About this file
This is a Bid Pack #3A design document issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration, Design and Construction Division, dated April 13, 2018, for fencing and gate work at the Brooks facility (Contract Order No. 37180, Consultant Job No. 17297.00). The document establishes specifications and technical requirements for chain link fencing installations, including both modifications to existing interior and exterior fencing and new fencing installations. The project requires hot-dipped galvanized steel fabric, rails, posts, and gates with 2-inch diamond mesh construction throughout. Key specifications include knuckled top and bottom fencing, weld cupped joints for gate frames, and the addition of detainer hook razor ribbon with 12-inch loop spacing at multiple fence locations. The contractor must provide shop drawings for all fencing components and conduct field measurements of existing posts prior to frame construction in the shop. All welds must be clean, uniform, continuous, and free of rust, with grinding and cleaning required prior to galvanized finish application.
The document represents a 50% review set of construction specifications with detailed site plans indicating existing spools, grading locations, and specific fence sections numbered 1 through 5, with measurements and approach specifications noted throughout. No pricing terms, bidding deadlines, award dates, set-asides, or contract duration information is contained within this technical specification document. The file serves as a technical reference guide for contractors preparing bids on the fencing work component of the larger Brooks facility project and does not include procurement timeline or financial details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A-000
JKB
JFS
file no.
checked by drawn by consultant issue date index no.
contract order no.
37180 consultant job no.
17297.00 sheet title
472/17405.SMD
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
R O
B
ER
T C
. H A
LL
, R
A , N
C A
R B
, D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
50% REVIEW SET 03/19/2018
BID PACK #3A 04/13/2018
C-100
JKB
JFS
N file no.
checked by drawn by consultant issue date index no.
contract order no.
37180 consultant job no.
17297.00 sheet title
472/17405.SMD
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
R O
B
ER
T C
. H A
LL
, R
A , N
C A
R B
, D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
FENCING AND GATES NOTES
1. ALL FABRIC, RAILS, POSTS, GATES AND FITTINGS SHALL BE HOT-DIPPED GALVANIZED
STEEL WITH ZINC COATING, UNLESS NOTED OTHERWISE. ALL FABRIC SHALL BE 2"
DIAMOND MESH.
2. ALL CHAIN LINK FENCE, GATE AND COMPONENTS SHALL HAVE GALVANIZED FINISH.
3. ALL FENCING TO BE KNUCKLED TOP AND BOTTOM.
4. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR ALL FENCING.
5. ALL FRAMES SHALL BE CONSTRUCTED IN SHOP. CONTRACTOR SHALL FIELD-MEASURE
POSTS PRIOR TO CONSTRUCTION.
6. ALL GATE FRAMES SHALL BE CONSTRUCTED WITH WELD CUPPED JOINTS (FISH MOUTH).
7. ALL WELDS SHALL BE CLEAN, UNIFORM, CONTINUOUS AND FREE OF RUST. GRIND
WELDS SMOOTH AND CLEAN PRIOR TO APPLICATION OF GALVANIZED FINISH.
GRADE
EXISTING INTERIOR
"A" FENCE
EXISTING EXTERIOR
"B" FENCE
EXISTING SPOOLS,
TYP
16'-0" x x x x x x x x x x x x x
11'-6" x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
EXISTING SPOOLS,
TYP
x x x x x x x x x x x x x x x x x x x x x x x x x x
EXISTING SPOOLS,
TYP
x x x x x x x x x x x x x x x x x x x x x x x x x x
11'-6" x x x x x x x x x x x x x
ADD DETAINER HOOK
RAZOR RIBBON w/ 12"
LOOP SPACING 36
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
ADD DETAINER HOOK
RAZOR RIBBON w/ 12"
LOOP SPACING
ADD INSTABARRIER
RAZOR RIBBON w/ 12"
LOOP SPACING
APPROACH
6'-4"
GATOR
x x x x x x x x x x x x xGRADE
EXISTING
INTERIOR
FENCE
x x x x x x x x x x x x x x x x x x x x x x x x x x
DETAINER HOOK
RAZOR RIBBON w/ 12"
LOOP SPACING
x x x x x x x x x x x x x
GRADE
EXISTING
INTERIOR
FENCE
x x x x x x x x x x x x x x x x x x x x x x x x x x
DETAINER HOOK
RAZOR RIBBON w/ 12"
LOOP SPACING
x x x x x x x x x x x x x
DETAINER HOOK
RAZOR RIBBON w/ 12"
LOOP SPACING
x x x x x x x x x x x x x
GRADE
EXISTING
INTERIOR
FENCE
DETAINER HOOK
RAZOR RIBBON w/ 12"
LOOP SPACING
x x x x x x x x x x x x x
DETAINER HOOK
RAZOR RIBBON w/ 12"
LOOP SPACING
x x x x x x x x x x x x x x x x x x x x x x x x x x
NEW 31" DETAINER
HOOK RAZOR RIBBON
@ 12" OC
x x x x x x x x x x x
EXISTING BUILDING
x x x x x x x x x x x x x
EXISTING SPOOLS
x
C-200
JKB
JFS
file no.
checked by drawn by consultant issue date index no.
contract order no.
37180 consultant job no.
17297.00 sheet title
472/17405.SMD
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
R O
B
ER
T C
. H A
LL
, R
A , N
C A
R B
, D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
File details come from the government source that posted it. Updated .