About this file

This sources sought notice is requesting capability statements for the construction of the Poplar Ancillary Healthcare Facility and renovation of the Vern E. Gibbs Health Center located on the Fort Peck Reservation in Poplar, Montana. The estimated value of construction is over $10 million to be awarded as a fixed-price contract by the Indian Health Service. Capability statements are due by March 12, 2019 with the anticipated period of performance from May 31, 2019 through 36 months after issuing the notice to proceed. The resulting contract is expected to be awarded on or about May 24, 2019. The solicitation is expected to be available for download on April 18, 2019 on FBO.gov with proposals due by May 17, 2019. The NAICS code is 236220 for Commercial and Institutional Building Construction with a size standard of $36.5 million.

Specification 26 27 13-Underground Electric Services

View the file

Other files

File Type Posted
B05_Amendment_7.pdf PDF
B05_Amendment_6.pdf PDF
281500.pdf PDF
263213.pdf PDF
281600.pdf PDF
281300.pdf PDF
B05_Amendment_5.pdf PDF
B05_Amendment_4.pdf PDF
B05_Amendment_3.pdf PDF
B05_Amendment_2.pdf PDF
B05_Amendment_1.pdf PDF
B05_Attachment_J-21.docx DOCX document
B01_Attachment_J-08_FFE.pdf PDF
B01_Attachment_J-01_White_Buffalo_Clinic_100_.pdf PDF
B01_Attachment_J-07_Combined_PCRA-ICRA-ILSM_-_2016.docx DOCX document
B01__Attachment_J-10_Key_Personal_Requirements.pdf PDF
Attachment_J-13_Pay_Application.xls XLS spreadsheet
B01_Attachment_J-03_ARCHITECTURAL_100_.pdf PDF
B01_Attachment_J-09_GFP_Turnover.pdf PDF
B01_Attachment_J-12-B_Wage_Determination.pdf PDF
B01_Attachment_J-15_PPQ.pdf PDF
B01_RFP.pdf PDF
B01_Attachment_J-18_FP1_Site_Plan.pdf PDF
Attachment_J-14_hhs_subk_plan_template.docx DOCX document
B01_Attachment_J-12-A_Wage_Determination.pdf PDF
https://www.gsa.gov/reference/forms#SF —
B01_Attachment_J-20.pdf PDF
B01_Attachment_J-19_FP2_Fire_Sprinkler_Plan.pdf PDF
B01_Attachment_J-02_Verne_E._Gibbs_Renovation_100_.pdf PDF
B01_Attachment_J-17_CERTIFIED_INDIAN_PREF_FIRMS_2018.pdf PDF
B01_Attachment_J-16_PPI.pdf PDF
A08_A-dec_Brand_Name_Justification_5-8-19.pdf PDF
B01_Attachment_J-05_MECHANICAL_100_.pdf PDF
B01_Attachment_J-04_02_PLUMBING_100_.pdf PDF
B01_Attachment_J-06_ELECTRICAL_100_.pdf PDF
A08_Brand_Name_Justification_WebCTRL_4.16.pdf PDF
A10_Attachment_Draft_Key_Personal_Requirements.pdf PDF
A10_CERTIFIED_INDIAN_PREF_FIRMS_2018.pdf PDF
02_PLUMBING.pdf PDF
A10_Sources_Sought_Questionnaire_010219.docx DOCX document
03_MECHANICAL.pdf PDF
_White_Buffalo_Clinic_95__02-18-19.pdf PDF
01_ARCHITECTURAL.pdf PDF
A10_289513_C142_Chemistry_With_COC.pdf PDF
A10_Draft_Wage_Determination.pdf PDF
04_ELECTRICAL.pdf PDF
A15_Draft_Evaluation_Criteria.pdf PDF
A15_Draft_Price_Schedule.docx DOCX document
_Renovation_95__02-18-19.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNDERGROUND ELECTRIC SERVICE 26 27 13 - 1

SECTION 26 27 13 – UNDERGROUND ELECTRIC SERVICE

PART 1 - GENERAL

1.1 SUMMARY

A. Arrange with Montana Dakota Utilities Company for permanent electric service including all charges or fees levied by the serving utility company relative to this project. All service fees shall be paid by Owner.

B. Underground service entrance, items furnished by serving utility company:

1. Pad mounted transformer.

2. Current transformers.

3. Meter and meter conductors.

4. Primary cable and installation.

5. Secondary cable and installation to CT Cabinet.

1.2 WORK INCLUDED - SECONDARY

A. Items furnished by contractor (verify all requirements with Utility Company):

1. Secondary conduit from transformer to CT Cabinet.

2. Secondary conduits and conductors from CT Cabinet to Main Disconnect.

3. Primary conduits stubbed out past pad.

4. Meter base.

5. 1” Conduit from CT cabinet to the meter base.

6. Transformer pad and vault.

7. Padmount CT Cabinet and concrete pad.

1.3 SYSTEM DESCRIPTION

A. System voltage: 208Y/120 volts, three phase, four wire, 60 hertz.

1.4 QUALITY ASSURANCE

A. Utility company: Montana Dakota Utilities Company.

B. Install service entrance in accordance with Utility Company's rules and regulations.

Amendment 0005 to RFP 19-102-SOL-00026

UNDERGROUND ELECTRIC SERVICE 26 27 13 - 2

PART 2 - EXECUTION

2.1 INSTALLATION

A. Coordinate all work relative to the electrical service with the serving Utility Company prior to construction.

END OF SECTION 26 27 13

Amendment 0005 to RFP 19-102-SOL-00026

PART 1 - GENERAL
1.1 SUMMARY
A. Arrange with Montana Dakota Utilities Company for permanent electric service including all charges or fees levied by the serving utility company relative to this project. All service fees shall be paid by Owner.
B. Underground service entrance, items furnished by serving utility company:
1.2 WORK INCLUDED � SECONDARY
A. Items furnished by contractor (verify all requirements with Utility Company):
1.3 SYSTEM DESCRIPTION
A. System voltage: 208Y/120 volts, three phase, four wire, 60 hertz.
1.4 QUALITY ASSURANCE
A. Utility company: Montana Dakota Utilities Company.
B. Install service entrance in accordance with Utility Company's rules and regulations.
PART 2 - EXECUTION
2.1 INSTALLATION
A. Coordinate all work relative to the electrical service with the serving Utility Company prior to construction.