This document is a technical specification section (333100) for sanitary sewerage piping work prepared by the Salt Lake School District for the Nibley Park Elementary School project. The specification outlines the complete scope of gravity-flow, nonpressure sanitary sewerage piping installation outside the building, including special fittings for expansion and deflection, cleanouts, drains, precast concrete manholes, cast-in-place manhole bases, and sewerage pipes. The work must meet a 10-foot head of water pressure rating with watertight joints. Key submittals required include product data for pipe fittings, cleanout materials, and pipes; shop drawings for manholes with design calculations and concrete mix reports; coordination drawings showing pipe sizes, locations, and elevations; and profile drawings at specified scales. A mandatory pre-bid site visit is scheduled for Tuesday, May 26, 2026, at 9:00 A.M. at Nibley Park Elementary School (2785 South 800 East, Salt Lake City, Utah 84106) in the northeast parking lot area, with contractors required to attend to be eligible for bidding. Contractors must not interrupt existing sanitary sewerage service without at least two days' advance notice to the Architect, Construction Manager, and Owner, plus written permission before proceeding; any shutdown affecting city infrastructure requires additional city and local sanitary sewer purveyor approval.
The specification mandates the use of PVC sewer pipe and fittings complying with ASTM D 3034 (SDR 35) for pipes 15 inches and smaller and ASTM F 679 for pipes 18 inches and larger, with bell-and-spigot ends and elastomeric seals. Acceptable flexible couplings include unshielded, shielded, ring-type, and split-sleeve options from approved manufacturers. Cleanouts must meet ASME A112.36.2M standards with top-loading classifications selected based on traffic conditions (light-duty for unpaved areas, medium-duty for paved foot-traffic areas, heavy-duty for vehicle-traffic service areas, and extra-heavy-duty for roads). Precast concrete manholes must comply with ASTM C 478 with a minimum 48-inch diameter, eccentric-cone top, and ductile iron or gray iron frames and covers. Cast-in-place concrete for primary structural elements requires 4,000 psi minimum compressive strength with a 0.45 water-cementitious materials ratio; ballast and pipe supports require 3,000 psi minimum. Field quality control includes interior pipe inspections at 24 inches of backfill and project completion, with video logging of the entire system in DVD format submitted monthly to the owner and finally with as-built drawings. Leakage testing between manholes is required, with allowable seepage of less than a specified gallon per 400 feet of 8-inch pipe, prorated for different pipe sizes and distances. All bids must be submitted electronically through Bonfire/U3P, and all questions must be submitted in writing through that system or asked at the mandatory pre-bid site visit.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Salt Lake School District – Nibley Park School
333100 - 1 Sanitary Sewerage Piping
SECTION 333100 –SANITARY SEWERAGE PIPING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes gravity-flow, nonpressure sanitary sewerage outside the building, with the following components:
1. Special fittings for expansion and deflection.
2. Cleanouts.
3. Drains.
4. Precast concrete manholes.
5. Cast in place manhole bases over existing pipes.
6. Sewerage Pipes.
1.3 DEFINITIONS
A. PVC: Polyvinyl chloride plastic.
1.4 PERFORMANCE REQUIREMENTS
A. Gravity-Flow, Nonpressure, Sewer-Piping Pressure Rating: 10-foot head of water. Pipe joints shall be at least water tight under specified head, unless otherwise indicated.
1.5 SUBMITTALS
A. Product Data: For the following:
1. Special pipe fittings.
2. Cleanout materials.
3. Pipes.
B. Shop Drawings: For the following:
1. Manholes: Include plans, elevations, sections, details, and frames and covers. Include design calculations, and concrete design-mix report for cast-in-place manholes.
C. Coordination Drawings: Show pipe sizes, locations, and elevations. Show other piping in same trench and clearances from storm drainage system piping. Indicate interface and spatial relationship between manholes, piping, and proximate structures.
D. Profile Drawings: Show system piping in elevation. Draw profiles at horizontal scale of not less than 1 inch equals 60 feet and vertical scale of not less than 1 inch equals 8 feet. Indicate
333100 - 2 Sanitary Sewerage Piping manholes and piping. Show types, sizes, materials, and elevations of other utilities crossing system piping.
E. Field quality-control test reports.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Do not store plastic pipe and fittings in direct sunlight.
B. Protect pipe, pipe fittings, and seals from dirt and damage.
C. Handle manholes according to manufacturer's written rigging instructions.
1.7 PROJECT CONDITIONS
A. Interruption of Existing Sanitary Sewerage Service: Do not interrupt service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary service according to requirements indicated:
1. Notify Architect, Construction Manager and Owner no fewer than two days in advance of proposed interruption of service. Coordinate interruptions during weekly meetings and at pre-construction meeting.
2. Do not proceed with interruption of service without Architect's, Construction Manager's, and Owner's written permission.
3. If shutdown will affect city streets, other city utilities, or city sewer line, do not proceed without approval from city and local sanitary sewer purveyor.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection:
1. Available Manufacturers: Subject to compliance with requirements.
2. Backfill Material shall comply with section 312000 – Earthwork and or the local sewage purveyors requirement. The contractor shall assume availability of acceptable material on the site at their own risk. No additional payment will be made for imported backfill should it be required.
2.2 PIPING MATERIALS - PVC PIPE AND FITTINGS
A. PVC Pressure Pipe: AWWA C900, Class 150 for gasketed joints and using ASTM F 477, elastomeric seals.
1. Fittings NPS 4 to NPS 8: PVC pressure fittings complying with AWWA C907, for gasketed joints and using ASTM F 477, elastomeric seals.
2. Fittings NPS 10 and Larger: Ductile-iron, compact fittings complying with AWWA C153, for push-on joints and using AWWA C111, rubber gaskets.
333100 - 3 Sanitary Sewerage Piping
B. PVC Water-Service Pipe and Fittings: ASTM D 1785, Schedule 80 pipe, with plain ends for solvent-cemented joints with ASTM D 2467, Schedule 80, socket-type fittings.
C. PVC Sewer Pipe and Fittings, NPS 15 and Smaller: ASTM D 3034, SDR 35, with bell-and-spigot ends for gasketed joints with ASTM F 477, elastomeric seals.
D. PVC Sewer Pipe and Fittings, NPS 18 and Larger: ASTM F 679, T 2 wall thickness, with bell-and-spigot ends for gasketed joints with ASTM F 477, elastomeric seals.
E. PVC Profile Gravity Sewer Pipe and Fittings: ASTM F 794 pipe, with bell-and-spigot ends;
ASTM D 3034 fittings, with bell ends; and ASTM F 477, elastomeric seals.
2.3 NONPRESSURE-TYPE PIPE COUPLINGS
A. Use non-pressure type couplings only when pipes can not be connected together with standard fittings and typical pipe connections such as bell and spigot. If possible, file the end on existing pipes to create spigot type connections to match existing pipe ends for connection to a new bell for an extension of the pipe.
B. Comply with ASTM C 1173, elastomeric, sleeve-type, reducing or transition coupling, for joining underground nonpressure piping. Include ends of same sizes as piping to be joined, and corrosion-resistant-metal tension band and tightening mechanism on each end.
C. Sleeve Materials:
1. For Concrete Pipes: ASTM C 443, rubber.
2. For Cast-Iron Soil Pipes: ASTM C 564, rubber.
3. For Plastic Pipes: ASTM F 477, elastomeric seal or ASTM D 5926, PVC.
4. For Dissimilar Pipes: ASTM D 5926, PVC or other material compatible with pipe materials being joined.
D. Unshielded Flexible Couplings: Elastomeric sleeve with stainless-steel shear ring and corrosion-resistant-metal tension band and tightening mechanism on each end.
1. Manufacturers:
a. Dallas Specialty & Mfg. Co.
b. Fernco Inc.
c. Logan Clay Products Company (The).
d. Mission Rubber Company; a division of MCP Industries, Inc.
e. NDS Inc.
f. Plastic Oddities, Inc.
E. Shielded Flexible Couplings: ASTM C 1460, elastomeric or rubber sleeve with full-length, corrosion-resistant outer shield and corrosion-resistant-metal tension band and tightening mechanism on each end.
1. Manufacturers:
a. Cascade Waterworks Mfg.
b. Dallas Specialty & Mfg. Co.
c. Mission Rubber Company; a division of MCP Industries, Inc.
F. Ring-Type Flexible Couplings: Elastomeric compression seal with dimensions to fit inside bell of larger pipe and for spigot of smaller pipe to fit inside ring.
333100 - 4 Sanitary Sewerage Piping
1. Manufacturers:
a. Fernco Inc.
b. Logan Clay Products Company (The).
c. Mission Rubber Company; a division of MCP Industries, Inc.
G. Split-Sleeve Couplings: With split sleeve with sealing pad and closure plates, O-ring gaskets, and bolt fasteners.
1. Manufacturers:
a. Brico Industries.
2. Sleeve Material: Manufacturer's standard.
3. Sleeve Dimensions: Of thickness and width required to provide pressure rating.
4. Gasket Material: O-rings made of EPDM rubber, unless otherwise indicated.
5. Metal Component Finish: Corrosion-resistant coating or material.
2.4 CLEANOUTS
A. Gray-Iron Cleanouts: ASME A112.36.2M, round, gray-iron housing with clamping device and round, secured, scoriated, gray-iron cover. Include gray-iron ferrule with inside calk or spigot connection and countersunk, tapered-thread, brass closure plug.
1. Manufacturers:
a. Josam Company.
b. MIFAB Manufacturing, Inc.
c. Smith, Jay R. Mfg. Co.
d. Wade Div.; Tyler Pipe.
e. Watts Industries, Inc.
f. Watts Industries, Inc.; Enpoco, Inc. Div.
g. Zurn Industries, Inc.; Zurn Specification Drainage Operation.
2. Top-Loading Classification(s): Light, Medium, Heavy, and Extra-heavy duty depending on location and expected driving load on cleanout.
3. Sewer Pipe Fitting and Riser to Cleanout: ASTM A 74, Service class, cast-iron soil pipe and fittings.
B. PVC Cleanouts: PVC body with PVC threaded plug. Include PVC sewer pipe fitting and riser to cleanout of same material as sewer piping. Place in grey iron housing with clamping device and round, secured, scoriated, gray-iron cover.
1. Manufacturers:
a. Canplas Inc.
b. Josam Company
c. MIFAB Manufacturing, Inc.
d. Wad Div.; Tyler Pipe
e. Watts Industries, Inc.
f. Zern Industries, Inc; Zern Specification Drainage Operation
g. IPS Corporation.
h. NDS Inc.
i. Plastic Oddities, Inc.
j. Sioux Chief Manufacturing Company, Inc.
k. Zurn Industries, Inc.; Zurn Light Commercial Specialty Plumbing Products.
333100 - 5 Sanitary Sewerage Piping
2.5 MANHOLES
A. Standard Precast Concrete Manholes: ASTM C 478, precast, reinforced concrete, of depth indicated, with provision for sealant joints.
1. Diameter: 48 inches minimum, unless otherwise indicated and as needed for pipe sizes.
2. Ballast: Increase thickness of precast concrete sections or add concrete to base section, as required to prevent flotation.
3. Base Section: 9-inch minimum thickness for floor slab and 4-inch minimum thickness for walls and base riser section, and having separate base slab or base section with integral floor.
4. Riser Sections: 4-inch minimum thickness, and lengths to provide depth indicated.
5. Top Section: Eccentric-cone type unless concentric-cone or flat-slab-top type is indicated. Top of cone of size that matches grade rings.
6. Joint Sealant: ASTM C 990, bitumen or butyl rubber.
7. Resilient Pipe Connectors: ASTM C 923, cast or fitted into manhole walls, for each pipe connection.
8. Steps: Not used.
9. Adjusting Rings: Interlocking rings with level or sloped edge in thickness and diameter matching manhole frame and cover. Include sealant recommended by ring manufacturer.
10. Grade Rings: Reinforced-concrete rings, 6- to 9-inch total thickness, to match diameter of manhole frame and cover.
11. Manhole Frames and Covers: Ferrous; 24-inch ID by 7- to 9-inch riser with 4-inch-minimum width flange and 26-inch- diameter cover. Include indented top design with lettering cast into cover, using wording equivalent to "SANITARY SEWER."
a. Material: ASTM A 536, Grade 60-40-18 ductile or ASTM A 48, Class 35 gray iron, unless otherwise indicated and to match existing manhole frames and covers.
b. Protective Coating: Foundry-applied, SSPC-Paint 16, coal-tar, epoxy-polyamide paint; 15-mil minimum thickness applied to all surfaces, unless otherwise indicated.
B. Cast-in-Place Concrete Manholes Base: Construct of reinforced-concrete bottom according to ASTM C 890 for A-16 (ASSHTO HS20-44), heavy-traffic, structural loading; of depth, shape, dimensions, and appurtenances indicated.
1. Ballast: Increase thickness of concrete, as required to prevent flotation.
2. Excavate around existing pipe where manhole is to be placed.
3. Place new pipe stub at line and grade and stubbed into new manhole location with pipe extending towards existing pipes.
4. Place CMU blocks or other approved support adjacent to pipes to support new barrel section.
5. Set first barrel section on CMU blocks and verify that barrel section is level in all directions and is not sitting on pipes.
6. Make sure that hole is deep enough that the depth of concrete will be 9-inches below existing and new pipes.
7. Place concrete around barrel section and inside barrel section so that the existing and new pipes are at least 50% covered with concrete.
8. Hand form trough as needed.
9. Let concrete cure and break out of pipes for trough. Grout all troughs smooth and even with pipes.
333100 - 6 Sanitary Sewerage Piping
10. Stack remaining barrel sections and add cone, ring and cover etc. as indicated for precast manhole.
2.6 CONCRETE
A. General: Cast-in-place concrete according to ACI 318/318R, ACI 350R, and the following:
1. Cement: ASTM C 150, Type II.
2. Fine Aggregate: ASTM C 33, sand.
3. Coarse Aggregate: ASTM C 33, crushed gravel.
4. Water: Potable.
B. Portland Cement Design Mix: 4000 psi minimum, with 0.45 maximum water-cementitious materials ratio.
1. Reinforcement Fabric: ASTM A 185, steel, welded wire fabric, plain.
2. Reinforcement Bars: ASTM A 615/A 615M, Grade 60, deformed steel.
C. Ballast and Pipe Supports: Portland cement design mix, 3000 psi minimum, with 0.58 maximum water-cementitious materials ratio.
1. Reinforcement Fabric: ASTM A 185, steel, welded wire fabric, plain.
2. Reinforcement Bars: ASTM A 615/A 615M, Grade 60, deformed steel.
PART 3 - EXECUTION
3.1 EARTHWORK
A. Excavation, trenching, and backfilling are specified in Division 31 Section "Earth Moving."
3.2 PIPING APPLICATIONS
A. Pipe couplings and special pipe fittings with pressure ratings at least equal to piping rating may be used in applications below, unless otherwise indicated.
1. Use nonpressure-type flexible couplings where required to join gravity-flow, nonpressure sewer piping, unless otherwise indicated.
a. Flexible or rigid couplings for same or minor difference OD pipes.
b. Unshielded, increaser/reducer-pattern, flexible or rigid couplings for pipes with different OD.
c. Ring-type flexible couplings for piping of different sizes where annular space between smaller piping's OD and larger piping's ID permits installation.
B. Special Pipe Fittings: Use for pipe expansion and deflection. Pipe couplings and special pipe fittings with pressure ratings at least equal to piping rating may be used in applications below, unless otherwise indicated.
C. Gravity-Flow, Nonpressure Sewer Piping: Use any of the following pipe materials for each size range:
1. PVC sewer pipe and fittings; gaskets; and gasketed joints.
333100 - 7 Sanitary Sewerage Piping
2. Ductile-iron pressure pipe, ductile-iron standard or compact fittings, gaskets, and gasketed joints.
3. PVC pressure, PVC pressure fittings, gaskets, and gasketed joints.
3.3 PIPING INSTALLATION
A. General Locations and Arrangements: Drawing plans and details indicate general location and arrangement of underground sanitary sewerage piping. Location and arrangement of piping layout take design considerations into account. Install piping as indicated, to extent practical.
B. Install piping beginning at low point, true to grades and alignment indicated with unbroken continuity of invert. Place bell ends of piping facing upstream. Install gaskets, seals, sleeves, and couplings according to manufacturer's written instructions for use of lubricants, cements, and other installation requirements.
C. Install manholes for changes in direction unless fittings are indicated. Use fittings for branch connections unless direct tap into existing sewer is indicated.
D. Install proper size increasers, reducers, and couplings where different sizes or materials of pipes and fittings are connected. Reducing size of piping in direction of flow is prohibited.
E. Tunneling: Install pipe under streets or other obstructions that cannot be disturbed by tunneling, jacking, or a combination of both.
F. Install gravity-flow, nonpressure drainage piping according to the following:
1. Install piping pitched down in direction of flow, at slope indicated.
2. Install piping with restrained joints at tee fittings and at changes in direction for pressure pipe. Use corrosion-resistant rods, pipe or fitting manufacturer's proprietary restraint system, or cast-in-place concrete supports or anchors.
3. Install piping with cover indicated.
4. Notify engineer of clearance problems that would result in changes to grade and alignment.
5. Install ductile-iron culvert piping according to ASTM A 716.
6. Install ductile-iron and special fittings according to AWWA C600 or AWWA M41.
7. Install PVC sewer piping according to ASTM D 2321 and ASTM F 1668.
8. Install PVC profile gravity sewer piping according to ASTM D 2321 and ASTM F 1668.
3.4 PIPE JOINT CONSTRUCTION
A. Basic pipe joint construction is specified in Division 33 Section "Common Work Results for Utilities." Where specific joint construction is not indicated, follow piping manufacturer's written instructions.
B. Join gravity-flow, nonpressure drainage piping according to the following:
1. Join ductile-iron culvert piping according to AWWA C600 for push-on joints.
2. Join ductile-iron and special fittings according to AWWA C600 or AWWA M41.
3. Join PVC cellular-core piping according to ASTM D 2321 and ASTM F 891 for solvent-cement joints.
4. Join PVC sewer piping according to ASTM D 2321 and ASTM D 3034 for elastomeric-seal joints or ASTM D 3034 for elastomeric gasket joints.
5. Join PVC profile gravity sewer piping according to ASTM D 2321 for elastomeric-seal joints or ASTM F 794 for gasketed joints.
333100 - 8 Sanitary Sewerage Piping
6. Join dissimilar pipe materials with nonpressure-type flexible or rigid couplings.
C. Join dissimilar pipe materials with pressure-type couplings.
3.5 CLEANOUT INSTALLATION
A. Install cleanouts and riser extension from sewer pipe to cleanout at grade. Use same pipe type as sewer line that the cleanout is connected to. Install piping so cleanouts open in direction of flow in sewer pipe.
1. Use light-duty, top-loading classification cleanouts in earth or unpaved foot-traffic areas.
2. Use medium-duty, top-loading classification cleanouts in paved foot-traffic areas.
3. Use heavy-duty, top-loading classification cleanouts in vehicle-traffic service areas.
4. Use extra-heavy-duty, top-loading classification cleanouts in roads areas.
B. Set cleanout frames and covers in earth in cast-in-place concrete block, 12 inches around outside of cover. At contractors option, a square block can be used that is at least 12-inches wider that the cover. Set with tops 1 inch above surrounding earth grade.
C. Set cleanout frames and covers in concrete pavement with tops flush with pavement surface.
3.6 MANHOLE INSTALLATION
A. General: Install manholes, complete with appurtenances and accessories indicated.
B. Install precast concrete manhole sections according to ASTM C 891.
C. Construct cast-in-place manhole bases as indicated.
D. Set tops of frames and covers flush with finished surface of manholes that occur in pavements.
Set tops 3 inches above finished surface elsewhere, unless otherwise indicated.
3.7 CONCRETE PLACEMENT
A. Place cast-in-place concrete according to ACI 318/318R.
3.8 CONNECTIONS
A. Connect nonpressure, gravity-flow drainage piping to building's sanitary sewer system.
1. Use commercially manufactured wye fittings for piping branch connections. Remove section of existing pipe; install wye fitting into existing piping; and encase entire wye fitting, plus 6-inch overlap, with not less than 6 inches of concrete with 28-day compressive strength of 3000 psi.
2. Protect existing piping, manholes, and structures to prevent concrete or debris from entering while making tap connections. Remove debris or other extraneous material that may accumulate.
333100 - 9 Sanitary Sewerage Piping
3.9 CLOSING ABANDONED SEWER DRAINAGE SYSTEMS
A. Abandoned Piping: Close open ends of abandoned underground piping indicated to remain in place. Include closures strong enough to withstand hydrostatic and earth pressures that may result after ends of abandoned piping have been closed. Use either procedure below:
1. Close open ends of piping with at least 8-inch-thick, brick masonry bulkheads.
2. Close open ends of piping with threaded metal caps, plastic plugs, or other acceptable methods suitable for size and type of material being closed. Do not use wood plugs.
B. Abandoned Manholes and Structures: Excavate around manholes and structures as required and use one procedure below:
1. Remove manhole or structure and close open ends of remaining piping.
2. Remove top of manhole or structure down to at least 36 inches below final grade. Fill to within 12 inches of top with stone, rubble, gravel, or compacted dirt. Fill to top with concrete.
C. Backfill to grade according to Division 31 Section "Earth Moving."
3.10 IDENTIFICATION
A. Materials and their installation are specified in Division 31 Section "Earth Moving." Arrange for installation of green warning tape directly over piping and at outside edge of underground structures.
1. Use warning tape or detectable warning tape over ferrous piping.
2. Use detectable warning tape over nonferrous piping and over edges of underground structures.
3.11 FIELD QUALITY CONTROL
A. Inspect interior of piping to determine whether line displacement or other damage has occurred.
Inspect after approximately 24 inches of backfill is in place, and again at completion of Project.
1. Submit separate reports for each system inspection.
a. Reports shall include a video log of storm drain showing all lineal footage of the system in DVD format. Log shall be submitted to the owner once a month. A final log shall be submitted with the as built drawing for the use of the owner and Architect.
2. Defects requiring correction include the following:
a. Alignment: Less than full diameter of inside of pipe is visible between structures.
b. Deflection: Flexible piping with deflection that prevents passage of ball or cylinder of size not less than 92.5 percent of piping diameter.
c. Crushed, broken, cracked, or otherwise damaged piping.
d. Infiltration: Water leakage into piping.
e. Exfiltration: Water leakage from or around piping.
f. Test for infiltration or exfiltration between manholes as follows:
1) Clean section of sewer line of dirt. Debris, gravel, rocks and other items.
2) Fill section between manholes with water. Allow water to sit in pipe for not less than 3-hours to acclimate to surrounding earth temperature.
333100 - 10 Sanitary Sewerage Piping
3) Use a water pump to pressurize the sewer pipe section to not less than 5 psi and not more than 10 psi. Record starting pressure.
4) Turn off water pressure and wait 20 minutes.
5) Refill pipe to same pressure as in step 3 and measure volume required to fill pipe to same pressure.
6) Pipe section passes test if volume required to refill pipe is less than ½-gallon per 400 feet of 8-inch pipe. Prorate the allowable seepage larger or smaller pipes and for shorter or longer distances.
7) Find and fix leaks in any section that fails to pass test. Fix any visible leaks found even if section of pipe passes test.
3. Replace defective piping using new materials, and repeat inspections until defects are within allowances specified.
4. Reinspect and repeat procedure until results are satisfactory.
B. Test new piping systems, and parts of existing systems that have been altered, extended, or repaired, for leaks and defects.
1. Do not enclose, cover, or put into service before inspection and approval.
2. Test completed piping systems according to authorities having jurisdiction.
3. Schedule tests and inspections by authorities having jurisdiction with at least 24 hours' advance notice.
4. Submit separate report for each test.
3.12 CLEANING
A. Clean interior of piping of dirt and superfluous materials.
END OF SECTION 333100
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. This Section includes gravity-flow, nonpressure sanitary sewerage outside the building, with the following components: |
| 1. Special fittings for expansion and deflection. |
| 2. Cleanouts. |
| 3. Drains. |
| 4. Precast concrete manholes. |
| 5. Cast in place manhole bases over existing pipes. |
| 6. Sewerage Pipes. |
| 1.3 DEFINITIONS |
| A. PVC: Polyvinyl chloride plastic. |
| 1.4 PERFORMANCE REQUIREMENTS |
| A. Gravity-Flow, Nonpressure, Sewer-Piping Pressure Rating: 10-foot head of water. Pipe joints shall be at least water tight under specified head, unless otherwise indicated. |
| 1.5 SUBMITTALS |
| A. Product Data: For the following: |
| 1. Special pipe fittings. |
| 2. Cleanout materials. |
| 3. Pipes. |
| B. Shop Drawings: For the following: |
| 1. Manholes: Include plans, elevations, sections, details, and frames and covers. Include design calculations, and concrete design-mix report for cast-in-place manholes. |
| C. Coordination Drawings: Show pipe sizes, locations, and elevations. Show other piping in same trench and clearances from storm drainage system piping. Indicate interface and spatial relationship between manholes, piping, and proximate structures. |
| D. Profile Drawings: Show system piping in elevation. Draw profiles at horizontal scale of not less than 1 inch equals 60 feet and vertical scale of not less than 1 inch equals 8 feet. Indicate manholes and piping. Show types, sizes, materials, an... |
| E. Field quality-control test reports. |
| 1.6 DELIVERY, STORAGE, AND HANDLING |
| A. Do not store plastic pipe and fittings in direct sunlight. |
| B. Protect pipe, pipe fittings, and seals from dirt and damage. |
| C. Handle manholes according to manufacturer's written rigging instructions. |
| 1.7 PROJECT CONDITIONS |
| A. Interruption of Existing Sanitary Sewerage Service: Do not interrupt service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary service according to requirem... |
| 1. Notify Architect, Construction Manager and Owner no fewer than two days in advance of proposed interruption of service. Coordinate interruptions during weekly meetings and at pre-construction meeting. |
| 2. Do not proceed with interruption of service without Architect's, Construction Manager's, and Owner's written permission. |
| 3. If shutdown will affect city streets, other city utilities, or city sewer line, do not proceed without approval from city and local sanitary sewer purveyor. |
| PART 2 - PRODUCTS |
| 2.1 MANUFACTURERS |
| A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection: |
| 1. Available Manufacturers: Subject to compliance with requirements. |
| 2. Backfill Material shall comply with section 312000 – Earthwork and or the local sewage purveyors requirement. The contractor shall assume availability of acceptable material on the site at their own risk. No additional payment will be made for impo... |
| 2.2 PIPING MATERIALS - PVC PIPE AND FITTINGS |
| A. PVC Pressure Pipe: AWWA C900, Class 150 for gasketed joints and using ASTM F 477, elastomeric seals. |
| 1. Fittings NPS 4 to NPS 8: PVC pressure fittings complying with AWWA C907, for gasketed joints and using ASTM F 477, elastomeric seals. |
| 2. Fittings NPS 10 and Larger: Ductile-iron, compact fittings complying with AWWA C153, for push-on joints and using AWWA C111, rubber gaskets. |
| B. PVC Water-Service Pipe and Fittings: ASTM D 1785, Schedule 80 pipe, with plain ends for solvent-cemented joints with ASTM D 2467, Schedule 80, socket-type fittings. |
| C. PVC Sewer Pipe and Fittings, NPS 15 and Smaller: ASTM D 3034, SDR 35, with bell-and-spigot ends for gasketed joints with ASTM F 477, elastomeric seals. |
| D. PVC Sewer Pipe and Fittings, NPS 18 and Larger: ASTM F 679, T 2 wall thickness, with bell-and-spigot ends for gasketed joints with ASTM F 477, elastomeric seals. |
| E. PVC Profile Gravity Sewer Pipe and Fittings: ASTM F 794 pipe, with bell-and-spigot ends; ASTM D 3034 fittings, with bell ends; and ASTM F 477, elastomeric seals. |
| 2.3 NONPRESSURE-TYPE PIPE COUPLINGS |
| A. Use non-pressure type couplings only when pipes can not be connected together with standard fittings and typical pipe connections such as bell and spigot. If possible, file the end on existing pipes to create spigot type connections to match exist... |
| B. Comply with ASTM C 1173, elastomeric, sleeve-type, reducing or transition coupling, for joining underground nonpressure piping. Include ends of same sizes as piping to be joined, and corrosion-resistant-metal tension band and tightening mechanism ... |
| C. Sleeve Materials: |
| 1. For Concrete Pipes: ASTM C 443, rubber. |
| 2. For Cast-Iron Soil Pipes: ASTM C 564, rubber. |
| 3. For Plastic Pipes: ASTM F 477, elastomeric seal or ASTM D 5926, PVC. |
| 4. For Dissimilar Pipes: ASTM D 5926, PVC or other material compatible with pipe materials being joined. |
| D. Unshielded Flexible Couplings: Elastomeric sleeve with stainless-steel shear ring and corrosion-resistant-metal tension band and tightening mechanism on each end. |
| 1. Manufacturers: |
| a. Dallas Specialty & Mfg. Co. |
| b. Fernco Inc. |
| c. Logan Clay Products Company (The). |
| d. Mission Rubber Company; a division of MCP Industries, Inc. |
| e. NDS Inc. |
| f. Plastic Oddities, Inc. |
| E. Shielded Flexible Couplings: ASTM C 1460, elastomeric or rubber sleeve with full-length, corrosion-resistant outer shield and corrosion-resistant-metal tension band and tightening mechanism on each end. |
| 1. Manufacturers: |
| a. Cascade Waterworks Mfg. |
| b. Dallas Specialty & Mfg. Co. |
| c. Mission Rubber Company; a division of MCP Industries, Inc. |
| F. Ring-Type Flexible Couplings: Elastomeric compression seal with dimensions to fit inside bell of larger pipe and for spigot of smaller pipe to fit inside ring. |
| 1. Manufacturers: |
| a. Fernco Inc. |
| b. Logan Clay Products Company (The). |
| c. Mission Rubber Company; a division of MCP Industries, Inc. |
| G. Split-Sleeve Couplings: With split sleeve with sealing pad and closure plates, O-ring gaskets, and bolt fasteners. |
| 1. Manufacturers: |
| a. Brico Industries. |
| 2. Sleeve Material: Manufacturer's standard. |
| 3. Sleeve Dimensions: Of thickness and width required to provide pressure rating. |
| 4. Gasket Material: O-rings made of EPDM rubber, unless otherwise indicated. |
| 5. Metal Component Finish: Corrosion-resistant coating or material. |
| 2.4 CLEANOUTS |
| A. Gray-Iron Cleanouts: ASME A112.36.2M, round, gray-iron housing with clamping device and round, secured, scoriated, gray-iron cover. Include gray-iron ferrule with inside calk or spigot connection and countersunk, tapered-thread, brass closure plug. |
| 1. Manufacturers: |
| a. Josam Company. |
| b. MIFAB Manufacturing, Inc. |
| c. Smith, Jay R. Mfg. Co. |
| d. Wade Div.; Tyler Pipe. |
| e. Watts Industries, Inc. |
| f. Watts Industries, Inc.; Enpoco, Inc. Div. |
| g. Zurn Industries, Inc.; Zurn Specification Drainage Operation. |
| 2. Top-Loading Classification(s): Light, Medium, Heavy, and Extra-heavy duty depending on location and expected driving load on cleanout. |
| 3. Sewer Pipe Fitting and Riser to Cleanout: ASTM A 74, Service class, cast-iron soil pipe and fittings. |
| B. PVC Cleanouts: PVC body with PVC threaded plug. Include PVC sewer pipe fitting and riser to cleanout of same material as sewer piping. Place in grey iron housing with clamping device and round, secured, scoriated, gray-iron cover. |
| 1. Manufacturers: |
| a. Canplas Inc. |
| b. Josam Company |
| c. MIFAB Manufacturing, Inc. |
| d. Wad Div.; Tyler Pipe |
| e. Watts Industries, Inc. |
| f. Zern Industries, Inc; Zern Specification Drainage Operation |
| g. IPS Corporation. |
| h. NDS Inc. |
| i. Plastic Oddities, Inc. |
| j. Sioux Chief Manufacturing Company, Inc. |
| k. Zurn Industries, Inc.; Zurn Light Commercial Specialty Plumbing Products. |
| 2.5 MANHOLES |
| A. Standard Precast Concrete Manholes: ASTM C 478, precast, reinforced concrete, of depth indicated, with provision for sealant joints. |
| 1. Diameter: 48 inches minimum, unless otherwise indicated and as needed for pipe sizes. |
| 2. Ballast: Increase thickness of precast concrete sections or add concrete to base section, as required to prevent flotation. |
| 3. Base Section: 9-inch minimum thickness for floor slab and 4-inch minimum thickness for walls and base riser section, and having separate base slab or base section with integral floor. |
| 4. Riser Sections: 4-inch minimum thickness, and lengths to provide depth indicated. |
| 5. Top Section: Eccentric-cone type unless concentric-cone or flat-slab-top type is indicated. Top of cone of size that matches grade rings. |
| 6. Joint Sealant: ASTM C 990, bitumen or butyl rubber. |
| 7. Resilient Pipe Connectors: ASTM C 923, cast or fitted into manhole walls, for each pipe connection. |
| 8. Steps: Not used. |
| 9. Adjusting Rings: Interlocking rings with level or sloped edge in thickness and diameter matching manhole frame and cover. Include sealant recommended by ring manufacturer. |
| 10. Grade Rings: Reinforced-concrete rings, 6- to 9-inch total thickness, to match diameter of manhole frame and cover. |
| 11. Manhole Frames and Covers: Ferrous; 24-inch ID by 7- to 9-inch riser with 4-inch- minimum width flange and 26-inch- diameter cover. Include indented top design with lettering cast into cover, using wording equivalent to "SANITARY SEWER." |
| a. Material: ASTM A 536, Grade 60-40-18 ductile or ASTM A 48, Class 35 gray iron, unless otherwise indicated and to match existing manhole frames and covers. |
| b. Protective Coating: Foundry-applied, SSPC-Paint 16, coal-tar, epoxy-polyamide paint; 15-mil minimum thickness applied to all surfaces, unless otherwise indicated. |
| B. Cast-in-Place Concrete Manholes Base: Construct of reinforced-concrete bottom according to ASTM C 890 for A-16 (ASSHTO HS20-44), heavy-traffic, structural loading; of depth, shape, dimensions, and appurtenances indicated. |
| 1. Ballast: Increase thickness of concrete, as required to prevent flotation. |
| 2. Excavate around existing pipe where manhole is to be placed. |
| 3. Place new pipe stub at line and grade and stubbed into new manhole location with pipe extending towards existing pipes. |
| 4. Place CMU blocks or other approved support adjacent to pipes to support new barrel section. |
| 5. Set first barrel section on CMU blocks and verify that barrel section is level in all directions and is not sitting on pipes. |
| 6. Make sure that hole is deep enough that the depth of concrete will be 9-inches below existing and new pipes. |
| 7. Place concrete around barrel section and inside barrel section so that the existing and new pipes are at least 50% covered with concrete. |
| 8. Hand form trough as needed. |
| 9. Let concrete cure and break out of pipes for trough. Grout all troughs smooth and even with pipes. |
| 10. Stack remaining barrel sections and add cone, ring and cover etc. as indicated for precast manhole. |
| 2.6 CONCRETE |
| A. General: Cast-in-place concrete according to ACI 318/318R, ACI 350R, and the following: |
| 1. Cement: ASTM C 150, Type II. |
| 2. Fine Aggregate: ASTM C 33, sand. |
| 3. Coarse Aggregate: ASTM C 33, crushed gravel. |
| 4. Water: Potable. |
| B. Portland Cement Design Mix: 4000 psi minimum, with 0.45 maximum water-cementitious materials ratio. |
| 1. Reinforcement Fabric: ASTM A 185, steel, welded wire fabric, plain. |
| 2. Reinforcement Bars: ASTM A 615/A 615M, Grade 60, deformed steel. |
| C. Ballast and Pipe Supports: Portland cement design mix, 3000 psi minimum, with 0.58 maximum water-cementitious materials ratio. |
| 1. Reinforcement Fabric: ASTM A 185, steel, welded wire fabric, plain. |
| 2. Reinforcement Bars: ASTM A 615/A 615M, Grade 60, deformed steel. |
| PART 3 - EXECUTION |
| 3.1 EARTHWORK |
| A. Excavation, trenching, and backfilling are specified in Division 31 Section "Earth Moving." |
| 3.2 PIPING APPLICATIONS |
| A. Pipe couplings and special pipe fittings with pressure ratings at least equal to piping rating may be used in applications below, unless otherwise indicated. |
| 1. Use nonpressure-type flexible couplings where required to join gravity-flow, nonpressure sewer piping, unless otherwise indicated. |
| a. Flexible or rigid couplings for same or minor difference OD pipes. |
| b. Unshielded, increaser/reducer-pattern, flexible or rigid couplings for pipes with different OD. |
| c. Ring-type flexible couplings for piping of different sizes where annular space between smaller piping's OD and larger piping's ID permits installation. |
| B. Special Pipe Fittings: Use for pipe expansion and deflection. Pipe couplings and special pipe fittings with pressure ratings at least equal to piping rating may be used in applications below, unless otherwise indicated. |
| C. Gravity-Flow, Nonpressure Sewer Piping: Use any of the following pipe materials for each size range: |
| 1. PVC sewer pipe and fittings; gaskets; and gasketed joints. |
| 2. Ductile-iron pressure pipe, ductile-iron standard or compact fittings, gaskets, and gasketed joints. |
| 3. PVC pressure, PVC pressure fittings, gaskets, and gasketed joints. |
| 3.3 PIPING INSTALLATION |
| A. General Locations and Arrangements: Drawing plans and details indicate general location and arrangement of underground sanitary sewerage piping. Location and arrangement of piping layout take design considerations into account. Install piping as... |
| B. Install piping beginning at low point, true to grades and alignment indicated with unbroken continuity of invert. Place bell ends of piping facing upstream. Install gaskets, seals, sleeves, and couplings according to manufacturer's written instru... |
| C. Install manholes for changes in direction unless fittings are indicated. Use fittings for branch connections unless direct tap into existing sewer is indicated. |
| D. Install proper size increasers, reducers, and couplings where different sizes or materials of pipes and fittings are connected. Reducing size of piping in direction of flow is prohibited. |
| E. Tunneling: Install pipe under streets or other obstructions that cannot be disturbed by tunneling, jacking, or a combination of both. |
| F. Install gravity-flow, nonpressure drainage piping according to the following: |
| 1. Install piping pitched down in direction of flow, at slope indicated. |
| 2. Install piping with restrained joints at tee fittings and at changes in direction for pressure pipe. Use corrosion-resistant rods, pipe or fitting manufacturer's proprietary restraint system, or cast-in-place concrete supports or anchors. |
| 3. Install piping with cover indicated. |
| 4. Notify engineer of clearance problems that would result in changes to grade and alignment. |
| 5. Install ductile-iron culvert piping according to ASTM A 716. |
| 6. Install ductile-iron and special fittings according to AWWA C600 or AWWA M41. |
| 7. Install PVC sewer piping according to ASTM D 2321 and ASTM F 1668. |
| 8. Install PVC profile gravity sewer piping according to ASTM D 2321 and ASTM F 1668. |
| 3.4 PIPE JOINT CONSTRUCTION |
| A. Basic pipe joint construction is specified in Division 33 Section "Common Work Results for Utilities." Where specific joint construction is not indicated, follow piping manufacturer's written instructions. |
| B. Join gravity-flow, nonpressure drainage piping according to the following: |
| 1. Join ductile-iron culvert piping according to AWWA C600 for push-on joints. |
| 2. Join ductile-iron and special fittings according to AWWA C600 or AWWA M41. |
| 3. Join PVC cellular-core piping according to ASTM D 2321 and ASTM F 891 for solvent-cement joints. |
| 4. Join PVC sewer piping according to ASTM D 2321 and ASTM D 3034 for elastomeric-seal joints or ASTM D 3034 for elastomeric gasket joints. |
| 5. Join PVC profile gravity sewer piping according to ASTM D 2321 for elastomeric-seal joints or ASTM F 794 for gasketed joints. |
| 6. Join dissimilar pipe materials with nonpressure-type flexible or rigid couplings. |
C. Join dissimilar pipe materials with pressure-type couplings.
| 3.5 CLEANOUT INSTALLATION |
| A. Install cleanouts and riser extension from sewer pipe to cleanout at grade. Use same pipe type as sewer line that the cleanout is connected to. Install piping so cleanouts open in direction of flow in sewer pipe. |
| 1. Use light-duty, top-loading classification cleanouts in earth or unpaved foot-traffic areas. |
| 2. Use medium-duty, top-loading classification cleanouts in paved foot-traffic areas. |
| 3. Use heavy-duty, top-loading classification cleanouts in vehicle-traffic service areas. |
| 4. Use extra-heavy-duty, top-loading classification cleanouts in roads areas. |
| B. Set cleanout frames and covers in earth in cast-in-place concrete block, 12 inches around outside of cover. At contractors option, a square block can be used that is at least 12-inches wider that the cover. Set with tops 1 inch above surrounding e... |
| C. Set cleanout frames and covers in concrete pavement with tops flush with pavement surface. |
| 3.6 MANHOLE INSTALLATION |
| A. General: Install manholes, complete with appurtenances and accessories indicated. |
| B. Install precast concrete manhole sections according to ASTM C 891. |
| C. Construct cast-in-place manhole bases as indicated. |
| D. Set tops of frames and covers flush with finished surface of manholes that occur in pavements. Set tops 3 inches above finished surface elsewhere, unless otherwise indicated. |
| 3.7 CONCRETE PLACEMENT |
| A. Place cast-in-place concrete according to ACI 318/318R. |
| 3.8 CONNECTIONS |
| A. Connect nonpressure, gravity-flow drainage piping to building's sanitary sewer system. |
| 1. Use commercially manufactured wye fittings for piping branch connections. Remove section of existing pipe; install wye fitting into existing piping; and encase entire wye fitting, plus 6-inch overlap, with not less than 6 inches of concrete with 2... |
| 2. Protect existing piping, manholes, and structures to prevent concrete or debris from entering while making tap connections. Remove debris or other extraneous material that may accumulate. |
| 3.9 CLOSING ABANDONED SEWER DRAINAGE SYSTEMS |
| A. Abandoned Piping: Close open ends of abandoned underground piping indicated to remain in place. Include closures strong enough to withstand hydrostatic and earth pressures that may result after ends of abandoned piping have been closed. Use eith... |
| 1. Close open ends of piping with at least 8-inch-thick, brick masonry bulkheads. |
| 2. Close open ends of piping with threaded metal caps, plastic plugs, or other acceptable methods suitable for size and type of material being closed. Do not use wood plugs. |
| B. Abandoned Manholes and Structures: Excavate around manholes and structures as required and use one procedure below: |
| 1. Remove manhole or structure and close open ends of remaining piping. |
| 2. Remove top of manhole or structure down to at least 36 inches below final grade. Fill to within 12 inches of top with stone, rubble, gravel, or compacted dirt. Fill to top with concrete. |
C. Backfill to grade according to Division 31 Section "Earth Moving."
| 3.10 IDENTIFICATION |
| A. Materials and their installation are specified in Division 31 Section "Earth Moving." Arrange for installation of green warning tape directly over piping and at outside edge of underground structures. |
| 1. Use warning tape or detectable warning tape over ferrous piping. |
| 2. Use detectable warning tape over nonferrous piping and over edges of underground structures. |
| 3.11 FIELD QUALITY CONTROL |
| A. Inspect interior of piping to determine whether line displacement or other damage has occurred. Inspect after approximately 24 inches of backfill is in place, and again at completion of Project. |
| 1. Submit separate reports for each system inspection. |
| a. Reports shall include a video log of storm drain showing all lineal footage of the system in DVD format. Log shall be submitted to the owner once a month. A final log shall be submitted with the as built drawing for the use of the owner and Architect. |
| 2. Defects requiring correction include the following: |
| a. Alignment: Less than full diameter of inside of pipe is visible between structures. |
| b. Deflection: Flexible piping with deflection that prevents passage of ball or cylinder of size not less than 92.5 percent of piping diameter. |
| c. Crushed, broken, cracked, or otherwise damaged piping. |
| d. Infiltration: Water leakage into piping. |
| e. Exfiltration: Water leakage from or around piping. |
| f. Test for infiltration or exfiltration between manholes as follows: |
| 1) Clean section of sewer line of dirt. Debris, gravel, rocks and other items. |
| 2) Fill section between manholes with water. Allow water to sit in pipe for not less than 3-hours to acclimate to surrounding earth temperature. |
| 3) Use a water pump to pressurize the sewer pipe section to not less than 5 psi and not more than 10 psi. Record starting pressure. |
| 4) Turn off water pressure and wait 20 minutes. |
| 5) Refill pipe to same pressure as in step 3 and measure volume required to fill pipe to same pressure. |
| 6) Pipe section passes test if volume required to refill pipe is less than ½-gallon per 400 feet of 8-inch pipe. Prorate the allowable seepage larger or smaller pipes and for shorter or longer distances. |
| 7) Find and fix leaks in any section that fails to pass test. Fix any visible leaks found even if section of pipe passes test. |
| 3. Replace defective piping using new materials, and repeat inspections until defects are within allowances specified. |
| 4. Reinspect and repeat procedure until results are satisfactory. |
| B. Test new piping systems, and parts of existing systems that have been altered, extended, or repaired, for leaks and defects. |
| 1. Do not enclose, cover, or put into service before inspection and approval. |
| 2. Test completed piping systems according to authorities having jurisdiction. |
| 3. Schedule tests and inspections by authorities having jurisdiction with at least 24 hours' advance notice. |
| 4. Submit separate report for each test. |
| 3.12 CLEANING |
| A. Clean interior of piping of dirt and superfluous materials. |
File details come from the government source that posted it. Updated .