These documents represent a comprehensive set of mechanical, electrical, and architectural drawings for the Boiler Replacement Project at Cincinnati/Northern Kentucky International Airport (CVG), prepared by KLH Engineers for the Kenton County Airport Board. The project involves replacing boiler systems in the Terminal and Concourse B areas, with design documents dated April 18, 2025, and marked as "Issue for Bid". The drawings cover detailed plans for mechanical demolition, new mechanical installations, electrical power configurations, and architectural modifications across multiple building levels, including basement and roof areas.
The project scope includes replacing multiple boilers in both the Terminal and Concourse B locations, with six condensing boilers planned (four in Terminal, six in Concourse B), each with 480V electrical connections and varying power requirements. The boilers are manufactured by Cleaver Brooks, with models SFC-E, and feature high efficiency ratings of 92% with 10:1 turn-down ratios. Accompanying infrastructure upgrades include new hot water pumps, fans, expansion tanks, and air separators, with comprehensive electrical disconnect schedules and power plans detailing the integration of new equipment into the existing airport systems. The electrical drawings also outline careful demolition and replacement strategies to minimize disruption to airport operations.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No:
1203 Main Street, Suite 4 Cincinnati, OH 45202
O: 513.409.2338 www.kpff.com
Consulting
EngineersO W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E
A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in th e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"
SCALE:
DATE:
PROJECT NUMBER:
DRAWN BY: CHECKED BY:
WWW.KLHENGRS.COM
MECHANICAL/ELECTRICAL ENGINEERS
LEXINGTON, KENTUCKY
LOUISVILLE, KENTUCKY
COLUMBUS, OHIO
1538 ALEXANDRIA PIKE, SUITE 11
FT. THOMAS, KENTUCKY 41075
800-354-9783 859-442-8050
859-442-8058 FAX
KOHRS LONNEMANN HEIL ENGINEERS, INC.
P R
O J E
C T
A D
D R
E S
S
P R
O J E
C T
T
IT
L E
FOR KENTON COUNTY AIRPORT BOARD AT
CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT
MEP ENGINEER
KLH ENGINEERS
1538 ALEXANDRIA PIKE
SUITE 11
FORT THOMAS, KY 41075
CONTACT: CHRIS MEHAFFIE, PE
PHONE: (859)-442-8050
EMAIL: CMEHAFFIE@KLHENGRS.COM
OWNER
CINCINNATI/NORTHERN KENTUCKY
INTERNATIONAL AIRPORT
PO BOX 752000
CINCINNATI, OH 45275-200C
CONTACT: THAD FOGLE
PHONE: (859) 743-5978
EMAIL: TFOGLE@CVGAIRPORT.COM
2400430
/1
/2
:4
:5
P
M A u to d e s k D o c s /C
V G
R e h a b a n d E ff ic ie n c y P ro g ra m
/M E
C H
-K L
H -C
V G
R
.r v t
BOILER REPLACEMENT PROJECT
BOILER PROJECT COVER
SHEET
C V
G I
N D
U S
T R
IA
L
R E
H A
B
IL
IT
A
T
IO
N A
N D
E F
F
IC
IE
N
C Y
P R
O G
R A
M
B O
IL
E
R R
E P
L A
C E
M E
N T
P R
O J E
C T
T e rm in a l D r H e b ro n
K Y
B-G0-001
KLH PROJECT # 26944
04/18/25
26944.00
CAM CAM
DRAWING INDEX - BOILER
SHEET NUMBER SHEET NAME CURRENT REVISION ISSUED CURRENT REVISION DATE CURRENT REVISION DESCRIPTION
B-G0-001 BOILER PROJECT COVER SHEET No 04/18/25 ISSUE FOR BID
B-T-A1-101 ARCHITECTURAL - TERMINAL ROOF PLANS & DETAILS No 04/18/25 ISSUE FOR BID
B-T-A1-102 ARCHITECTURAL - TERMINAL BASEMENT PLANS & DETAILS No 04/18/25 ISSUE FOR BID
B-B-A1-101 ARCHITECTURAL - CONCOURSE B ROOF PLANS & DETAILS No 04/18/25 ISSUE FOR BID
B-T-M1-001 MECHANICAL TERMINAL COVER SHEET No 04/18/25 ISSUE FOR BID
B-T-M1-100 MECHANICAL DEMOLITION TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-T-M3-100 MECHANICAL TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-T-M3-501 MECHANICAL TERMINAL SCHEMATIC No 04/18/25 ISSUE FOR BID
B-T-M3-601 MECHANICAL TERMINAL SCHEDULES No 04/18/25 ISSUE FOR BID
B-B-M1-001 MECHANICAL CONCOURSE B COVER SHEET No 04/18/25 ISSUE FOR BID
B-B-M1-100 MECHANICAL DEMOLITION CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-B-M3-100 MECHANICAL CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-B-M3-101 MECHANICAL CONCOURSE B - CLUB LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-B-M3-501 MECHANICAL CONCOURSE B SCHEMATIC No 04/18/25 ISSUE FOR BID
B-B-M3-601 MECHANICAL CONCOURSE B SCHEDULES No 04/18/25 ISSUE FOR BID
B-B-M3-602 MECHANICAL CONCOURSE B DETAILS No 04/18/25 ISSUE FOR BID
B-T-M3-602 MECHANICAL TERMINAL DETAILS No 04/18/25 ISSUE FOR BID
B-B-E0-000 ELECTRIC GENERAL INFORMATION No 04/18/25 ISSUE FOR BID
B-T-E1-100 ELECTRIC DEMOLITION TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-T-E4-100 ELECTRIC POWER TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-T-E4-700 ELECTRIC POWER TERMINAL - PANEL SCHEDULES No 04/18/25 ISSUE FOR BID
B-B-E1-100 ELECTRIC DEMOLITION CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-B-E4-100 ELECTRIC POWER CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-B-E4-101 ELECTRIC POWER CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-B-E4-700 ELECTRIC POWER CONCOURSE B - PANEL SCHEDULES No 04/18/25 ISSUE FOR BID
REVISIONS
# DATE DESCRIPTION
D 04/18/25 ISSUE FOR BID
Project No:
1203 Main Street, Suite 4 Cincinnati, OH 45202
O: 513.409.2338 www.kpff.com
Consulting
EngineersO W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E
A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"
SCALE:
DATE:
PROJECT NUMBER:
DRAWN BY: CHECKED BY:
WWW.KLHENGRS.COM
MECHANICAL/ELECTRICAL ENGINEERS
LEXINGTON, KENTUCKY
LOUISVILLE, KENTUCKY
COLUMBUS, OHIO
1538 ALEXANDRIA PIKE, SUITE 11
FT. THOMAS, KENTUCKY 41075
800-354-9783 859-442-8050
859-442-8058 FAX
KOHRS LONNEMANN HEIL ENGINEERS, INC.
P R
O J E
C T
A D
D R
E S
S
P R
O J E
C T
T
IT
L E
FOR KENTON COUNTY AIRPORT BOARD AT
CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT
MEP ENGINEER
KLH ENGINEERS
1538 ALEXANDRIA PIKE
SUITE 11
FORT THOMAS, KY 41075
CONTACT: CHRIS MEHAFFIE, PE
PHONE: (859)-442-8050
EMAIL: CMEHAFFIE@KLHENGRS.COM
OWNER
CINCINNATI/NORTHERN KENTUCKY
INTERNATIONAL AIRPORT
PO BOX 752000
CINCINNATI, OH 45275-200C
CONTACT: THAD FOGLE
PHONE: (859) 743-5978
EMAIL: TFOGLE@CVGAIRPORT.COM
2400430
/1
/2
:4
:5
P
M A u to d e s k D o c s /C
V G
R e h a b a n d E ff ic ie n c y P ro g ra m
/M E
C H
-K L
H -C
V G
R
.r v t
BOILER REPLACEMENT PROJECT
BOILER PROJECT COVER
SHEET
C V
G I
N D
U S
T R
IA
L
R E
H A
B
IL
IT
A
T
IO
N A
N D
E F
F
IC
IE
N
C Y
P R
O G
R A
M
B O
IL
E
R R
E P
L A
C E
M E
N T
P R
O J E
C T
T e rm in a l D r H e b ro n
K Y
B-G0-001
KLH PROJECT # 26944
04/18/25
26944.00
CAM CAM
DRAWING INDEX - BOILER
SHEET NUMBER SHEET NAME CURRENT REVISION ISSUED CURRENT REVISION DATE CURRENT REVISION DESCRIPTION
B-G0-001 BOILER PROJECT COVER SHEET No 04/18/25 ISSUE FOR BID
B-T-A1-101 ARCHITECTURAL - TERMINAL ROOF PLANS & DETAILS No 04/18/25 ISSUE FOR BID
B-T-A1-102 ARCHITECTURAL - TERMINAL BASEMENT PLANS & DETAILS No 04/18/25 ISSUE FOR BID
B-B-A1-101 ARCHITECTURAL - CONCOURSE B ROOF PLANS & DETAILS No 04/18/25 ISSUE FOR BID
B-T-M1-001 MECHANICAL TERMINAL COVER SHEET No 04/18/25 ISSUE FOR BID
B-T-M1-100 MECHANICAL DEMOLITION TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-T-M3-100 MECHANICAL TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-T-M3-501 MECHANICAL TERMINAL SCHEMATIC No 04/18/25 ISSUE FOR BID
B-T-M3-601 MECHANICAL TERMINAL SCHEDULES No 04/18/25 ISSUE FOR BID
B-B-M1-001 MECHANICAL CONCOURSE B COVER SHEET No 04/18/25 ISSUE FOR BID
B-B-M1-100 MECHANICAL DEMOLITION CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-B-M3-100 MECHANICAL CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-B-M3-101 MECHANICAL CONCOURSE B - CLUB LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-B-M3-501 MECHANICAL CONCOURSE B SCHEMATIC No 04/18/25 ISSUE FOR BID
B-B-M3-601 MECHANICAL CONCOURSE B SCHEDULES No 04/18/25 ISSUE FOR BID
B-B-M3-602 MECHANICAL CONCOURSE B DETAILS No 04/18/25 ISSUE FOR BID
B-T-M3-602 MECHANICAL TERMINAL DETAILS No 04/18/25 ISSUE FOR BID
B-B-E0-000 ELECTRIC GENERAL INFORMATION No 04/18/25 ISSUE FOR BID
B-T-E1-100 ELECTRIC DEMOLITION TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-T-E4-100 ELECTRIC POWER TERMINAL - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-T-E4-700 ELECTRIC POWER TERMINAL - PANEL SCHEDULES No 04/18/25 ISSUE FOR BID
B-B-E1-100 ELECTRIC DEMOLITION CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-B-E4-100 ELECTRIC POWER CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-B-E4-101 ELECTRIC POWER CONCOURSE B - BASEMENT LEVEL PLAN No 04/18/25 ISSUE FOR BID
B-B-E4-700 ELECTRIC POWER CONCOURSE B - PANEL SCHEDULES No 04/18/25 ISSUE FOR BID
REVISIONS
# DATE DESCRIPTION
D 04/18/25 ISSUE FOR BID
H
J
J.3
J.2
H.5
11.3 11.4 11.8
J.4
226226
B-T-A1-101B-T-A1-101
MAIN TERMINAL
N
EXHUAST FLUE AS SCHEDULED
TEMPERATURE APPROPRIATE
SEALANT: TOOL TO FACILITATE
WATER RUN OFF
DRAW BAND
PREFABRICATED STAINLESS STEEL
COVER
REGLET AND COUNTERFLASHING
TERMINATION BAR
ROOFING MEMBRANE
METAL STUD AND SHEATHING KNEE WALL
ROOF DECK
ROOF ASSEMBLY; TIE-IN TO
EXISTING ROOF ASSEMBLY
PER MANUFACTURE'S
REQUIREMENTS FOR
APPROPRIATE WATER-TIGHT
OVERLAP
CONTINUOUS 12" WIDE GALVANIZED
SHEET METAL BACKER PLATE
WIND CLIPS
AT EACH
CORNER
GALVANIZED
PLATE
/8
GASKETED FASTENERS
CONTINUOUS STRIPS
OF SELF-ADHERING
UNDERLAYMENT
GENERAL NOTE:
VERIFY DIAMETER AND HEIGHT OF PIPE ABOVE ROOF WITH EQUIPMENT AND ADJACENT ROOF REQUIREMENTS.
H
J
J.3
J.2
H.5
11.3 11.4 11.8
J.4
Project No:
1203 Main Street, Suite 4 Cincinnati, OH 45202
O: 513.409.2338 www.kpff.com
Consulting
EngineersO W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a ti o n s c o m p u te r fi le s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w it h o u t lim it a ti o n th e c o p y ri g h t th e re to
THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"
SCALE:
DATE:
PROJECT NUMBER:
DRAWN BY: CHECKED BY:
WWW.KLHENGRS.COM
MECHANICAL/ELECTRICAL ENGINEERS
LEXINGTON, KENTUCKY
LOUISVILLE, KENTUCKY
COLUMBUS, OHIO
1538 ALEXANDRIA PIKE, SUITE 11
FT. THOMAS, KENTUCKY 41075
800-354-9783 859-442-8050
859-442-8058 FAX
KOHRS LONNEMANN HEIL ENGINEERS, INC.
2400430
P R
O J E
C T
A D
D R
E S
S
P R
O J E
C T
T
IT
L E
/1
/2
:5
:5
P
M A u to d e s k D o c s /C
V G
R e h a b a n d
E ff ic ie n c y P ro g ra m /A
R C
H -G re s h a m
S m it h
-T e rm in a l_
R
.r v t
As indicated
ARCHITECTURAL - TERMINAL
ROOF PLANS & DETAILS
B-T-A1-101
KLH PROJECT # 26944
04/18/2025
26944.00
MH DH
C V
G I
N D
U S
T R
IA
L
R E
H A
B
IL
IT
A
T
IO
N A
N D
E F
F
IC
IE
N
C Y
P R
O G
R A
M
B O
IL
E
R R
E P
L A
C E
M E
N T
P R
O J E
C T
T e rm in a l D r H e b ro n
K Y
0' 12'8'4'2'3/16" = 1'-0"
BOILER FLUE TERMINAL NEW CONSTRUCTION PLAN
NOT TO SCALE
EXHAUST DETAIL
Keynote Legend
Key Value Keynote Text
126 EXISTING ROOF PENETRATION.
VERIFY EXTENTS IN FIELD.
127 DEMOLISH EXISTING ROOFING AS
REQUIRED; SEE DETAIL THIS SHEET.
VERIFY EXTENTS OF DEMOLITION IN
FIELD.
225 PENETRATION COVERING; SEE
DETAIL THIS SHEET.
226 NEW EXHAUST FLUES THROUGH
EXISTING OPENING IN ROOF SLAB.
0' 12'8'4'2'3/16" = 1'-0"
BOILER FLUE TERMINAL DEMOLITION PLAN
REVISIONS
# DATE DESCRIPTION
D 04/18/25 ISSUE FOR BID
I
S
EAN M. BOGAR
T
R
EG STER
DNO.
COMMONWEALTH
OFK
N U C K
RC H T CT
Y
I E
E T
A E bogarts Date 04/17/2025
12 13
H
J
J.3
J.2
H.5
11.8 12.6 12.8
J.4
VENTILATION VAULT
BOILER ROOM
TU12
TOILET
TU15
B-T-A1-102
B-T-A1-102
B-T-A1-102
B-T-A1-102B-T-A1-102
OH
220220
B-T-A1-102
B-T-A1-102
B-T-A1-102
B-T-A1-102
MAIN TERMINAL
N
J
EXISTING EXTERIOR
WALL
EXISTING LOUVERED
WALL PANEL
INSTALL BACKER ROD
AND APPLY CAULK
AROUND THE ENTIRE
PERIMETER OF THE
LOUVER PANELS;
SEALANT COLOR TO
MATCH LOUVER FINISH
EXISTING STRUCTURE
OVERHEAD
EXISTING LOUVERED
WALL PANEL
INSTALL BACKER ROD
AND APPLY CAULK
AROUND THE ENTIRE
PERIMETER OF THE
LOUVER PANELS;
SEALANT COLOR TO
MATCH LOUVER FINISH
EXISTING CONCRETE
KNEE WALL
EXISTING LOUVERED
WALL PANEL
INSTALL BACKER ROD
AND APPLY CAULK
AROUND THE ENTIRE
PERIMETER OF THE
LOUVER PANELS;
SEALANT COLOR TO
MATCH LOUVER FINISH
CONTINUOUS
FLASHING SET IN
FULL LENGHT
BACKBEAD WITH END
DAM AT EACH END;
FINISH TO MATCH
LOUVER FINISH
Project No:
1203 Main Street, Suite 4 Cincinnati, OH 45202
O: 513.409.2338 www.kpff.com
Consulting
EngineersO W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a ti o n s c o m p u te r fi le s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w it h o u t lim it a ti o n th e c o p y ri g h t th e re to
THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"
SCALE:
DATE:
PROJECT NUMBER:
DRAWN BY: CHECKED BY:
WWW.KLHENGRS.COM
MECHANICAL/ELECTRICAL ENGINEERS
LEXINGTON, KENTUCKY
LOUISVILLE, KENTUCKY
COLUMBUS, OHIO
1538 ALEXANDRIA PIKE, SUITE 11
FT. THOMAS, KENTUCKY 41075
800-354-9783 859-442-8050
859-442-8058 FAX
KOHRS LONNEMANN HEIL ENGINEERS, INC.
2400430
P R
O J E
C T
A D
D R
E S
S
P R
O J E
C T
T
IT
L E
/1
/2
:5
:0
P
M A u to d e s k D o c s /C
V G
R e h a b a n d
E ff ic ie n c y P ro g ra m /A
R C
H -G re s h a m
S m it h
-T e rm in a l_
R
.r v t
As indicated
ARCHITECTURAL - TERMINAL
BASEMENT PLANS & DETAILS
B-T-A1-102
KLH PROJECT # 26944
04/18/2025
26944.00
MH DH
C V
G I
N D
U S
T R
IA
L
R E
H A
B
IL
IT
A
T
IO
N A
N D
E F
F
IC
IE
N
C Y
P R
O G
R A
M
B O
IL
E
R R
E P
L A
C E
M E
N T
P R
O J E
C T
T e rm in a l D r H e b ro n
K Y
0' 12'8'4'2'3/16" = 1'-0"
BOILER TERMINAL NEW CONSTRUCTION PLAN
0' 12'8'4'2'1/4" = 1'-0"
EAST LOUVER NEW CONSTRUCTION ELEVATION
0' 6" 1 1/2'1'1 1/2" = 1'-0"
JAMB DETAIL
0' 6" 1 1/2'1'1 1/2" = 1'-0"
HEADER DETAIL
0' 6" 1 1/2'1'1 1/2" = 1'-0"
SILL DETAIL
Keynote Legend
Key Value Keynote Text
120 CAREFULLY REMOVE SHEET METAL
PANEL WALL AND ASSOCIATED
STRUCTURAL FRAME BRACING AS
REQUIRED FOR REMOVAL OF
BOILERS AND INSTALLATION OF
NEW BOILERS. STORE AND
PROTECT FOR REINSTALLATION.
DOCUMENT EXISTING ANCHORING
PRIOR TO REMOVAL. REFER TO
MECHANICAL DRAWINGS FOR
MODIFICATIONS TO PANEL WALL
LOUVERS.
121 REMOVABLE METAL GRATE
OVERHEAD AT GRADE.
220 REINSTALL SHEET METAL PANEL
WALL SYSTEM AND ASSOCIATED
STRUCTURAL FRAME BRACING AS
PREVIOUSLY INSTALLED. REFER TO
MECHANICAL DRAWINGS FOR
LOUVERS REPLACEMENTS WITHIN
WALL.
REVISIONS
# DATE DESCRIPTION
D 04/18/25 ISSUE FOR BID
I
S
EAN M. BOGAR
T
R
EG STER
DNO.
COMMONWEALTH
OFK
N U C K
RC H T CT
Y
I E
E T
A E bogarts
37 38
F
E
B-B-A1-101B-B-A1-101
CONCOURSE B
N
EXHUAST FLUE AS SCHEDULED
TEMPERATURE APPROPRIATE
SEALANT: TOOL TO FACILITATE
WATER RUN OFF
DRAW BAND
PREFABRICATED STAINLESS STEEL
COVER
REGLET AND COUNTERFLASHING
TERMINATION BAR
ROOFING MEMBRANE
CONTINUOUS 12" WIDE GALVANIZED
SHEET METAL BACKER PLATE
WIND CLIPS
AT EACH
CORNER
GALVANIZED
PLATE
/8
GASKETED FASTENERS
CONTINUOUS STRIPS
OF SELF-ADHERING
UNDERLAYMENT
GENERAL NOTE:
VERIFY DIAMETER AND HEIGHT OF PIPE ABOVE ROOF WITH EQUIPMENT AND ADJACENT ROOF REQUIREMENTS.
B-B-A1-101
TERMINATION BAR
B-B-A1-101
METAL STUD AND SHEATHING KNEE WALL
ROOF DECK
ROOF ASSEMBLY; TIE-IN TO
EXISTING ROOF ASSEMBLY
PER MANUFACTURE'S
REQUIREMENTS FOR
APPROPRIATE WATER-TIGHT
OVERLAP
PREFABRICATED
STAINLESS STEEL
COVER
DOUBLE BAND OF
SILICONE EACH SIDE
SHEET METAL FASTENER
B-T-A1-101B-B-A1-101
37 38
F
E
Project No:
1203 Main Street, Suite 4 Cincinnati, OH 45202
O: 513.409.2338 www.kpff.com
Consulting
EngineersO W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a ti o n s c o m p u te r fi le s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w it h o u t lim it a ti o n th e c o p y ri g h t th e re to
THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"
SCALE:
DATE:
PROJECT NUMBER:
DRAWN BY: CHECKED BY:
WWW.KLHENGRS.COM
MECHANICAL/ELECTRICAL ENGINEERS
LEXINGTON, KENTUCKY
LOUISVILLE, KENTUCKY
COLUMBUS, OHIO
1538 ALEXANDRIA PIKE, SUITE 11
FT. THOMAS, KENTUCKY 41075
800-354-9783 859-442-8050
859-442-8058 FAX
KOHRS LONNEMANN HEIL ENGINEERS, INC.
2400430
P R
O J E
C T
A D
D R
E S
S
P R
O J E
C T
T
IT
L E
/1
/2
:5
:5
P
M A u to d e s k D o c s /C
V G
R e h a b a n d
E ff ic ie n c y P ro g ra m /A
R C
H -G re s h a m
S m it h
-T e rm in a l_
R
.r v t
As indicated
ARCHITECTURAL -
CONCOURSE B ROOF PLANS &
DETAILS
B-B-A1-101
KLH PROJECT # 26944
04/18/2025
26944.00
MH DH
C V
G I
N D
U S
T R
IA
L
R E
H A
B
IL
IT
A
T
IO
N A
N D
E F
F
IC
IE
N
C Y
P R
O G
R A
M
B O
IL
E
R R
E P
L A
C E
M E
N T
P R
O J E
C T
T e rm in a l D r H e b ro n
K Y
0' 12'8'4'2'3/16" = 1'-0"
BOILER FLUE CONCOURSE B NEW CONSTRUCTION ROOF PLAN
NOT TO SCALE
ROOF PENETRATION COVER PLAN
0' 6" 1 1/2'1'1 1/2" = 1'-0"
EXHAUST DETAIL
Keynote Legend
Key Value Keynote Text
125 EXISTING EXPANSION LOOPS.
126 EXISTING ROOF PENETRATION.
VERIFY EXTENTS IN FIELD.
127 DEMOLISH EXISTING ROOFING AS
REQUIRED; SEE DETAIL THIS SHEET.
VERIFY EXTENTS OF DEMOLITION IN
FIELD.
225 PENETRATION COVERING; SEE
DETAIL THIS SHEET.
226 NEW EXHAUST FLUES THROUGH
EXISTING OPENING IN ROOF SLAB.
0' 12'8'4'2'3/16" = 1'-0"
BOILER FLUE CONCOURSE B DEMOLITION PLAN
REVISIONS
# DATE DESCRIPTION
D 04/18/25 ISSUE FOR BID
I
S
EAN M. BOGAR
T
R
EG STER
DNO.
COMMONWEALTH
OFK
N U C K
RC H T CT
Y
I E
E T
A E bogarts
GENERAL NOTES (DEMOLITION): GENERAL NOTES (NEW):
GENERAL ABBREVIATIONS
MECHANICAL SYMBOLS
CONTROL SYMBOL LEGEND
BALANCING VALVE
A=AUTOMATIC M=MANUAL CALIBRATED
CIRCUIT SENSOR (VENTURI)
GATE VALUE
BUTTERFLY VALVE
GLOBE VALVE
BALL VALVE
CHECK VALVE
GAS COCK
TEMPERATURE REGULATING VALVE
PRESSUR RELIEF VALVE
RELEIF VALVE
STRAINER
3-WAY VALVE
VALVE AND END CAP
UNION
FLANGED CONNECTION
REDUCER
ELBOW UP
PIPE TEE DOWN
ELBOW DOWN
INSERTION TYPE FLOW METER
STRAP-ON TYPE FLOW METER
PRESSURE TEMPERATURE
TEST STATION (PTTS)
THERMOMETER
MANUAL AIR VENT (A=AUTOMATIC)
WATER FLOW TRANSMITTER
SUPPLY DIFFUSER
RETURN DIFFUSER
EXHAUST DIFFUSER
PLENUM SLOT DIFFUSER
DUCT TAP LEFT
DUCT TAP RIGHT
AIR FLOW DIRECTION
OPPOSED BLADE DAMPER
PARALLEL BLADE DAMPER
FIRE DAMPER (HORIZONTAL OR VERTICAL)
SMOKE DAMPER (HORIZONTAL OR VERTICAL)
COMBINATION SMOKE FIRE DAMPER
TEMPERATURE TRANSMITTER
BALANCED BACKDRAFT DAMPER
AUTOMATIC AIR DAMPER
MANUAL DAMPER
THERMOSTAT OR TEMPERATURE SENSOR
STATIC PRESSURE TRANSMITTER
POINT OF CONNECTION
POINT OF REMOVAL
DUCT SMOKE DETECTOR
HUMIDITY TRANSMITTER
CARBON MONOXIDE SENSOR
CARBON DIOXIDE SENSOR
FLEXIBLE CONNECTION
FLEXIBLE CONNECTION
SQUARE ELBOW WITH TURNING VAINS
DUCT RISE IN DIRECTION OF AIR FLOW
DUCT DROP IN DIRECTION OF AIR FLOW
RECTANGULAR DUCT TO ROUND DUCT TRANSITION
SUPPLY AIR (RECTANGULAR DUCT)
R=RETURN, E=EXHAUST, OA=OUTSIDE AIR
SUPPLY AIR (ROUND DUCT)
R=RETURN, E=EXHAUST, OA=OUTSIDE AIR
AIR DEVICE TYPE - DEVICE WIDTH (IN) - NECK SIZE (IN)
CFM INDICATED
CD=LAY-IN CEILING DIFFUSER, PD=PERFORATED DIFFUSER,
LD=LINEAR DIFFUSER, RD=ROUND DIFFUSER, RG=RETURN GRILLE
DUCT TURN DOWN
DUCT TURN UP
INTERNALLY LINED DUCTWORK
(DIMENSIONS INDICATED ARE OUTSIDE
SHEET METAL DIMENSIONS)
MANUFACTURED DOUBLE WALL DUCTWORK
(DIMENSIONS INDICATED ARE INSIDE
SHEET METAL DIMENSIONS)
ANALOG INPUT SIGNAL
ANALOG OUTPUT SIGNAL
DIGITAL INPUT SIGNAL
DIGITAL OUTPUT SIGNAL
END SWITCH
DIFFERENTIAL PRESSURE TRANSMITTER
STATIC PRESSURE TRANSMITTER
LOW TEMPERATURE SWITCH
AIR FLOW TRANSMITTER
END SWITCH
NORMALLY OPEN
NORMALLY CLOSED
TEMPERATURE TRANSMITTER
ROOM TEMPERATURE SENSOR
RELATIVE HUMIDITY SENSOR
CARBON DIOXIDE SENSOR
DIFFERENTIAL PRESSURE SWITCH
HUMIDITY TRANSMITTER
DUCT MOUNTED SMOKE DETECTOR
CURRENT TRANSFORMER SWITCH
MECHANICAL LEGEND (not all may apply)
BBD
AAD
EQUIP. #
POC
POR
S
EQUIP. #
EQUIP. #
EQUIP. #
H
S
CO
CO2
S-12X8
S-12
CD-24-10
100 CFM
CTS
SD
HT
DPS
S
H
T
TT
LTS
AFT
ES
NO
NC
SPT
DPT
ES
DO
DI
AO
AI
CO2
FM
FM TT
C
S
F
M
P
T
DN
UP
A. UNLESS OTHERWISE NOTED, ALL DUCTWORK AND PIPING SHOWN DARK IS NEW.
B. ALL WORK SHALL BE INSTALLED PER THE STATE BUILDING CODE, STATE
MECHANICAL CODE AND ALL LOCAL APPLICABLE CODES.
C. VERIFY CONDITIONS IN THE FIELD PRIOR TO BID AND CONSTRUCTION.
D. WHERE CONFLICTS EXIST AMONG DRAWINGS, SPECIFICATIONS AND EQUIPMENT
SCHEDULES, THE MORE STRINGENT SHALL APPLY.
E. REFER TO DRAWINGS B-T-M3-501, AND B-T-M3-601 FOR MECHANICAL DETAILS,
DIAGRAMS AND SCHEDULES.
F. CONTRACTOR SHALL CAREFULLY COORDINATE DUCTWORK AND PIPING
PATHWAY / LOCATIONS WITH OTHER TRADES AND EXISTING CONDITIONS. ALL
DUCTWORK AND PIPING SHALL BE INSTALLED AS TIGHT TO THE STRUCTURE AS
POSSIBLE. CONNECTIONS TO THE SUPPLY AIR DEVICES MAY BE MADE WITH
FLEXIBLE DUCTWORK. ALL CONDITIONS SHALL BE FIELD VERIFIED BEFORE
ORDERING EQUIPMENT OR FABRICATED MATERIAL.
G. CONTRACTOR SHALL PROVIDE ALL ROOF OR WALL NON-COMBUSTIBLE FRAMING
AS REQUIRED TO INSTALL EQUIPMENT, DUCTWORK, AND PIPING. COORDINATE
NEW WORK WITH OTHER TRADES PRIOR TO BEGINNING CONSTRUCTION. NO
WORK IS TO BE INSTALLED OR FABRICATED UNTIL AFTER THE PROJECT
COORDINATION HAS BEEN APPROVED BY THE OWNER'S REPRESENTATIVE.
H. INSTALL A MANUAL BALANCE DAMPER IN ALL BRANCH DUCTS, INCLUDING ALL
SUPPLY, RETURN, AND EXHAUST GRILLES.
I. INSTALL A SHUT-OFF VALVE IN ALL PIPING BRANCHES.
J. ALL SQUARE THROATED ELBOWS SHALL HAVE AIRFOIL TURNING VANES AND
SHALL ONLY BE USED WHEN RADIUS ELBOWS WILL NOT FIT.
K. ALL ROUND BRANCH DUCT CONNECTIONS SHALL BE MADE WITH BELLMOUTH
FITTINGS OR ANGLED TEES. STRAIGHT SPIN-IN TAP COLLARS SHALL NOT BE
ACCEPTABLE.
L. ALL DAMPERS, VALVES, AND CONTROL COMPONENTS THAT ARE LOCATED ABOVE
CEILINGS SHALL BE INSTALLED WHERE COMPLETELY ACCESSIBLE. CONTRACTOR
SHALL PROVIDE ACCESS PANELS AS REQUIRED.
M. ALL NEW VARIABLE AIR VOLUME TERMINAL UNITS ARE TO BE INSTALLED WHERE
COMPONENTS ARE COMPLETELY ACCESSIBLE. CONTRACTOR SHALL
COORDINATE TO PROVIDE THE VAV UNIT WITH A CONTROL ENCLOSURE AND PIPE
CONNECTIONS ON THE MOST ACCESSIBLE SIDE OF THE UNIT. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR PROVIDING THE CORRECT LEFT OR RIGHT HAND
CONFIGURATION.
N. DUCTWORK CONNECTION TO DIFFUSER / VAV TO BE THE SAME SIZE AS THE
NECK SIZE UNLESS OTHERWISE NOTED.
O. UNLESS OTHERWISE NOTED, ALL DUCTWORK SHALL BE FABRICATED FROM
GALVANIZED STEEL METAL, INSTALLED IN ACCORDANCE WITH SMACNA DUCT
CONSTRUCTION STANDARDS FOR GAUGE, REINFORCEMENT, AND SUPPORT; 2"
W.G. PRESSURE CLASS FOR ALL DUCTWORK, UNLESS NOTED OTHERWISE. ALL
JOINTS AND SEAMS SHALL BE SEALED AND FASTENED AND MADE AIRTIGHT IN
ACCORDANCE OF CHAPTER 13 OF THE STATE BUILDING CODE.
P. CONTRACTOR SHALL TAKE OVERALL CFM MEASUREMENTS ON ALL EXISTING
DUCTWORK TO REMAIN PRIOR TO COMMENCING ANY WORK. INFORMATION
GATHERED SHALL BE UTILIZED FOR REBALANCING SYSTEM. CONTRACTOR SHALL
REBALANCE ALL SYSTEMS AT THE CONCLUSION OF THE PROJECT.
Q. UL LISTED FIRESTOPPING SHALL BE USED AT ANY PENETRATION THROUGH A
FIRE RATED ASSEMBLY. REFER TO ARCHITECTURAL CONSTRUCTION
DOCUMENTS FOR LOCATIONS OR RATED ASSEMBLIES. CONTRACTOR SHALL USE
UL LISTED FIRESTOP SYSTEM METHODS FOR "THROUGH-PENETRATION
ASSEMBLIES." TYPICAL OF ALL FIRE RATED WALLS.
R. DUCTWORK AND PIPING SHALL BE SUPPORTED INDEPENDENT OF CEILING,
CONDUIT, OTHER DUCTWORK, OTHER PIPING,ETC.
S. IN AREAS WHERE CEILINGS ARE NOT BEING REPLACED, AND CONTRACTOR HAS
WORK ABOVE CEILINGS, CONTRACTOR SHALL PATCH AND REPAIR CEILINGS TO
MATCH EXISTING.
T. CONTRACTOR SHALL COORDINATE ALL REQUIRED WALL PENETRATIONS FOR
DUCT OR PIPING WITH GENERAL CONTRACTOR PRIOR TO CONSTRUCTION OF
NEW WALLS. ALL DUCT PENETRATIONS SHALL BE IN COMPLIANCE WITH THE
PROJECT SPECIFICATIONS. CONTRACTOR SHALL PERFORM ALL CUTTING AND
PATCHING REQUIRED FOR DUCT PENETRATIONS THROUGH WALLS.
U. CONTRACTOR SHALL COORDINATE ALL REQUIRED ROOF OPENINGS FOR
DUCTWORK WITH THE GENERAL CONTRACTOR.
V. CONTRACTOR SHALL PROVIDE ALL ADDITIONAL STEEL FRAMING AS REQUIRED TO
INSTALL ROOF MOUNTED EQUIPMENT CURBS.
W. CONTRACTOR SHALL INSTALL ALL EQUIPMENT, DUCTWORK, PIPING, VALVES,
INSULATION, SUPPORTS ETC. AS INDICATED OR AS REQUIRED TO ALLOW
OPERATION AND USE OF ALL AREAS AND ALL SYSTEMS REQUIRED FOR
OCCUPIED USE DURING CONSTRUCTION.
X. CONTRACTOR TO VERIFY EXISTING DUCTWORK / PIPING SUPPLY AND RETURN
SYSTEM, SIZE, AND TYPE PRIOR TO MAKING CONNECTIONS.
A. UNLESS OTHERWISE NOTED, ALL DUCTWORK AND PIPING SHOWN DASHED AND
DARK IS TO BE REMOVED.
B. CONTRACTOR TO COORDINATE DEMOLITION WITH OTHER TRADES BEFORE
BEGINNING WORK.
C. REFER TO B-T-M1-001 OR GENERAL NOTES AND ABBREVIATIONS.
D. CONTRACTOR SHALL TAKE OVERALL CFM MEASUREMENTS ON ALL EXISTING TO
REMAIN EQUIPMENT PRIOR TO COMMENCING ANY DEMOLITION WORK.
INFORMATION GATHERED SHALL BE UTILIZED FOR RE-BALANCING SYSTEM.
CONTRACTOR SHALL RE-BALANCE ALL SYSTEMS AT THE CONCLUSION OF THE
PROJECT.
E. THIS CONTRACTOR SHALL PATCH AND REPAIR ALL HOLES, DAMAGE OR
MODIFICATIONS LEFT BY REMOVAL OF DUCTWORK AND REPAIR WALLS,
FLOORS, CEILINGS, ETC. TO MATCH EXISTING. ALL PATCHING AND FINISHING
SHALL BE PERFORMED BY A QUALIFIED TRADESPERSONS. ALL DEMOLITION
WORK AND INSTALLATION SHALL BE COORDINATED WITH OWNER PRIOR TO
STARTING.
F. ALL REMOVED EQUIPMENT IN WORKING ORDER SHALL BE REVIEWED BY THE
OWNER'S REPRESENTATIVE. IF OWNER'S REPRESENTATIVE WISHES TO RETAIN
THE EQUIPMENT, CONTRACTOR REMOVING EQUIPMENT SHALL DELIVER
EQUIPMENT TO LOCATION AS DIRECTED BY THE OWNER'S REPRESENTATIVE. IF
THE OWNER'S REPRESENTATIVE WISHES THE EQUIPMENT TO BE DISPOSED OF,
THE CONTRACTOR REMOVING THE EQUIPMENT SHALL DISPOSE OF EQUIPMENT
WITH NO ADDITIONAL COST TO THE OWNER.
S
AAD AUTOMATIC AIR DAMPER
AAV AUTOMATIC AIR VENT
AB AIR BLENDER
AC-* AIR CONDITIONING UNIT
ACC AIR COOLED CONDENSER
ACCU AIR COOLED CONDENSING UNIT
AD ACCESS DOOR
ADD'L ADDITIONAL
ADJ ADJUSTABLE
AF AFTER FILTER
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
ALUM ALUMINUM
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
AUTO AUTOMATIC
AVG AVERAGE
BAS BUILDING AUTOMATION SYSTEM
BBD BALANCED BACKDRAFT DAMPER
BE BOTTOM ELEVATION
BF BUTTERFLY
BFP BACKFLOW PREVENTER
BLDG BUILDING
BLR BOILER
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BOT BOTTOM
BP BOOSTER PUMP
BTU BRITISH THERMAL UNIT
BTUH BTU'S PER HOUR
BV BALL VALVE
CA COMPRESSED AIR
CAF COMBUSTION AIR FAN
CCW COUNTER CLOCKWISE
CD CEILING DIFFUSER
CFM CUBIC FEET PER MINUTE
CHV CHECK VALVE
CH CHILLER
CHWP CHILLED WATER PUMP
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
COL COLUMN
CONN CONNECTION
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CU FT CUBIC FEET
CU IN CUBIC INCH
CW CITY WATER
CWP CONDENSING WATER PUMP
CWS CONDENSING WATER SUPPLY
CWR CONDENSING WATER RETURN
DB DRY BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROL
DET DETAIL
DIA DIAMETER
DN DOWN
DPR DAMPER
DPT DEW POINT TEMPERATURE
DR DRAIN
DTS DUAL TEMPERATURE SUPPLY
DTR DUAL TEMPERATURE RETURN
DWG DRAWING
EA EACH / EXHAUST AIR
EAH EXHAUST AIR HOOD
EAL EXHAUST AIR LOUVER
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
EG EXHAUST GRILLE
EL ELEVATION
ELEC ELECTRIC/ELECTRICAL
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ER EXHAUST REGISTER
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMPERATURE
EXCL EXCLUDING
EXIST EXISTING
EXP EXPANSION
°F DEGREE FAHRENHEIT
FD FLAT DRAIN
FF FINISHED FLOOR
FH FIRE HYDRANT
FL FLOOR
FOB FLAT ON BOTTOM
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOT FLAT ON TOP
FPC FIRE PROTECTION CONTRACTOR
FPM FEET PER MINUTE
FPVAV FAN POWERED VAV
FS FLOOR SINK
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HEX HEAT EXCHANGER
HORIZ HORIZONTAL
HR HOUR
HT HEAT TRACE
HVAC HEATING, VENTILATING AND AIR CONDITIONING
HWP HOT WATER PUMP
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER
IA INSTRUMENT AIR
IE INVERT ELEVATION
IN INCH
INV INVERT
KEC KITCHEN EQUIPMENT CONTRACTOR
KH KITCHEN HOOD
KV KITCHEN VENT
LAT LEAVING AIR TEMPERATURE
LB POUND
LD LINEAR DIFFUSER
LWT LEAVING WATER TEMPERATURE
MAT'L MATERIAL
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH BTU'S PER HOUR, THOUSAND
MC MECHANICAL CONTRACTOR
MCW MECHANICAL CITY WATER
MECH MECHANICAL
MFG/MFGR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MSW MECHANICAL SOFT WATER
NA NOT APPLICABLE
NC NORMALLY CLOSED/NOISE CRITERIA
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
OA OUTSIDE AIR
OAH OUTSIDE AIR HOOD
OAL OUTSIDE AIR LOUVER
OC ON CENTER
OC OCCUPANCY SENSOR
OPG OPENING
OS&Y OUTSIDE SCREW AND YOKE
OZ OUNCE
PC PLUMBING CONTRACTOR
PCHWP PRIMARY CHILLED WATER PUMP
PERIM PERIMETER
PF PRE FILTER
PH PHASE
PHWP PRIMARY HOT WATER PUMP
PI PRESSURE INDICATOR
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PS PRESSURE SWITCH
PSD PLENUM SLOT DIFFUSER
PSI POUND PER SQUARE INCH
PSIA POUND PER SQUARE INCH ABSOLUTE
PSIG POUND PER SQUARE INCH GAUGE
PVC POLYVINYL CHLORIDE
RCP RECIRCULATION PUMP
REF REFERENCE
REQ'D REQUIRED
REV REVISE(D)
RG RETURN GRILLE
RH RELATIVE HUMIDITY/ROOF
RV RELIEF VENT
RM ROOM
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
SA SUPPLY AIR
SCHED SCHEDULE
SCHWP SECONDARY CHILLED WATER PUMP
SD SUCTION DIFFUSER
SECT SECTION
SG SUPPLY GRILLE
SHWP SECONDARY HOT WATER PUMP
SHT SHEET
SL SOUND LINING
SM SURFACE MOUNT
SPEC SPECIFICATIONS
SPT STATIC PRESSURE TRANSMITTER
SQ SQUARE
SQ FT/SF SQUARE FOOT (FEET)
SQ IN SQUARE INCHES
SR SUPPLY REGISTER
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STRUCT STRUCTURAL
TCC TEMPERATURE CONTROL CONTRACTOR
TCV TEMPERATURE CONTROL VALVE
TE TOP ELEVATION
TI TEMPERATURE INDICATOR
TMV THERMOSTATIC MIXING VALVE
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TXV THERMAL EXPANSION VALVE
TYP TYPICAL
TW TEMPERED WATER
UG UNDERGROUND
UH UNIT HEATER
UON UNLESS OTHERWISE NOTED
UNO UNLESS NOTED OTHERWISE
VAC VACUUM
VA VALVE
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
W/ WITH
W/O WITHOUT
WB WET BULB TEMPERATURE
WG WATER GAUGE
WP WEATHER PROOF
XP EXPLOSION PROOF
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSING WATER SUPPLY
CONDENSING WATER RETURN
HOT WATER SUPPLY
HOT WATER RETURN
DRAIN
REFRIGERANT HOT GAS
REFRIGERANT LIQUID
REFRIGERANT SUCTION
NEW DUCT OR PIPING
EXISTING DUCT OR PIPING
EXISTING DUCT OR PIPING TO BE REMOVED
RS
RL
RHG
DR
HWS
CWR
CWS
CHWR
CHWS
HWR
DUAL TEMPERATURE SUPPLY
DUAL TEMPERATURE RETURN
DTS
DTR
Project No:
1203 Main Street, Suite 4 Cincinnati, OH 45202
O: 513.409.2338 www.kpff.com
Consulting
EngineersO W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"
SCALE:
DATE:
PROJECT NUMBER:
DRAWN BY: CHECKED BY:
WWW.KLHENGRS.COM
MECHANICAL/ELECTRICAL ENGINEERS
LEXINGTON, KENTUCKY
LOUISVILLE, KENTUCKY
COLUMBUS, OHIO
1538 ALEXANDRIA PIKE, SUITE 11
FT. THOMAS, KENTUCKY 41075
800-354-9783 859-442-8050
859-442-8058 FAX
KOHRS LONNEMANN HEIL ENGINEERS, INC.
P R
O J E
C T
A D
D R
E S
S
P R
O J E
C T
T
IT
L E
2400430
/1
/2
:4
:0
P
M A u to d e s k D o c s /C
V G
R e h a b a n d E ff ic ie n c y P ro g ra m
/M E
C H
-K L
H -C
V G
R
.r v t
12" = 1'-0"
MECHANICAL TERMINAL
COVER SHEET
C V
G I
N D
U S
T R
IA
L
R E
H A
B
IL
IT
A
T
IO
N A
N D
E F
F
IC
IE
N
C Y
P R
O G
R A
M
B O
IL
E
R R
E P
L A
C E
M E
N T
P R
O J E
C T
T e rm in a l D r H e b ro n
K Y
B-T-M1-001
KLH PROJECT # 26944
04/18/25
26944.00
AB BG
REVISIONS
# DATE DESCRIPTION
D 04/18/25 ISSUE FOR BID
GENERAL NOTES (DEMOLITION): GENERAL NOTES (NEW):
GENERAL ABBREVIATIONS
MECHANICAL SYMBOLS
CONTROL SYMBOL LEGEND
BALANCING VALVE
A=AUTOMATIC M=MANUAL CALIBRATED
CIRCUIT SENSOR (VENTURI)
GATE VALUE
BUTTERFLY VALVE
GLOBE VALVE
BALL VALVE
CHECK VALVE
GAS COCK
TEMPERATURE REGULATING VALVE
PRESSUR RELIEF VALVE
RELEIF VALVE
STRAINER
3-WAY VALVE
VALVE AND END CAP
UNION
FLANGED CONNECTION
REDUCER
ELBOW UP
PIPE TEE DOWN
ELBOW DOWN
INSERTION TYPE FLOW METER
STRAP-ON TYPE FLOW METER
PRESSURE TEMPERATURE
TEST STATION (PTTS)
THERMOMETER
MANUAL AIR VENT (A=AUTOMATIC)
WATER FLOW TRANSMITTER
SUPPLY DIFFUSER
RETURN DIFFUSER
EXHAUST DIFFUSER
PLENUM SLOT DIFFUSER
DUCT TAP LEFT
DUCT TAP RIGHT
AIR FLOW DIRECTION
OPPOSED BLADE DAMPER
PARALLEL BLADE DAMPER
FIRE DAMPER (HORIZONTAL OR VERTICAL)
SMOKE DAMPER (HORIZONTAL OR VERTICAL)
COMBINATION SMOKE FIRE DAMPER
TEMPERATURE TRANSMITTER
BALANCED BACKDRAFT DAMPER
AUTOMATIC AIR DAMPER
MANUAL DAMPER
THERMOSTAT OR TEMPERATURE SENSOR
STATIC PRESSURE TRANSMITTER
POINT OF CONNECTION
POINT OF REMOVAL
DUCT SMOKE DETECTOR
HUMIDITY TRANSMITTER
CARBON MONOXIDE SENSOR
CARBON DIOXIDE SENSOR
FLEXIBLE CONNECTION
FLEXIBLE CONNECTION
SQUARE ELBOW WITH TURNING VAINS
DUCT RISE IN DIRECTION OF AIR FLOW
DUCT DROP IN DIRECTION OF AIR FLOW
RECTANGULAR DUCT TO ROUND DUCT TRANSITION
SUPPLY AIR (RECTANGULAR DUCT)
R=RETURN, E=EXHAUST, OA=OUTSIDE AIR
SUPPLY AIR (ROUND DUCT)
R=RETURN, E=EXHAUST, OA=OUTSIDE AIR
AIR DEVICE TYPE - DEVICE WIDTH (IN) - NECK SIZE (IN)
CFM INDICATED
CD=LAY-IN CEILING DIFFUSER, PD=PERFORATED DIFFUSER,
LD=LINEAR DIFFUSER, RD=ROUND DIFFUSER, RG=RETURN GRILLE
DUCT TURN DOWN
DUCT TURN UP
INTERNALLY LINED DUCTWORK
(DIMENSIONS INDICATED ARE OUTSIDE
SHEET METAL DIMENSIONS)
MANUFACTURED DOUBLE WALL DUCTWORK
(DIMENSIONS INDICATED ARE INSIDE
SHEET METAL DIMENSIONS)
ANALOG INPUT SIGNAL
ANALOG OUTPUT SIGNAL
DIGITAL INPUT SIGNAL
DIGITAL OUTPUT SIGNAL
END SWITCH
DIFFERENTIAL PRESSURE TRANSMITTER
STATIC PRESSURE TRANSMITTER
LOW TEMPERATURE SWITCH
AIR FLOW TRANSMITTER
END SWITCH
NORMALLY OPEN
NORMALLY CLOSED
TEMPERATURE TRANSMITTER
ROOM TEMPERATURE SENSOR
RELATIVE HUMIDITY SENSOR
CARBON DIOXIDE SENSOR
DIFFERENTIAL PRESSURE SWITCH
HUMIDITY TRANSMITTER
DUCT MOUNTED SMOKE DETECTOR
CURRENT TRANSFORMER SWITCH
MECHANICAL LEGEND (not all may apply)
BBD
AAD
EQUIP. #
POC
POR
S
EQUIP. #
EQUIP. #
EQUIP. #
H
S
CO
CO2
S-12X8
S-12
CD-24-10
100 CFM
CTS
SD
HT
DPS
S
H
T
TT
LTS
AFT
ES
NO
NC
SPT
DPT
ES
DO
DI
AO
AI
CO2
FM
FM TT
C
S
F
M
P
T
DN
UP
A. UNLESS OTHERWISE NOTED, ALL DUCTWORK AND PIPING SHOWN DARK IS NEW.
B. ALL WORK SHALL BE INSTALLED PER THE STATE BUILDING CODE, STATE
MECHANICAL CODE AND ALL LOCAL APPLICABLE CODES.
C. VERIFY CONDITIONS IN THE FIELD PRIOR TO BID AND CONSTRUCTION.
D. WHERE CONFLICTS EXIST AMONG DRAWINGS, SPECIFICATIONS AND EQUIPMENT
SCHEDULES, THE MORE STRINGENT SHALL APPLY.
E. REFER TO DRAWINGS B-T-M3-501, AND B-T-M3-601 FOR MECHANICAL DETAILS,
DIAGRAMS AND SCHEDULES.
F. CONTRACTOR SHALL CAREFULLY COORDINATE DUCTWORK AND PIPING
PATHWAY / LOCATIONS WITH OTHER TRADES AND EXISTING CONDITIONS. ALL
DUCTWORK AND PIPING SHALL BE INSTALLED AS TIGHT TO THE STRUCTURE AS
POSSIBLE. CONNECTIONS TO THE SUPPLY AIR DEVICES MAY BE MADE WITH
FLEXIBLE DUCTWORK. ALL CONDITIONS SHALL BE FIELD VERIFIED BEFORE
ORDERING EQUIPMENT OR FABRICATED MATERIAL.
G. CONTRACTOR SHALL PROVIDE ALL ROOF OR WALL NON-COMBUSTIBLE FRAMING
AS REQUIRED TO INSTALL EQUIPMENT, DUCTWORK, AND PIPING. COORDINATE
NEW WORK WITH OTHER TRADES PRIOR TO BEGINNING CONSTRUCTION. NO
WORK IS TO BE INSTALLED OR FABRICATED UNTIL AFTER THE PROJECT
COORDINATION HAS BEEN APPROVED BY THE OWNER'S REPRESENTATIVE.
H. INSTALL A MANUAL BALANCE DAMPER IN ALL BRANCH DUCTS, INCLUDING ALL
SUPPLY, RETURN, AND EXHAUST GRILLES.
I. INSTALL A SHUT-OFF VALVE IN ALL PIPING BRANCHES.
J. ALL SQUARE THROATED ELBOWS SHALL HAVE AIRFOIL TURNING VANES AND
SHALL ONLY BE USED WHEN RADIUS ELBOWS WILL NOT FIT.
K. ALL ROUND BRANCH DUCT CONNECTIONS SHALL BE MADE WITH BELLMOUTH
FITTINGS OR ANGLED TEES. STRAIGHT SPIN-IN TAP COLLARS SHALL NOT BE
ACCEPTABLE.
L. ALL DAMPERS, VALVES, AND CONTROL COMPONENTS THAT ARE LOCATED ABOVE
CEILINGS SHALL BE INSTALLED WHERE COMPLETELY ACCESSIBLE. CONTRACTOR
SHALL PROVIDE ACCESS PANELS AS REQUIRED.
M. ALL NEW VARIABLE AIR VOLUME TERMINAL UNITS ARE TO BE INSTALLED WHERE
COMPONENTS ARE COMPLETELY ACCESSIBLE. CONTRACTOR SHALL
COORDINATE TO PROVIDE THE VAV UNIT WITH A CONTROL ENCLOSURE AND PIPE
CONNECTIONS ON THE MOST ACCESSIBLE SIDE OF THE UNIT. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR PROVIDING THE CORRECT LEFT OR RIGHT HAND
CONFIGURATION.
N. DUCTWORK CONNECTION TO DIFFUSER / VAV TO BE THE SAME SIZE AS THE
NECK SIZE UNLESS OTHERWISE NOTED.
O. UNLESS OTHERWISE NOTED, ALL DUCTWORK SHALL BE FABRICATED FROM
GALVANIZED STEEL METAL, INSTALLED IN ACCORDANCE WITH SMACNA DUCT
CONSTRUCTION STANDARDS FOR GAUGE, REINFORCEMENT, AND SUPPORT; 2"
W.G. PRESSURE CLASS FOR ALL DUCTWORK, UNLESS NOTED OTHERWISE. ALL
JOINTS AND SEAMS SHALL BE SEALED AND FASTENED AND MADE AIRTIGHT IN
ACCORDANCE OF CHAPTER 13 OF THE STATE BUILDING CODE.
P. CONTRACTOR SHALL TAKE OVERALL CFM MEASUREMENTS ON ALL EXISTING
DUCTWORK TO REMAIN PRIOR TO COMMENCING ANY WORK. INFORMATION
GATHERED SHALL BE UTILIZED FOR REBALANCING SYSTEM. CONTRACTOR SHALL
REBALANCE ALL SYSTEMS AT THE CONCLUSION OF THE PROJECT.
Q. UL LISTED FIRESTOPPING SHALL BE USED AT ANY PENETRATION THROUGH A
FIRE RATED ASSEMBLY. REFER TO ARCHITECTURAL CONSTRUCTION
DOCUMENTS FOR LOCATIONS OR RATED ASSEMBLIES. CONTRACTOR SHALL USE
UL LISTED FIRESTOP SYSTEM METHODS FOR "THROUGH-PENETRATION
ASSEMBLIES." TYPICAL OF ALL FIRE RATED WALLS.
R. DUCTWORK AND PIPING SHALL BE SUPPORTED INDEPENDENT OF CEILING,
CONDUIT, OTHER DUCTWORK, OTHER PIPING,ETC.
S. IN AREAS WHERE CEILINGS ARE NOT BEING REPLACED, AND CONTRACTOR HAS
WORK ABOVE CEILINGS, CONTRACTOR SHALL PATCH AND REPAIR CEILINGS TO
MATCH EXISTING.
T. CONTRACTOR SHALL COORDINATE ALL REQUIRED WALL PENETRATIONS FOR
DUCT OR PIPING WITH GENERAL CONTRACTOR PRIOR TO CONSTRUCTION OF
NEW WALLS. ALL DUCT PENETRATIONS SHALL BE IN COMPLIANCE WITH THE
PROJECT SPECIFICATIONS. CONTRACTOR SHALL PERFORM ALL CUTTING AND
PATCHING REQUIRED FOR DUCT PENETRATIONS THROUGH WALLS.
U. CONTRACTOR SHALL COORDINATE ALL REQUIRED ROOF OPENINGS FOR
DUCTWORK WITH THE GENERAL CONTRACTOR.
V. CONTRACTOR SHALL PROVIDE ALL ADDITIONAL STEEL FRAMING AS REQUIRED TO
INSTALL ROOF MOUNTED EQUIPMENT CURBS.
W. CONTRACTOR SHALL INSTALL ALL EQUIPMENT, DUCTWORK, PIPING, VALVES,
INSULATION, SUPPORTS ETC. AS INDICATED OR AS REQUIRED TO ALLOW
OPERATION AND USE OF ALL AREAS AND ALL SYSTEMS REQUIRED FOR
OCCUPIED USE DURING CONSTRUCTION.
X. CONTRACTOR TO VERIFY EXISTING DUCTWORK / PIPING SUPPLY AND RETURN
SYSTEM, SIZE, AND TYPE PRIOR TO MAKING CONNECTIONS.
A. UNLESS OTHERWISE NOTED, ALL DUCTWORK AND PIPING SHOWN DASHED AND
DARK IS TO BE REMOVED.
B. CONTRACTOR TO COORDINATE DEMOLITION WITH OTHER TRADES BEFORE
BEGINNING WORK.
C. REFER TO B-T-M1-001 OR GENERAL NOTES AND ABBREVIATIONS.
D. CONTRACTOR SHALL TAKE OVERALL CFM MEASUREMENTS ON ALL EXISTING TO
REMAIN EQUIPMENT PRIOR TO COMMENCING ANY DEMOLITION WORK.
INFORMATION GATHERED SHALL BE UTILIZED FOR RE-BALANCING SYSTEM.
CONTRACTOR SHALL RE-BALANCE ALL SYSTEMS AT THE CONCLUSION OF THE
PROJECT.
E. THIS CONTRACTOR SHALL PATCH AND REPAIR ALL HOLES, DAMAGE OR
MODIFICATIONS LEFT BY REMOVAL OF DUCTWORK AND REPAIR WALLS,
FLOORS, CEILINGS, ETC. TO MATCH EXISTING. ALL PATCHING AND FINISHING
SHALL BE PERFORMED BY A QUALIFIED TRADESPERSONS. ALL DEMOLITION
WORK AND INSTALLATION SHALL BE COORDINATED WITH OWNER PRIOR TO
STARTING.
F. ALL REMOVED EQUIPMENT IN WORKING ORDER SHALL BE REVIEWED BY THE
OWNER'S REPRESENTATIVE. IF OWNER'S REPRESENTATIVE WISHES TO RETAIN
THE EQUIPMENT, CONTRACTOR REMOVING EQUIPMENT SHALL DELIVER
EQUIPMENT TO LOCATION AS DIRECTED BY THE OWNER'S REPRESENTATIVE. IF
THE OWNER'S REPRESENTATIVE WISHES THE EQUIPMENT TO BE DISPOSED OF,
THE CONTRACTOR REMOVING THE EQUIPMENT SHALL DISPOSE OF EQUIPMENT
WITH NO ADDITIONAL COST TO THE OWNER.
S
AAD AUTOMATIC AIR DAMPER
AAV AUTOMATIC AIR VENT
AB AIR BLENDER
AC-* AIR CONDITIONING UNIT
ACC AIR COOLED CONDENSER
ACCU AIR COOLED CONDENSING UNIT
AD ACCESS DOOR
ADD'L ADDITIONAL
ADJ ADJUSTABLE
AF AFTER FILTER
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
ALUM ALUMINUM
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
AUTO AUTOMATIC
AVG AVERAGE
BAS BUILDING AUTOMATION SYSTEM
BBD BALANCED BACKDRAFT DAMPER
BE BOTTOM ELEVATION
BF BUTTERFLY
BFP BACKFLOW PREVENTER
BLDG BUILDING
BLR BOILER
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BOT BOTTOM
BP BOOSTER PUMP
BTU BRITISH THERMAL UNIT
BTUH BTU'S PER HOUR
BV BALL VALVE
CA COMPRESSED AIR
CAF COMBUSTION AIR FAN
CCW COUNTER CLOCKWISE
CD CEILING DIFFUSER
CFM CUBIC FEET PER MINUTE
CHV CHECK VALVE
CH CHILLER
CHWP CHILLED WATER PUMP
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
COL COLUMN
CONN CONNECTION
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CU FT CUBIC FEET
CU IN CUBIC INCH
CW CITY WATER
CWP CONDENSING WATER PUMP
CWS CONDENSING WATER SUPPLY
CWR CONDENSING WATER RETURN
DB DRY BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROL
DET DETAIL
DIA DIAMETER
DN DOWN
DPR DAMPER
DPT DEW POINT TEMPERATURE
DR DRAIN
DTS DUAL TEMPERATURE SUPPLY
DTR DUAL TEMPERATURE RETURN
DWG DRAWING
EA EACH / EXHAUST AIR
EAH EXHAUST AIR HOOD
EAL EXHAUST AIR LOUVER
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
EG EXHAUST GRILLE
EL ELEVATION
ELEC ELECTRIC/ELECTRICAL
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ER EXHAUST REGISTER
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMPERATURE
EXCL EXCLUDING
EXIST EXISTING
EXP EXPANSION
°F DEGREE FAHRENHEIT
FD FLAT DRAIN
FF FINISHED FLOOR
FH FIRE HYDRANT
FL FLOOR
FOB FLAT ON BOTTOM
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOT FLAT ON TOP
FPC FIRE PROTECTION CONTRACTOR
FPM FEET PER MINUTE
FPVAV FAN POWERED VAV
FS FLOOR SINK
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HEX HEAT EXCHANGER
HORIZ HORIZONTAL
HR HOUR
HT HEAT TRACE
HVAC HEATING, VENTILATING AND AIR CONDITIONING
HWP HOT WATER PUMP
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER
IA INSTRUMENT AIR
IE INVERT ELEVATION
IN INCH
INV INVERT
KEC KITCHEN EQUIPMENT CONTRACTOR
KH KITCHEN HOOD
KV KITCHEN VENT
LAT LEAVING AIR TEMPERATURE
LB POUND
LD LINEAR DIFFUSER
LWT LEAVING WATER TEMPERATURE
MAT'L MATERIAL
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH BTU'S PER HOUR, THOUSAND
MC MECHANICAL CONTRACTOR
MCW MECHANICAL CITY WATER
MECH MECHANICAL
MFG/MFGR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MSW MECHANICAL SOFT WATER
NA NOT APPLICABLE
NC NORMALLY CLOSED/NOISE CRITERIA
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
OA OUTSIDE AIR
OAH OUTSIDE AIR HOOD
OAL OUTSIDE AIR LOUVER
OC ON CENTER
OC OCCUPANCY SENSOR
OPG OPENING
OS&Y OUTSIDE SCREW AND YOKE
OZ OUNCE
PC PLUMBING CONTRACTOR
PCHWP PRIMARY CHILLED WATER PUMP
PERIM PERIMETER
PF PRE FILTER
PH PHASE
PHWP PRIMARY HOT WATER PUMP
PI PRESSURE INDICATOR
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PS PRESSURE SWITCH
PSD PLENUM SLOT DIFFUSER
PSI POUND PER SQUARE INCH
PSIA POUND PER SQUARE INCH ABSOLUTE
PSIG POUND PER SQUARE INCH GAUGE
PVC POLYVINYL CHLORIDE
RCP RECIRCULATION PUMP
REF REFERENCE
REQ'D REQUIRED
REV REVISE(D)
RG RETURN GRILLE
RH RELATIVE HUMIDITY/ROOF
RV RELIEF VENT
RM ROOM
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
SA SUPPLY AIR
SCHED SCHEDULE
SCHWP SECONDARY CHILLED WATER PUMP
SD SUCTION DIFFUSER
SECT SECTION
SG SUPPLY GRILLE
SHWP SECONDARY HOT WATER PUMP
SHT SHEET
SL SOUND LINING
SM SURFACE MOUNT
SPEC SPECIFICATIONS
SPT STATIC PRESSURE TRANSMITTER
SQ SQUARE
SQ FT/SF SQUARE FOOT (FEET)
SQ IN SQUARE INCHES
SR SUPPLY REGISTER
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STRUCT STRUCTURAL
TCC TEMPERATURE CONTROL CONTRACTOR
TCV TEMPERATURE CONTROL VALVE
TE TOP ELEVATION
TI TEMPERATURE INDICATOR
TMV THERMOSTATIC MIXING VALVE
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TXV THERMAL EXPANSION VALVE
TYP TYPICAL
TW TEMPERED WATER
UG UNDERGROUND
UH UNIT HEATER
UON UNLESS OTHERWISE NOTED
UNO UNLESS NOTED OTHERWISE
VAC VACUUM
VA VALVE
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
W/ WITH
W/O WITHOUT
WB WET BULB TEMPERATURE
WG WATER GAUGE
WP WEATHER PROOF
XP EXPLOSION PROOF
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSING WATER SUPPLY
CONDENSING WATER RETURN
HOT WATER SUPPLY
HOT WATER RETURN
DRAIN
REFRIGERANT HOT GAS
REFRIGERANT LIQUID
REFRIGERANT SUCTION
NEW DUCT OR PIPING
EXISTING DUCT OR PIPING
EXISTING DUCT OR PIPING TO BE REMOVED
RS
RL
RHG
DR
HWS
CWR
CWS
CHWR
CHWS
HWR
DUAL TEMPERATURE SUPPLY
DUAL TEMPERATURE RETURN
DTS
DTR
Project No:
1203 Main Street, Suite 4 Cincinnati, OH 45202
O: 513.409.2338 www.kpff.com
Consulting
EngineersO W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"
SCALE:
DATE:
PROJECT NUMBER:
DRAWN BY: CHECKED BY:
WWW.KLHENGRS.COM
MECHANICAL/ELECTRICAL ENGINEERS
LEXINGTON, KENTUCKY
LOUISVILLE, KENTUCKY
COLUMBUS, OHIO
1538 ALEXANDRIA PIKE, SUITE 11
FT. THOMAS, KENTUCKY 41075
800-354-9783 859-442-8050
859-442-8058 FAX
KOHRS LONNEMANN HEIL ENGINEERS, INC.
P R
O J E
C T
A D
D R
E S
S
P R
O J E
C T
T
IT
L E
2400430
/1
/2
:4
:0
P
M A u to d e s k D o c s /C
V G
R e h a b a n d E ff ic ie n c y P ro g ra m
/M E
C H
-K L
H -C
V G
R
.r v t
12" = 1'-0"
MECHANICAL TERMINAL
COVER SHEET
C V
G I
N D
U S
T R
IA
L
R E
H A
B
IL
IT
A
T
IO
N A
N D
E F
F
IC
IE
N
C Y
P R
O G
R A
M
B O
IL
E
R R
E P
L A
C E
M E
N T
P R
O J E
C T
T e rm in a l D r H e b ro n
K Y
B-T-M1-001
KLH PROJECT # 26944
04/18/25
26944.00
AB BG
REVISIONS
UP
10 11 12 13
H
J
K
L
DEMO.B-TD-1
DEMO.B-TD-2
DEMO.B-TD-3
DEMO.BP-TD-6
DEMO.BP-TD-5
EX. 8" HWS
EX. 6" HWS
EX. 6" HWS
EX. 6" HWS
EX. 6" HWS
EX. 8" HWS
EX. 8" HWR
EX. 6" HWR
EX. 6" HWS
EX. 6" HWS
EX. 8" HWS
EX. 6" HWS
EX. 8" HWS
EX. 8" HWR
EX. 8" HWS
EX. 8" HWR
EX. 6" HWR
EX. 6" HWRMD1
MD1
MD1
MD2
MD2 MD3
MD3
MD3
MD3
30"ø EA
24"ø EA
36"ø EA
42"ø EA
20"ø EA
20"ø EA
20"ø EA
22"ø EA
EX. FD
EX. FD
EXIST FD
EX. FD
EXIST FD
EXIST FD
EX. FD
EX. FD
EX. FD
MD5MD5
MD6 MD7
EX. 1" NG
EX. 1" NG
EX. 1" NG
EX. 6" NG
EX. 1" NG
EX. 3" NG
EX. 3" NG
EX. 1" NG
EX. 1" NG
EX. 3" NG
EX. 8" HWS
EX. 1" NG
EX. 1" NG
EX. 1" NG
EX. 6" NG
EX. 3" CW
EX. 1" NG
EX. 1" NG
EX. 1" NG
MD5
MD3
MD3
EX. 1" NG
EX. 1" NG
MD3
EX. 1" NG
EX. 1" NG
EX. 1" NG
EX. 2" HWSEX. 2" HWR
EX. 1 1/2" HWS
EX. 1 1/2" HWR
EX. 1 1/2" HWR
EX. 1 1/2" HWS
EX. SIDE-STREAM FILTER
BY WATER TREATMENT
CONTRACTOR
MD9
MD10
1/4" = 1'-0"
MECHANICAL DEMOLITION PLAN - TERMINAL - BASEMENT LEVEL - B-T3-01_02_03
Project No:
1203 Main Street, Suite 4 Cincinnati, OH 45202
O: 513.409.2338 www.kpff.com
Consulting
EngineersO W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E
A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"
SCALE:
DATE:
PROJECT NUMBER:
DRAWN BY: CHECKED BY:
WWW.KLHENGRS.COM
MECHANICAL/ELECTRICAL ENGINEERS
LEXINGTON, KENTUCKY
LOUISVILLE, KENTUCKY
COLUMBUS, OHIO
1538 ALEXANDRIA PIKE, SUITE 11
FT. THOMAS, KENTUCKY 41075
800-354-9783 859-442-8050
859-442-8058 FAX
KOHRS LONNEMANN HEIL ENGINEERS, INC.
P R
O J E
C T
A D
D R
E S
S
P R
O J E
C T
T
IT
L E
2400430
/1
/2
:4
:4
P
M A u to d e s k D o c s /C
V G
R e h a b a n d E ff ic ie n c y P ro g ra m
/M E
C H
-K L
H -C
V G
R
.r v t
1/4" = 1'-0"
MECHANICAL DEMOLITION
TERMINAL - BASEMENT LEVEL
PLAN
C V
G I
N D
U S
T R
IA
L
R E
H A
B
IL
IT
A
T
IO
N A
N D
E F
F
IC
IE
N
C Y
P R
O G
R A
M
B O
IL
E
R R
E P
L A
C E
M E
N T
P R
O J E
C T
T e rm in a l D r H e b ro n
K Y
B-T-M1-100
KLH PROJECT # 26944
04/18/25
26944.00
AB BG
N
KEYED NOTES
MD1 DEMOLISH EXISTING BOILERS, PADS, AND ASSOCIATED VFD's.
MD2 DEMOLISH EXISTING HOT WATER PUMPS, PADS AND VFD's.
MD3 DEMOLISH EXISTING PIPING CONNECTED TO PUMPS AND BOILERS BACK
TO POINT OF CONNECTIONS.
MD5 REPLACE EXISTING MOTORIZED DAMPERS HIGH AND LOW ON LOUVERED
WALL IN EACH POSITION.
MD6 PNEUMATIC LINES CONNECTED TO OLD BOILER CONTROLS TO BE
CAPPED.
MD7 EXISTING AIR COMPRESSOR TO REMAIN.
MD9 EXISTING PUMP VFD's TO BE DEMOLISHED.
MD10 MAINTAIN PATH THROUGH EXISTING LOUVER FOR CHILLER ROOM.
REVISIONS
# DATE DESCRIPTION
D 04/18/25 ISSUE FOR BID
UP
10 11 12 13
H
J
K
L
DEMO.B-TD-1
DEMO.B-TD-2
DEMO.B-TD-3
DEMO.BP-TD-6
DEMO.BP-TD-5
EX. 8" HWS
EX. 6" HWS
EX. 6" HWS
EX. 6" HWS
EX. 6" HWS
EX. 8" HWS
EX. 8" HWR
EX. 6" HWR
EX. 6" HWS
EX. 6" HWS
EX. 8" HWS
EX. 6" HWS
EX. 8" HWS
EX. 8" HWR
EX. 8" HWS
EX. 8" HWR
EX. 6" HWR
EX. 6" HWRMD1
MD1
MD1
MD2
MD2 MD3
MD3
MD3
MD3
30"ø EA
24"ø EA
36"ø EA
42"ø EA
20"ø EA
20"ø EA
20"ø EA
22"ø EA
EX. FD
EX. FD
EXIST FD
EX. FD
EXIST FD
EXIST FD
EX. FD
EX. FD
EX. FD
MD5MD5
MD6 MD7
EX. 1" NG
EX. 1" NG
EX. 1" NG
EX. 6" NG
EX. 1" NG
EX. 3" NG
EX. 3" NG
EX. 1" NG
EX. 1" NG
EX. 3" NG
EX. 8" HWS
EX. 1" NG
EX. 1" NG
EX. 1" NG
EX. 6" NG
EX. 3" CW
EX. 1" NG
EX. 1" NG
EX. 1" NG
MD5
MD3
MD3
EX. 1" NG
EX. 1" NG
MD3
EX. 1" NG
EX. 1" NG
EX. 1" NG
EX. 2" HWSEX. 2" HWR
EX. 1 1/2" HWS
EX. 1 1/2" HWR
EX. 1 1/2" HWR
EX. 1 1/2" HWS
EX. SIDE-STREAM FILTER
BY WATER TREATMENT
CONTRACTOR
MD9
MD10
1/4" = 1'-0"
MECHANICAL DEMOLITION PLAN - TERMINAL - BASEMENT LEVEL - B-T3-01_02_03
Project No:
1203 Main Street, Suite 4 Cincinnati, OH 45202
O: 513.409.2338 www.kpff.com
Consulting
EngineersO W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E
A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d r ig h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
THIS DRAWING IS INTENDED TO BE PRINTED AT 30"X42"
SCALE:
DATE:
PROJECT NUMBER:
DRAWN BY: CHECKED BY:
WWW.KLHENGRS.COM
MECHANICAL/ELECTRICAL ENGINEERS
LEXINGTON, KENTUCKY
LOUISVILLE, KENTUCKY
COLUMBUS, OHIO
1538 ALEXANDRIA PIKE, SUITE 11
FT. THOMAS, KENTUCKY 41075
800-354-9783 859-442-8050
859-442-8058 FAX
KOHRS LONNEMANN HEIL ENGINEERS, INC.
P R
O J E
C T
A D
D R
E S
S
P R
O J E
C T
T
IT
L E
2400430
/1
/2
:4
:5
P
M A u to d e s k D o c s /C
V G
R e h a b a n d E ff ic ie n c y P ro g ra m
/M E
C H
-K L
H -C
V G
R
.r v t
1/4" = 1'-0"
MECHANICAL DEMOLITION
TERMINAL - BASEMENT LEVEL
PLAN
C V
G I
N D
U S
T R
IA
L
R E
H A
B
IL
IT
A
T
IO
N A
N D
E F
F
IC
IE
N
C Y
P R
O G
R A
M
B O
IL
E
R R
E P
L A
C E
M E
N T
P R
O J E
C T
T e rm in a l D r H e b ro n
K Y
B-T-M1-100
KLH PROJECT # 26944
04/18/25
26944.00
AB BG
N
KEYED NOTES
MD1 DEMOLISH EXISTING BOILERS, PADS, AND ASSOCIATED VFD's.
MD2 DEMOLISH EXISTING HOT WATER PUMPS, PADS AND VFD's.
MD3 DEMOLISH EXISTING PIPING CONNECTED TO PUMPS AND BOILERS BACK
TO POINT OF CONNECTIONS.
MD5 REPLACE EXISTING MOTORIZED DAMPERS HIGH AND LOW ON LOUVERED
WALL IN EACH POSITION.
MD6 PNEUMATIC LINES CONNECTED TO OLD BOILER CONTROLS TO BE
CAPPED.
MD7 EXISTING AIR COMPRESSOR TO REMAIN.
MD9 EXISTING PUMP VFD's TO BE DEMOLISHED.
MD10 MAINTAIN PATH THROUGH EXISTING LOUVER FOR CHILLER ROOM.
REVISIONS
UP
10 11 12 13
H
J
K
L
EX. 8" HWR
EX. 8" HWS
EX. 8" HWR
EX. 8" HWS
M2M2 M2 M2
M6
NEW HOT WATER
EXPANSION TANKS
B-TD-4
M1
BP-TD-5
BP-TD-6
BP-TD-7
M3
M3
M3
EXIST FD
EXIST FD
EXIST FD
8" HWS
8" HWS
8" HWS
8" HWS8" HWS
8" HWS
8" HWS
8" HWS
6" HWS
6" HWS
6" HWS
6" HWS
6" HWS
6" HWS
8" HWR
AS-TD-1
EXIST FD
EXIST FD
EXIST FD
EXIST FD
EXIST FD
8" HWS
8" HWS
B-TD-3
B-TD-2
B-TD-1
EXIST FD
M1
M1
M1
6" HWR
6" HWR
6" HWR
6" HWR
6" HWS
6" HWS
6" HWS
6" HWS
8" HWR
8" HWR
8" HWR
EX. 1" NG
EX. 1" NG
EX. 1" NG
1" NG
1" NG
1" NG
1" NG
1" NG
1" NG
6" NG
1" NG
1" NG
1" NG
1" NG
6" NG
8" HWS
3" CW
EX. 3" CW
M4
EX. 1" NG
M5
1" NG
EX. 1 1/2" HWR
EX. 1 1/2" HWS
EX. 1 1/2" HWR
EX. 1 1/2" HWS
2" HWR 2" HWS
M13
3" NG
3" NG
3" NG
3" NG
VFD-BP-TD-7
VFD-BP-TD-6
VFD-BP-TD-5
M14
M15
M10 3/4" CD
1 1/2" CW
M18
M19
T-TD-1
T-TD-2
22"ø EA UP
22"ø EA UP
1/4" = 1'-0"
MECHANICAL PLAN - TERMINAL - BASEMENT LEVEL - B-T3-01_02_03
Project No:
1203 Main Street, Suite 4 Cincinnati, OH 45202
O: 513.409.2338 www.kpff.com
Consulting
EngineersO W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E
A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .