Document_Notice-CUI.pdf

PDF 33 KB Posted

Attached to
South Bay International Wastewater Treatment Plant Expansion
Solicitation number
191BWC24R0001
Issued by

About this file

This notice provides access to confidential documents for solicitation number 191BWC24R0001 to rehabilitate and expand the South Bay International Wastewater Treatment Plant. Interested contractors must first complete a nondisclosure agreement to access over thirty engineering assessment reports, design documents, construction plans, and conceptual expansion studies for the facility conducted from 1996 to 2023. The solicitation is issued by the International Boundary and Water Commission U.S.-Mexico for the rehabilitation and expansion of the existing South Bay International Wastewater Treatment Plant to increase its treatment capacity.

View the file

Other files

File Type Posted
191BWC24R0001_0005.pdf PDF
QA_through_1 20240116.pdf PDF
QA_through_20240116.pdf PDF
191BWC24R0001_A0005_Solicitation.pdf PDF
Prebid_Conference_Agenda.pdf PDF
Prebid_Sign_In_Sheet.pdf PDF
191BWC24R0001 0004.pdf PDF
191BWC24R0001 A0003 Solicitation.pdf PDF
191BWC24R0001 0003.pdf PDF
QA_through_20231221.pdf PDF
00-31-32-01_1-3-B-16_2008_05_23_Smugglers_Gulch_Geotech_Report_Ninyo Moore.pdf PDF
191BWC24R0001_SBIWTP_Rehabilition_and_Expansion_SOW_20240103.pdf PDF
00-31-32-01_1-3-B-03_1995_11_Geotech_Goat_Canyon__Hollister_Rd_Woodward-Clyde.pdf PDF
Document_Notice-CUI_R1.pdf PDF
191BWC24R0001 0002.pdf PDF
00-31-21-01_1-4-A-1_27399-000-00_SBIWTP_ALTA-ACSM_Land_Title_Survey_2023-07-06_Alysoncorp.pdf PDF
IBWC_Form_245E_Schedule_of_Construction.pdf PDF
00-31-32-01_1-3-B-08_2006_12_18_Geotech_DHS-CBP_San_Diego_Sector_Area_V_Kleinfelder.pdf PDF
191BWC24R0001 0001.pdf PDF
191BWC24R0001_Client_Authorization_Letter.docx DOCX document
IBWC_Form_110_Cert_of_Authority_for_Signing.pdf PDF
191BWC24R0001_Past_Performance_Questionnaire.pdf PDF
00-31-32-01_1-3-B-09_2009_01_12_Dynamic_Compaction_Program_SBIWTP_Densification.pdf PDF
IBWC_Form_358A_Nondisclosure_Agreement_Release.pdf PDF
00-31-32-01_1-3-B-14_2015_04_30_Geotech_Report_SBIWTP_Addendum_URS.pdf PDF
00-31-32-01_1-3-B-12_2014_09_02_IBM13C0014_SD_Admin_Geotech_Addendum_Stantec.pdf PDF
00-31-32-01_1-3-B-02_1994_06_SBIWTP_Geotech_Design_Recommendations_Woodward-Clyde.pdf PDF
00-31-21-01_1-4-A-2_27399-000-S_SBIWTP_Survey_Report_2023-07-07_Alysoncorp.pdf PDF
00-31-26-01_1-4-A_2014_03_15_San_Ysidro_Asbestos_Survey.pdf PDF
00-31-32-01_1-3-B-13_2015_02_13_Geotech_Report_SBIWTP_URS.pdf PDF
General_Decision_Number_CA20230001_20231117.pdf PDF
191BWC24R0001_Client_Authorization_Letter.pdf PDF
00-31-32-01_1-3-B-11_2014_05_27_IBM13C0014_SD_Admin_Geotech_Report_Stantec.pdf PDF
00-31-32-01_1-3-B-15_2023_05_31_Geotech_SBIWTP_Ninyo__More.pdf PDF
IBWC_Form_358_Nondisclosure_Agreement.pdf PDF
00-31-32-01_1-3-B-04_2005_07_15_Geotech_DHS-CBP_Border_Park_Field_Kleinfelder.pdf PDF
00-31-32-01_1-3-B-05_2005_09_27_Prelim_Geotech_Eval_San_Ysidro_BP_Ninyo__Moore.pdf PDF
00-31-24-01_1-5-C_NEPA_Mitigation_Measures.pdf PDF
00-31-32-01_1-3-B-01_1994_03_18_Geotech_SBIWTP_Woodward-Clyde.pdf PDF
00-31-32-01_1-3-B-06_2006_11_22_Geotech_Addl_Explore_DHS-CBP_Border_Field_Park_Kleinfelder.pdf PDF
00-31-32-01_1-3-B-07_2006_11_22_Sum_Geotech__Geologic_Reconn_DHS-CBP_Area_VI_Kleinfelder.pdf PDF
IBWC_Form_117_Statement_of_Attendance.pdf PDF
00-31-32-01_1-3-B-10_2009_04_24_SPT-Based_Eval_of_Deep_Dynamic_Compaction_SBIWTP_CTE.pdf PDF
00-31-19-01_1-4-D_SBIWTP_Monthly_Flow_Volumes_4-2021_to_10-2023.pdf PDF
IBWC_Form_116_Statement_of_Equipment.pdf PDF
00-31-24-01_1-5-A_2023_05_31_2022-0014986-S7-I_SD_USMCA_Transboundary_Flows_FWS.pdf PDF
IBWC_Form_245D_Performance_of_Work_DB.pdf PDF
191BWC24R0001_SBIWTP_Rehabilition_and_Expansion_SOW_20231208.pdf PDF
191BWC24R0001 South Bay Expantion.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 191BWC24R0001 - SBIWTP Rehabilitation and Expansion

The documents listed below will be made available to interested contractors once a IBWC Form 358

Nondisclosure Agreement has been completed and provided to the CO (philip.johnson@ibwc.gov).

Access will be granted for no more than two email addresses per contractor.

All unsuccessful contractors must submit IBWC Form 358A-Nondisclosure Agreement Release within seven days of receiving notice of their unsuccessful offer.

AVAILABLE CUI DOCUMENTS

CUI_00-31-19-01_1-4-B_2023_07_27_SBIWTP_Assessment_and_Rehabilitation_Report_Arcadis.pdf

CUI_00-31-19-01_1-4-B_2021_04_30_2021-2025_Five_Year_Capital_Plan_Veolia.pdf

CUI_00-31-19-01_1-4-B-04_2015_07_31_SBIWTP_Infrastructure_Improvement_Design_Report_URS.pdf

CUI_00-31-19-01_1-4-B-05_2021_01_28_Risk_Assessment_Veolia.pdf

CUI_00-31-19-01_1-4-B-06_2022_01_28_Condition_Assessment_Report_Veolia.pdf

CUI_00-31-19-01_1-4-B-07_2020_12_21_Condition_Assessment_Report_Veolia.pdf

CUI_00-31-19-01_1-4-B-08_2020_Relative_Criticality_Ranking_Report_Veolia.pdf

CUI_00-31-19-01_1-4-B-09_2018_06_25_IBM16C0003_I&C_Testing_and_Closeout.pdf

CUI_00-31-19-01_1-4-B-10_2011_09_12_SBIWTP_Design_Report_S&B.pdf

CUI_00-31-19-01_1-4-B-11_2008_11_14_Specs_SBIWTP_Secondary_Treatment_S&B.pdf

CUI_00-31-19-01_1-4-B-12_2015-07-31_SBIWTP_Infrastructure_Improvement_Specs_URS.pdf

CUI_00-31-19-01_1-4-C_2002_05_22_SBIWTP_Goat-Smugglers_Diversion.pdf

CUI_00-31-19-01_1-4-C-02_2018_05_08_IBM16C0003_SBIWTP_Record_Drawings_Pacific_Hydrotech.pdf

CUI_00-31-19-01_1-4-C-03_2001_08_09_Soil_Voids_Mitigation_at_Hollister_PS_MWH.pdf

CUI_00-31-19-01_1-4-C-04_1998_06_22_SBIWTP_CC-2_25MGD_Advanced_Primary_1of4.pdf

CUI_00-31-19-01_1-4-C-04_1998_06_22_SBIWTP_CC-2_25MGD_Advanced_Primary_2of4.pdf

CUI_00-31-19-01_1-4-C-04_1998_06_22_SBIWTP_CC-2_25MGD_Advanced_Primary_3of4.pdf

CUI_00-31-19-01_1-4-C-04_1998_06_22_SBIWTP_CC-2_25MGD_Advanced_Primary_4of4.pdf

CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_1of8.pdf

CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_2of8.pdf

CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_3of8.pdf

CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_4of8.pdf

CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_5of8.pdf

CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_6of8.pdf

CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_7of8.pdf

CUI_00-31-19-01_1-4-C-05_SBIWTP_CC-3_25MGD_Secondary_Treatment_As_Builts_8of8.pdf

CUI_00-31-19-01_1-4-C-06_1996_12_03_SBIWTP_CC-1A_Effluent_Corridor_Site_Work_As_Builts.pdf

CUI_00-31-19-01_1-4-C-07_1998_07_31_SBIWTP_CC-2B_Effluent_Structures_As_Builts.pdf

CUI_00-31-19-01_1-4-C-08_1997_02_SBIWTP_CC-2C_Flow_Equalization_Basin_Facilities.pdf

CUI_00-31-19-01_1-4-C-09_1996_03_SBIWTP_CC-4B_Goat_Canyon_Facilities.pdf

CUI_00-31-19-01_1-4-C-10_1998_11_SBIWTP_CC-2D_Misc_Improvements.pdf

CUI_00-31-19-01_1-4-C-11_1996_11_25_SBIWTP_CC-2A_Off-Site_Water_Main_Extension_As_Builts.pdf

CUI_00-31-19-01_1-4-C-12_2002_05_SBIWTP_Primary_Effluent_Return_Connection_PERC_As_Builts.pdf

CUI_00-31-19-01_1-4-C-13_1997_07_SBIWTP_CC-5_Remote_Dechlorination_Facility.pdf

CUI_00-31-19-01_1-4-C-14_2001_01_SBIWTP_Secondary_Wastewater_Treatment.pdf

CUI_00-31-19-01_1-4-C-15_1995_04_20_SBIWTP_CC-1_Site_Grading_As_Builts.pdf

CUI_00-31-19-01_1-4-C-16_1996_03_SBIWTP_CC-4A_Smuggler's_Gulch_Facilities.pdf

CUI_00-31-19-01_1-4-C-17_2016_08_26_IBM13C0014_Admin_Bldg_Record_Drawings.pdf

CUI_00-31-19-01_1-4-C-18_SBIWTP_Smugglers_Gulch_Intercepting_Facilities.pdf

CUI_01-80-05-01_1-7-A-2_2023_08_24_SBIWTP_Eval_of_Largest_Expansion_Possible_Arcadis.pdf

CUI_01-80-05-01_1-7-A-3_2023_11_27_Facility_Expansion_Conceptual_Arcadis.pdf

CUI_01-80-05-01_1-7-A-4_2023_11_27_Facility_Rehabilitation_Conceptual_Arcadis.pdf

All forms are available at: www.ibwc.gov/resources-info/ mailto:philip.johnson@ibwc.gov https://www.ibwc.gov/resources-info/

File details come from the government source that posted it. Updated .