This is a technical specification document for City of Olathe project SPC-7 3-C-025-18, detailing requirements for seeding and building demolition services. The project involves comprehensive demolition of existing structures including buildings, foundations, pavement, and miscellaneous infrastructure, followed by site restoration through seeding of disturbed areas. Seeding requirements specify Kentucky 31 Fescue and Rye Grass mixture applied at 435 pounds per acre using hydro-mulching methods. The contractor must obtain demolition permits, install six-foot temporary fencing around the construction area, disconnect utilities (electric, gas, sanitary), and handle proper disposal of all materials including contaminated liquids from a Valvoline Instant Oil Change facility.

The project operates under a lump-sum payment structure where demolition work is paid through the "Building Demolition" bid item with no separate payment for individual removal tasks. The contractor assumes ownership of all existing structures and contents upon Notice to Proceed and must handle all disposal responsibilities according to International Building Code Chapter 33 requirements. Substantial completion occurs when all buildings are demolished, sites cleared, and final grading completed. The document includes penalties of $250 per day for failure to install required safety fencing and emphasizes environmental compliance for contaminated material disposal according to City and State regulations.

View the file

Other files

File Type Posted
4-3C02518 Fiber Optic Relocation.pdf PDF
3-304 Highway Permit.pdf PDF
2-310 Highway Permit Bridges.pdf PDF
1-Santa Fe Fiber Optic Interconnect Plans 2026-09-03.pdf PDF
19-Terracon ESA Standard Report - Tract 16.pdf PDF
15-Terracon ESA Standard Report - Tract 13.pdf PDF
18-Terracon ESA Standard Report - Tract 14.pdf PDF
31-Entry to Buildings.pdf PDF
28-Asbestos Survey Report - Tract 20.pdf PDF
3-Asbestos Survey Report - Tract 14.pdf PDF
4-Asbestos Survey Report - Tract 15.pdf PDF
5-Asbestos Survey Report - Tract 16.pdf PDF
9-Asbestos Survey Report - Tract 74.pdf PDF
1-Building Demo and Site Restoration Phase 2.pdf PDF
24-Terracon ESA Standard Report - Tract 74.pdf PDF
17-Terracon ESA Standard Report - Tract 47.pdf PDF
16-Terracon ESA Standard Report - Tract 20.pdf PDF
23-Terracon ESA Standard Report - Tract 76.pdf PDF
20-Terracon ESA Standard Report - Tract 79.pdf PDF
27-Terracon ESA Standard Report - Tract 18.pdf PDF
30-Santa Fe - Demo Plans Package 2.pdf PDF
2-Asbestos Survey Report - Tract 13.pdf PDF
29-Asbestos Survey Report - Tract 47.pdf PDF
14-Terracon ESA Standard Report - Tract 21.pdf PDF
6-Asbestos Survey Report - Tract 21.pdf PDF
13-Asbestos Survey Report - Tract 46.pdf PDF
10-Asbestos Survey Report - Tract 17.pdf PDF
21-Terracon ESA Standard Report - Tract 17.pdf PDF
7-Asbestos Survey Report - Tract 18.pdf PDF
22-Terracon ESA Standard Report - Tract 15.pdf PDF
12-Asbestos Survey Report - Tract 79.pdf PDF
8-Asbestos Survey Report - Tract 23.pdf PDF
26-Terracon ESA Standard Report - Tract 46.pdf PDF
11-Asbestos Survey Report - Tract 76.pdf PDF
25-Terracon ESA Standard Report - Tract 23.pdf PDF
15-Terracon ESA Standard Report - Tract 19.pdf PDF
20-Bid Tab 3C02518 Demolition.pdf PDF
12-Asbestos Survey - Tract 51 (118-126 S. Clairborne).pdf PDF
8-Pre Bid Meeting.pdf PDF
6-Building and Demolition Contract.pdf PDF
14-Terracon ESA Standard Report - Tract 51 (Townsquare).pdf PDF
5-Z Asbestos Survey - 189 S. Rogers Rd. - 02237230.pdf PDF
3-Z Asbestos Survey - 1904 E. Santa Fe St. - 02237230.pdf PDF
2-Z Asbestos Survey - 102-120 N. Clairborne Rd. - 02237230.pdf PDF
13-Terracon ESA Standard Report - Tract 75A.pdf PDF
1-Z Asbestos Survey - 1990 E. Santa Fe St. - 02237230.pdf PDF
16-Asbestos Survey - Tract 51 (128-140 S. Clairborne).pdf PDF
19-Bid Opening.pdf PDF
7-Z Terracon ESA Standard Report - 02237230 - Vape-Liberty Tax (1990 E Santa Fe).pdf PDF
9-Demo Plan Sheet Tract 51 Rev1.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Olathe SPC-7 3-C-025-18

17. SEEDING

All grass areas disturbed during construction and not designated as being restored with sod or staked sod shall be seeded. Section 7200 of the Olathe Technical Specifications shall govern all items related to seeding EXCEPT the seed shall be applied at a rate of 435 pounds per acre (10 lbs. per 1,000 sq.ft.) and the seed mixture shall be as follows:

SEED TYPE APPLICATION RATE

Kentucky 31 Fescue 280 pounds per acre Rye Grass 155 pounds per acre

All seed shall be applied by using the Hyrdo-Mulching method.

18. SUBSTANTIAL COMPLETION

It shall be determined by the Engineer that the CONTRACTOR has the project substantially complete when all buildings have been demolished and the site has been cleared and final grading has occurred.

19. SCHEDULE OF REMOVALS

Description

The City assumes no responsibility for the actual condition of buildings or structures to be removed. All existing structures and their contents present on the date of the Notice to Proceed shall become the property of the Contractor, who shall be responsible for the proper removal and disposal thereof. All removal work on the site must be performed by the Contractor or his approved subcontractors. No other individuals or firms shall be permitted to access the site for the purpose of removing or salvaging materials. The contractor shall not be permitted to use the project site for the purposes of selling, showing, or auctioning of any salvaged materials from the property.

Construction Requirements

This work shall conform to Chapter 33 of the International Building Code, which covers demolition of buildings and structures, except as otherwise noted herein.

Raze, remove and dispose of all existing man-made structures and debris not designated to remain.

Items to be removed and responsibilities of the contractor include, but are not limited to, the following:

• Service utility connections shall be discontinued and capped as required by the City and/or the utility provider. Utility disconnect letters must be provided to the City and are required for approval of the demolition permit. Utilities requiring disconnection are anticipated to be electric, gas, and sanitary.

• Obtain demolition permit from the City prior to construction activities.

• Six-foot-tall temporary fencing must be installed and maintained, enclosing the entire construction area during demolition activities. Fencing must remain until all hazardous conditions are removed. Hazards include, but are not limited to, any and all construction debris and drop-off site conditions exceeding six inches in height. Failure to install fencing will result in an immediate stoppage of work at the contractor’s expense and a disincentive of

$250 per day until fencing is installed.

Added within Addendum 2

City of Olathe SPC-8 3-C-025-18

• Provide temporary erosion and pollution control per the Technical Specifications.

• For Valvoline Instant Oil Change, pump out any water or liquid in the below grade working bay. Any liquid or material should be considered contaminated with oil and must be disposed of properly offsite according to City and State environmental regulations. Discharge will not be allowed on site or into the City storm sewer system.

• Remove structures and all contents, building and sign foundations, asphalt and concrete pavement and driveways, walkways, slabs, steps, masonry, signs, poles and bollards, fences, above ground tanks, septic tanks and other underground storage tanks (USTs), and any other miscellaneous man-made structures to the limits shown.

• Excavate and backfill areas in accordance with the Technical Specifications and placed to drain. Proposed contours are included for reference only. It is the Contractor’s responsibility to verify the terrain and provide a final grade that maintains positive drainage. The top 6 inches of excavated areas shall be topsoil and left in a graded condition as approved by the Engineer.

• Plant fescue seed on all removal areas. Where noted on the plans, place a minimum top lift of

3” AB-1 to match surrounding grades in lieu of seed.

• Remove all trash and debris from the site.

Measurement And Payment

No direct payment shall be made for this work as it shall be considered subsidiary to the bid item

“Building Demolition”.