Document_Notice-CUI.pdf
PDF 33 KB Posted
- Solicitation number
- 191BWC24R0001
About this file
This notice provides access to confidential documents for solicitation number 191BWC24R0001 to rehabilitate and expand the South Bay International Wastewater Treatment Plant. Interested contractors must first complete a nondisclosure agreement to access over thirty engineering assessment reports, design documents, construction plans, and conceptual expansion studies for the facility conducted from 1996 to 2023. The solicitation is issued by the International Boundary and Water Commission U.S.-Mexico for the rehabilitation and expansion of the existing South Bay International Wastewater Treatment Plant to increase its treatment capacity.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 191BWC24R0001 - SBIWTP Rehabilitation and Expansion
The documents listed below will be made available to interested contractors once a IBWC Form 358
Nondisclosure Agreement has been completed and provided to the CO (philip.johnson@ibwc.gov).
Access will be granted for no more than two email addresses per contractor.
All unsuccessful contractors must submit IBWC Form 358A-Nondisclosure Agreement Release within seven days of receiving notice of their unsuccessful offer.
AVAILABLE CUI DOCUMENTS
CUI_00-31-19-01_1-4-B_2023_07_27_SBIWTP_Assessment_and_Rehabilitation_Report_Arcadis.pdf
CUI_00-31-19-01_1-4-B_2021_04_30_2021-2025_Five_Year_Capital_Plan_Veolia.pdf
CUI_00-31-19-01_1-4-B-04_2015_07_31_SBIWTP_Infrastructure_Improvement_Design_Report_URS.pdf
CUI_00-31-19-01_1-4-B-05_2021_01_28_Risk_Assessment_Veolia.pdf
CUI_00-31-19-01_1-4-B-06_2022_01_28_Condition_Assessment_Report_Veolia.pdf
CUI_00-31-19-01_1-4-B-07_2020_12_21_Condition_Assessment_Report_Veolia.pdf
CUI_00-31-19-01_1-4-B-08_2020_Relative_Criticality_Ranking_Report_Veolia.pdf
CUI_00-31-19-01_1-4-B-09_2018_06_25_IBM16C0003_I&C_Testing_and_Closeout.pdf
CUI_00-31-19-01_1-4-B-10_2011_09_12_SBIWTP_Design_Report_S&B.pdf
CUI_00-31-19-01_1-4-B-11_2008_11_14_Specs_SBIWTP_Secondary_Treatment_S&B.pdf
CUI_00-31-19-01_1-4-B-12_2015-07-31_SBIWTP_Infrastructure_Improvement_Specs_URS.pdf
CUI_00-31-19-01_1-4-C_2002_05_22_SBIWTP_Goat-Smugglers_Diversion.pdf
CUI_00-31-19-01_1-4-C-02_2018_05_08_IBM16C0003_SBIWTP_Record_Drawings_Pacific_Hydrotech.pdf
CUI_00-31-19-01_1-4-C-03_2001_08_09_Soil_Voids_Mitigation_at_Hollister_PS_MWH.pdf
CUI_00-31-19-01_1-4-C-04_1998_06_22_SBIWTP_CC-2_25MGD_Advanced_Primary_1of4.pdf
CUI_00-31-19-01_1-4-C-04_1998_06_22_SBIWTP_CC-2_25MGD_Advanced_Primary_2of4.pdf
CUI_00-31-19-01_1-4-C-04_1998_06_22_SBIWTP_CC-2_25MGD_Advanced_Primary_3of4.pdf
CUI_00-31-19-01_1-4-C-04_1998_06_22_SBIWTP_CC-2_25MGD_Advanced_Primary_4of4.pdf
CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_1of8.pdf
CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_2of8.pdf
CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_3of8.pdf
CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_4of8.pdf
CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_5of8.pdf
CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_6of8.pdf
CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_7of8.pdf
CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_8of8.pdf
CUI_00-31-19-01_1-4-C-06_1996_12_03_SBIWTP_CC-1A_Effluent_Corridor_Site_Work_As_Builts.pdf
CUI_00-31-19-01_1-4-C-07_1998_07_31_SBIWTP_CC-2B_Effluent_Structures_As_Builts.pdf
CUI_00-31-19-01_1-4-C-08_1997_02_SBIWTP_CC-2C_Flow_Equalization_Basin_Facilities.pdf
CUI_00-31-19-01_1-4-C-09_1996_03_SBIWTP_CC-4B_Goat_Canyon_Facilities.pdf
CUI_00-31-19-01_1-4-C-10_1998_11_SBIWTP_CC-2D_Misc_Improvements.pdf
CUI_00-31-19-01_1-4-C-11_1996_11_25_SBIWTP_CC-2A_Off-Site_Water_Main_Extension_As_Builts.pdf
CUI_00-31-19-01_1-4-C-12_2002_05_SBIWTP_Primary_Effluent_Return_Connection_PERC_As_Builts.pdf
CUI_00-31-19-01_1-4-C-13_1997_07_SBIWTP_CC-5_Remote_Dechlorination_Facility.pdf
CUI_00-31-19-01_1-4-C-14_2001_01_SBIWTP_Secondary_Wastewater_Treatment.pdf
CUI_00-31-19-01_1-4-C-15_1995_04_20_SBIWTP_CC-1_Site_Grading_As_Builts.pdf
CUI_00-31-19-01_1-4-C-16_1996_03_SBIWTP_CC-4A_Smuggler's_Gulch_Facilities.pdf
CUI_00-31-19-01_1-4-C-17_2016_08_26_IBM13C0014_Admin_Bldg_Record_Drawings.pdf
CUI_00-31-19-01_1-4-C-18_SBIWTP_Smugglers_Gulch_Intercepting_Facilities.pdf
CUI_01-80-05-01_1-7-A-2_2023_08_24_SBIWTP_Eval_of_Largest_Expansion_Possible_Arcadis.pdf
CUI_01-80-05-01_1-7-A-3_2023_11_27_Facility_Expansion_Conceptual_Arcadis.pdf
CUI_01-80-05-01_1-7-A-4_2023_11_27_Facility_Rehabilitation_Conceptual_Arcadis.pdf
All forms are available at: www.ibwc.gov/resources-info/ mailto:philip.johnson@ibwc.gov https://www.ibwc.gov/resources-info/
File details come from the government source that posted it. Updated .