IBWC Form 245C Minimum Qualifications for Award (Performance of Work By Contractor).pdf

PDF 111 KB Posted

Attached to
Retamal Dam Building and Generator
Solicitation number
191BWC26R0005
Issued by

About this file

This is a template form used by the International Boundary & Water Commission (IBWC) to document and verify the percentage of construction work that will be self-performed by a contractor versus subcontracted, in compliance with FAR Clause 52.236-1.

The form requires contractors to identify their company name, the solicitation name and number, and provide a detailed description of work to be self-performed. Contractors must calculate the total construction work to be performed by subtracting design costs, preconstruction survey costs, geotechnical borings/analysis, utility surveys, site inspections, and general overhead expenses (G&A, profit, bond, insurance) from the total bid price. The form then requires entry of total self-performed construction work and calculates the percentage of self-performed work using the formula (I / H x 100). The instructions define self-performance to include mobilization and utilization of contractor-owned or rented equipment operated by the contractor's own employees, materials both purchased and installed by the contractor's forces, associated labor, and job overhead costs. Explicitly excluded from self-performance are profit markups, general and administrative overhead, bonds, insurance, owner-operated equipment, rental of equipment for subcontractor operation, and materials purchased for subcontractor installation. The form must be completed, certified by the contractor's representative with signature and date, and printed to PDF prior to submission to USIBWC.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IBWC Form 245C (COND)

12/31/2024 Previous Editions are Obsolete Page 1 of 1

INTERNATIONAL BOUNDARY & WATER COMMISSION

MINIMUM QUALIFICATIONS FOR AWARD

PERFORMANCE OF CONSTRUCTION WORK BY CONTRACTOR

Contractor Name:

Solicitation Name: Solicitation No:

Complete form to determine percent of work performed by Contractor per FAR 52.236-1.

Describe the work to be self-performed:

A. Total Bid Price on Above Solicitation

B. Total Design Costs included in Bid ++

C. Total Preconstruction Survey Costs included in Bid ++

D. Total Preconstruction Geotechnical Borings/Analysis included in Bid ++

E. Total Preconstruction Utility Surveys included in Bid ++

F. Total Preconstruction Site Inspection included in Bid ++

G. Total G&A, Home Office Overhead, Profit, Bond, Insurance, etc.

H. Total Construction Work to be Performed (H = A - B - C - D - E - F - G)

I. Total Self-Performed Construction Work

J. Percent Self-Performed Construction Work (I / H x 100) % .

++ Include both self-performed and subcontractor costs for these items

I certify that the above information is current, accurate and complete to the best of my knowledge and that I have the authority to provide the information requested on this form.

Printed Name of Contractor's Representative Contractor's Representative's Title

Signature of Contractor's Representative Date Signed

IBWC Form 245C (COND)

12/31/2024 Previous Editions are Obsolete Instructions

INTERNATIONAL BOUNDARY & WATER COMMISSION

MINIMUM QUALIFICATIONS FOR AWARD

PERFORMANCE OF CONSTRUCTION WORK BY CONTRACTOR

INSTRUCTIONS

Contractor Name: Enter the name of the company biding on the solicitation (IFB/RFP), i.e. your name.

Solicitation Name: Enter the name of the project that is being solicited.

Solicitation Number: Enter the USIBWC solicitation number.

The following are definitions concerning self-performance of work by the Contractor in accordance with FAR Clause 52.236-1 Performance of Work by the Contractor (APR 1984).

“Self-Performance of Work” generally includes mobilization and utilization of owned or rented plant and equipment to be operated by the Contractor's own (not subcontract) employees. Include only those materials which will be both purchased and installed by the Contractor's own (not subcontract) forces, the labor associated with those aforementioned materials or equipment, only those supplies to directly support work performed by the Contractor's own employees, and the Contractor's own job overhead costs.

"Design Costs" includes all work defined in FAR 36.306-4(a)(1) and (2). Include all work that produces an engineer signed and stamped document required to proceed with construction except for work on as-built drawings.

"Preconstruction Survey Costs" includes all work defined in FAR 36.306-4(a)(4) that is performed before construction begins. This does not include surveying for as-builts, quantities, or other post construction work.

"Preconstruction Geotechnical Borings/Analysis" includes all work associated with collecting geotechnical bores or samples, performing analysis on collected materials, and performing additional or new geotechnical analysis on the site of work. This includes preconstruction establishment/identification of borrow areas but does not include any quality control testing detailed in the construction specifications.

"Preconstruction Utility Surveys" includes all work performed to identify type or location of utilities performed prior to construction in the area of the utilities.

"Preconstruction Site Inspection" includes all work associated with photographing the site, videotaping the site, trips to the site, and other similar work performed prior to construction.

"On the Site" includes the construction site(s), jobsite, and worksite as well as offsite fabrication plant, borrow sites, or other facilities necessary to manufacture assemblies or provide materials to be incorporated into the construction project. See Technical Specifications Section 01.42.00 for definition of jobsite and worksite.

“Total Self-Performed Construction Work" is comprised of all direct (variable, fixed, one-time and semi-variable) costs to the Contractor, including jobsite overhead costs, to construct the project. It generally includes all self-performed work, as defined above, and cost of all supplies and materials installed by Contractor.

The following are NOT self-performed work for purposes of the clause: markups for profit, general and administrative (G&A) overhead, bonds, insurance, or other indirect costs on self-performed or subcontracted work, "Owner-operated equipment," rental of plant or equipment for operation by subcontractors, and purchase of materials for installation by subcontractors. These items are entered into Line G.

RELATED FORMS

245 Minimum Qualifications for Award (Individual, Partnership, Company, or Corporation) 245A Minimum Qualifications for Award (Joint Venture) 245B Minimum Qualifications for Award: Backup Information 245D Minimum Qualifications for Award: Performance of Work by Design-Builder

Button3:
Project:
Print Title:
Click here1: Click below to add signature image to form
Contractor_Signature:
Date Signed:
Note2: Use signature image
Check: Off
Note1: Use digital signature
Button2:
Print:
Note: Form must be "printed" to pdf prior to submittal to USIBWC.
buttonClear:
Contractor Name:
Print_Name:
Contract Number:
Describe the work to be selfperformed 1:
Total:
Design:
Survey:
Geotechnical:
Utility:
Site_Inspection:
G&A:
Construction: 0
Total_SelfPerformed:
Percent:

File details come from the government source that posted it. Updated .