00-31-32-01_1-3-B-14_2015_04_30_Geotech_Report_SBIWTP_Addendum_URS.pdf

PDF 346 KB Posted

Attached to
South Bay International Wastewater Treatment Plant Expansion
Solicitation number
191BWC24R0001
Issued by

About this file

This addendum to a geotechnical investigation report provides an updated site plan and revised dimensions for proposed features at the South Bay International Wastewater Treatment Plant in San Ysidro, California. The report was prepared for the U.S. International Boundary and Water Commission for a project with a solicitation number of 191BWC24R0001. The addendum presents a revised site plan showing features such as equalization tanks with a capacity of 3.75 million gallons, sedimentation tanks, effluent channels, and access roads. It also clarifies that the capacity of the equalization tanks is 3.75 million gallons rather than the 3.5 million gallons stated in the original February 2015 report. This addendum should be incorporated along with the original geotechnical investigation report from February 2015 in all future submittals for the South Bay International Wastewater Treatment Plant expansion project.

View the file

Other files

File Type Posted
191BWC24R0001_0005.pdf PDF
QA_through_1 20240116.pdf PDF
QA_through_20240116.pdf PDF
191BWC24R0001_A0005_Solicitation.pdf PDF
Prebid_Conference_Agenda.pdf PDF
Prebid_Sign_In_Sheet.pdf PDF
191BWC24R0001 0004.pdf PDF
191BWC24R0001 A0003 Solicitation.pdf PDF
191BWC24R0001 0003.pdf PDF
QA_through_20231221.pdf PDF
00-31-32-01_1-3-B-16_2008_05_23_Smugglers_Gulch_Geotech_Report_Ninyo Moore.pdf PDF
191BWC24R0001_SBIWTP_Rehabilition_and_Expansion_SOW_20240103.pdf PDF
00-31-32-01_1-3-B-03_1995_11_Geotech_Goat_Canyon__Hollister_Rd_Woodward-Clyde.pdf PDF
Document_Notice-CUI_R1.pdf PDF
191BWC24R0001 0002.pdf PDF
00-31-21-01_1-4-A-1_27399-000-00_SBIWTP_ALTA-ACSM_Land_Title_Survey_2023-07-06_Alysoncorp.pdf PDF
IBWC_Form_245E_Schedule_of_Construction.pdf PDF
00-31-32-01_1-3-B-08_2006_12_18_Geotech_DHS-CBP_San_Diego_Sector_Area_V_Kleinfelder.pdf PDF
191BWC24R0001 0001.pdf PDF
191BWC24R0001_Client_Authorization_Letter.docx DOCX document
IBWC_Form_110_Cert_of_Authority_for_Signing.pdf PDF
191BWC24R0001_Past_Performance_Questionnaire.pdf PDF
00-31-32-01_1-3-B-09_2009_01_12_Dynamic_Compaction_Program_SBIWTP_Densification.pdf PDF
IBWC_Form_358A_Nondisclosure_Agreement_Release.pdf PDF
00-31-32-01_1-3-B-12_2014_09_02_IBM13C0014_SD_Admin_Geotech_Addendum_Stantec.pdf PDF
00-31-32-01_1-3-B-02_1994_06_SBIWTP_Geotech_Design_Recommendations_Woodward-Clyde.pdf PDF
00-31-21-01_1-4-A-2_27399-000-S_SBIWTP_Survey_Report_2023-07-07_Alysoncorp.pdf PDF
00-31-26-01_1-4-A_2014_03_15_San_Ysidro_Asbestos_Survey.pdf PDF
00-31-32-01_1-3-B-13_2015_02_13_Geotech_Report_SBIWTP_URS.pdf PDF
General_Decision_Number_CA20230001_20231117.pdf PDF
191BWC24R0001_Client_Authorization_Letter.pdf PDF
00-31-32-01_1-3-B-11_2014_05_27_IBM13C0014_SD_Admin_Geotech_Report_Stantec.pdf PDF
00-31-32-01_1-3-B-15_2023_05_31_Geotech_SBIWTP_Ninyo__More.pdf PDF
IBWC_Form_358_Nondisclosure_Agreement.pdf PDF
Document_Notice-CUI.pdf PDF
00-31-32-01_1-3-B-04_2005_07_15_Geotech_DHS-CBP_Border_Park_Field_Kleinfelder.pdf PDF
00-31-32-01_1-3-B-05_2005_09_27_Prelim_Geotech_Eval_San_Ysidro_BP_Ninyo__Moore.pdf PDF
00-31-24-01_1-5-C_NEPA_Mitigation_Measures.pdf PDF
00-31-32-01_1-3-B-01_1994_03_18_Geotech_SBIWTP_Woodward-Clyde.pdf PDF
00-31-32-01_1-3-B-06_2006_11_22_Geotech_Addl_Explore_DHS-CBP_Border_Field_Park_Kleinfelder.pdf PDF
00-31-32-01_1-3-B-07_2006_11_22_Sum_Geotech__Geologic_Reconn_DHS-CBP_Area_VI_Kleinfelder.pdf PDF
IBWC_Form_117_Statement_of_Attendance.pdf PDF
00-31-32-01_1-3-B-10_2009_04_24_SPT-Based_Eval_of_Deep_Dynamic_Compaction_SBIWTP_CTE.pdf PDF
00-31-19-01_1-4-D_SBIWTP_Monthly_Flow_Volumes_4-2021_to_10-2023.pdf PDF
IBWC_Form_116_Statement_of_Equipment.pdf PDF
00-31-24-01_1-5-A_2023_05_31_2022-0014986-S7-I_SD_USMCA_Transboundary_Flows_FWS.pdf PDF
IBWC_Form_245D_Performance_of_Work_DB.pdf PDF
191BWC24R0001_SBIWTP_Rehabilition_and_Expansion_SOW_20231208.pdf PDF
191BWC24R0001 South Bay Expantion.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J:\41011854 USIBWC - South Bay\017 PROJECT DELIVERABLES\Geotechnical Final Report\2015-04-30 SBIWTP Addendum 1 GeoRept (URS).doc\1-May-15\SDG

URS Group, Inc.

4225 Executive Square, Suite 1600 La Jolla, CA 92037 Tel: 858.812.9292 Fax: 858.812.9293

April 30, 2015

Ms. Lisa Ramirez U.S. International Boundary and Water Commission (USIBWC) 4171 North Mesa, Suite C100 El Paso, Texas 79902-1441

Subject: Addendum No. 1 Geotechnical Investigation Report South Bay International Wastewater Treatment Plant Improvements San Ysidro, California URS Project No. 41011854.01 USIBWC Task Order – IBM14T0013

Dear Ms. Ramirez:

URS Group, Inc. (URS) has prepared this addendum to provide an updated site plan and revise the dimensions of the proposed project features.

URS completed the geotechnical investigation for the project and prepared a report titled “Geotechnical Investigation, South Bay International Wastewater Treatment Plant Improvements, San Ysidro, California,” and dated February 13, 2015.

This addendum presents an updated Site Plan (Figure 2) based on the 90 percent project design submittal. Further, we understand the capacity of the Equalization (EQ) Tanks is 3.75 million gallons. A capacity of 3.5 million gallons was stated in Section 1.1 of our report dated February 13, 2015.

CLOSURE

This letter should be bound with our February 13, 2015 report on all future submittals.

13'

13'

26'

TP-10

TP-9

B-3

B-4

PROPOSED

SSTs

SST EFFLUENT

CHANNEL

PROPERTY LINE

DIRT ROADWAY

RELOCATED

AC ROAD

RELOCATED DIRT

ROADWAY

RELOCATED DIRT

ACCESS ROAD

SLOPE,

2:1 MAX

S S

T N

O . 1

S S

T N

O . 1

S S

T N

O . 1

AC SPILLWAY

RIP RAP

AR-25

29'

31'

51'

55'

E Q

U A

LI

ZA

TI

O

N

TA

N K

N O

. 2

E Q

U

IL

IZ

A

TI

O

N

TA

N K

N O

. 1

HSA-14

HSA-16

HSA-17

B-1

HSA-20

B-2

PROPOSED

EQ BASIN

AC

ACCESS

ROAD

WET WELL

EQ EFFLUENT PIPE

AC

ACCESS

ROAD

AR-10

EQ INFLUENT PIPE

LEGEND

90% SBIWTP PDR 5-13-15.pdf
Appendix A-SOW.pdf
DOC005
SOW FINAL

File details come from the government source that posted it. Updated .