This is a technical report on the electrical power supply system for the El Retamal International Dam located on the Rio Bravo in Tamaulipas, Mexico. The report is complementary analysis to contract CILA-JUA-LPN-21-2023 for rehabilitation and modernization of the dam's lifting systems, prepared by DUSGEM SA de CV in October 2024.
The contract encompasses six stages: engineering development, executive design, manufacturing, assembly, dismantling of previous systems, and commissioning of new lifting systems. The modernization project involves installing a hydraulic power unit (HPU) driven by two 25 HP electric motors operating independently as backup for each other, along with associated servomechanisms, control panels, and hydraulic components. The electrical scope includes manufacture and installation of a power and control panel for movement of side and central gates, power supply from the control room to HPU mechanisms, and signal cables to existing mechanisms. Current power infrastructure consists of 34.50 kV three-phase overhead lines with 220-volt transformers in both Mexican and U.S. sections, emergency generators rated at 30 kVA maximum capacity, and a contracted load of 25 KW. Short-circuit analysis identified values of 3.603 kA and 3.675 kA from the nearby SE Parque Industrial Colonial 138 kV substation. The proposed arrangement requires installation of 75 KVA (34,500/480-277 VAC) Delta Star transformers, 3x100 AMP and 3x150 AMP safety switches, new conduit piping and cable feeds of various gauges between 1/0 AWG and #8 AWG, 30 KVA dry-type transformers, and 30-pole NF30 distribution boards. Procurement and installation work is estimated at 6-8 weeks. The report recommends modernizing the three-phase power system to 480 volts nominal voltage to optimize electrical consumption and accommodate the new HPU motors, including upgrading main transformers, switchboards, transfers, and conductors; existing generators can be migrated from 220 to 480 volts with minimal adjustments.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical report on the power supply of the El Retamal Dam Sheet 1 of 13
Complementary analysis to CILA-JUA-LPN-21-2023 for the “Rehabilitation and modernization of the lifting systems at Retamal Dam”, carried out by the company DUSGEM SA de CV.
Reynosa, Tamaulipas, October 2024.
TECHNICAL REPORT ON THE ELECTRICAL SUPPLIES OF THE EL
RETAMAL INTERNATIONAL DAM, LOCATED ON THE RIO BRAVO,
TAMAULIPAS.
Machine Translated by Google
Table of Contents.
Sheet 2 of 13
Stage 4
Figure 3. Diagram of the mechanisms and current power supply system of El Retamal Dam
VI. TECHNICAL REQUIREMENTS OF THE NEW LIFTING SYSTEM
Figure 6. List of components that make up the HPU in charge of the El Retamal Dam Modernization project
Photographs 2 and 3. Power line and three-phase transformer of the Mexican section
Stage 5
VII. DESCRIPTION OF THE PROPOSED ARRANGEMENT
Figure 7. Single-line diagram of the El Retamal Dam Modernization project
Stage 6
Figure 1. Diagram of the HPU system, showing two electric motors
Figure 3. Preliminary Short Circuit Values provided by the CFE
Photographs 4, 5 and 6. Main power supply boards and registers (Mexican section). .. 7
II. SCOPE
Photographs 7 and 8. Main power supply (US section)
VIII. CONCLUSIONS AND RECOMMENDATIONS
Technical report on the power supply of the El Retamal Dam
III. AIM
I. BACKGROUND
Photographs 9 and 10. Emergency plants, backup unit (US section). 8
V. SCOPE CONSIDERED IN THE MODERNIZATION STAGE
Stage 1
Stage 2
IV. DESCRIPTION OF THE EXISTING POWER SUPPLY SYSTEM
Figure 2. Single-line diagram of existing power supply (October 2024)
Stage 3
Photograph 1. General view of the El Retamal Dam, note the feeds coming from the ends
Figure 4. Diagram of the mechanisms and power supply system in charge of the El Retamal Dam Modernization project
PIIOl1CIDS,CGf!SHUCTION,SUPEP:'IISll,jf/llQNIAJESDEIH6UUIIIAESPt:CW..LIFT
Technical report on the power supply of the El Retamal Dam
Stage 2.
Commissioning of lifting systems: servomechanisms, support structures on concrete piles (chassis) and on the gate structure (lug), control panel and hydraulic power unit, inclinometer programming, power and control systems.
Executive designs of the lifting systems: servomechanisms, support structures on concrete piles
(chassis) and on the metal structure of the gate screen (lug), control panel and hydraulic power unit.
Stage 3.
Manufacturing of lifting systems: servomechanisms, support structures on concrete piles (chassis) and on the metal structure of the gate screen (lug), control panel and hydraulic power unit, including the procurement of power cables, accessories and supply pipes for the hydraulic power system.
REPORT ON THE MAIN FEED OF THE EL RETAMAL DAM, RIO BRAVO, TAMAULIPAS.
Stage 4.
I. BACKGROUND.
Assembly of lifting systems: servomechanisms, support structures on concrete piles (chassis) and on the metal structure of the gate screen (lug), control panel and hydraulic power unit, including supply pipes, complementary elements such as inclinometers, power wiring, control and accessories.
On September 1, 2023, the unit-price, fixed-time public works contract No. CILA-JUA-LPN-21-2023 was signed for the work described as the "Rehabilitation and modernization of the lifting systems of the
Retamal Dam floodgates." This contract includes several stages:
Stage 5.
Stage 1.
Dismantling of the previous systems consisting of rocker arm structures, cables, pulleys, and gearmotors, which will be moved to the side yard of the El Retamal Dam.
Development of the engineering for the implementation of the central gate lifting system, control panel, and hydraulic power unit.
Stage 6.
PIIOl1CIDS,CGf!SHUCTION,SUPEP:'IISll,jf/llQNIAJESDEIH6UUIIIAESPt:CW..LIFT
Sheet 3 of 13
G1 " G 1"
DO NOT SUBMERGE
CD
CD 1600 Us.
~~ ... -.,.,-,,., ... -=-.. ...,,,.~ 1 ~ ~ -----~ ij
During the engineering phase, the servomotors were designed to be capable of lifting the central gate and actuating all its movements without deformations, alterations, or variations. This was evident in the engineering developed, leading to the selection of a robust servomotor system with specific characteristics.
II. SCOPE.
Figure 1. Diagram of the HPU system, showing two electric motors.
We are currently in phase 3 of the modernization project, which involves the manufacture of a servo system, which will be driven by a HPU (Hydraulic Power Unit). This is connected to the control panel, which links the power supply with the data system to operate and control the movement of the gates, simultaneously performing the graphic identification to be displayed on the control panel.
The purpose of this document is to explain the scope of the contract for the power supply to the lifting system of the El Retamal Dam, which is currently being modernized.
III. OBJECTIVE.
To clarify and identify urgent modifications to the dam's electrical power system, as well as to demonstrate the current state of the systems, including panels, conductors, grounding systems, and others that clearly require maintenance. Also, to consider modernization efforts, especially to create optimal conditions for the dam's lifting system. Part of the main objective is to identify the procurement of specially manufactured elements, which must be carried out by CILA in both the Mexican and U.S. sections, along with other complementary work.
GD
Sheet 4 of 13
CID
i.e., Tt :a~!I' aa, 2.5~ ÿ
13.2h"l'l'.it0.'1GY
Technical report on the power supply of the El Retamal Dam
34 k~
T~ ai.iflP
SA _j A.oome:ida CirE
3. Contracted load. This represents a demand of 25 KW, data provided for the representation of CILA in Reynosa.
Figure 2. Single-line diagram of existing power supply (October 2024).
This diagram was the result of surveys, reviews, visits, analyses, and inspections carried out at the facilities to determine the composition of the current system, since updated plans are not available.
1. Main power lines. Both the Mexican and U.S. sections are composed of 34.50 kV three-phase overhead lines, both with three-phase transformers with a nominal voltage of 220 volts.
2. Generators. That is, emergency generators are also configured for a nominal voltage of 220 volts and a maximum capacity of 30 kVA.
The main power supply considers the following:
IV. DESCRIPTION OF THE EXISTING POWER SUPPLY SYSTEM.
Sheet 5 of 13
'1 :!-~ h'l2.40-12(W utr..leu:!dikv ÿ
W ÿ
International Commission on Natural Resources T
Commission
Commission
International Commission of~
International Boundary and W aterInternational Commission on Water Limits
L_ I _ _j t
Water Comm1ss1on
Yo
Yo
Yo
Yo
Technical report on the power supply of the El Retamal Dam
IBCWCILA
Sheet 6 of 13
Yo
YoYo
International Boundary and Water
MEX Waters
MEX Water Limits
MEX Waters
Figure 3. Diagram of the mechanisms and current power supply system of El Retamal Dam
Photograph 1. General view of the El Retamal Dam, observe the feeds coming from the ends.
Photograph 2 and 3. Power line and three-phase transformer of the Mexican section.
r
34 KV W Transformer
Gate Central
Emergency Plant
River Flow
34 KV Transformer
Unea Principal Aerea emational Bou~d~ry and
Main Air Line
Emergency Plant
Fourth Dr. Control
Description:
Electrical Installations
----- Electrical/Mechanical Installations
Icc = 3.603 kA
Icc
The Mexican section's connection is 34.5 kV and the main substation nearby is the SE Parque Industrial
Colonial 138 kV. Consulting the short-circuit level in the document "Short Circuit Values of the General Distribution Networks 2026" published annually by the CFE Distribution Directorate, the characteristics of the electrical equipment of the HPU system were verified, having the following value.
= 3.675 kA
Figure 3. Preliminary Short Circuit Values provided by the CFE Below, some elements will be shown in their current state.
Photographs 4, 5 and 6. Main power supply boards and records (Mexican section).
Technical report on the power supply of the El Retamal Dam
North Gulf Reynosa
S.nco
Yo
3.008
Division
7.511
Gotto Norte Re"- 00
Number Subsb.cion
3F X/R
Maximum CC level 2024Capacity CC level mini ~ 202-4
Cone current (YCI.Jito {kA), and X/ R ratio
X/R
17.284
7.302
Golfo Norte Reynosa
Golfo Norte Reynosa
06-NRE-138-1
IF
MT
(kV) (kV)
Gelfo Norte Distribution Division Medium voltage short - circuit values in the RGD, corresponding to the year 2026
~Fttl#m_,., t NEJ«JrlfltJH
Tension Tension Aaimimo
Sheet 7 of 13
CFE
-MVA
Gotto Norte Reynosa
North Gulf Reynosa
North Gulf Reynosa
Golfo Norte Reynosa
North Gulf Reynosa
North Gulf Reynosa
Gotto Norte Reynosa
Gelfo Norte Reynosa
Yo
16.498 7,650 17,475
7,646 17,763
06-OR2-138-1
2,923 15,909Golfo Norte Reynosa
7,797 18,710
13.8
7,679 18,007
4.623 16.772
13.8
06-JRA-138 JARACHINA
3.653 17.234
8,766 15,820
06-DOR-138-1
8.598
2,990 17,010
7,562 17,600
06-PAl-138 PARDUE INDUSTRIAL RE' 06-PAl-138-1
7,928 17,860
06-MEX-138 MEXICO
16.196
13.8
7,328 15,559
3.555 18.064
13.8
2,948 16,861
06-JRA-138-2
7,655 17,387
06-DOR-138 DIAZ ORDAZ
3.603
06-PIC-138 COLONIAL INDUSTRIAL 06-PIC-138-1
7.881
7,677 18,303
7.276 18.254
8.042
34.5
06-MEX-138-1
8,503 14,452
13.8
17.207
06-JUZ-138 JUAREZ
3.675
17,746
13.806-JUZ-138-2
06-INO2-138 INDUSTRIAL DEL NDRTE 06-INO2-138-1
7.178 17.529
8,834 16,619
IF
17.060
06-PAl-138 PAROUE INDUSTRIAL RP 06-PA~1 38-2 3.458 16.294
7.217 18.260
18,495
34.5
06-NRE-136 NORTH
06-JUZ-138 JUAREZ
18.006
7,730 17,146
13.8
06-INO2-1 38 NORTH INDUSTRIAL 06 -INO2-138-2
30 14,183 14,831
8,009 17,903
13.8
3.053 17.350
7,686 16,432 1 7,831 17,423
7,506 16,733
Golfo Norte Reynosa
IF
34.5
7,588 17,942 7,692 18,554
06-NVP-138 NEW PROGRESS
06-JUZ-136-1
2,990 16,342
3.534 17.311
7,862 17,965
13.8
4.520
06-JRA-138 JARACHINA
34.5
7,366 16,158
18,785
12.t 4.611 16.4294.503 15.175
7,767 18,148
06-MEX-138 MEXICO
3.488
13.8
7,553 17,202
3.013 17.245
7.532
14,652 16,125 14,348 15,901 14,769 16,989
06-OR2-136 ORIZATLAN
7,699 18,156
06-MEX-138-2
3.571
15.604
13.8
7,516 16,875
06-JRA-138-1
7,545 17,167 1 7,662 17.9&1
3.069 18.037
138 17.205
Area
270 Gano Norte Reynosa
XIRXIR
AT
15.42606-NVP-138-1
Photographs 9 and 10. Emergency plants, backup unit (US section).
Photograph 7 and 8. Main power supply (US section).
The facilities at the American section are in slightly better condition; however, both have wire as their main conductor, which is due for replacement, and the cabinets and auxiliary systems show advanced oxidation. Insects and harmful fauna have affected much of the wire insulation, causing weakening, which could lead to a power failure.
Sheet 8 of 13
Water Comm1ss1on
International Boundary and Water 34 KV Transformer
Emergency Plant Emergency Plant
Fourth Dr. Control
W Transformer 34 KV
River Flow International Air Main Line
Bou~d~ry and
Main Air Line
Description:
Electrical Installations
In charge of Modernization
Electrical/Mechanical Installations
MEX Waters
MEX Water Limits
MEX Waters
International Commission of:}
Commission
Commission t
IBCWCILA
International Commission on Water Limits
Technical report on the power supply of the El Retamal Dam
International Commission on Water Limits
Sheet 9 of 13
"T
1. Manufacture and installation of a power and control panel (control unit for movement of the side gates and central gate) including the cabinet, push-button system for control and actuation of the mechanisms, accessories, computer, control panel and interface.
3. Power, including supply of signal cables from the control room to the existing mechanisms located at the rear upstream of the side gates. This includes new conduits, accessories and connections of the existing mechanism system with the new control system.
The contract that DUSGEM is developing for the modernization of lifting systems includes the following for the electrical part:
V. SCOPE CONSIDERED IN THE MODERNIZATION STAGE.
Figure 4. Diagram of the mechanisms and power supply system in charge of the El Retamal Dam Modernization project.
As mentioned, the original scope was to connect the new system (board) to the existing lateral mechanisms and to the HPU for the central gate system; however, the feed line capacity was revised and requires additional adjustments, which will be mentioned later.
2. Power supply from the control room to the HPU mechanisms for the central gate (everything within the control room, including wiring, routing, connection and programming from the original power supply of the previous system to the new control panel).
International Boundary and Water l
Accumulator security block
Gauge lsolaior
Level switch
Level gauge
Description
Technical report on the power supply of the El Retamal Dam
Mpnllli
RPEC-lWN
18 Return fUter
FT-290-114"
Hand pump
Mpflltrl
Hawe
Voss
Voss
Atos
Qty, Type 1
SBR10TCM000330CNZ0
Electrical Indication<
Electrical Indication
Oilseed oil
Garma
Garma
25HP 1750rpm, 60Hz 460V 83/8~
GCL001360
Pressure Transducer
Pressure Relief Valve
EM22V•G24 7749 0024-00,HW
GPL003782
212 Poppet Valve Normally Closed
Leduc
PGP511 A0270CS2D3NL212B1B1
FT26712-34
GLUAL
PISTER
Electric molor
Throttle Check Valve
Check Valve
Check Valve
Check Valve
Wlka
PT250R-2004-12-DA91
DLES0HA50P01
Gear Pump
Mpflltrl
Mpfiltri
RHD-20S
Separator Plate
MPflltrl
Tognella
Tognella
Tognella
Check Vallie
Manufacturer
D3W020BNJW
STR1003SG1M90P01
Cimberian
Mpfiltri
Mpfiltrl
2 Way Ball Valve
L VA30TVPM 12S01
2 Way Ball Valve
BKH-ON06-G 1 J4-11 2A
CMC000011 _ PT-100(4, .,20mA)_L=600mm Temperature Sensor
PVC-1-l=600 mm level switch
Commercial
RHD-20S
4/2 Direct Current Control Valve
CIM-16-1
STR0501SG1M90P0 1
PVC-1-L=SO0 m
Well, Breather desiccant
Sun
'212 Poppet Valve Normally Closed
PARKER
Sheet 10 of 13
Man~old
PM25S00 LPM270
BEA20HA50P01
Mpfillt1
EM42V
Parker
KQ-024
The servomechanisms and the HPU (Hydraulic Power Unit) include two electric motors within their components, as shown in diagram number 1, both are used to move the gate and these operate independently, that is, one will be a backup for the other, its drive will also be independent, both mobilize the hydraulic system, these according to the calculations resulted in 25 HP of power each, the HPU component table is attached.
VI. TECHNICAL REQUIREMENTS OF THE NEW LIFTING SYSTEM.
Figure 6. List of components that make up the HPU in charge of the El Retamal Dam Modernization project.
63-MM-EV-250
Pressure Filler
Voss
AKA 13FS200Z4S
MPF1811AG1A25HBP01
Pressure gauge
Suction filler
RHD-25S
CFI000010
Hawe
Regglana
FT26716-12
Accumulator
Support coupling
Tank and components
FMP 1352BAG2A25NP01
Throttle valve
Hans Turck
ABVE 50 (066890)
GLUAL
GLUAL
GLUAL
Parker
Suction Qlter
Technical report on the power supply of the El Retamal Dam Sheet 11 of 13
3. Supply and install two 3x100 AMP safety switches for both sections after the transformer connection point.
4. Supply and install 3-wire feeds of 1/0 AWG cable, 1 wire of 1/0 AWG cable and 1 wire in # 4 bare copper cable channeled with 2" diameter conduit pipe for both sections, from transformers to double-throw transfer, for both sections, as well as a 3x150 AMP protected switch. At this point, changes must be made to the generator equipment to operate at 480 volts and provide major service to the plants.
5. Supply and install after double throw transfer safety switch 3x150 AMP for both sections.
6. Supply and install feeds of 3 wires of # 2 AWG cable, 1 wire of # 2 AWG cable and 1 wire in bare copper cable of # 6 channeled with 2” diameter Conduit pipe for both sections, from the double-throw transfer to a 30-pole NF30 distribution board, for both sections, these boards are also recorded as new elements (approximately 85 linear meters of feed).
The installation of the mechanical components, namely the servomotors, HPU hydraulic power unit and the control panel, will begin in approximately 5 weeks. Therefore, the following action plan has been developed, which considers the following, for the part not covered within the modernization contract:
2. Supply and install 75 KVA (34,500 / 480-277 VAC) three-phase Delta Star type transformers for both sections.
1. Supply and install 3x5 AMP fuses as primary protection on the transformer bases for both sections.
VII. DESCRIPTION OF THE PROPOSED ARRANGEMENT.
7. After the distribution board, the supply and installation of a feed (approximately 15 linear meters) is considered, consisting of 3 wires of # 6 AWG cable, 1 wire of # 6 AWG cable and 1 wire of bare copper cable of # 8 channeled through 1-1/2” diameter Conduit pipe, for both sections.
8. Supply and install 30 KVA (34,500/480-) three-phase dry-type transformers
9. After the dry transformers, the supply and installation of a feed (approximately 10 linear meters) of 3 #
4 AWG cable wires, 1 # 4 AWG cable wire and 1 # 6 bare copper cable wire channeled with 1-1/2” diameter Conduit pipe is considered for both sections.
10. After the distribution board (point 7), the supply and installation of power (85 linear meters) is considered, consisting of 3 wires of #2 AWG cable, 1 wire of #2 AWG cable and 1 wire of bare copper cable of #6 channeled through 1-1/2” diameter Conduit pipe, for both sections.
220-127 VAC) for both power supplies. (These will be rated at a nominal voltage of 220 volts, in accordance with the rest of the installations, including lighting, outlets, and air conditioning.)
EOU)()R
A.COMETIOA CFE 3X34.5 KV
Sheet 12 of 13 l·#ICUD(TF}
POST
F\JSISlES----
In charge of Modernization of the
Electrical/ Mechanical Installations
Description:
ElectricalNew arrangement facilities .
3X40AMP
T•I-V2'°0
~mo
480VA.C
3-f4AWG(Fl
1-CUOi 4 TF
480VAC
1-A.\YGII/ON
JOPOI.OS tE30
3- 11.0ASCR CA6t.EAOOOECFE
)..AWG • I
CABlEAOOOECFE 3- #IMASCR
RIFLES
1-IIIBCUO(TF) s
1-112"0
T~OOtsTRIBUTION
NEW.3R
480VAC
NBM lR
3X 1!!IOA.W'
TRANSF'OR.MAOOR ·nPO OEl
TA STAR MULPHASIC 75
KVA 3'1.e00 J480-2nVAt.
~1/.,) m, 1.1Se,AWG (N)
-~u..-~
Technical report on the power supply of the El Retamal Dam
I-080.JD (TF)
BETTER~
JX, A.YP
CCM
---®--1 ~•WG• t/0
T•?'O and
15m .MS 3- •
0AWG(')
85m rr,e.HS
3-12AWG (F) l•
• .,AW1/GN ) 15miinNln •• dcuocm
TR.AHSFORMAOOR • OELTA TYPE -~~ A ESTRELI...A.
TIUFASIC075KVA J4-'00 l 440-2"V,A,C
3-f2AWG (F) 1· •
2 AWG (N} 1- •
eCUO(TF)
USA
4EICIVAC
450-2n VAC
T•Z'B
480VN:.
3X-40AMP
3X15DAMP3Xl!'IOAMP
T•l•11Z"£1
3X70NJ,P220VN:.
ex,smne
3X. 70ANP210VAC
EXISTENT
As indicated in section V, the scope of the contract may be adjusted to the new arrangement, identified within the purple polygon. For the remaining items, if necessary, written authorization is required. It is understood that modifications must be reconciled as unforeseen and additional items. We note that these are being quantified and valued. The technical and financial proposal for these items will be sent via email.
Additionally, the steps to be taken to replace the transformers are actions that must be promoted by the
Mexican and American branches and are dependent on different agencies and authorities.
Figure 7. Single-line diagram of the El Retamal Dam Modernization project.
The diagram developed with the basic information of the feeding proposal is attached below:
ZHP
lQkW
Z?OVAC
480-m VAC
NEIAAJR
IITTERRUPTOR_/ ! ~~oor
C NEMAJR
1.AWG IIO
Ga<ERAOOR El.ECTRJCO ElUSTEHTE 30 KV G er:] TRAHSFER!at<CIASOE 0061.ETIRO [YJ
T• 1-112'"0
POST
TZ-0
1-Cml • TF
3X \50.AMP
3X tOOAMf~
J CONNECTION SECTION 3X34 5KV :r A.
\1ERTCANA
220 1127VAC
T"91.ERO OISTRll!UTION
:220 / 127VAC
1-#4 AWG(N) 1-
f0CUD(TF}
Technical report on the power supply of the El Retamal Dam Sheet 13 of 13
VIII. CONCLUSIONS AND RECOMMENDATIONS.
• Different alternatives have been analyzed and explored for the use of the optimal nominal voltage, including the normal voltage of 220 volts currently used, both in the main feeds and in the emergency, transfer and supplementary plants. However, using this nominal voltage would generate greater energy consumption after the inclusion of the HPU (Hydraulic Power Unit) electric motors.
Procurement and additional installation work is estimated to take 6 to 8 weeks, depending on supplies.
I inform you that the company is fully prepared to jointly carry out the necessary actions to successfully complete the modernization contract. Resources will be allocated to address these additional works, pending approval.
• While some of the feeds are currently undergoing modernization, we consider it appropriate to additionally modernize the main transformers, switchboards, transfers, conduits, and existing conductors, since we are in this process and the condition of some elements can be classified as operational with their integrity in reserve.
• The most prudent alternative is to integrate the three-phase power system with a nominal voltage of 480 volts without having to adapt the main lines, i.e., the overhead lines, significantly optimizing electrical consumption and even regulating variations in the main system within the El Retamal
Dam.
• In the case of generators, they have been inspected and, according to the manufacturer's data, can be migrated from 220 volts to 480 volts of nominal power, making minimal adjustments, generating the necessary compatibility with the new electrical panel, taking advantage of these elements.
File details come from the government source that posted it. Updated .