This sources sought notice from the Department of Health and Human Services Indian Health Service solicits capability statements for the construction of the Poplar Ancillary Healthcare Facility and renovation of the Vern E Gibbs Health Center located on the Fort Peck Reservation in Poplar, Montana. The estimated magnitude of construction is over $10 million to be awarded as a fixed-price contract. Interested parties are to provide relevant project experience, references, certifications, licenses and financial information by March 12, 2019. The eventual solicitation will be available for download on April 18, 2019 on FBO.gov with proposals due by May 17, 2019. The work includes supervision, labor, materials and equipment for construction and renovations in accordance with the specifications and drawings provided as attachments, as well as optional items for medical equipment, furnishings, landscaping, and asbestos abatement.
Draft Price Schedule (1 page)
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN
Item Numbers
| Description |
| Quantity |
| Unit |
| Unit Price |
| Amount |
| 0001 |
| Provide a Firm-Fixed-Price for all supervision, labor, materials, equipment and associated costs with the plans, specifications, and all other RFP documents related to the Fort Peck Service Unit (FPSU) Poplar Ancillary Building & Vern E Gibbs Health Center Renovation |
JB
Option Item
Provide a firm-fixed-price, fully burdened, including all labor, equipment, materials, supervision, and all necessary and incidental costs required for the supply and installation of medical equipment, in accordance with the specifications, drawings, designs, and all other requirements of the solicitation and resulting Contract.
Provide a firm-fixed-price, fully burdened, including all labor, equipment, materials, supervision, and all necessary and incidental costs required for the supply and installation of furnishings, in accordance with the specifications, drawings, designs, and all other requirements of the solicitation and resulting Contract.
Provide a firm-fixed-price fully burdened unit cost, including all labor, equipment, materials, supervision, and all necessary and incidental costs required for the installation of all landscaping.
Option Item Provide a firm-fixed-price fully burdened unit cost, including all labor, equipment, materials, asbestos testing, supervision, and all necessary and incidental costs required for the abatement, handling, hauling/transport, and disposal to a certified landfill of asbestos encountered in this requirement and removal of the two existing residences and foundations and all necessary clearing of the site, in accordance with the specifications, drawings, designs, and all other requirements of the solicitation and resulting Contract.
TBD
TBD
Sum Total Items 0001-0005
Key:
JB=Job TBD=To be determined