About this file
This document is a comprehensive project manual for the St. Louis Public Schools (SLPS) covering renovations and additions to the Central Visual and Performing Arts (CVPA) High School and Collegiate School of Medicine and Bioscience (CSMB) located at 3125 S Kingshighway Boulevard in St. Louis, Missouri. The project involves multiple phases of construction, including secure vestibule additions at the north and south entrances, parking lot renovations, and interior improvements. Key project milestones include a pre-bid meeting on July 7, 2025, with substantial completion of the North Vestibule scheduled for August 31, 2026, and South Vestibule and interior renovations targeted for July 30, 2027. The project includes several bid alternates such as renovating gymnasium locker rooms, restrooms, counseling offices, and creating an exterior courtyard.
The project is funded through the St. Louis Public Schools and has a comprehensive bidding process with specific requirements for contractors. The base bid includes an unforeseen conditions allowance of $1,500,000 and a landscape allowance of $30,000. Contractors must provide payment and performance bonds, submit detailed construction schedules, and comply with prevailing wage rates according to Missouri Division of Labor Standards Annual Wage Order Number 31. The bid documents outline strict requirements for background checks, safety protocols, dust control, utility coordination, and maintenance of site access and operations during construction. Contractors are required to provide comprehensive documentation, including daily logs, photographic documentation, and close-out materials, with an emphasis on minimizing disruption to school operations.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manual
27 June 2025
Saint Louis Public Schools 801 North 11th Street Saint Louis, Missouri
63101
Central VPA High School and Collegiate High School 3125 S Kingshighway Blvd Saint Louis, MO 63139
Central VPA and Collegiate High School Additions and Renovations
CCA Project No: 234003
3001 Locust Street, Second Floor Saint Louis, Missouri 63101 T: 314.421.3542 www.cordoganclark.com
CVPA + CSMB HIGH SCHOOL ADDITIONS / RENOVATIONS #234003
SEALS 000107 - 1
SECTION 000107 - SEALS
1.1 Professional Seals
A. Architect – Expires 11/30/24
B. Structural Engineer
C. MEP Engineer jmckinney Snapshot jmckinney Snapshot jmckinney Snapshot
SEALS 000107 - 2
END OF DOCUMENT 000107
Text Box D. Civil Engineer
TABLE OF CONTENTS 000110 - 1
DOCUMENT 000110 – TABLE OF CONTENTS
Division ............. Section Title ....................................................................................................................... Pages
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
000107 ............. SEALS
000110 ............. TABLE OF CONTENTS
000115 ............. LIST OF DRAWING SHEETS
002114 ............. REQUEST FOR CLARIFICATION
......................... REQUEST FOR CLARIFICATION FORM
002513 ............. PREBID MEETINGS
002600 ............. PROCUREMENT SUBSTITUTION PROCEDURES
003113 ............. REQUEST FOR PROPOSAL
003113B ........... AFFADAVIT OF WORK AUTHORIZATION
003113C ........... CERTIFICATION REGARDING ISRAEL
003113D ........... VENDOR POINT OF CONTACT
003119 ............. EXISTING CONDITION INFORMATION
004113 ............. PROPOSAL / BID FORM
004113B ........... SUPPLIMENTAL BID INFORMATION
004113C ........... CHANGE ORDER FEE EXPLANATION
004113D ........... BID SUMMARY FORM
006000 ............. PROJECT FORMS (Bonds, Insurance, Certifications, etc.)
......................... AIA DOCUMENT A101 – 2017
......................... AIA A201 GENERAL CONDITIONS of the Contract ......................... AIA A310 Bid Bond ......................... AIA A312 Payment Bond ......................... AIA A312 Performance Bond
......................... CVPA-CSMB GEOTECHNICAL REPORT
......................... CORDOGAN CLARK ELECTRONIC TRANSFER FORMS
008025 ............. WAGE DETERMINATION SCHEDULE
......................... ST. LOUIS CITY PREVAILING WAGE RATES
DIVISION 01 GENERAL REQUIREMENTS
011000 ............. SCOPE OF WORK
011000B ........... LOGISTICS PLAN
012100 ............. ALLOWANCES
012200 ............. UNIT PRICES
012500 ............. SUBSTITUTION PROCEDURES (post-bid)
012600 ............. CONTRACT MODIFICATION PROCEDURES
012900 ............. PAYMENT PROCEDURES
013100 ............. PROJECT MANAGEMENT AND COORDINATION
013200 ............. CONSTRUCTION PROGRESS DOCUMENTATION
013233 ............. PHOTOGRAPHIC DOCUMENTATION
013300 ............. SUBMITTAL PROCEDURES
014000 ............. QUALITY REQUIREMENTS
014200 ............. REFERENCES
015000 ............. TEMPORARY FACILITIES AND CONTROLS
016000 ............. PRODUCT REQUIREMENTS
017300 ............. EXECUTION
017419 ............. WASTE MANAGEMENT
017700 ............. CLOSEOUT PROCEDURES
017823 ............. OPERATION AND MAINTENANCE DATA
017839 ............. PROJECT RECORD DOCUMENTS
017900 ............. DEMONSTRATION AND TRAINING
TABLE OF CONTENTS 000110 - 2
DIVISION 02 – EXISTING CONDITIONS
024119 ............. SELECTIVE STRUCTURE DEMOLITION
DIVISION 03 CONCRETE
031000FL ......... CONCRETE FORMING AND ACCESSORIES
032000FL ......... CONCRETE REINFORCING
033000FL ......... CAST-IN-PLACE CONCRETE
DIVISION 04 MASONRY
042000 ............. UNIT MASONRY
047200 ............. CAST STONE MASONRY
048500 ............. STONE CLADDING PANELS
DIVISION 05 METALS
051200FL ......... STRUCTURAL STEEL FRAMING
052100FL ......... STEEL JOIST FRAMING
053100FL ......... STEEL DECKING
054000FL ......... COLD-FORMED METAL FRAMING
055000 ............. METAL FABRICATIONS
055113 ............. METAL PAN STAIRS
055213 ............. PIPE AND TUBE RAILINGS
055313 ............. BAR GRATINGS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
060423 ............. PLASTIC LAMINATE FACED ARCHITECTURAL CABINETS
061000 ............. ROUGH CARPENTRY
061600 ............. SHEATHING
066400 ............. PLASTIC PANELING
DIVISION 07 THERMAL AND MOISTURE PROTECTION
071416 ............. COLD FLUID-APPLIED WATERPROOFING
071900 ............. WATER REPELLENT
072100 ............. THERMAL INSULATION
072160 ............. STRUCTURAL THERMAL BREAK
072200 ............. VENTILATED NAILABLE INSULATED PANELS
072726 ............. FLUID-APPLIED MEMBRANE AIR BARRIERS
074213.23 ........ METAL COMPOSITE MATERIAL WALL PANELS
075216 ............. SBS MODIFIED BITUMINOUS MEMBRANE ROOFING
076200 ............. SHEET METAL FLASHING AND TRIM
077100 ............. ROOF SPECIALITIES
077129 ............. MANUFACTURED ROOF EXPANSION JOINTS
077200 ............. ROOF ACCESSORIES
078413 ............. PENETRATION FIRESTOPPING
078446 ............. FIRE-RESISTIVE JOINT SYSTEMS
079200 ............. JOINT SEALANTS
079500 ............. EXPANSION CONTROL
DIVISION 08 OPENINGS
081113 ............. HOLLOW METAL DOORS AND FRAMES
081400 ............. WOOD DOORS
083113 ............. ACCESS DOORS AD FRAMES
083323 ............. OVERHEAD COILING DOORS
083343 ............. OVERHEAD COILING SMOKE CURTAINS FOR ELEVATOR DOORS
083473.13 ........ METAL SOUND CONTROL DOOR ASSEMBLIES
083473.16 ........ WOOD SOUND CONTROL DOOR ASSEMBILES
084113 ............. ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
TABLE OF CONTENTS 000110 - 3
087100 ............. DOOR HARDWARE
………..DOOR HARDWARE INDEX
088000 ............. GLAZING
088300 ............. MIRRORS
DIVISION 09 FINISHES
092216.23 ........ GYPSUM BOARD SHAFT WALL ASSEMBLIES
092216 ............. NON-STRUCTURAL METAL FRAMING
092900 ............. GYPSUM BOARD
093000 ............. TILE
095123 ............. ACOUSTICAL PANEL CEILINGS
095423 ............. SPECIALTY CEILINGS
096263 ............. STAINLESS STEEL WALL BASE
096440 ............. DANCE STUDIO FLOORING
096513 ............. RESILIENT BASE AND ACCESSORIES
096519 ............. RESILIENT TILE FLOORING
096613.1 .......... PATCHING PORTLAND CEMENT TERRAZZO FLOORING
096623 ............. RESINOUS MATRIX TERRAZZO FLOORING
096723 ............. RESINOUS FLOORING
096800 ............. CARPETING
097200 ............. COMMERCIAL WALL COVERING
098300 ............. ACOUSTIC FINISHES
098400 ............. DIRECT-ATTACHED ACOUSTICAL CEILING PANELS
099000 ............. INTERIOR PAINTS & COATINGS
099113 ............. EXTERIOR PAINTING
099300 ............. STAINING AND TRANSPARENT FINISHING
DIVISION 10 .... SPECIALTIES
101100 ............. VISUAL DISPLAY SURFACES
101200 ............. DISPLAY CASES
101419 ………..DIMENSIONAL LETTER SIGNAGE
102113 ............. TOILET COMPARTMENTS
102800 ............. TOILET, BATH, AND LAUNDRY ACCESSORIES
104413 ............. FIRE EXTINGUISHER CABINETS 2-10
104416 ............. FIRE EXTINGUISHERS 2-10
105113 ............. METAL LOCKERS, BENCHES & HOOKS
105129 ............. PHENOLIC LOCKERS
DIVISION 11 EQUIPMENT
113100 ............. RESIDENTIAL APPLIANCES
DIVISION 12 FURNISHINGS
122413 ............. ROLLER WINDOW SHADES
123623.13 ........ PLASTIC LAMINATE CLAD COUNTERTOPS
123661 ............. SIMULATED STONE COUNTERTOPS
DIVISION 13 SPECIAL CONSTRUCTION
NOT USED
DIVISION 14 CONVEYING EQUIPMENT
142123.16 ........ MACHINE ROOM-LESS ELECTRIC TRACTION PASSENGER ELEVATORS
DIVISIONS 15 THRU 20 (RESERVED)
DIVISION 20 BASIC MECHANICAL, PLUMBING, AND FIRE PROTECTION
NOT USED
TABLE OF CONTENTS 000110 - 4
DIVISION 21 FIRE SUPPRESSION
NOT USED
DIVISION 22 PLUMBING
220517 ............. SLEEVES AND SLEEVE SEALS FOR PLUMBING
220518 ............. ESCUTCHEONS FOR PLUMBING PIPING
220523.12 ........ BALL VALVES FOR PLUMBING PIPING
220529 ............. HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
220719 ............. PLUMBING PIPING INSULATION
221116 ............. DOMESTIC WATER PIPING
221119 ............. DOMESTIC WATER PIPING SPECIALTIES
221316 ............. SANITARY WASTE AND VENT PIPING
221414 ............. STORM DRAINAGE PIPING
221429 ............. SUMP PUMPS
223300 ............. ELECTRIC, DOMESTIC WATER HEATERS
224213.13 ........ COMMERCIAL WATER CLOSETS
224213.16 ........ COMMERCIAL URINALS
224216.13 ........ COMMERCIAL LAVATORIES
DIVISION 23 HVAC PIPING AND EQUIPMENT
230513 ............. COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
230529 ............. HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230548 ............. VIBRATION AND SEISMIC CONTROLS FOR HVAC
230553 ............. IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
230593 ............. TESTING, ADJUSTING, AND BALANCING FOR HVAC
230713 ............. DUCT INSULATION
230719 ............. HVAC PIPING INSULATION
230923.11 ........ CONTROL VALVES
231123 ............. FACILITY NATURAL GAS PIPING
232113 ............. HYDRONIC PIPING
233113 ............. METAL DUCTS
233300 ............. AIR DUCT ACCESSORIES
233346 ............. FLEXIBLE DUCTS
233416 ............. CENTRIFUGAL HVAC FANS
233439 ............. HIGH VOLUME, LOW-SPEED FANS
233600 ............. AIR TERMINAL UNITS
233713.23 ........ REGISTERS AND GRILLES
237416.11 ........ PACKAGED, SMALL-CAPACITY, ROOFTOP AIR-CONDITIONING UNITS
238126 ............. SPLIT SYSTEM AIR CONDITIONERS
237433 ............. DEDICATED OUTDOOR AIR UNITS
238239.13 ........ CABINET UNIT HEATERS
238239.16 ........ PROPELLER UNIT HEATERS
238323 ............. RADIENT HEATING ELECTRIC PANELS
DIVISIONS 24 AIR DISTRIBUTION
NOT USED
DIVISION 25 TEMPERATURE CONTROL SYSTEM
NOT USED
DIVISION 26 ELECTRICAL WORK
260519 ............. LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260526 ............. GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260529 ............. HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
260533.13 ........ CONDUITS FOR ELECTRICAL SYSTEMS
TABLE OF CONTENTS 000110 - 5
260533.16 ........ BOXES AND COVERS FOR ELECTRICAL SYSTEMS
260533.23 ........ SURFACE RACEWAYS FOR ELECTRICAL SYSTEMS
260548 ............. VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
262416 ............. PANELBOARDS
262726 ............. WIRING DEVICES
262816 ............. ENCLOSED SWITCHES AND CIRCUIT BREAKERS
265119 ............. LED INTERIOR LIGHTING
265213 ............. EMERGENCY AND EXIT LIGHTING
283111 ............. DIGITAL ADDRESSABLE FIRE ALARM SYSTEM
DIVISION 27 TELECOMMUNICATION WORK
NOT USED
DIVISION 28 SAFETY AND SECURITY
283111 ............. DIGITAL ADDRESSABLE FIRE-ALARM SYSTEM
DIVISIONS 29 AND 30 (RESERVED)
NOT USED
DIVISION 31 – EARTHWORK
311000 ............. SITE CLEARING
312200 ............. GRADING
312316 ............. EXCAVATION
312316.13 ........ TRENCHING
312323 ............. FILL
312500 ............. EROSION AND SEDIMENTATION CONTROLS
313219 ............. LIGHTWEIGHT GEO-SYNTHETIC FILL
314680 ............. GROUND IMPROVEMENT
316223FL ......... COMPOSITE PILES
DIVISION 32 – EXTERIOR IMPROVEMENTS
321120 ............. SUBBASE AND AGGREGATE BASE COURSES
321216 ............. ASHPALT PAVING
321313 ............. CONCRETE PAVING
321623 ............. SIDEWALKS
321710 ............. PARKING BUMPERS AND MANUFACTURED TRAFFIC-CALMING DEVICES
321723 ............. PARKING MARKINGS
323119 ............. DECORATIVE METAL FENCES
323223 ............. SEGMENTAL RETAINING WALL SYSTEM
323300 ............. SITE FURNISHINGS
DIVISION 33 – UTILITIES
330561 ............. CONCRETE MANHOLES
334211 ............. STORMWATER GRAVITY PIPING
334230 ............. STORMWATER DRAINS
DIVISIONS 34 THRU 49 (RESERVED)
END OF DOCUMENT 000110
REQUEST FOR CLARIFICATION 002114 - 1
002114 – REQUEST FOR CLARIFICATIONS
PART 1 - GENERAL
1.1 FORMS
A. Use the following form to request for clarification from the Architect or Engineer unless otherwise indicated in the contract documents
B. Email the attached form to Navigate Building Solutions for processing and response.
END OF DOCUMENT 002114
REQUEST FOR CLARIFICATION NO. (By A/E) (ALL RFC’S to be emailed to
THIS PORTION TO BE COMPLETED BY TRADE CONTRACTOR/BIDDER
Date of Request: Name of Bidder Requesting Clarification:
Phone #: Fax #:
Contact Person:
Proposal Reference (Letter A, B, C, D, or E): Please check one of the following clarification categories:
A. ( ) Information not shown on Contract Documents B. ( ) Interpretation of Contract Requirements C. ( ) Conflict in Contract Requirements D. ( ) Coordination Problems
Please list the appropriate Bid Document reference for this Request for Clarification:
A. Contract Drawing/Detail Number Reference:
B. Contract Specification Section, Page, Item # Reference:
C. Other Reference:
Description of Request for Clarification:
THIS PORTION TO BE COMPLETED BY ARCHITECT/ENGINEER:
Architect’s reply to Request for Clarification:
( ) The above reply will not be included in an Addendum ( ) The above reply will be included in Addendum No. _________
Project:
PREBID MEETINGS 002513 - 1
002513 - PREBID MEETINGS
1.1 PREBID MEETING
A. The owner, Architect and Owner’s Representative will conduct a Prebid meeting as indicated below:
1. Meeting Date: May 5, 2025
2. Meeting Time: 2:00 PM to 4:00 PM
3. Location: SLPS Buildings and Grounds - 3416 Cook Ave, St. Louis, MO 63106, USA
B. Attendance:
1. Prime Bidders: Attendance at Prebid meeting is recommended.
2. Subcontractors: Attendance at Prebid meeting is recommended.
3. Notice: Bids will only be accepted from prime bidders represented on Prebid Meeting sign-in sheet.
C. Bidder Questions: Submit written questions to be addressed at Prebid meeting minimum of two business days prior to meeting.
D. Agenda: Prebid meeting agenda will include review of topics that may affect proper preparation and submittal of bids, including the following:
1. Procurement and Contracting Requirements:
a. Invitation to Bid
b. Instructions to Bidders.
c. Bidder Qualifications.
d. Bonding.
e. Insurance.
f. Bid Security.
g. Bid Form and Attachments.
h. Bid Submittal Requirements.
i. Bid Submittal Checklist.
j. Notice of Award.
2. Communication during Bidding Period:
a. Obtaining documents.
b. Access to Project Web site.
c. Bidder's Requests for Information.
d. Bidder's Substitution Request/Prior Approval Request.
e. Addenda.
3. Contracting Requirements:
a. Agreement.
b. The General Conditions.
c. The Supplementary Conditions.
d. Other Owner requirements.
4. Construction Documents:
PREBID MEETINGS 002513 - 2
a. Scopes of Work.
b. Temporary Facilities.
c. Use of Site.
d. Work Restrictions.
e. Alternates, Allowances, and Unit Prices.
f. Substitutions following award.
5. Separate Contracts:
a. Work by Owner.
b. Work of Other Contracts.
6. Schedule:
a. Project Schedule.
b. Contract Time.
c. Other Bidder Questions.
7. Site/facility visit or walkthrough.
8. Post-Meeting Addendum.
E. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes to attendees and others known by the issuing office to have received a complete set of Procurement and Contracting Documents. Minutes of meeting are issued as Available Information and do not constitute a modification to the Procurement and Contracting Documents. Modifications to the Procurement and Contracting Documents are issued by written Addendum only.
1. Sign-in Sheet: Minutes will include list of meeting attendees.
2. List of Planholders: Minutes will include list of planholders.
END OF DOCUMENT 002513
PROCUREMENT SUBSTITUTION PROCEDURES 002600 - 1
002600 - PROCUREMENT SUBSTITUTION PROCEDURES
1.1 DEFINITIONS
A. Procurement Substitution Requests: Requests for changes in products, materials, equipment, and methods of construction from those indicated in the Procurement and Contracting Documents, submitted prior to receipt of bids.
B. Substitution Requests: Requests for changes in products, materials, equipment, and methods of construction from those indicated in the Contract Documents, submitted following Contract award. See Section 012500 "Substitution Procedures" for conditions under which Substitution requests will be considered following Contract award.
1.2 QUALITY ASSURANCE
A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.
1.3 PROCUREMENT SUBSTITUTIONS
A. Procurement Substitutions, General: By submitting a bid, the Bidder represents that its bid is based on materials and equipment described in the Procurement and Contracting Documents, including Addenda. As a rule, substitutions are not allowed when three or more manufacturers have been specified for each product.
B. Procurement Substitution Requests will be received and considered by Owner when the following conditions are satisfied, as determined by Architect; otherwise requests will be returned without action:
1. Extensive revisions to the Contract Documents are not required.
2. Proposed changes are in keeping with the general intent of the Contract Documents, including the level of quality of the Work represented by the requirements therein.
3. The request is fully documented and properly submitted.
1.4 SUBMITTALS
A. Procurement Substitution Request: Submit to Architect. Procurement Substitution Request must be made in writing by prime contract Bidder only in compliance with the following requirements:
1. Requests for substitution of materials and equipment will be considered if received no later than 5 five days prior to date of bid opening.
2. Submittal Format: Submit Procurement Substitution Request, using format provided on Project Web site.
a. Identify the product or the fabrication or installation method to be replaced in each request. Include related Specifications Sections and drawing numbers.
b. Provide complete documentation on both the product specified and the proposed substitute, including the following information as appropriate:
PROCUREMENT SUBSTITUTION PROCEDURES 002600 - 2
1) Point-by-point comparison of specified and proposed substitute product data, fabrication drawings, and installation procedures.
2) Copies of current, independent third-party test data of salient product or system characteristics.
3) Samples where applicable or when requested by Architect.
4) Detailed comparison of significant qualities of the proposed substitute with those of the Work specified. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.
5) Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated.
6) Research reports, where applicable, evidencing compliance with building code in effect for Project, from ICC-ES.
7) Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by Owner and separate contractors, which will become necessary to accommodate the proposed substitute.
c. Provide certification by manufacturer that the substitute proposed is equal to or superior to that required by the Procurement and Contracting Documents, and that its in-place performance will be equal to or superior to the product or equipment specified in the application indicated.
d. Bidder, in submitting the Procurement Substitution Request, waives the right to additional payment or an extension of Contract Time because of the failure of the substitute to perform as represented in the Procurement Substitution Request.
B. Architect's Action:
1. Architect may request additional information or documentation necessary for evaluation of the Procurement Substitution Request. Architect will notify all bidders of acceptance of the proposed substitute by means of an Addendum to the Procurement and Contracting Documents.
C. Architect's approval of a substitute during bidding does not relieve Contractor of the responsibility to submit required shop drawings and to comply with all other requirements of the Contract Documents.
END OF DOCUMENT 002600
St. Louis Public Schools
REQUEST FOR PROPOSAL (RFP)
RFP #056 -2025
TITLE: St. Louis Public Schools SLPS CVPA & CSMB Entrance & Parking Lots Project
Schedule & Deadlines:
Monday, July 7th, 2025 Pre-Bid Meeting @ 2PM (Meet at 3416 Cook Ave, St. Louis, MO 63106)
Tuesday, July 22nd, 2025 Final Deadline to Submit Questions
Tuesday, July 29th, 2025 Final Addendum Deadline
Wednesday, August 6th, 2025 Deadline to Submit Bid
Thursday August 7th, 2025 Review Bids/Interviews
Tuesday, August 12th, 2025 Board Approval of Contractor
RFP responses must be received no later than “Deadline to Submit Bid”
Wednesday, August 6th, 2025
Square Watson, Chief of Operations Chaz Jaquess, Owner Representative
Phone: 314-698-0022
Email: chaz@navigatebuildingsolutions.com
Submittal Instructions: Print this Packet in its entirety and complete all pages per instructions.
Print the LABEL found in Attachment 1 of this packet and attach to the front of your envelope.
Purpose of Request:
The purpose of this Request for Proposals is to obtain bids for: SLPS CVPA & CSMB Entrance & Parking Lots Project. Please download a set of the specifications and plans using the links below.
Plans and Specifications
Documents will be available by contacting Custom Blueprint:
Custom Blueprint
1632 SOUTH BROADWAY
Saint Louis, MO 63104 Phone: 314-231-4400 customblueprint-supply.com
Alternates
Alternates must be pre-approved by the owner in writing before RFP responses are submitted.
To ask questions and any other pertinent submittal information please submit through the SLPS Bonfire portal.
Questions will be accepted until 12:00 p.m. Tuesday, July 22nd, 2025; question responses will be issued through an addendum through the SLPS BONFIRE by 5:00 p.m. Tuesday, July 29th, 2025.
RFP responses are due in Bonfire no later than 12:00pm on 08/06/2025.
It is the responsibility of the firm to ensure the proposals are received prior to the deadline. Proposals received after the above date and time will not be considered.
AFFIDAVIT OF WORK AUTHORIZATION
The grantee, sub grantee, contractor or subcontractor who meets the section 285.525, RSMo definition of a business entity must complete and return the following Affidavit of Work Authorization.
Comes now___________________________________ (Name of Business Entity Authorized Representative) as_____________________________________________________ (Position/Title) first being duly sworn on my oath, affirm______________________________________(Business Entity Name) is enrolled and will continue to participate in the E-Verify Federal Work Authorization program with respect to employees hired after enrollment in the program who are proposed to work in connection with the services related to ________________________ (Bid/Grant/Sub grant/Contract/Subcontract) for the duration of the grant, sub grant, contractor, or subcontractor, if awarded in accordance with subsection 2 of section 285.530, RSMo.
I also affirm that _____________________________________________________ (Business Entity Name) does not and will not knowingly employ a person who is an unauthorized alien in connection with the contracted services related to ______________________________________ (Bid/Grant/Sub grant/Contract/Subcontract) for the duration of the grant, sub grant, contract, or subcontract, if awarded.
In Affirmation thereof, the facts stated above are true and correct. (The undersigned understands that false statements made in this filing are subject to the penalties provided under section 575.040, RSMo.)
Authorized Representative’s Signature Printed Name
Title Date
Subscribed and sworn to before me this of ______________________. I am
Day Month, Year
Commissioned as a notary public within the County of ______________________, State of _____________________ and my commission expires on Date
Signature of Notary Date
AFFIDAVIT OF WORK AUTHORIZATION
(Continued)
CURRENT BUSINESS ENTITY STATUS
I certify that ______________________ (Business Entity Name) MEETS the definition of a business entity as defined in section 285.525, RSMo pertaining to section 285.530, RSMo as stated above.
Authorized Business Entity Authorized Business Entity Representative’s Name Representative’s Signature (Please Print)
Business Entity Name Date
As a business entity, the grantee, sub grantee, contractor, or subcontractor must perform/provide the following. The grantee, sub grantee, contractor, or subcontractor shall check each to verify completion/submission:
o Enroll and participate in the E-Verify Federal Work Authorization Program (Website: http://www.dhs.gov/e-verify; Phone: 888-464-4218 Email: e-verify@dhs.gov) with respect to the employees hired after enrollment in the program who are proposed to work in connection with the services required herein;
AND
o Provide documentation affirming said company’s/individual’s enrollment and participation in the E- Verify Federal Work Authorization Program. Documentation shall include a page from the E-Verify
Memorandum of Understanding (MOU) listing the grantee’s, sub grantee’s, contractor’s. or subcontractor’s name and the MOU signature page completed and signed, at minimum, by the grantee, sub grantee, contractor, or subcontractor and the Department of Homeland Security –
Verification Division; (if the signature page of the MOU lists the grantee’s, sub grantee’s, contractor’s, or subcontractor’s name, then no additional pages of the MOU must be submitted).
CERTIFICATION REGARDING ISRAEL
1.____________________Contractor hereby certifies in writing to the _______________School District as follows (for purposes of this certification, Contractor shall be referred to as Company):
That Company is not currently engaged in and shall not, for the duration of the contract, engage in a boycott of goods or services from the State of Israel; companies doing business in or with Israel or authorized by, licensed by, or organized under the laws of the State of Israel; or persons or entities doing business in the State of Israel.
2. As used in this certification, the following terms and phrases shall be defined as follows:
(a) "Boycott Israel" and "boycott of the State of Israel", engaging in refusals to deal, terminating business activities, or other actions to discriminate against, inflict economic harm, or otherwise limit commercial relations specifically with the State of Israel; companies doing business in or with Israel or authorized by, licensed by, or organized under the laws of the State of Israel; or persons or entities doing business in the State of Israel, that are all intended to support a boycott of the State of Israel. A company's statement that it is participating in boycotts of the State of Israel; companies doing business in or with Israel or authorized by, licensed by, or organized under the laws of the State of Israel; or persons or entities doing business in the State of Israel, or that it has taken the boycott action at the request, in compliance with, or in furtherance of calls for a boycott of the State of Israel; companies doing business in or with Israel or authorized by, licensed by, or organized under the laws of the State of Israel; or persons or entities doing business in the State of Israel shall be considered to be conclusive evidence that a company is participating in a boycott of the State of Israel;
companies doing business in or with Israel or authorized by, licensed by, or organized under the laws of the State of Israel; or persons or entities doing business in the State of Israel;
provided, however that a company that has made no such statement may still be considered to be participating in a boycott of the State of Israel; companies doing business in or with Israel or authorized by, licensed by, or organized under the laws of the State of Israel; or persons or entities doing business in the State of Israel if other factors warrant such a conclusion; and
(b) "Company", any for-profit or not-for-profit organization, association, corporation, partnership, joint venture, limited partnership, limited liability partnership, limited liability company, or other entity or business association, including all wholly-owned subsidiaries, majority-owned subsidiaries, parent companies, or affiliates of those entities or business associations.
In Witness Whereof, the foregoing certification is entered into as of ______________, 20____.
Contractor/Company:_______________________
By:_______________________________________ Authorized Party
VENDOR “POC” Point of Contact
Following award of contract
Company Name______________________________________________________
Mailing Address______________________________________________________
Phone number______________________________________________________
Contact Name_______________________________________________________
Contact Name Title___________________________________________________
Email Address_______________________________________________________
EXISTING CONDITION INFORMATION 003119 - 1
003119 - EXISTING CONDITION INFORMATION
1.1 EXISTING CONDITION INFORMATION
A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of the Bidders' own investigations. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.
B. Existing drawings that include information on existing conditions including previous construction at Project site are available for viewing on the project website.
C. Photographic report of existing conditions that includes photographic documentation on existing conditions, prepared by the Architect, will be available on the project website.
D. Related Requirements:
1. Document 002113 "Instructions to Bidders" for the Bidder's responsibilities for examination of Project site and existing conditions.
2. Document 003126 "Existing Hazardous Material Information" for hazardous materials reports that are made available to bidders.
3. Document 003132 "Geotechnical Data" for reports and soil-boring data from geotechnical investigations that are made available to bidders.
St. Louis Public Schools SLPS CVPA & CSMB Entrance & Parking Lots Project
PROPOSAL/BID FORM
The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
The OWNER reserves the right to accept and proceed with one or multiple of the proposed bid package(s).
Below is a contact form for the BIDDER submitting this bid, who will be responsible for any questions that may arise during bid review and who may also be contacted to discuss the acceptance or rejection of this bid:
BIDDER Company Name BIDDER Contact Person Name Address City/State/Zip Phone Number Email Address Fax Number
BIDDER accepts all of the terms and conditions of the “Notice to Bidders” and the “Instructions to Bidders”, including without limitation those dealing with the disposition of Bid security.
Bidding and Contract Requirements
STIPULATED SUM BID FORM
Name of Project: St. Louis Public Schools SLPS Central VPA & CSMB Entrance & Parking Lots Project
Date: ______________________
Proposal from: ________________________________________________________
(Hereinafter called Bidder), a corporation organized and existing under the laws of the state of_________________________, a partnership, or an individual doing business as_____________________________________________ (cross out inapplicable).
TO: ATTN: Square Watson, Chief of Operations St. Louis Public Schools 801 N. 11th Street.
St. Louis, MO 63101
The Bidder, in compliance with the Invitation for Bid for the project and having carefully examined the Bidding Documents as set forth in the Scope of Work, which documents are made a part hereof, as well as the site and all conditions surrounding and affecting the work, agrees to furnish all labor, materials, and supplies necessary to perform all the work in accordance with said documents and within the time and at the prices stated below.
BASE BID
SLPS – SLPS CVPA & CSMB Entrance & Parking Lots Project
ITEM
NO.
ITEM DESCRIPTION SUB-TOTAL
1 St. Louis Public Schools SLPS CVPA & CSMB Entrance & Parking Lots Project
2 Unforeseen Conditions Allowance $1,500,000
3 Landscape Allowance $30,000
*SLPS intends to award all scopes to a single general contractor.
Furnish all labor, tools, equipment, and material required to perform all work indicated for St. Louis Public Schools, as defined in the Bid Documents for the TOTAL LUMP SUM AMOUNT of (as the total of Items 1 thru 5 in above table as one Bid Package to be awarded together):
________________________________________________________________Dollars
PERFORMANCE & PAYMENT BOND
If a performance bond is required by this Contractor, add the sum of
________________________________________________________________Dollars
UNIT PRICES (ST – Straight Time, OT – Overtime)
Unit Price Description
Unit
$/Hr.
Hourly Labor Rates
Selective Demolition ST 2nd Shift
OT
1.
2.
3.
Concrete ST 2nd Shift
OT
1.
2.
3.
Structural Concrete ST 2nd Shift
OT
1.
2.
3.
Masonry ST 2nd Shift
OT
1.
2.
3.
Structural Steel ST 2nd Shift
OT
1.
2.
3.
Metal Fabrication ST 2nd Shift
OT
1.
2.
3.
Rough Carpentry ST 2nd Shift
OT
1.
2.
3.
Finish Carpentry ST 2nd Shift
OT
1.
2.
3.
Air Barrier ST 2nd Shift
OT
1.
2.
3.
Roofing ST 2nd Shift
OT
1.
2.
3.
Doors, Frames, and Hardware (Supplier) ST 2nd Shift
OT
1.
2.
3.
Glass and Glazing ST 2nd Shift
OT
1.
2.
3.
Framing ST 2nd Shift
OT
1.
2.
3.
Drywall ST 2nd Shift
OT
1.
2.
3.
Taping ST 2nd Shift
OT
1.
2.
3.
Tiling ST 2nd Shift
OT
1.
2.
3.
Ceilings ST 2nd Shift
OT
1.
2.
3.
Flooring ST 2nd Shift
OT
1.
2.
Painting
ST
2nd Shift
OT
1.
2.
Furnishings
OT
1.
2.
3.
Elevators ST 2nd Shift
OT
1.
2.
3.
Fire Protection ST 2nd Shift
OT
1.
2.
Plumbing
OT
1.
2.
3.
HVAC ST
2nd Shift
OT
1.
2.
Electrical
OT
1.
2.
3.
Low Voltage ST 2nd Shift
OT
1.
2.
3.
Earthwork ST 2nd Shift
OT
1.
2.
3.
Paving ST 2nd Shift
OT
1.
2.
3.
Landscaping ST 2nd Shift
OT
1.
2.
3.
Utilities ST 2nd Shift
OT
1.
2.
3.
Other: ST 2nd Shift
OT
1.
PRE-APPROVED ALTERNATE #1 Main Gymnasium Locker Rooms:
ADD / DEDUCT (circle one) ______________________________________________________________________Dollars
*Attach additional information to the bid form if required.
PRE-APPROVED ALTERNATE #2 Renovate 2nd and 3rd Floor Restrooms:
______________________________________________________________________Dollars
PRE-APPROVED ALTERNATE #3 3rd Floor Counseling Office:
______________________________________________________________________Dollars
PRE-APPROVED ALTERNATE #4 Northeast Plaza:
______________________________________________________________________Dollars
PRE-APPROVED ALTERNATE #5 Demo Scope Completed Off-Shift (4pm – 6am):
______________________________________________________________________Dollars
PREAPPROVED ALTERNATES WILL BE INCLUDED IN THE PRE-BID ADDENDUM.
REFERENCES – To be submitted at the time of bid.
Bids will not be accepted if references are not provided at the time of the bid. Bidder shall provide at least three references of similar projects.
Company: ____________________________________________________________________________________
Address: _____________________________________________________________________________________
Contact Person: _______________________________________________________________________________
Telephone: ___________________________________________________________________________________
Email: ________________________________________________________________________________________
Type of service provided: _________________________________________________________________________
Dates/year(s) service was provided: ________________________________________________________________
Contact Person: _______________________________________________________________________________
Telephone: ___________________________________________________________________________________
Email: ________________________________________________________________________________________
Dates/year(s) service was provided: _______________________________________________________________
Contact Person: _______________________________________________________________________________
Telephone: ___________________________________________________________________________________
Email: ________________________________________________________________________________________
Dates/year(s) service was provided: _______________________________________________________________
TIME
BIDDER hereby states that the time required to perform all work indicated in the BID DOCUMENTS (and any accepted alternates) and work necessary to complete the project per the project milestone schedule listed in the scope of work is acceptable. Liquidated Damages shall be assessed for delays to Substantial Completion and are further described in the bidding and contract requirements.
PROJECT SUBSTANTIAL COMPLETION – St. Louis Public Schools SLPS CVPA & CSMB Entrance & Parking Lots Project
The completion dates listed in the Summary of Work are as follows:
CVPA & CSMB North Vestibule: Friday, August 31st, 2026 CVPA & CSMB South Vestibule, Parking Lots, and Interior office renovations:
Friday, July 30, 2027
Contractor to list alternate completion dates below, if different from those listed in the Scope of Work. The proposed durations below will be used as key criteria along with other information on the Bid Form and Statement of Qualifications to select and award a contractor. The proposed completion dates will be incorporated into the Contract between the Owner and Contractor.
CVPA & CSMB Entrance & Parking Lots Project North Vestibule:
CVPA & CSMB Entrance & Parking Lots Project South Vestibule, Parking Lots, and Interior office renovations: _____________________________
BID DOCUMENTS
A. Bidder acknowledges receipt of the following Appendixes & Addenda:
1. Drawings and Specifications
2. Addenda
a. Addenda No. _____ Dated _____
b. Addenda No. _____ Dated _____
c. Addenda No. _____ Dated _____
d. Addenda No. _____ Dated _____
e. Addenda No. _____ Dated _____
MISCELLANEOUS BID REQUIREMENTS
A. The undersigned understands that this bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the scheduled closing time and date for receiving bids.
B. The undersigned understands that the Owner reserves the right to reject any or all bids or subcontractors.
C. The undersigned further agrees to indemnify and save the Owner from and against all losses, judgments of every nature and description made, brought, or recovered against the Owner by reason of any act or omission of the undersigned, his agents, subcontractors, or employees in the execution of the work or in guarding the same.
D. The undersigned hereby declares that this Stipulated Sum Bid is based solely upon the materials and equipment described in the bidding documents (including Addenda), and that no substitutions are contemplated.
E. The Bidder declares that he/she has had an opportunity to examine the site of the work and he/she has examined the bidding Documents therefore, and that he/she has carefully prepared his Bid upon the basis thereof and that he/she has carefully examined and checked this Bid and the materials, equipment and labor required thereunder, the cost thereof, and his figures therefor, and hereby states that the amount or amounts set forth in this Bid is, or are, correct and that no mistake or error has occurred in this bid.
F. See next page for signatures.
IF A CORPORATION
Name of Corporation Signature of Officer Name and Title of Officer
Incorporated under the laws of the State of _______________________ (Print)
Licensed to do business in Missouri? (Check one) [ ] Yes [ ] No
Address for Communications ________________________________
(Seal if bid is by a corporation.)
IF A PARTNERSHIP State name and address of all partners:
Name of Partnership
Signature of Authorized Partner
IF INDIVIDUAL
Name of Firm (if any)
Address for Communications Signature of Individual _______________________________
Name of Individual (Print)
IF BIDDING AS A JOINT VENTURE (List all parties.)
SUPPLEMENTAL BID INFORMATION
ATTN:
Square Watson, Chief of Operations Saint Louis Public Schools 801 N. 11th Street St. Louis, MO 63101
Proposal for:
Saint Louis Public Schools – St. Louis Public Schools SLPS CVPA & CSMB Entrance & Parking Lots Project
3125 S Kingshighway Blvd St. Louis, MO 63139
LIST OF PROPOSED SUBCONTRACTORS
A list of the three apparent subcontractors in each division that are being considered for award to perform work on the jobsite including their union affiliation and their M/WBE status and amount.
If you do not plan to use subcontractors, indicate below and return this form with your bid.
Please list the three subcontractors in each category that the above referenced Bidder intends to negotiate subcontracts for materials, services, supplies, specialty contractors, etc. as follows:
Scope of Work
Proposed Subcontractors
Union/ Non- Union
Potential M/W/DBE Contract Amount
Selective Demolition 1.
Concrete 1.
Structural Concrete 1.
Masonry 1.
Structural Steel 1.
Metal Fabrication 1.
Rough Carpentry 1.
Finish Carpentry 1.
Air Barrier 1.
Roofing 1.
Doors, Frames, and Hardware (Supplier)
1.
Glass and Glazing 1.
Framing 1.
Drywall 1.
Taping 1.
Tiling 1.
Ceilings 1.
Flooring 1.
Painting
1.
Furnishings
Elevators 1.
Fire Protection 1.
Plumbing
HVAC 1.
Electrical
Low Voltage 1.
Earthwork 1.
Paving 1.
Landscaping 1.
Utilities 1.
Other: 1.
Submitted By:
Bidder: ___________________________________________
Address: __________________________________________
Business Telephone: _______________ Fax Number:__________________
Typed/Printed Name:_______________________________
Authorized Signature:______________________________
Title:____________________________________________
(Seal - if bid by a corporation)
Date:___________________________________________
END: SUPPLEMENTAL BID INFORMATION
Saint Louis Public Schools – CVPA & CSMB Entrance & Parking Lots Project Modification/Explanation to the Change Order Fee
The maximum that will be allowed for overhead and profit on changes in work shall be as follows, expressed as a percentage of the basic cost of the change. The allowable percentages for profit or overhead may be less, depending on the nature, extent, or complexity of the change, where the percentage is not commensurate with the responsibility and administration involved (such as the Contractor merely processing substantial Change Order to a Subcontractor) but in no event shall they exceed the following:
To the Contractor and/or its Subcontractor for work performed with their own forces 12% To the Contractor for work performed by other than its own forces 5% To the Subcontractor/Supplier for work performed with their own forces 12% To the Subcontractor/Supplier for work performed by other than its own forces 5%
Not more than above specified percentages for overhead, profit and commission will be allowed to be added to the basic cost, regardless of the number of tiers of Contractors, Subcontractors or Sub-subcontractors.
The burden on labor may be indicated as a dollar/cents addition to the hourly rate or may be expressed as a percentage of the extended hourly rate costs. If required by the Owner, the Contractor shall provide a detailed breakdown to justify the labor burden. The Owner reserves the right to reject any labor burden which is inconsistent with other similar contractors or where the cost of fringe benefits are in excess of established labor agreements.
Material, equipment, and supply costs shall be quoted at the actual cost to the Contractor, or Subcontractor. Upon request, the Contractor (or Subcontractor) shall submit evidence to substantiate the costs. Said costs shall be quoted at trade discount prices, with quantity discounts also applied where the quantities warrant. In any proposal with material, equipment and supply credit, the credit shall be based on the actual Contract cost of the material (including trade and quantity discounts) less any charges actually incurred for handling or returning a material which has been delivered.
The percentages allowed for overhead and profit herein shall be deemed to include, and no further addition allowed the Contractor, Subcontractor or Sub-subcontractors for: (1) field and office supervision and administration, including the field superintendent and non-working foremen; (2) general insurance; (3) use or replacement of tools; (4) shop burden; (5) engineering costs; (6) performance (guaranty) and labor/material payment bonds; (7) cost of safety measures (including those imposed by OSHA); (8) permits, unless a new permit type is required; (9) and warranty costs.
Cost changes shall be computed by determining the basic costs enumerated below (as further specified under this Subparagraph), to which the overhead may be added, then the profit figure may be added, and finally adding the sales tax on materials if allowable.
For changes in the Work, the cost shall be determined as provided under this section. The Contractor shall submit an itemized list of quantities with the applicable unit costs and extended price for each, in such form and detail as required by the Owner. As a minimum, the detailed breakdown shall include and indicate the items enumerated below. Items (a) and (b) constitute the cost of labor, and items (a), (b), (c) and (d) constitute the basic costs referred to under this section.
a) Labor costs, itemized by each trade involved, showing the hourly rates for each, and the hours required for the change. Labor rates shall be the same for extra and credit computations and shall be the actual rate paid the workmen in accordance with established management labor agreements.
b) Burden on labor, which shall be only the actual costs of mandatory fringe benefits required by established agreements, taxes on labor, worker's or workmen's compensation, insurance on labor as affected by payroll, unemployment taxes and insurance, including FICA and FUTA. No other costs will be allowed as burden on labor.
c) Quantities of materials, equipment, and supplies, at their actual costs, with unit costs indicated.
d) The cost of subcontracted work computed in the same way as provided for under this section.
e) Overhead, profit and commission as set forth herein.
f) Applicable sales tax on materials, added after the above computations are complete.
Subcontractors (or Sub-subcontractors) shall compute their costs in the same way and are subject to the same conditions of what may be included in the cost and the same maximum percentages for overhead and profit. To the Subcontractor's price, the Contractor may add up to a maximum of five percent (5%).
For changes involving work of the Contractor with its own forces and work by a Subcontractor (or Sub-subcontractor), the commission shall be applied directly to the Subcontractor's price, with the overhead and profit figure applied only to the Work the Contractor performs with its own forces.
For changes involving both extra and credit amounts, the overhead and profit, or commission, shall be applied only to net difference where the extra exceeds the credit.
For changes resulting in a credit in the basic costs, a reasonable allowance for overhead, profit or commission may be required to be credited to the Owner, as approved by the Owner. In general, no credit for overhead, profit or commission will be required where the net change credit is minor or where the Change in Work indicates it is reasonable that no credit be allowed to the Owner due to the effort, cost or responsibility of the Contractor. In the event of substantial subcontract credits or for Work the Contractor does not provide or perform, a reasonable overhead, profit or commission credit shall be allowed to the Owner, as determined by the Owner.
If anytime, Contractor is directed to proceed in writing by the Owner or Owner’s Representative on a Time and Material Not to Exceed basis for a change, the Contractor must notify Owner’s Representative when work is beginning, when it is complete and daily tickets must be submitted as backup documentation.
Daily tickets to be signed daily and verified by the Contractor’s onsite superintendent and submitted daily to the Owner’s Representative. Any change order request submitted without these daily signed tickets will be rejected and will not be compensated.
Additional scope that is authorized to be completed on a Time and Material Not to Exceed (T&M NTE) basis on behalf of the Owner, shall be documented as follows:
a) Contractor shall issue daily tickets identifying hours worked, classification of worker, materials used, internally or externally rented equipment, and subcontractors utilized.
b) The additional scope should be delineated from the base bid scope.
c) Hours worked shall be verified by the General Contractor’s Superintendent and/or Authorized Owner’s Representative and indicated by signature on daily work tickets.
d) There should be a separate ticket for each day that additional scope of work takes place.
e) Unit costs, material costs and rental rates will be evaluated accordingly to typical market value.
f) The contractor is responsible for expending costs with the Owner’s best interest in mind.
St. Louis Public Schools CVPA CSMB Entrance & Parking Lots Project
BID SUMMARY
The information below will be read at the conclusion of this RFP during the bid opening.
SLPS – Gateway STEM High School Athletic Building Renovations Bidder Company Name:
ITEM
NO.
ITEM DESCRIPTION SUB-TOTAL
1 CVPA & CSMB Entrance & Parking Lots Project
2 Unforeseen Conditions Allowance $1,500,000
3 Landscape Allowance $30,000
4 Performance and Payment Bond
5 Pre-approved alternate #1 Main Gymnasium Locker Rooms
6 Pre-approved alternate #2 Renovate 2nd and 3rd Floor Restrooms
7 Pre-approved alternate #3 3rd Floor Counseling Office
8 Pre-approved alternate #4: Northeast Plaza
9 Demo Scope Completed Off-Shift (4pm – 6am)
10 Additional Pre-approved alternates
11 Additional Pre-approved alternates
PROJECT FORMS 006000 - 1
SECTION 006000 – PROJECT FORMS
1.1 FORM OF AGREEMENT AND GENERAL CONDITIONS
A. The following form of Owner/Contractor Agreement and form of the General Conditions shall be used for Project:
1. AIA Document A101-2017…