW):

GENERAL ABBREVIATIONS

MECHANICAL SYMBOLS

CONTROL SYMBOL LEGEND

BALANCING VALVE

A=AUTOMATIC M=MANUAL CALIBRATED

CIRCUIT SENSOR (VENTURI)

GATE VALUE

BUTTERFLY VALVE

GLOBE VALVE

BALL VALVE

CHECK VALVE

GAS COCK

TEMPERATURE REGULATING VALVE

PRESSUR RELIEF VALVE

RELEIF VALVE

STRAINER

3-WAY VALVE

VALVE AND END CAP

UNION

FLANGED CONNECTION

REDUCER

ELBOW UP

PIPE TEE DOWN

ELBOW DOWN

INSERTION TYPE FLOW METER

STRAP-ON TYPE FLOW METER

PRESSURE TEMPERATURE

TEST STATION (PTTS)

THERMOMETER

MANUAL AIR VENT (A=AUTOMATIC)

WATER FLOW TRANSMITTER

SUPPLY DIFFUSER

RETURN DIFFUSER

EXHAUST DIFFUSER

PLENUM SLOT DIFFUSER

DUCT TAP LEFT

DUCT TAP RIGHT

AIR FLOW DIRECTION

OPPOSED BLADE DAMPER

PARALLEL BLADE DAMPER

FIRE DAMPER (HORIZONTAL OR VERTICAL)

SMOKE DAMPER (HORIZONTAL OR VERTICAL)

COMBINATION SMOKE FIRE DAMPER

TEMPERATURE TRANSMITTER

BALANCED BACKDRAFT DAMPER

AUTOMATIC AIR DAMPER

MANUAL DAMPER

THERMOSTAT OR TEMPERATURE SENSOR

STATIC PRESSURE TRANSMITTER

POINT OF CONNECTION

POINT OF REMOVAL

DUCT SMOKE DETECTOR

HUMIDITY TRANSMITTER

CARBON MONOXIDE SENSOR

CARBON DIOXIDE SENSOR

FLEXIBLE CONNECTION

FLEXIBLE CONNECTION

SQUARE ELBOW WITH TURNING VAINS

DUCT RISE IN DIRECTION OF AIR FLOW

DUCT DROP IN DIRECTION OF AIR FLOW

RECTANGULAR DUCT TO ROUND DUCT TRANSITION

SUPPLY AIR (RECTANGULAR DUCT)

R=RETURN, E=EXHAUST, OA=OUTSIDE AIR

SUPPLY AIR (ROUND DUCT)

R=RETURN, E=EXHAUST, OA=OUTSIDE AIR

AIR DEVICE TYPE - DEVICE WIDTH (IN) - NECK SIZE (IN)

CFM INDICATED

CD=LAY-IN CEILING DIFFUSER, PD=PERFORATED DIFFUSER,

LD=LINEAR DIFFUSER, RD=ROUND DIFFUSER, RG=RETURN GRILLE

DUCT TURN DOWN

DUCT TURN UP

INTERNALLY LINED DUCTWORK

(DIMENSIONS INDICATED ARE OUTSIDE

SHEET METAL DIMENSIONS)

MANUFACTURED DOUBLE WALL DUCTWORK

(DIMENSIONS INDICATED ARE INSIDE

SHEET METAL DIMENSIONS)

ANALOG INPUT SIGNAL

ANALOG OUTPUT SIGNAL

DIGITAL INPUT SIGNAL

DIGITAL OUTPUT SIGNAL

END SWITCH

DIFFERENTIAL PRESSURE TRANSMITTER

STATIC PRESSURE TRANSMITTER

LOW TEMPERATURE SWITCH

AIR FLOW TRANSMITTER

END SWITCH

NORMALLY OPEN

NORMALLY CLOSED

TEMPERATURE TRANSMITTER

ROOM TEMPERATURE SENSOR

RELATIVE HUMIDITY SENSOR

CARBON DIOXIDE SENSOR

DIFFERENTIAL PRESSURE SWITCH

HUMIDITY TRANSMITTER

DUCT MOUNTED SMOKE DETECTOR

CURRENT TRANSFORMER SWITCH

MECHANICAL LEGEND (not all may apply)

BBD

AAD

EQUIP. #

POC

POR

S

EQUIP. #

EQUIP. #

EQUIP. #

H

S

CO

CO2

S-12X8

S-12

CD-24-10

100 CFM

CTS

SD

HT

DPS

S

H

T

TT

LTS

AFT

ES

NO

NC

SPT

DPT

ES

DO

DI

AO

AI

CO2

FM

FM TT

C

S

F

M

P

T

DN

UP

A. UNLESS OTHERWISE NOTED, ALL DUCTWORK AND PIPING SHOWN DARK IS NEW.

B. ALL WORK SHALL BE INSTALLED PER THE STATE BUILDING CODE, STATE

MECHANICAL CODE AND ALL LOCAL APPLICABLE CODES.

C. VERIFY CONDITIONS IN THE FIELD PRIOR TO BID AND CONSTRUCTION.

D. WHERE CONFLICTS EXIST AMONG DRAWINGS, SPECIFICATIONS AND EQUIPMENT

SCHEDULES, THE MORE STRINGENT SHALL APPLY.

E. REFER TO DRAWINGS B-T-M3-501, AND B-T-M3-601 FOR MECHANICAL DETAILS,

DIAGRAMS AND SCHEDULES.

F. CONTRACTOR SHALL CAREFULLY COORDINATE DUCTWORK AND PIPING

PATHWAY / LOCATIONS WITH OTHER TRADES AND EXISTING CONDITIONS. ALL

DUCTWORK AND PIPING SHALL BE INSTALLED AS TIGHT TO THE STRUCTURE AS

POSSIBLE. CONNECTIONS TO THE SUPPLY AIR DEVICES MAY BE MADE WITH

FLEXIBLE DUCTWORK. ALL CONDITIONS SHALL BE FIELD VERIFIED BEFORE

ORDERING EQUIPMENT OR FABRICATED MATERIAL.

G. CONTRACTOR SHALL PROVIDE ALL ROOF OR WALL NON-COMBUSTIBLE FRAMING

AS REQUIRED TO INSTALL EQUIPMENT, DUCTWORK, AND PIPING. COORDINATE

NEW WORK WITH OTHER TRADES PRIOR TO BEGINNING CONSTRUCTION. NO

WORK IS TO BE INSTALLED OR FABRICATED UNTIL AFTER THE PROJECT

COORDINATION HAS BEEN APPROVED BY THE OWNER'S REPRESENTATIVE.

H. INSTALL A MANUAL BALANCE DAMPER IN ALL BRANCH DUCTS, INCLUDING ALL

SUPPLY, RETURN, AND EXHAUST GRILLES.

I. INSTALL A SHUT-OFF VALVE IN ALL PIPING BRANCHES.

J. ALL SQUARE THROATED ELBOWS SHALL HAVE AIRFOIL TURNING VANES AND

SHALL ONLY BE USED WHEN RADIUS ELBOWS WILL NOT FIT.

K. ALL ROUND BRANCH DUCT CONNECTIONS SHALL BE MADE WITH BELLMOUTH

FITTINGS OR ANGLED TEES. STRAIGHT SPIN-IN TAP COLLARS SHALL NOT BE

ACCEPTABLE.

L. ALL DAMPERS, VALVES, AND CONTROL COMPONENTS THAT ARE LOCATED ABOVE

CEILINGS SHALL BE INSTALLED WHERE COMPLETELY ACCESSIBLE. CONTRACTOR

SHALL PROVIDE ACCESS PANELS AS REQUIRED.

M. ALL NEW VARIABLE AIR VOLUME TERMINAL UNITS ARE TO BE INSTALLED WHERE

COMPONENTS ARE COMPLETELY ACCESSIBLE. CONTRACTOR SHALL

COORDINATE TO PROVIDE THE VAV UNIT WITH A CONTROL ENCLOSURE AND PIPE

CONNECTIONS ON THE MOST ACCESSIBLE SIDE OF THE UNIT. THE CONTRACTOR

SHALL BE RESPONSIBLE FOR PROVIDING THE CORRECT LEFT OR RIGHT HAND

CONFIGURATION.

N. DUCTWORK CONNECTION TO DIFFUSER / VAV TO BE THE SAME SIZE AS THE

NECK SIZE UNLESS OTHERWISE NOTED.

O. UNLESS OTHERWISE NOTED, ALL DUCTWORK SHALL BE FABRICATED FROM

GALVANIZED STEEL METAL, INSTALLED IN ACCORDANCE WITH SMACNA DUCT

CONSTRUCTION STANDARDS FOR GAUGE, REINFORCEMENT, AND SUPPORT; 2"

W.G. PRESSURE CLASS FOR ALL DUCTWORK, UNLESS NOTED OTHERWISE. ALL

JOINTS AND SEAMS SHALL BE SEALED AND FASTENED AND MADE AIRTIGHT IN

ACCORDANCE OF CHAPTER 13 OF THE STATE BUILDING CODE.

P. CONTRACTOR SHALL TAKE OVERALL CFM MEASUREMENTS ON ALL EXISTING

DUCTWORK TO REMAIN PRIOR TO COMMENCING ANY WORK. INFORMATION

GATHERED SHALL BE UTILIZED FOR REBALANCING SYSTEM. CONTRACTOR SHALL

REBALANCE ALL SYSTEMS AT THE CONCLUSION OF THE PROJECT.

Q. UL LISTED FIRESTOPPING SHALL BE USED AT ANY PENETRATION THROUGH A

FIRE RATED ASSEMBLY. REFER TO ARCHITECTURAL CONSTRUCTION

DOCUMENTS FOR LOCATIONS OR RATED ASSEMBLIES. CONTRACTOR SHALL USE

UL LISTED FIRESTOP SYSTEM METHODS FOR "THROUGH-PENETRATION

ASSEMBLIES." TYPICAL OF ALL FIRE RATED WALLS.

R. DUCTWORK AND PIPING SHALL BE SUPPORTED INDEPENDENT OF CEILING,

CONDUIT, OTHER DUCTWORK, OTHER PIPING,ETC.

S. IN AREAS WHERE CEILINGS ARE NOT BEING REPLACED, AND CONTRACTOR HAS

WORK ABOVE CEILINGS, CONTRACTOR SHALL PATCH AND REPAIR CEILINGS TO

MATCH EXISTING.

T. CONTRACTOR SHALL COORDINATE ALL REQUIRED WALL PENETRATIONS FOR

DUCT OR PIPING WITH GENERAL CONTRACTOR PRIOR TO CONSTRUCTION OF

NEW WALLS. ALL DUCT PENETRATIONS SHALL BE IN COMPLIANCE WITH THE

PROJECT SPECIFICATIONS. CONTRACTOR SHALL PERFORM ALL CUTTING AND

PATCHING REQUIRED FOR DUCT PENETRATIONS THROUGH WALLS.

U. CONTRACTOR SHALL COORDINATE ALL REQUIRED ROOF OPENINGS FOR

DUCTWORK WITH THE GENERAL CONTRACTOR.

V. CONTRACTOR SHALL PROVIDE ALL ADDITIONAL STEEL FRAMING AS REQUIRED TO

INSTALL ROOF MOUNTED EQUIPMENT CURBS.

W. CONTRACTOR SHALL INSTALL ALL EQUIPMENT, DUCTWORK, PIPING, VALVES,

INSULATION, SUPPORTS ETC. AS INDICATED OR AS REQUIRED TO ALLOW

OPERATION AND USE OF ALL AREAS AND ALL SYSTEMS REQUIRED FOR

OCCUPIED USE DURING CONSTRUCTION.

X. CONTRACTOR TO VERIFY EXISTING DUCTWORK / PIPING SUPPLY AND RETURN

SYSTEM, SIZE, AND TYPE PRIOR TO MAKING CONNECTIONS.

A. UNLESS OTHERWISE NOTED, ALL DUCTWORK AND PIPING SHOWN DASHED AND

DARK IS TO BE REMOVED.

B. CONTRACTOR TO COORDINATE DEMOLITION WITH OTHER TRADES BEFORE

BEGINNING WORK.

C. REFER TO B-T-M1-001 OR GENERAL NOTES AND ABBREVIATIONS.

D. CONTRACTOR SHALL TAKE OVERALL CFM MEASUREMENTS ON ALL EXISTING TO

REMAIN EQUIPMENT PRIOR TO COMMENCING ANY DEMOLITION WORK.

INFORMATION GATHERED SHALL BE UTILIZED FOR RE-BALANCING SYSTEM.

CONTRACTOR SHALL RE-BALANCE ALL SYSTEMS AT THE CONCLUSION OF THE

PROJECT.

E. THIS CONTRACTOR SHALL PATCH AND REPAIR ALL HOLES, DAMAGE OR

MODIFICATIONS LEFT BY REMOVAL OF DUCTWORK AND REPAIR WALLS,

FLOORS, CEILINGS, ETC. TO MATCH EXISTING. ALL PATCHING AND FINISHING

SHALL BE PERFORMED BY A QUALIFIED TRADESPERSONS. ALL DEMOLITION

WORK AND INSTALLATION SHALL BE COORDINATED WITH OWNER PRIOR TO

STARTING.

F. ALL REMOVED EQUIPMENT IN WORKING ORDER SHALL BE REVIEWED BY THE

OWNER'S REPRESENTATIVE. IF OWNER'S REPRESENTATIVE WISHES TO RETAIN

THE EQUIPMENT, CONTRACTOR REMOVING EQUIPMENT SHALL DELIVER

EQUIPMENT TO LOCATION AS DIRECTED BY THE OWNER'S REPRESENTATIVE. IF

THE OWNER'S REPRESENTATIVE WISHES THE EQUIPMENT TO BE DISPOSED OF,

THE CONTRACTOR REMOVING THE EQUIPMENT SHALL DISPOSE OF EQUIPMENT

WITH NO ADDITIONAL COST TO THE OWNER.

S

AAD AUTOMATIC AIR DAMPER

AAV AUTOMATIC AIR VENT

AB AIR BLENDER

AC-* AIR CONDITIONING UNIT

ACC AIR COOLED CONDENSER

ACCU AIR COOLED CONDENSING UNIT

AD ACCESS DOOR

ADD'L ADDITIONAL

ADJ ADJUSTABLE

AF AFTER FILTER

AFF ABOVE FINISHED FLOOR

ALT ALTERNATE

ALUM ALUMINUM

AP ACCESS PANEL

APPROX APPROXIMATE

ARCH ARCHITECT(URAL)

AUTO AUTOMATIC

AVG AVERAGE

BAS BUILDING AUTOMATION SYSTEM

BBD BALANCED BACKDRAFT DAMPER

BE BOTTOM ELEVATION

BF BUTTERFLY

BFP BACKFLOW PREVENTER

BLDG BUILDING

BLR BOILER

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BOT BOTTOM

BP BOOSTER PUMP

BTU BRITISH THERMAL UNIT

BTUH BTU'S PER HOUR

BV BALL VALVE

CA COMPRESSED AIR

CAF COMBUSTION AIR FAN

CCW COUNTER CLOCKWISE

CD CEILING DIFFUSER

CFM CUBIC FEET PER MINUTE

CHV CHECK VALVE

CH CHILLER

CHWP CHILLED WATER PUMP

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

COL COLUMN

CONN CONNECTION

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CU FT CUBIC FEET

CU IN CUBIC INCH

CW CITY WATER

CWP CONDENSING WATER PUMP

CWS CONDENSING WATER SUPPLY

CWR CONDENSING WATER RETURN

DB DRY BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROL

DET DETAIL

DIA DIAMETER

DN DOWN

DPR DAMPER

DPT DEW POINT TEMPERATURE

DR DRAIN

DTS DUAL TEMPERATURE SUPPLY

DTR DUAL TEMPERATURE RETURN

DWG DRAWING

EA EACH / EXHAUST AIR

EAH EXHAUST AIR HOOD

EAL EXHAUST AIR LOUVER

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

EF EXHAUST FAN

EG EXHAUST GRILLE

EL ELEVATION

ELEC ELECTRIC/ELECTRICAL

EQ EQUAL

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ER EXHAUST REGISTER

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

EUH ELECTRIC UNIT HEATER

EWH ELECTRIC WATER HEATER

EWT ENTERING WATER TEMPERATURE

EXCL EXCLUDING

EXIST EXISTING

EXP EXPANSION

°F DEGREE FAHRENHEIT

FD FLAT DRAIN

FF FINISHED FLOOR

FH FIRE HYDRANT

FL FLOOR

FOB FLAT ON BOTTOM

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOT FLAT ON TOP

FPC FIRE PROTECTION CONTRACTOR

FPM FEET PER MINUTE

FPVAV FAN POWERED VAV

FS FLOOR SINK

GA GAUGE

GALV GALVANIZED

GC GENERAL CONTRACTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HEX HEAT EXCHANGER

HORIZ HORIZONTAL

HR HOUR

HT HEAT TRACE

HVAC HEATING, VENTILATING AND AIR CONDITIONING

HWP HOT WATER PUMP

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HX HEAT EXCHANGER

IA INSTRUMENT AIR

IE INVERT ELEVATION

IN INCH

INV INVERT

KEC KITCHEN EQUIPMENT CONTRACTOR

KH KITCHEN HOOD

KV KITCHEN VENT

LAT LEAVING AIR TEMPERATURE

LB POUND

LD LINEAR DIFFUSER

LWT LEAVING WATER TEMPERATURE

MAT'L MATERIAL

MAV MANUAL AIR VENT

MAX MAXIMUM

MBH BTU'S PER HOUR, THOUSAND

MC MECHANICAL CONTRACTOR

MCW MECHANICAL CITY WATER

MECH MECHANICAL

MFG/MFGR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MSW MECHANICAL SOFT WATER

NA NOT APPLICABLE

NC NORMALLY CLOSED/NOISE CRITERIA

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NTS NOT TO SCALE

OA OUTSIDE AIR

OAH OUTSIDE AIR HOOD

OAL OUTSIDE AIR LOUVER

OC ON CENTER

OC OCCUPANCY SENSOR

OPG OPENING

OS&Y OUTSIDE SCREW AND YOKE

OZ OUNCE

PC PLUMBING CONTRACTOR

PCHWP PRIMARY CHILLED WATER PUMP

PERIM PERIMETER

PF PRE FILTER

PH PHASE

PHWP PRIMARY HOT WATER PUMP

PI PRESSURE INDICATOR

PLBG PLUMBING

PRESS PRESSURE

PRV PRESSURE REDUCING VALVE

PS PRESSURE SWITCH

PSD PLENUM SLOT DIFFUSER

PSI POUND PER SQUARE INCH

PSIA POUND PER SQUARE INCH ABSOLUTE

PSIG POUND PER SQUARE INCH GAUGE

PVC POLYVINYL CHLORIDE

RCP RECIRCULATION PUMP

REF REFERENCE

REQ'D REQUIRED

REV REVISE(D)

RG RETURN GRILLE

RH RELATIVE HUMIDITY/ROOF

RV RELIEF VENT

RM ROOM

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

SA SUPPLY AIR

SCHED SCHEDULE

SCHWP SECONDARY CHILLED WATER PUMP

SD SUCTION DIFFUSER

SECT SECTION

SG SUPPLY GRILLE

SHWP SECONDARY HOT WATER PUMP

SHT SHEET

SL SOUND LINING

SM SURFACE MOUNT

SPEC SPECIFICATIONS

SPT STATIC PRESSURE TRANSMITTER

SQ SQUARE

SQ FT/SF SQUARE FOOT (FEET)

SQ IN SQUARE INCHES

SR SUPPLY REGISTER

SS STAINLESS STEEL

STD STANDARD

STL STEEL

STRUCT STRUCTURAL

TCC TEMPERATURE CONTROL CONTRACTOR

TCV TEMPERATURE CONTROL VALVE

TE TOP ELEVATION

TI TEMPERATURE INDICATOR

TMV THERMOSTATIC MIXING VALVE

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TXV THERMAL EXPANSION VALVE

TYP TYPICAL

TW TEMPERED WATER

UG UNDERGROUND

UH UNIT HEATER

UON UNLESS OTHERWISE NOTED

UNO UNLESS NOTED OTHERWISE

VAC VACUUM

VA VALVE

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

W/ WITH

W/O WITHOUT

WB WET BULB TEMPERATURE

WG WATER GAUGE

WP WEATHER PROOF

XP EXPLOSION PROOF

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CONDENSING WATER SUPPLY

CONDENSING WATER RETURN

HOT WATER SUPPLY

HOT WATER RETURN

DRAIN

REFRIGERANT HOT GAS

REFRIGERANT LIQUID

REFRIGERANT SUCTION

NEW DUCT OR PIPING

EXISTING DUCT OR PIPING

EXISTING DUCT OR PIPING TO BE REMOVED

RS

RL

RHG

DR

HWS

CWR

CWS

CHWR

CHWS

HWR

DUAL TEMPERATURE SUPPLY

DUAL TEMPERATURE RETURN

DTS

DTR

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

2400430

/1

/2

:4

:0

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

12" = 1'-0"

MECHANICAL TERMINAL

COVER SHEET

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

B O

IL

E

R R

E P

L A

C E

M E

N T

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

B-T-M1-001

KLH PROJECT # 26944

04/18/25

26944.00

AB BG

REVISIONS

UP

10 11 12 13

H

J

K

L

DEMO.B-TD-1

DEMO.B-TD-2

DEMO.B-TD-3

DEMO.BP-TD-6

DEMO.BP-TD-5

EX. 8" HWS

EX. 6" HWS

EX. 6" HWS

EX. 6" HWS

EX. 6" HWS

EX. 8" HWS

EX. 8" HWR

EX. 6" HWR

EX. 6" HWS

EX. 6" HWS

EX. 8" HWS

EX. 6" HWS

EX. 8" HWS

EX. 8" HWR

EX. 8" HWS

EX. 8" HWR

EX. 6" HWR

EX. 6" HWRMD1

MD1

MD1

MD2

MD2 MD3

MD3

MD3

MD3

30"ø EA

24"ø EA

36"ø EA

42"ø EA

20"ø EA

20"ø EA

20"ø EA

22"ø EA

EX. FD

EX. FD

EXIST FD

EX. FD

EXIST FD

EXIST FD

EX. FD

EX. FD

EX. FD

MD5MD5

MD6 MD7

EX. 1" NG

EX. 1" NG

EX. 1" NG

EX. 6" NG

EX. 1" NG

EX. 3" NG

EX. 3" NG

EX. 1" NG

EX. 1" NG

EX. 3" NG

EX. 8" HWS

EX. 1" NG

EX. 1" NG

EX. 1" NG

EX. 6" NG

EX. 3" CW

EX. 1" NG

EX. 1" NG

EX. 1" NG

MD5

MD3

MD3

EX. 1" NG

EX. 1" NG

MD3

EX. 1" NG

EX. 1" NG

EX. 1" NG

EX. 2" HWSEX. 2" HWR

EX. 1 1/2" HWS

EX. 1 1/2" HWR

EX. 1 1/2" HWR

EX. 1 1/2" HWS

EX. SIDE-STREAM FILTER

BY WATER TREATMENT

CONTRACTOR

MD9

MD10

1/4" = 1'-0"

MECHANICAL DEMOLITION PLAN - TERMINAL - BASEMENT LEVEL - B-T3-01_02_03

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

2400430

/1

/2

:4

:4

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

1/4" = 1'-0"

MECHANICAL DEMOLITION

TERMINAL - BASEMENT LEVEL

PLAN

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

B O

IL

E

R R

E P

L A

C E

M E

N T

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

B-T-M1-100

KLH PROJECT # 26944

04/18/25

26944.00

AB BG

N

KEYED NOTES

MD1 DEMOLISH EXISTING BOILERS, PADS, AND ASSOCIATED VFD's.

MD2 DEMOLISH EXISTING HOT WATER PUMPS, PADS AND VFD's.

MD3 DEMOLISH EXISTING PIPING CONNECTED TO PUMPS AND BOILERS BACK

TO POINT OF CONNECTIONS.

MD5 REPLACE EXISTING MOTORIZED DAMPERS HIGH AND LOW ON LOUVERED

WALL IN EACH POSITION.

MD6 PNEUMATIC LINES CONNECTED TO OLD BOILER CONTROLS TO BE

CAPPED.

MD7 EXISTING AIR COMPRESSOR TO REMAIN.

MD9 EXISTING PUMP VFD's TO BE DEMOLISHED.

MD10 MAINTAIN PATH THROUGH EXISTING LOUVER FOR CHILLER ROOM.

REVISIONS

# DATE DESCRIPTION

D 04/18/25 ISSUE FOR BID

UP

10 11 12 13

H

J

K

L

DEMO.B-TD-1

DEMO.B-TD-2

DEMO.B-TD-3

DEMO.BP-TD-6

DEMO.BP-TD-5

EX. 8" HWS

EX. 6" HWS

EX. 6" HWS

EX. 6" HWS

EX. 6" HWS

EX. 8" HWS

EX. 8" HWR

EX. 6" HWR

EX. 6" HWS

EX. 6" HWS

EX. 8" HWS

EX. 6" HWS

EX. 8" HWS

EX. 8" HWR

EX. 8" HWS

EX. 8" HWR

EX. 6" HWR

EX. 6" HWRMD1

MD1

MD1

MD2

MD2 MD3

MD3

MD3

MD3

30"ø EA

24"ø EA

36"ø EA

42"ø EA

20"ø EA

20"ø EA

20"ø EA

22"ø EA

EX. FD

EX. FD

EXIST FD

EX. FD

EXIST FD

EXIST FD

EX. FD

EX. FD

EX. FD

MD5MD5

MD6 MD7

EX. 1" NG

EX. 1" NG

EX. 1" NG

EX. 6" NG

EX. 1" NG

EX. 3" NG

EX. 3" NG

EX. 1" NG

EX. 1" NG

EX. 3" NG

EX. 8" HWS

EX. 1" NG

EX. 1" NG

EX. 1" NG

EX. 6" NG

EX. 3" CW

EX. 1" NG

EX. 1" NG

EX. 1" NG

MD5

MD3

MD3

EX. 1" NG

EX. 1" NG

MD3

EX. 1" NG

EX. 1" NG

EX. 1" NG

EX. 2" HWSEX. 2" HWR

EX. 1 1/2" HWS

EX. 1 1/2" HWR

EX. 1 1/2" HWR

EX. 1 1/2" HWS

EX. SIDE-STREAM FILTER

BY WATER TREATMENT

CONTRACTOR

MD9

MD10

1/4" = 1'-0"

MECHANICAL DEMOLITION PLAN - TERMINAL - BASEMENT LEVEL - B-T3-01_02_03

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.

T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to

THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"

SCALE:

DATE:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

WWW.KLHENGRS.COM

MECHANICAL/ELECTRICAL ENGINEERS

LEXINGTON, KENTUCKY

LOUISVILLE, KENTUCKY

COLUMBUS, OHIO

1538 ALEXANDRIA PIKE, SUITE 11

FT. THOMAS, KENTUCKY 41075

800-354-9783 859-442-8050

859-442-8058 FAX

KOHRS LONNEMANN HEIL ENGINEERS, INC.

P R

O J E

C T

A D

D R

E S

S

P R

O J E

C T

T

IT

L E

2400430

/1

/2

:4

:5

P

M A u to d e s k D o c s /C

V G

R e h a b a n d E ff ic ie n c y P ro g ra m

/M E

C H

-K L

H -C

V G

R

.r v t

1/4" = 1'-0"

MECHANICAL DEMOLITION

TERMINAL - BASEMENT LEVEL

PLAN

C V

G I

N D

U S

T R

IA

L

R E

H A

B

IL

IT

A

T

IO

N A

N D

E F

F

IC

IE

N

C Y

P R

O G

R A

M

B O

IL

E

R R

E P

L A

C E

M E

N T

P R

O J E

C T

T e rm in a l D r H e b ro n

K Y

B-T-M1-100

KLH PROJECT # 26944

04/18/25

26944.00

AB BG

N

KEYED NOTES

MD1 DEMOLISH EXISTING BOILERS, PADS, AND ASSOCIATED VFD's.

MD2 DEMOLISH EXISTING HOT WATER PUMPS, PADS AND VFD's.

MD3 DEMOLISH EXISTING PIPING CONNECTED TO PUMPS AND BOILERS BACK

TO POINT OF CONNECTIONS.

MD5 REPLACE EXISTING MOTORIZED DAMPERS HIGH AND LOW ON LOUVERED

WALL IN EACH POSITION.

MD6 PNEUMATIC LINES CONNECTED TO OLD BOILER CONTROLS TO BE

CAPPED.

MD7 EXISTING AIR COMPRESSOR TO REMAIN.

MD9 EXISTING PUMP VFD's TO BE DEMOLISHED.

MD10 MAINTAIN PATH THROUGH EXISTING LOUVER FOR CHILLER ROOM.

REVISIONS

UP

10 11 12 13

H

J

K

L

EX. 8" HWR

EX. 8" HWS

EX. 8" HWR

EX. 8" HWS

M2M2 M2 M2

M6

NEW HOT WATER

EXPANSION TANKS

B-TD-4

M1

BP-TD-5

BP-TD-6

BP-TD-7

M3

M3

M3

EXIST FD

EXIST FD

EXIST FD

8" HWS

8" HWS

8" HWS

8" HWS8" HWS

8" HWS

8" HWS

8" HWS

6" HWS

6" HWS

6" HWS

6" HWS

6" HWS

6" HWS

8" HWR

AS-TD-1

EXIST FD

EXIST FD

EXIST FD

EXIST FD

EXIST FD

8" HWS

8" HWS

B-TD-3

B-TD-2

B-TD-1

EXIST FD

M1

M1

M1

6" HWR

6" HWR

6" HWR

6" HWR

6" HWS

6" HWS

6" HWS

6" HWS

8" HWR

8" HWR

8" HWR

EX. 1" NG

EX. 1" NG

EX. 1" NG

1" NG

1" NG

1" NG

1" NG

1" NG

1" NG

6" NG

1" NG

1" NG

1" NG

1" NG

6" NG

8" HWS

3" CW

EX. 3" CW

M4

EX. 1" NG

M5

1" NG

EX. 1 1/2" HWR

EX. 1 1/2" HWS

EX. 1 1/2" HWR

EX. 1 1/2" HWS

2" HWR 2" HWS

M13

3" NG

3" NG

3" NG

3" NG

VFD-BP-TD-7

VFD-BP-TD-6

VFD-BP-TD-5

M14

M15

M10 3/4" CD

1 1/2" CW

M18

M19

T-TD-1

T-TD-2

22"ø EA UP

22"ø EA UP

1/4" = 1'-0"

MECHANICAL PLAN - TERMINAL - BASEMENT LEVEL - B-T3-01_02_03

Project No:

1203 Main Street, Suite 4 Cincinnati, OH 45202

O: 513.409.2338 www.kpff.com

Consulting

EngineersO W

N E

R S

H

IP

O F

I N

S T

R U

M E

N T

S O

F S

E R

V

IC

E

A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .