B05_Amendment_4.pdf

PDF 154 KB Posted

Attached to
Poplar Ancillary Healthcare Facility & Vern E Gibbs Health Center Construction Renovation
Solicitation number
19-102-SOL-00026
Issued by

About this file

This sources sought notice is seeking capability statements from contractors interested in the construction of the Poplar Ancillary Healthcare Facility and renovation of the Vern E Gibbs Health Center located on the Fort Peck Reservation in Poplar, Montana. The estimated value of construction is over $10 million. Interested contractors are asked to submit capability statements by March 12, 2019 detailing their relevant projects, references, certifications, licenses and financial stability. The resulting fixed-price design-build contract is expected to be awarded on or around May 24, 2019 for a period of performance from May 31, 2019 through 36 months after notice to proceed. The solicitation will be posted on April 18, 2019 at https://www.fbo.gov/ with proposals due by May 17, 2019. The notice provides preliminary construction drawings, specifications and wage determinations for interested contractors. The North American Industry Classification System code is 236220 and size standard is $36.5 million.

Amendment 4

View the file

Other files

File Type Posted
B05_Amendment_7.pdf PDF
B05_Amendment_6.pdf PDF
281500.pdf PDF
263213.pdf PDF
281600.pdf PDF
262713.pdf PDF
281300.pdf PDF
B05_Amendment_5.pdf PDF
B05_Amendment_3.pdf PDF
B05_Amendment_2.pdf PDF
B05_Amendment_1.pdf PDF
B05_Attachment_J-21.docx DOCX document
B01_Attachment_J-08_FFE.pdf PDF
B01_Attachment_J-01_White_Buffalo_Clinic_100_.pdf PDF
B01_Attachment_J-07_Combined_PCRA-ICRA-ILSM_-_2016.docx DOCX document
B01__Attachment_J-10_Key_Personal_Requirements.pdf PDF
Attachment_J-13_Pay_Application.xls XLS spreadsheet
B01_Attachment_J-03_ARCHITECTURAL_100_.pdf PDF
B01_Attachment_J-09_GFP_Turnover.pdf PDF
B01_Attachment_J-12-B_Wage_Determination.pdf PDF
B01_Attachment_J-15_PPQ.pdf PDF
B01_RFP.pdf PDF
B01_Attachment_J-18_FP1_Site_Plan.pdf PDF
Attachment_J-14_hhs_subk_plan_template.docx DOCX document
B01_Attachment_J-12-A_Wage_Determination.pdf PDF
https://www.gsa.gov/reference/forms#SF —
B01_Attachment_J-20.pdf PDF
B01_Attachment_J-19_FP2_Fire_Sprinkler_Plan.pdf PDF
B01_Attachment_J-02_Verne_E._Gibbs_Renovation_100_.pdf PDF
B01_Attachment_J-17_CERTIFIED_INDIAN_PREF_FIRMS_2018.pdf PDF
B01_Attachment_J-16_PPI.pdf PDF
A08_A-dec_Brand_Name_Justification_5-8-19.pdf PDF
B01_Attachment_J-05_MECHANICAL_100_.pdf PDF
B01_Attachment_J-04_02_PLUMBING_100_.pdf PDF
B01_Attachment_J-06_ELECTRICAL_100_.pdf PDF
A08_Brand_Name_Justification_WebCTRL_4.16.pdf PDF
A10_Attachment_Draft_Key_Personal_Requirements.pdf PDF
A10_CERTIFIED_INDIAN_PREF_FIRMS_2018.pdf PDF
02_PLUMBING.pdf PDF
A10_Sources_Sought_Questionnaire_010219.docx DOCX document
03_MECHANICAL.pdf PDF
_White_Buffalo_Clinic_95__02-18-19.pdf PDF
01_ARCHITECTURAL.pdf PDF
A10_289513_C142_Chemistry_With_COC.pdf PDF
A10_Draft_Wage_Determination.pdf PDF
04_ELECTRICAL.pdf PDF
A15_Draft_Evaluation_Criteria.pdf PDF
A15_Draft_Price_Schedule.docx DOCX document
_Renovation_95__02-18-19.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States of America

(Signature of Contracting Officer)

16C. Date Signed

(Signature of person authorized to sign)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code Page of Pages

1 3

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)

AMENDMENT 0004 June 20, 2019 TBD

6. Issued By Code 7. Administered By (If other than Item 6) Code SEE BLOCK 6 Indian Health Service - DES 701 Fifth Avenue, Suite 1600 MS/24 Seattle, WA 98104

8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.

X

19-102-SOL-00026

9B. Date (See Item 11)

May 16, 2019 10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended X is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SUMMARY OF CHANGES:

The purpose of this amendment is to:

1. Answer pre-proposal inquiries (PPI).

(END SUMMARY OF CHANGES)

19-102-SOL-00026, Amendment 0004

1. Responses to PPI

Question No. 3

Furniture, Fixtures, and Equipment (FF&E)

QUESTION: Was in Interior Designer involved in providing the FF&E selections? If so, are they open to questions regarding alternatives? Is there additional specification criteria available or a place holder budget expected?

ANSWER: Yes, an interior designer was involved. All questions related to this solicitation should be sent to Mr. Anthony Buch at anthony.buch@ihs.gov and “alternatives” were addressed in amendment 0001 to the solicitation posted at the link provided below. The specifications were posted to FedBizOpps (FBO) with the Request for Proposals (RFP) on May 16, 2019at:

https://www.fbo.gov/index?s=opportunity&mode=form&id=5381a2e67f6893e68abf57f9c60 cd4ca&tab=core&_cview=1.

There is no place holder budget.

Question No. 4

General Contractor (GC) & FF&E

QUESTION: Is the GC or the Fed Gov procuring the package?

ANSWER: The GC will be obtaining subcontractors and suppliers, if necessary, to support its proposal in response to this RFP. Some FF&E will be government furnished and others will be provided by the successful offeror. Please see the RFP, attachments, and amendments for detailed information.

Question No. 5

FF&E

QUESTION: Which CLIN option is it = 3 or 5?

ANSWER: Offerors should verify that they are viewing the latest updates to the RFP on

FBO. It appears some offerors may be viewing draft documents posted earlier as part of the initial sources sought notice or pre-solicitation.

Question No. 6

FF&E

16-102-SOL-00005, Amendment 0004

QUESTION: Being HON has been used as basis of design, is that the grade level you are seeking or establishing your budget from?

ANSWER: HON is the basis of design and the grade level we are seeking.

All other terms, conditions, and requirements remain unchanged.

File details come from the government source that posted it. Updated .