This sources sought notice is seeking capability statements from contractors interested in the construction of the Poplar Ancillary Healthcare Facility and renovation of the Vern E. Gibbs Health Center located on the Fort Peck Reservation in Poplar, Montana. The estimated value of construction is over $10 million. Capability statements are due by March 12, 2019. The resulting contract is expected to be a fixed-price design-bid-build contract awarded on or about May 24, 2019 for a period of performance from May 31, 2019 through 36 months after notice to proceed. The draft solicitation and attachments include preliminary drawings, specifications, wage determinations, and evaluation criteria. Interested parties should monitor the FedBizOpps site for release of the request for proposal around April 18, 2019. The North American Industry Classification code is 236220 for commercial and institutional building construction.

Attachment J-15: Past Performance Questionnaire (4 pages)-Solicitation Only

View the file

Other files

File Type Posted
B05_Amendment_7.pdf PDF
B05_Amendment_6.pdf PDF
281500.pdf PDF
263213.pdf PDF
281600.pdf PDF
262713.pdf PDF
281300.pdf PDF
B05_Amendment_5.pdf PDF
B05_Amendment_4.pdf PDF
B05_Amendment_3.pdf PDF
B05_Amendment_2.pdf PDF
B05_Amendment_1.pdf PDF
B05_Attachment_J-21.docx DOCX document
B01_Attachment_J-08_FFE.pdf PDF
B01_Attachment_J-01_White_Buffalo_Clinic_100_.pdf PDF
B01_Attachment_J-07_Combined_PCRA-ICRA-ILSM_-_2016.docx DOCX document
B01__Attachment_J-10_Key_Personal_Requirements.pdf PDF
Attachment_J-13_Pay_Application.xls XLS spreadsheet
B01_Attachment_J-03_ARCHITECTURAL_100_.pdf PDF
B01_Attachment_J-09_GFP_Turnover.pdf PDF
B01_Attachment_J-12-B_Wage_Determination.pdf PDF
B01_RFP.pdf PDF
B01_Attachment_J-18_FP1_Site_Plan.pdf PDF
Attachment_J-14_hhs_subk_plan_template.docx DOCX document
B01_Attachment_J-12-A_Wage_Determination.pdf PDF
https://www.gsa.gov/reference/forms#SF —
B01_Attachment_J-20.pdf PDF
B01_Attachment_J-19_FP2_Fire_Sprinkler_Plan.pdf PDF
B01_Attachment_J-02_Verne_E._Gibbs_Renovation_100_.pdf PDF
B01_Attachment_J-17_CERTIFIED_INDIAN_PREF_FIRMS_2018.pdf PDF
B01_Attachment_J-16_PPI.pdf PDF
A08_A-dec_Brand_Name_Justification_5-8-19.pdf PDF
B01_Attachment_J-05_MECHANICAL_100_.pdf PDF
B01_Attachment_J-04_02_PLUMBING_100_.pdf PDF
B01_Attachment_J-06_ELECTRICAL_100_.pdf PDF
A08_Brand_Name_Justification_WebCTRL_4.16.pdf PDF
A10_Attachment_Draft_Key_Personal_Requirements.pdf PDF
A10_CERTIFIED_INDIAN_PREF_FIRMS_2018.pdf PDF
02_PLUMBING.pdf PDF
A10_Sources_Sought_Questionnaire_010219.docx DOCX document
03_MECHANICAL.pdf PDF
_White_Buffalo_Clinic_95__02-18-19.pdf PDF
01_ARCHITECTURAL.pdf PDF
A10_289513_C142_Chemistry_With_COC.pdf PDF
A10_Draft_Wage_Determination.pdf PDF
04_ELECTRICAL.pdf PDF
A15_Draft_Evaluation_Criteria.pdf PDF
A15_Draft_Price_Schedule.docx DOCX document
_Renovation_95__02-18-19.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J-15 Past Performance Questionnaire

IHS PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: IHS REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO IHS WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON IHS SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO IHS. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

e) Did the Quality Control Manager communicate issues and concerns during the project? E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N

c) Rate the contractor’s ability to highlight any delays and to offer potential solutions to keep the project on schedule. E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed E VG S M U N price(s)?

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client E VG S M U N

c) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. Yes No

d) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

e) Did the contractor bring to the attention of the government any long lead items that would need payment upfront? For example structural steel, mechanical units, etc.

Yes No

f) Have there been any indications that the contractor has had any financial problems that impacted its performance? If yes, please explain below. Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Ability to act professionally and communicate effectively to government personal E VG S M U N

d) Would you hire or work with this firm again? (If no, please explain below) Yes No

e) In summary, provide an overall rating for the work performed by this contractor. E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

File details come from the government source that posted it. Updated .