IBWC_Form_245D_Performance_of_Work_DB.pdf
PDF 240 KB Posted
- Solicitation number
- 191BWC24R0001
About this file
This document is a template form from the International Boundary and Water Commission (IBWC) for contractors to calculate the percentage of self-performed work for a project.
The form requires contractors to provide the solicitation name and number, total bid price, and itemized costs for subcontracted design, survey, geotechnical, utility, and site inspection work. Contractors must also specify other subcontracted work and calculate totals for self-performed work, overhead, and the percentage of the overall work that will be self-performed. By signing the form, contractors certify the information is accurate. Instructions define key terms like self-performance, design costs, and surveys. The related federal contract opportunity is for expansion of the South Bay International Wastewater Treatment Plant under solicitation number 191BWC24R0001 issued by IBWC.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERNATIONAL BOUNDARY & WATER COMMISSION
MINIMUM QUALIFICATIONS FOR AWARD
Performance of Work by Design-Builder
IBWC Form 245D(COND) Updated 11/13/2023 www.ibwc.gov
Design-Builder Name
Solicitation Name
Solicitation Number
Complete form to determine percent of work performed by Design-Builder per FAR 52.236-1.
Describe the work to be self-performed:
A. Total Bid Price on Above Solicitation
B. Total Subcontracted Design Costs included in Bid
C. Total Subcontracted Survey Costs included in Bid
D. Total Subcontracted Geotechnical Borings/Analysis included in Bid
E. Total Subcontracted Utility Surveys included in Bid
F. Total Subcontracted Site Inspection included in Bid
G. Total Subcontracted Construction Work included in Bid
H. Total Other Subcontracted Work included in Bid
I. Total G&A, Home Office Overhead, Profit, Bond, Insurance, etc.
J. Total Work to be Performed (J = A - B - C - D - E - F - G - H - I)
K. Percent Self-Performed Work (J / A x 100) % .
I certify that the above information is current, accurate and complete to the best of my knowledge and that I have the authority to provide the information requested on this form.
Sign Date
Design-Builder's Representative Name Design-Builder's Representative Title
INTERNATIONAL BOUNDARY & WATER COMMISSION
MINIMUM QUALIFICATIONS FOR AWARD
Performance of Work by Design-Builder
INSTRUCTIONS
IBWC Form 245D(COND) Updated 11/13/2023 Instructions www.ibwc.gov
Design-Builder Name: Enter the name of the company biding on the solicitation, i.e. your name.
Solicitation Name: Enter the name of the project that is being solicited.
Solicitation Number: Enter the USIBWC solicitation number.
The following are definitions concerning self-performance of work by the Design-Builder in accordance with FAR Clause 52.236-1 Performance of Work by the Contractor (APR 1984).
“Self-Performance of Work” generally includes mobilization and utilization of owned or rented plant and equipment to be operated by the Design-Builder's own (not subcontract) employees.
Include only those materials which will be both purchased and installed by the Design-Builder's own (not subcontract) forces, the labor associated with those aforementioned materials or equipment, only those supplies to directly support work performed by the Design-Builder's own employees, and the Design-Builder's own job overhead costs.
"Design Costs" includes all work defined in FAR 36.306-4(a)(1) and (2). Include all work that produces an engineer signed and stamped document.
"Survey Costs" includes all work defined in FAR 36.306-4(a)(4) that is performed as part of the project.
"Geotechnical Borings/Analysis" includes all work associated with collecting geotechnical bores or samples, performing analysis on collected materials, and performing additional or new geotechnical analysis on the site of work. This includes establishment/identification of borrow areas and any quality control testing.
"Utility Surveys" includes all work performed to identify type or location of utilities whether performed prior to design or prior to construction.
"Site Inspection" includes all work associated with photographing the site, videotaping the site, trips to the site, and other similar work.
"On the Site" includes the office site(s), construction site(s), jobsite, and worksite as well as offsite fabrication plant, borrow sites, or other facilities necessary to manufacture assemblies or provide materials to be incorporated into the project. See Scope of Work Section 01.42.00 for definition of jobsite and worksite.
“Total Self-Performed Work" is comprised of all direct (variable, fixed, one-time and semi-variable) costs to the Design-Builder, including jobsite overhead costs, to complete the project.
It generally includes all self-performed work, as defined above, and cost of all supplies and materials installed by Design-Builder.
The following are NOT self-performed work for purposes of the clause: markups for profit, general and administrative (G&A) overhead, bonds, insurance, or other indirect costs on self-performed or subcontracted work, "Owner-operated equipment," rental of plant or equipment for operation by subcontractors, and purchase of materials for installation by subcontractors.
| Company Name: |
| Project Name: |
| Solicitation Number: |
| Describe the work to be selfperformed 1: |
| Button3: |
| Contractor_Signature: |
| Click here1: Click below to add signature image to form |
| Check: Off |
| Date: |
| Note2: Use signature image |
| Note1: Use digital signature |
| Button2: |
| Print: |
| Note: Form must be "printed" to pdf prior to submittal to USIBWC. |
| buttonClear: |
| buttonClear2: |
| CR Name: |
| Title: |
| Total: |
| Design: |
| Survey: |
| Geotechnical: |
| Utility: |
| Site_Inspection: |
| Total_SelfPerformed: 0 |
| Percent: |
| GA_Overhead: |
| Construction: |
| Other: |
File details come from the government source that posted it. Updated .