This document provides notice of controlled unclassified information available to support the solicitation for the South Bay International Wastewater Treatment Plant Expansion project. Interested contractors must complete a nondisclosure agreement to access over thirty technical reports and as-built drawings detailing the facility's design, infrastructure assessments, capital improvement plans, and rehabilitation studies conducted from 1996 to 2023. The International Boundary and Water Commission is soliciting proposals to rehabilitate and expand the existing wastewater treatment plant through solicitation number 191BWC24R0001. Proposals are due in response to plans to increase the plant's treatment capacity. The expansion conceptual designs and rehabilitation studies conducted by Arcadis are among the documents available to support offerors.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 191BWC24R0001 - SBIWTP Rehabilitation and Expansion
The documents listed below will be made available to interested contractors once a IBWC Form 358
Nondisclosure Agreement has been completed and provided to the CO (philip.johnson@ibwc.gov).
Access will be granted for no more than two email addresses per contractor.
All unsuccessful contractors must submit IBWC Form 358A-Nondisclosure Agreement Release within seven days of receiving notice of their unsuccessful offer.
AVAILABLE CUI DOCUMENTS
CUI_00-31-19-01_1-4-B-01_2023_07_27_SBIWTP_Assessment_and_Rehabilitation_Report_Arcadis.pdf
CUI_00-31-19-01_1-4-B-02_2021_04_30_2021-2025_Five_Year_Capital_Plan_Veolia.pdf
CUI_00-31-19-01_1-4-B-04_2015_07_31_SBIWTP_Infrastructure_Improvement_Design_Report_URS.pdf
CUI_00-31-19-01_1-4-B-05_2021_01_28_Risk_Assessment_Veolia.pdf
CUI_00-31-19-01_1-4-B-06_2022_01_28_Condition_Assessment_Report_Veolia.pdf
CUI_00-31-19-01_1-4-B-07_2020_12_21_Condition_Assessment_Report_Veolia.pdf
CUI_00-31-19-01_1-4-B-08_2020_Relative_Criticality_Ranking_Report_Veolia.pdf
CUI_00-31-19-01_1-4-B-09_2018_06_25_IBM16C0003_I&C_Testing_and_Closeout.pdf
CUI_00-31-19-01_1-4-B-10_2011_09_12_SBIWTP_Design_Report_S&B.pdf
CUI_00-31-19-01_1-4-B-11_2008_11_14_Specs_SBIWTP_Secondary_Treatment_S&B.pdf
CUI_00-31-19-01_1-4-B-12_2015-07-31_SBIWTP_Infrastructure_Improvement_Specs_URS.pdf
CUI_00-31-19-01_1-4-C-01_2002_05_22_SBIWTP_Goat-Smugglers_Diversion.pdf
CUI_00-31-19-01_1-4-C-02_2018_05_08_IBM16C0003_SBIWTP_Record_Drawings_Pacific_Hydrotech.pdf
CUI_00-31-19-01_1-4-C-03_2001_08_09_Soil_Voids_Mitigation_at_Hollister_PS_MWH.pdf
CUI_00-31-19-01_1-4-C-04_1998_06_22_SBIWTP_CC-2_25MGD_Advanced_Primary_1of4.pdf
CUI_00-31-19-01_1-4-C-04_1998_06_22_SBIWTP_CC-2_25MGD_Advanced_Primary_2of4.pdf
CUI_00-31-19-01_1-4-C-04_1998_06_22_SBIWTP_CC-2_25MGD_Advanced_Primary_3of4.pdf
CUI_00-31-19-01_1-4-C-04_1998_06_22_SBIWTP_CC-2_25MGD_Advanced_Primary_4of4.pdf
CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_1of8.pdf
CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_2of8.pdf
CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_3of8.pdf
CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_4of8.pdf
CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_5of8.pdf
CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_6of8.pdf
CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_7of8.pdf
CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_8of8.pdf
CUI_00-31-19-01_1-4-C-06_1996_12_03_SBIWTP_CC-1A_Effluent_Corridor_Site_Work_As_Builts.pdf
CUI_00-31-19-01_1-4-C-07_1998_07_31_SBIWTP_CC-2B_Effluent_Structures_As_Builts.pdf
CUI_00-31-19-01_1-4-C-08_1997_02_SBIWTP_CC-2C_Flow_Equalization_Basin_Facilities.pdf
CUI_00-31-19-01_1-4-C-09_1996_03_SBIWTP_CC-4B_Goat_Canyon_Facilities.pdf
CUI_00-31-19-01_1-4-C-10_1998_11_SBIWTP_CC-2D_Misc_Improvements.pdf
CUI_00-31-19-01_1-4-C-11_1996_11_25_SBIWTP_CC-2A_Off-Site_Water_Main_Extension_As_Builts.pdf
CUI_00-31-19-01_1-4-C-12_2002_05_SBIWTP_Primary_Effluent_Return_Connection_PERC_As_Builts.pdf
CUI_00-31-19-01_1-4-C-13_1997_07_SBIWTP_CC-5_Remote_Dechlorination_Facility.pdf
CUI_00-31-19-01_1-4-C-14_2001_01_SBIWTP_Secondary_Wastewater_Treatment.pdf
CUI_00-31-19-01_1-4-C-15_1995_04_20_SBIWTP_CC-1_Site_Grading_As_Builts.pdf
CUI_00-31-19-01_1-4-C-16_1996_03_SBIWTP_CC-4A_Smuggler's_Gulch_Facilities.pdf
CUI_00-31-19-01_1-4-C-17_2016_08_26_IBM13C0014_Admin_Bldg_Record_Drawings.pdf
CUI_00-31-19-01_1-4-C-18_SBIWTP_Smugglers_Gulch_Intercepting_Facilities.pdf
CUI_01-80-05-01_1-7-A-2_2023_08_24_SBIWTP_Eval_of_Largest_Expansion_Possible_Arcadis.pdf
CUI_01-80-05-01_1-7-A-3_2023_11_27_Facility_Expansion_Conceptual_Arcadis.pdf
CUI_01-80-05-01_1-7-A-4_2023_11_27_Facility_Rehabilitation_Conceptual_Arcadis.pdf
Amendment A0001 added:
CUI_00-31-19-01_1-4-F_2011_04_SBIWTP_O&M_Manual.pdf
All forms are available at: www.ibwc.gov/resources-info/ mailto:philip.johnson@ibwc.gov https://www.ibwc.gov/resources-info/
File details come from the government source that posted it. Updated .