This sources sought notice is seeking capability statements from contractors interested in the construction of the Poplar Ancillary Healthcare Facility and renovation of the Vern E Gibbs Health Center located on the Fort Peck Reservation in Poplar, Montana. The estimated value of construction is over $10 million. The North American Industry Classification System code for this procurement is 236220 for commercial and institutional building construction. Capability statements are due by March 12, 2019 and should include relevant project experience, references, certifications, licenses and information demonstrating financial stability such as Dun & Bradstreet reports. The resulting fixed-price design-build contract is expected to be awarded on or about May 24, 2019 for a period of performance from May 31, 2019 through 36 months after notice to proceed. The draft solicitation and attachments provide preliminary drawings, specifications and requirements for the project. The final solicitation will be available for download on April 18, 2019 on FedBizOpps.

Attachment J-10: Key Personnel Requirements (1 page)

View the file

Other files

File Type Posted
B05_Amendment_7.pdf PDF
B05_Amendment_6.pdf PDF
281500.pdf PDF
263213.pdf PDF
281600.pdf PDF
262713.pdf PDF
281300.pdf PDF
B05_Amendment_5.pdf PDF
B05_Amendment_4.pdf PDF
B05_Amendment_3.pdf PDF
B05_Amendment_2.pdf PDF
B05_Amendment_1.pdf PDF
B05_Attachment_J-21.docx DOCX document
B01_Attachment_J-08_FFE.pdf PDF
B01_Attachment_J-01_White_Buffalo_Clinic_100_.pdf PDF
B01_Attachment_J-07_Combined_PCRA-ICRA-ILSM_-_2016.docx DOCX document
Attachment_J-13_Pay_Application.xls XLS spreadsheet
B01_Attachment_J-03_ARCHITECTURAL_100_.pdf PDF
B01_Attachment_J-09_GFP_Turnover.pdf PDF
B01_Attachment_J-12-B_Wage_Determination.pdf PDF
B01_Attachment_J-15_PPQ.pdf PDF
B01_RFP.pdf PDF
B01_Attachment_J-18_FP1_Site_Plan.pdf PDF
Attachment_J-14_hhs_subk_plan_template.docx DOCX document
B01_Attachment_J-12-A_Wage_Determination.pdf PDF
https://www.gsa.gov/reference/forms#SF —
B01_Attachment_J-20.pdf PDF
B01_Attachment_J-19_FP2_Fire_Sprinkler_Plan.pdf PDF
B01_Attachment_J-02_Verne_E._Gibbs_Renovation_100_.pdf PDF
B01_Attachment_J-17_CERTIFIED_INDIAN_PREF_FIRMS_2018.pdf PDF
B01_Attachment_J-16_PPI.pdf PDF
A08_A-dec_Brand_Name_Justification_5-8-19.pdf PDF
B01_Attachment_J-05_MECHANICAL_100_.pdf PDF
B01_Attachment_J-04_02_PLUMBING_100_.pdf PDF
B01_Attachment_J-06_ELECTRICAL_100_.pdf PDF
A08_Brand_Name_Justification_WebCTRL_4.16.pdf PDF
A10_Attachment_Draft_Key_Personal_Requirements.pdf PDF
A10_CERTIFIED_INDIAN_PREF_FIRMS_2018.pdf PDF
02_PLUMBING.pdf PDF
A10_Sources_Sought_Questionnaire_010219.docx DOCX document
03_MECHANICAL.pdf PDF
_White_Buffalo_Clinic_95__02-18-19.pdf PDF
01_ARCHITECTURAL.pdf PDF
A10_289513_C142_Chemistry_With_COC.pdf PDF
A10_Draft_Wage_Determination.pdf PDF
04_ELECTRICAL.pdf PDF
A15_Draft_Evaluation_Criteria.pdf PDF
A15_Draft_Price_Schedule.docx DOCX document
_Renovation_95__02-18-19.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J-10 Key Personnel Requirements

1) The following Key Personnel are required:

a. (Prime) Project Manager. This person shall have a minimum of five (5) years of experience in projects of similar size and complexity with facility design and the construction industry.

b. Project Site Superintendent. This person shall have a minimum of ten (10) years of experience in construction contracts that must include at least five (5) years’ experience in government construction projects and at least five (5) years’ experience in commercial construction projects. This person shall have at least five (5) years’ overall construction experience as a Project Superintendent. The contractor will ensure that a competent superintendent is on site at all times. They should be directly overseeing all work to include subcontractors, safety, and quality control. They are responsible to ensure all labor and safety requirements are complied with and ensure the work site is cleaned each work day. All communications concerning day-to-day workmanship on the project is the responsibility of the superintendent who has the necessary authority to act for the Contractor.

c. Project Scheduler. This person shall have previously developed, created and maintained electronic schedules for projects similar in nature and complexity to this project. This person shall have a minimum of ten (10) years of experience in construction scheduling that must include at least five (5) years’ experience in government construction scheduling and at least five (5) years’ experience in construction project scheduling. This person shall have at least five (5) years’ overall construction experience as a Project Scheduler. The scheduler must have experience with cost loaded scheduling software that is capable with Oracle’s PRIMAVERA Contractor software (Version 6.1). The scheduler must be available for monthly construction progress meetings.

d. Project Estimator This individual shall have a minimum of five (5) years of experience in projects of similar size and complexity. Experience working on Government projects will be beneficial.

e. Quality Control Manager. This person must be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of five (5) years construction experience on construction similar to this contract. A construction person with a minimum of ten (10) years in related work. This person will need to hold the Project Superintendent responsible for the quality of work and may, with the assistance of the Contracting Officer, have to remove the Project Superintendent for non-compliance with the quality requirements specified in the contract. This person must have no other duties other than quality control.