20-Bid Tab 3C02518 Demolition.pdf
PDF 118 KB Posted
- Solicitation number
- 3-C-025-18
- Issued by
- Johnson County, Kansas
About this file
This document is a Tabulation of Bids for a building demolition and site restoration project located in Santa Fe, specifically for the Ridgeview to Mur-Len segment, with the project number 3-C-025-18. The bid was opened on August 28, 2025, at 10:00 A.M., and includes demolition work for multiple tracts (19, 22, 51, and 75A), along with erosion control and seeding. The project involves comprehensive site preparation, including mobilization, building demolition across different tracts, erosion control measures, and post-demolition land restoration through seeding.
Three bidders are represented in the document: HNTB (the Engineer's Estimate), Denton Excavating DBA Midland Wrecking, and Remco Demolition. The total bid prices vary significantly between these entities, with HNTB's estimate at $2,058,459.94, Denton Excavating at $922,059.60, and Remco Demolition at $930,641.00. Each bidder provided unit prices for specific line items such as mobilization, building demolition for different tracts, erosion control, and seeding. An owner's contingency allowance of $40,000.00 is also included in the engineer's estimate, suggesting potential additional funding or risk mitigation for the project.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Santa Fe, Ridgeview to Mur-Len, Building Demolition and Site Restoration
PN 3-C-025-18
August 28, 2025 - 10:00 A.M.
Item Description Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 Mobilization 1 L.S. $ 25,000.00 25,000.00$ $ 10,000.00 10,000.00$ $ 3,690.00 3,690.00$ 2 Building Demolition (Tract 19) 1 L.S. $ 19,444.44 19,444.44$ $ 47,957.00 47,957.00$ $ 40,444.00 40,444.00$ 3 Building Demolition (Tract 22) 1 L.S. $ 86,333.00 86,333.00$ $ 73,851.00 73,851.00$ $ 67,603.00 67,603.00$ 4 Building Demolition (Tract 51) 1 L.S. $ 1,526,712.50 1,526,712.50$ $ 624,798.00 624,798.00$ $ 635,345.00 635,345.00$ 5 Building Demolition (Tract 75A) 1 L.S. $ 336,825.00 336,825.00$ $ 102,093.60 102,093.60$ $ 111,693.00 111,693.00$ 6 Erosion Control 1 L.S. $ 7,945.00 7,945.00$ $ 5,000.00 5,000.00$ $ 8,646.00 8,646.00$ 7 Seeding 5.4 ACRES $ 3,000.00 16,200.00$ $ 3,400.00 18,360.00$ $ 4,300.00 23,220.00$
2,018,459.94$ 882,059.60$ 890,641.00$ 40,000.00$ 40,000.00$ 40,000.00$
2,058,459.94$ 922,059.60$ 930,641.00$
Remco Demolition
3-C-025-18 DEMOLITION BID TOTAL
3-C-025-18 DEMOLITION GRAND TOTAL
Denton Excavating DBA Midland WreckingHNTB (Engineer's Estimate)
OWNER'S CONTINGENCY ALLOWANCE