20180413_Bellamy_BidPack 3A.pdf
PDF 2 MB Posted
- Solicitation number
- RFQ 171 180000000556 2
- Issued by
- Macomb County, Michigan
About this file
This is a Bid Pack document from the State of Michigan Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division, dated April 13, 2018, for the Bellamy project (Contract Order No. 62240, Consultant Job No. 17299.00). The document is a 50% review set issued on March 19, 2018, containing design and construction specifications for fencing and gate work. The project requires the contractor to provide shop drawings for all fencing components, including chain link fence fabrication with hot-dipped galvanized steel construction, 2-inch diamond mesh fabric, and knuckled top and bottom specifications. The work includes installation of new detainer hook razor ribbon with 12-inch loop spacing on multiple grade sections, removal and reinstallation of cameras with brackets, and concrete footing work utilizing 18-inch diameter piers with 6 inches of depth and MDOT 23A crushed limestone base preparation. All welds must be clean, uniform, continuous, and free of rust, with grinding and smoothing prior to galvanized finish application.
The specifications detail multiple existing fence grades that require modification and enhancement with razor ribbon barriers. The contractor must field-measure existing posts prior to construction and fabricate all gate frames with weld cupped joints (fish mouth connections). The document provides technical drawings at various scales noting existing building structures, existing spools, and grade elevations ranging from Grade 1 through Grade 4, with detailed measurements and material specifications for each section. Pricing terms, award dates, contract duration, and other administrative details are not contained within this technical specifications document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A-000
JKB
JFS
file no.
checked by drawn by consultant issue date index no.
contract order no.
62240 consultant job no.
17299.00 sheet title
472/17406.SMD
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
R O
B
ER
T C
. H A
LL
, R
A , N
C A
R B
, D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
50% REVIEW SET 03/19/2018
BID PACK #3A 04/13/2018
file no.
checked by drawn by consultant issue date index no.
contract order no.
62240 consultant job no.
17299.00 sheet title
472/17406.SMD
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
R O
B
ER
T C
. H A
LL
, R
A , N
C A
R B
, D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
50% REVIEW SET 03/19/2018
BID PACK #3A 04/13/2018
C-100
JKB
JFS
N file no.
checked by drawn by consultant issue date index no.
contract order no.
62240 consultant job no.
17299.00 sheet title
472/17406.SMD
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
R O
B
ER
T C
. H A
LL
, R
A , N
C A
R B
, D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
50% REVIEW SET 03/19/2018
BID PACK #3A 04/13/2018
C-101
JKB
JFS
N
FENCING AND GATES NOTES
1. ALL FABRIC, RAILS, POSTS, GATES AND FITTINGS SHALL BE HOT-DIPPED GALVANIZED
STEEL WITH ZINC COATING, UNLESS NOTED OTHERWISE. ALL FABRIC SHALL BE 2"
DIAMOND MESH.
2. ALL CHAIN LINK FENCE, GATE AND COMPONENTS SHALL HAVE GALVANIZED FINISH.
3. ALL FENCING TO BE KNUCKLED TOP AND BOTTOM.
4. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR ALL FENCING.
5. ALL FRAMES SHALL BE CONSTRUCTED IN SHOP. CONTRACTOR SHALL FIELD-MEASURE
POSTS PRIOR TO CONSTRUCTION.
6. ALL GATE FRAMES SHALL BE CONSTRUCTED WITH WELD CUPPED JOINTS (FISH MOUTH).
7. ALL WELDS SHALL BE CLEAN, UNIFORM, CONTINUOUS AND FREE OF RUST. GRIND
WELDS SMOOTH AND CLEAN PRIOR TO APPLICATION OF GALVANIZED FINISH.
GRADE
EXISTING INTERIOR
STUN FENCE
EXISTING EXTERIOR
"B" FENCE
EXISTING SPOOLS,
TYP
16'-0" x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
EXISTING SPOOLS,
TYP
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
ADD DETAINER HOOK
RAZOR RIBBON w/ 12"
LOOP SPACING
ADD INSTABARRIER
RAZOR RIBBON w/ 12"
LOOP SPACING
APPROACH
REMOVE CAMERAS
AND BRACKET TO
MOUNT CAMERAS.
SEE C100 FOR
LOCATIONS
CUT OFF AND CAP
EXISTING POST
GRADE
EXISTING SPOOLS,
TYP
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
ADD DETAINER HOOK
RAZOR RIBBON w/ 12"
LOOP SPACING 36
GRADE
EXISTING SPOOLS,
TYP
x x x x x x x x x x x x x x x x x x x x x x x x x x
ADD DETAINER HOOK
RAZOR RIBBON w/ 12"
LOOP SPACING 36
x x x x x x x x x x x x xADD DETAINER HOOK RAZOR RIBBON w/ 12"
LOOP SPACING
GRADE
EXISTING SPOOLS,
TYP
x x x x x x x x x x x x x x x x x x x x x x x x x x
ADD DETAINER HOOK
RAZOR RIBBON w/ 12"
LOOP SPACING
x x x x x x x x x x x x x
10'-6"
1'-0"
4'-0"
SCALE: N.T.S.
6" OF SOIL
WIRE TIES TO CONNECT
5/6" STEEL ROD TO PIER,
TYP.
CONCRETE FOOTING
TYP., 18" DIA.
6" DEEP MDOT 23A
CRUSHED LIMESTONE
5'-0"
7'-2"
GATOR
NEW 31" DETAINER
HOOK RAZOR RIBBON
@ 12" OC
x x x x x x x x x x x x x
EXISTING BUILDING
x x x x x x x x x x x x x
EXISTING SPOOLS
x x x x x x x x x x x x x
NEW 31" DETAINER
HOOK RAZOR RIBBON
@ 12" OC
EXISTING STUN
FENCE
C-200
JKB
JFS
file no.
checked by drawn by consultant issue date index no.
contract order no.
62240 consultant job no.
17299.00 sheet title
472/17406.SMD
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
R O
B
ER
T C
. H A
LL
, R
A , N
C A
R B
, D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
50% REVIEW SET 03/19/2018
BID PACK #3A 04/13/2018
File details come from the government source that posted it. Updated .