This document is a Design Criteria Manual for the Utah Transit Authority (UTA), covering comprehensive design standards for transit infrastructure across multiple transportation modes including Bus Rapid Transit (BRT), Commuter Rail Transit (CRT), Light Rail Transit (LRT), and Streetcar systems. The manual provides detailed technical specifications and guidelines for various aspects of transit system design, including environmental considerations, track alignment, trackwork, civil engineering, utilities, structural design, stations and stops, landscaping, traffic control, transit vehicles, electric traction power supply, train control, and other critical infrastructure components. The document serves as a comprehensive technical reference for engineers, planners, and contractors involved in UTA transit projects, ensuring consistency, safety, and operational efficiency across the transit system.
The design criteria manual establishes standardized design parameters that prioritize safety, reliability, maintainability, and cost-effectiveness. It specifies technical requirements for materials, equipment, and systems, with an emphasis on using proven, off-the-shelf technologies and maintaining compatibility with existing infrastructure. The manual includes detailed specifications for electrical systems, vehicle interfaces, signal systems, and operational requirements, with specific attention to accessibility, environmental considerations, and integration with local jurisdictions. Key design principles include sustainable landscaping, energy conservation, crime prevention through environmental design (CPTED), and adherence to federal and state regulations such as the Americans with Disabilities Act (ADA) and various transportation safety standards.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN CRITERIA
MANUAL
September 2024
Design Criteria Manual i
Table of Contents
CHAPTER 1 GENERAL REQUIREMENTS
1.1 PURPOSE
1.2 TRANSIT SYSTEM GOALS
1.2.1 Proven Hardware
1.2.2 Design Life
1.2.3 Service Integration
1.2.4 Risk Management
1.3 SYSTEM SAFETY AND SECURITY
1.3.1 Safety Considerations
1.3.2 System Security Goals
1.4 WEATHER CONDITIONS CRITERIA FOR SYSTEMS DESIGN
1.5 RELATED DOCUMENTS
1.6 SPECIFIC CHAPTERS
CHAPTER 2 ENVIRONMENTAL
2.1 GENERAL
2.2 ENVIRONMENTAL RESOURCES
2.2.1 Acquisitions and Relocations
2.2.2 Air Quality
2.2.3 Biological Resources
2.2.4 Community Impacts
2.2.5 Economic Impacts
2.2.6 Energy Conservation
2.2.7 Environmental Justice
2.2.8 Geology and Soils
2.2.9 Hazardous Materials
2.2.10 Historic, Architectural, Archaeological, and Cultural Resources
2.2.11 Traffic
2.2.12 Transit Noise and Vibration
2.2.13 Safety/Security
2.2.14 Section 4(f) Requirements
2.2.15 Visual
2.2.16 Water Resources
CHAPTER 3 RUNNING WAY AND TRACK ALIGNMENT
3.1 INTRODUCTION
3.2 BRT RUNNING WAYS
3.2.1 BRT Running Ways – General
3.2.2 Types of BRT Running Ways
3.2.3 Other BRT Design Considerations
3.2.4 Pavement Design
3.2.5 Design Vehicle
3.2.6 Access by Non-Bus Traffic and Pedestrian Access
3.3 COMMUTER RAIL TRACK ALIGNMENT
3.3.1 Design Speed
3.3.2 Track Center Spacing
3.3.3 Clearances - General
3.3.4 Horizontal Alignment
ii
3.3.5 Vertical Alignments
3.4 LIGHT RAIL TRANSIT (LRT) TRACK ALIGNMENT
3.4.1 General
3.4.2 Design Speed
3.4.3 Semi-Exclusive LRT Track in Dedicated Right-of-Way Alignment Criteria
3.4.4 Semi-Exclusive Joint Use LRT/Freight Track Alignment Criteria
3.4.5 LRT Track in Existing Streets Alignment Criteria
3.4.6 LRT Lead and Yard Track and Freight Industrial Track Alignment Criteria
3.4.7 CLEARANCES
3.5 STREETCAR TRACK ALIGNMENT CRITERIA
3.5.1 Horizontal Alignment
3.5.2 Vertical Alignment
3.5.3 Clearances
CHAPTER 4 TRACKWORK
4.1 INTRODUCTION
4.2 TRACK STANDARDS
4.3 COMMUTER RAIL GENERAL
4.3.1 Description
4.3.2 References
4.3.3 CRT Track Standards
4.3.4 CRT Track Classification
4.3.5 Types of Track
4.3.6 Track Materials
4.3.7 Special Trackwork
4.3.8 Miscellaneous Track Components
4.3.9 Fill
4.4 LIGHT RAIL/STREETCAR GENERAL
4.4.1 LRT Track System
4.4.2 Track Types
4.4.3 Track Gauge
4.4.4 Track Construction Tolerances
4.4.5 Traction Power—Impact on Track
4.4.6 Signaling and Train Control Impact on Track
4.4.7 Ballast, Subballast, and Subgrade
4.4.8 Concrete Ties, Timber Ties, and Switch Ties
4.4.9 Running Rail
4.4.10 Rail Deflection
4.4.11 Emergency Guardrail
4.4.12 Tie Plates for Timber Ties
4.4.13 Special Trackwork Plates for Timber Switch Ties
4.4.14 Derails
4.4.15 Special Trackwork
4.4.16 Switch Machines—Power Operated and Manual
4.4.17 Rail Expansion Joints
4.4.18 At-Grade Crossings
4.4.19 Miscellaneous Track Appurtenances
4.4.20 Embedded Track Drains
4.4.21 Rail Lubricators
CHAPTER 5 CIVIL WORK
5.1 GENERAL
iii
5.2 SURVEYING AND MAPPING
5.2.1 Survey Control System
5.3 ROADWAY ELEMENTS
5.3.1 General
5.3.2 Applicable Standards
5.3.3 Grading
5.3.4 Traffic Lane Widths
5.3.5 On-street Parking
5.3.6 Curbs, Wheelchair Ramps, and Curb Cuts
5.3.7 Sidewalks and Park Strips
5.3.8 Driveways
5.3.9 Paving
5.4 BUS FACILITIES
5.4.1 Local Bus Service
5.4.2 Turning Radii
5.4.3 Bus Stop Placement Criteria
5.4.4 Bus Shelter Pads
5.4.5 Bus Loading Zones
5.5 MAINTENANCE OF TRAFFIC
5.6 DRAINAGE
5.6.1 General
5.6.2 Submittals
5.6.3 Drainage Provisions
5.6.4 Hydrology and Hydraulics
5.6.5 Design Method
5.6.6 Storm Frequency
5.6.7 Fencing
5.7 RIGHT-OF-WAY
5.7.1 General
5.7.2 Types of Property Ownership and Rights
5.7.3 At-Grade Construction
5.7.4 Right-of-Way Information Requirements
CHAPTER 6 UTILITIES
6.1 GENERAL
6.2 EXISTING INFORMATION
6.2.1 Ownership by Others
6.3 UTILITY AGREEMENTS
6.3.1 Master Utility Agreements
6.3.2 Supplemental Utility Agreements
6.3.3 Betterment Utility Agreements
6.4 SCOPE OF RELOCATION
6.4.1 Drawings
6.5 UTAH TRANSIT AUTHORITY RESTRICTED UTILITY AREA
6.6 CONFLICTING UTILITIES
6.6.1 Crossing Utilities (Underground)
6.6.2 Crossing and Parallel Utilities (Overhead)
6.6.3 Parallel Utilities (Underground)
6.6.4 Abandoned Utilities
6.7 CORROSION PROTECTION
6.8 NATURAL GAS LINES
6.8.1 Standards
iv
6.8.2 Requirements within Railroad ROW
6.9 SANITARY SEWERS
6.9.1 Standards
6.9.2 General Requirements
6.9.3 Manhole Locations
6.10 UNDERGROUND COMMUNICATIONS SYSTEMS
6.11 WATER MAINS
6.11.1 Standards
6.11.2 Requirements
6.12 LIQUID-PETROLEUM PIPELINES
6.12.1 Standards
6.13 STREETLIGHTS AND TRAFFIC SIGNALS
6.13.1 Standards
6.14 OVERHEAD UTILITY LINES
6.14.1 Standards
CHAPTER 7 STRUCTURAL
7.1 GENERAL
7.1.1 Introduction
7.1.2 Design Codes, Manuals, and Specifications
7.1.3 Responsibility for Geotechnical Information
7.1.4 Loads and Forces
7.1.5 Differential Settlement
7.1.6 Earthquake (EQ)
7.1.7 Horizontal Earth Pressure (E)
7.1.8 Hydrostatic Pressure and Buoyancy (B)
7.1.9 Wind Load on Structure (WS)
7.1.10 Wind Load on Live Load (WL)
7.1.11 Force from Stream Current, Floating Ice, and Drift
7.1.12 Thermal Force (T)
7.1.13 Pier Protection Walls
7.2 SPECIAL DESIGN REQUIREMENTS
7.2.1 Vibration Limitations
7.2.2 Track Work
7.2.3 Fatigue
7.2.4 Uplift
7.2.5 Friction
7.2.6 End Diaphragms
7.2.7 Reinforced and Prestressed Concrete Design
7.2.8 Emergency Access and Provisions
7.2.9 Improvements on UPRR or Other Non-UTA Right-of-Way
7.3 MATERIALS
7.3.1 General
7.3.2 Fire Protection of Structures
7.3.3 Structural Steel
7.3.4 Reinforced and Prestressed Concrete
7.4 EARTH RETAINING STRUCTURES
7.4.1 General
7.4.2 Types of Retaining Walls, Abutments, and Wingwalls
7.4.3 Soils and Geological Criteria
7.4.4 Elastomeric Bearings
7.4.5 Improvements on UPRR or Other Non-UTA Right-of-Way
v
CHAPTER 8 STATIONS AND STOPS
8.1 GENERAL
8.1.1 Scope
8.1.2 Codes and Standards
8.1.3 General Design Parameters
8.2 BRT PLATFORMS
8.2.1 Configuration
8.2.2 EV Bus Charging
8.3 CRT PLATFORMS
8.3.1 Configuration
8.4 LRT PLATFORMS
8.4.1 Configuration
8.4.2 Platform Height and Offsets
8.5 STREETCAR PLATFORMS
8.5.1 Configuration
8.5.2 Platform Height
8.6 GENERAL STATION REQUIREMENTS
8.6.1 Platform Surface
8.6.2 Fare Vending Equipment
8.6.3 Amenities and Provisions
8.6.4 Signing and Communications
8.6.5 Public Address (PA) System
8.6.6 Advertising
8.6.7 Railings
8.6.8 Maintenance Space and Procedures
8.6.9 Circulation Elements
8.6.10 Lighting
8.6.11 Other Station Considerations
8.6.12 Crime Prevention and Vandal Resistance
8.6.13 General Materials and Finishes Guidelines
CHAPTER 9 LANDSCAPING
9.1 GENERAL
9.2 OBJECTIVES (GOALS)
9.3 REFERENCE CODES AND LANDSCAPE STANDARDS
9.4 LANDSCAPING CONSIDERATIONS AND CRITERIA
9.4.1 Climate Control
9.4.2 Height Requirements
9.4.3 Movement Control
9.4.4 Grading and Drainage
9.4.5 Berming
9.4.6 Slope Stabilization
9.4.7 Retaining Walls
9.4.8 Planter Walls/Landscape Walls
9.4.9 Lighting and Signage Interface
9.4.10 Irrigation
9.5 SECURITY/SAFETY CONSIDERATIONS
9.6 SITE SPECIFIC OBJECTIVES
9.6.1 Station
9.6.2 Platform
9.6.3 Relationship of the Park-and-Ride Facility to the Platform vi
9.6.4 Parking Lot (Park-and-Ride)
9.6.5 Bus Drop-Off to the Platform
9.6.6 Kiss-and-Ride Relationship to the Platform
9.6.7 Railroad Right-of-Way
9.7 RECOMMENDED PLANT LIST—LOW WATER USE
9.7.1 Trees
9.7.2 Vines and Ground Covers
9.7.3 Flowers and Forbs
9.7.4 Ornamental Grasses
9.8 PLANT MATERIALS
9.8.1 Canopy Trees
9.8.2 Understory/Decorative Trees
9.8.3 Conifers
9.8.4 Shrubs and Hedges
9.8.5 Vines and Ground Cover
9.9 TREES
9.9.1 Patterns
9.9.2 Size Guidelines
9.9.3 Tree Pits
9.9.4 Tree Grates
9.9.5 Tree Guards
9.9.6 Tree Root Barriers
9.9.7 Guying and Staking
9.9.8 Topsoil
9.9.9 Mulch
CHAPTER 10 TRAFFIC CONTROL AND SIGNALS
10.1 INTRODUCTION
10.1.1 Responsible Owner
10.2 APPLICABLE STANDARDS
10.3 AGENCY COORDINATION
10.3.1 Local Agency Requirements and Coordination
10.3.2 Coordination with Adjacent Railroads
10.4 GENERAL OPERATIONS
10.4.1 Mixed Flow Operations
10.4.2 Dedicated Running Way Operations
10.5 DESIGN GUIDELINES
10.5.1 Traffic Signal Items
10.5.2 Communications/Interconnect
10.5.3 TSP/Signal Timing & Coordination
10.5.4 BRT Detection
10.5.5 LRT Detection
10.5.6 Railroad Preemption
10.5.7 Queue Cutter Signals
10.5.8 Channelization
10.5.9 Turns Crossing the Tracks at Signalized Intersections
10.6 TRAFFIC SIGNAL HARDWARE AND SOFTWARE
10.7 SIGNS
10.8 PEDESTRIAN CONSIDERATIONS
10.8.1 General
10.8.2 Pedestrian Movements at and Near Stations
10.8.3 Crosswalks
vii
10.8.4 Islands
10.9 GRADE CROSSING WARNING DEVICES
10.9.1 Public Highway-Rail Grade Crossings
10.9.2 Private Highway-Rail Grade Crossings
10.10 BRT PAVEMENT MARKINGS
CHAPTER 11 TRANSIT VEHICLES
11.1 GENERAL DESCRIPTION BUS RAPID TRANSIT VEHICLE
11.1.1 Vehicle Configuration
11.1.2 Boarding and Alighting
11.1.3 Electrical Vehicle Supporting Infrastructure
11.1.4 Vehicle Finishes
11.2 COMMUTER RAIL VEHICLES
11.2.1 General Description
11.2.2 Locomotive
11.2.3 Commuter Passenger Vehicles
11.3 HIGH VOLTAGE SYSTEM
11.4 LIGHT RAIL VEHICLE
11.4.1 General Description
11.4.2 Weight Constraints and Design Loading
11.4.3 Light Rail Vehicle Dimensions
11.4.4 Vehicle Performance
CHAPTER 12 ELECTRIC TRACTION POWER SUPPLY AND DISTRIBUTION SYSTEM
12.1 INTRODUCTION
12.2 REQUIREMENTS
12.2.1 Traction Power Substations
12.2.2 DC Feeder System
12.2.3 Overhead Contact System (OCS)
12.2.4 Signal and Communications System Interface
12.2.5 Sectionalization
12.2.6 Design Environment
12.2.7 Codes and Standards
12.3 TRACTION POWER SUBSTATIONS
12.3.1 General
12.3.2 System Operating Requirements
12.3.3 Basis for Substation Location, Spacing, and Rating
12.3.4 Substation Power Supply
12.3.5 Substation Equipment
12.3.6 Substation Enclosure
12.3.7 Substation Foundation
12.3.8 Substation Grounding
12.3.9 Ventilation
12.3.10 Noise Level
12.3.11 Miscellaneous
12.4 DC FEEDER SYSTEM
12.4.1 General
12.4.2 Cables
12.4.3 Raceways
12.5 OVERHEAD CONTACT SYSTEM
12.5.1 General
12.5.2 OCS Configuration
viii
12.5.3 Operations
12.5.4 Contact Wire Height
12.5.5 Vehicle Data
12.5.6 Climate Conditions
12.5.7 Loading
12.5.8 Span Lengths and Staggers
12.5.9 OCS Conductors
12.5.10 Construction and Maintenance Tolerance
12.5.11 Factor of Safety
12.5.12 Poles and Foundation
12.5.13 Electrical Clearances
12.5.14 OCS Support Systems
12.5.15 OCS Registration Systems
12.5.16 Disconnect Switches
12.5.17 OCS Tensioning
12.5.18 OCS Grounding and Bonding
12.5.19 Surge Protection
12.6 NEGATIVE RETURN PATH AND STRAY CURRENT CONTROL
CHAPTER 13 TRAIN CONTROL
13.1 GENERAL (CRT)
13.1.1 Definitions
13.1.2 System Description
13.1.3 Systems Assurance
13.1.4 System Safety
13.1.5 Recommended Spare Parts List
13.1.6 Circuit Design Drawings
13.1.7 Technical Literature
13.1.8 As-In Service Drawings and Logic
13.1.9 Warranty
13.1.10 System Interfaces
13.1.11 Functional Design Requirements
13.1.12 Signal Equipment and Technologies
13.2 LRT SIGNAL SYSTEM
13.2.1 General (LRT)
13.2.2 Signal System Description
13.2.3 Interface Requirements
13.2.4 Site Work
13.2.5 Electrical Requirements for Signal Work
13.2.6 Functional Design Requirements
13.2.7 ABS Signal Block Design
13.2.8 Highway Rail Grade Crossing Warning
13.2.9 Interlocking Control
13.2.10 Yard
13.2.11 Signal Power
13.2.12 Signal Equipment and Technologies
13.2.13 Highway Crossing Warning Devices
13.2.14 Equipment Housings
13.2.15 Wire and Cable
13.2.16 Installation, Testing, Manuals, and Training
CHAPTER 14 COMMUNICATIONS
ix
14.1 GENERAL
14.2 CODES AND STANDARDS
14.3 INSTALLATION, TESTING, MANUALS, AND TRAINING
14.4 WARRANTY AND INITIAL PROVISIONING
14.5 AS-BUILT DRAWINGS
14.6 COMMUNICATIONS SYSTEMS INTERFACES
14.6.1 Operational Compatibility
14.6.2 Electromagnetic Interference (EMI)
14.7 SYSTEM SAFETY AND SYSTEM SECURITY
14.7.1 IP Security Camera System
14.7.2 Emergency Communication Devices
14.8 COMMUNICATION TRANSMISSION SYSTEM
14.8.1 Fiber Optic Conduit Duct Bank
14.8.2 Station I.T. Data Fiber Optic Cable
14.8.3 Signaling Communications & TPSS SCADA Fiber Optic Cable
14.8.4 Advanced Traffic Management (ATMS) Conduit Duct Bank and Fiber Optic Cable System
14.8.5 Microwave Transmission System
14.9 FARE COLLECTION DEVICES
14.10 ELECTRONIC PASSENGER INFORMATION SIGNS
14.11 TELEPHONE SYSTEM
14.11.1 VOIP Telephones
14.12 RADIO SYSTEMS
14.12.1 Two-Way Radio
14.12.2 Vehicle Radios
14.12.3 Mobiles and Portable Radios
14.13 RAIL TRANSIT COMMUNICATIONS
14.13.1 Wayside Communications Equipment
14.13.2 Central Control System (CCS) and SCADA Remote Terminal Units (RTUs)
14.14 CRT COMMUNICATIONS
14.14.1 Fire and Intrusion Detection System Alarms
14.15 COMMUNICATIONS POWER AND RACEWAY
14.15.1 Communications Raceway
14.15.2 Communications Power
14.16 BATTERY AND UPS BACK-UP POWER SUPPLY
CHAPTER 15 FARE COLLECTION EQUIPMENT
15.1 GENERAL
15.1.1 Conditions of Service
15.2 HANDICAPPED ACCESSIBILITY
15.3 ADDITIONAL DESIGN CRITERIA
15.3.1 Power Supply
15.3.2 Mounting
15.3.3 Fare Collection Communications
CHAPTER 16 CORROSION CONTROL
16.1 GENERAL
16.1.1 Electric Bus Charging
16.2 SCOPE
16.3 STANDARDS AND CODES
16.4 PRE-DESIGN SURVEY AND TESTING
16.5 SOIL AND WATER CORROSION CONTROL
16.5.1 Materials of Construction
x
16.5.2 Safety and Continuity of Operations
16.5.3 Accessibility of Installations
16.5.4 Special Considerations
16.5.5 Protective Coatings
16.5.6 Cathodic Protection
16.6 STRAY CURRENT CORROSION CONTROL
16.6.1 Baseline Corrosion Survey
16.6.2 Baseline Stray Current Survey
16.7 TRACKWORK
16.7.1 Ballasted Track Construction
16.7.2 Embedded Track Construction
16.7.3 Vehicle Grade Crossing and Pedestrian Crossing Track Construction
16.7.4 Direct Fixation Track Construction
16.7.5 Maintenance Shops and Yard
16.7.6 Special Trackwork and Hardware
16.7.7 Hardware
16.7.8 Track-to-Earth Resistance Testing
16.8 TRACTION POWER FACILITIES AND SUBSTATIONS
16.8.1 Traction Power Substations
16.8.2 Overhead Contact System
16.8.3 Negative Distribution System
16.8.4 Resistance-to-Earth Criteria
16.9 UTILITY STRUCTURES
16.9.1 Facilities Owned by Others
16.9.2 Bridge Structures
16.10 ATMOSPHERIC CORROSION CONTROL
16.10.1 Scope
16.11 GROUNDING
16.11.1 Scope
16.11.2 Design and Coordination of Grounding Systems
CHAPTER 17 YARDS AND SHOPS
17.1 INTRODUCTION
17.1.1 Standards, Codes, and Guidelines
17.2 COMMUTER RAIL YARDS AND SHOPS
17.2.1 Operating Requirements
17.2.2 Maintenance Shop
17.3 LRT YARDS AND SHOPS
17.3.1 General Requirements
17.3.2 Yard and Shop Facilities
17.3.3 LRT Heavy Maintenance Facility and Yard Requirements
17.3.4 LRT Light Maintenance Facility and Yard Requirements
17.4 BUS MAINTENANCE FACILITIES
CHAPTER 18 RAIL TRAILS
18.1 GENERAL
18.2 PROJECT IMPLEMENTATION
18.3 SITE WORK
18.3.1 Setback
18.3.2 Fencing
18.3.3 Trail Surface
18.3.4 Drainage
xi
18.3.5 Landscaping
18.3.6 Lighting
18.3.7 Signs
18.3.8 Striping
18.3.9 Roadway Interface Features
18.3.10 Restroom Facilities
18.4 CROSSINGS
CHAPTER 19 PEDESTRIAN CROSSINGS
19.1 GENERAL
19.2 STANDARDS
19.3 DESIGN INTENTIONS
19.4 IMPLEMENTATION
19.5 DEFINITIONS
19.6 PEDESTRIAN GRADE CROSSING DESIGN
19.6.1 Grade Crossing Diagnostic Review
19.6.2 Diagnostic Team
19.6.3 Existing Conditions and Hazard Assessment
19.6.4 Pedestrian Hazard Evaluation and Mitigation
CHAPTER 20 PARK AND RIDE LOTS
20.1 GENERAL
20.2 SCOPE
20.3 CODES AND STANDARDS
20.4 LIGHTING
20.5 GENERAL PARK AND RIDE SITE DESIGN GUIDELINES
20.5.1 Vehicular Entrances and Exits to Station Site Facilities
20.5.2 Kiss-and-Ride Facilities
20.5.3 Automobile Parking Facilities
20.5.4 Motorcycle Parking
20.5.5 Bicycle Storage
20.5.6 Borders of Parking Areas
20.5.7 Pedestrian Access
20.5.8 ADA
20.5.9 Park-and-Ride Entrance Signs
20.5.10 Snow Removal
20.6 CRIME PREVENTION AND VANDAL RESISTANCE
20.6.1 System Safety and Security
20.6.2 EV Charging
DESIGN CRITERIA MANUAL
CHAPTER 1
GENERAL
REQUIREMENTS
Chapter 1: General Requirements | i
Table of Contents
CHAPTER 1 GENERAL REQUIREMENTS
1.1 PURPOSE
1.2 TRANSIT SYSTEM GOALS
1.2.1 Proven Hardware
1.2.2 Design Life
1.2.3 Service Integration
1.2.4 Risk Management
1.3 SYSTEM SAFETY AND SECURITY
1.3.1 Safety Considerations
1.3.2 System Security Goals
1.4 WEATHER CONDITIONS CRITERIA FOR SYSTEMS DESIGN
1.5 RELATED DOCUMENTS
1.6 SPECIFIC CHAPTERS
Chapter 1: General Requirements | 1
CHAPTER 1 GENERAL REQUIREMENTS
1.1 Purpose
The material in the following chapters provides a uniform basis for project design of bus rapid transit (BRT), light rail transit (LRT), Streetcar, and commuter rail transit (CRT) systems. These criteria apply to all projects, including new construction, remodel, and rehabilitation projects.
For bus stops, wayfinding signs, and State of Good Repair projects, the criteria as set forth herein shall govern, or the appropriate governing documentation for these elements will be referenced herein.
For bus stop design details, see the UTA Bus Stop Master Plan, latest version.
These criteria serve as guidelines and do not substitute for engineering judgment and sound engineering practice.
Exceptions may apply in special cases. Applications for exceptions to the criteria, deviations from the criteria, changes to the criteria, additions to the criteria, and other questions shall be submitted in writing to UTA per UTA Capital Development Procedures 3C Design Criteria Section 5.2 and shall be approved in writing before any modification is implemented.
1.2 Transit System Goals
The basic goal of UTA’s transit systems is to provide improved public transportation systems in a cost-effective, environmentally sensitive, and socially responsible manner. The design of system elements will be based on a “design to cost” philosophy, where the designer works with UTA and the system’s stakeholders to define the scope of each system, ensuring it can be completed within the available budget.
UTA is responsible for delivering safe, reliable, cost-effective, and efficient public transportation within UTA’s service areas. UTA is constantly seeking to provide new and improved services to meet the transportation needs of the public and increase operational efficiency.
The principal objectives of the UTA system are to:
• Facilitate the safe and cost-effective movement of people.
• Provide efficient, high-capacity transit service to the communities located within UTA’s service area.
Chapter 1: General Requirements | 2
• Enhance economic potential in the corridor by improving access to existing and planned employment and activity centers by creating transit-oriented development (TOD) opportunities.
• Support regional plans and policies that describe a balanced transportation system.
• Support and contribute to regional air quality goals.
1.2.1 Proven Hardware
The transit system shall be designed to use proven subsystems hardware and design concepts. Subsystems shall be supplied by established manufacturers, have a documented operating history of previous and current usage, and be available off-the-shelf, as far as practicable. The same requirements shall apply to spare parts. Waiver of these requirements shall be considered only where the alternative subsystem offers substantial technical and cost advantages, is in an advanced state of development, and has accumulated substantial test data under near-revenue conditions.
Designs and specifications shall be prepared in such a way as to encourage competitive bidding by established manufacturers of transportation equipment in accordance with current procurement guidelines. Industry guidelines from recognized and established organizations such as the American Railway Engineering and Maintenance-of-Way Association and the Utah Department of Transportation shall be used.
1.2.2 Design Life
The system’s structures, such as bridges and culverts, shall be designed for a minimum of 75 years. Stations shall be designed for a 25-year life, and other fixed facilities, including administrative and maintenance buildings, shall be designed for continued operation over a minimum period of 50 years before complete refurbishment and renovations are necessary due to wear.
Major facilities system equipment shall also be designed for a minimum of 15 years before complete replacement becomes necessary, assuming that approved maintenance policies are followed.
Major infrastructure system equipment shall also be designed for a minimum of 25 years before complete replacement becomes necessary, assuming that approved maintenance policies are followed.
Where possible, the functional life and capacity of the system shall be designed to match design life of a system’s element or be sufficiently scalable to accommodate future expansion.
Chapter 1: General Requirements | 3
1.2.3 Service Integration
Each system and/or project shall be designed as an integral part of the overall UTA transportation system. Design considerations shall include efficient passenger interchange to and from private and other public transportation modes. Incorporate active transportation elements where feasible.
1.2.4 Risk Management
A Risk Management strategy, proportional to the size and complexity of each system, shall be implemented to maintain the system on budget and on schedule. Risks identified and tracked shall include items that may affect the successful implementation of the system.
1.3 System Safety and Security
The primary safety goal of the transit system is to achieve the highest practicable level of safety while maintaining operational and cost effectiveness. All vehicles, equipment, infrastructure, buildings, and facilities shall be designed in accordance with all relevant codes and standards and maintained to ensure safe operation. Safety and security are to be priority considerations in the planning and execution of all work on the system. Decisions made during all phases of system development shall be based on UTA’s current Transit Agency Safety Plan (TASP).
1.3.1 Safety Considerations
The inherent safety of a transit system is most significantly influenced by the design of the system, particularly in its interaction with vehicles and pedestrians during operations. Designers shall be cognizant of, plan for, and complete designs that prioritize the safest means of interaction between travel modes. Required safety items are incorporated in the technical sections of this Design Criteria Manual. These safety items shall be included in the design plans and the detailed specifications prepared for the construction and procurement of physical systems.
1.3.1.1 ADA
All design elements will consider and accommodate customers and the public as determined by the Americans with Disabilities Act.
Chapter 1: General Requirements | 4
1.3.1.2 Signage
Standardized systems and signs should be utilized to provide the public with consistent, meaningful warnings, and regulatory information. For details on wayfinding and signage standards, refer to the UTA Wayfinding & Signage Sign Schedule and Drawing Package, latest version.
1.3.1.3 Grade Crossings (LRT, CRT and Streetcar)
All rail at-grade crossings that are not traffic signal-controlled shall have automatic crossing gates and raised medians. Quad gate intersections shall be considered where medians are not practical, and where budget, geometric/site, and traffic conditions warrant their use.
1.3.1.4 Hazard Identification and Mitigation
UTA employs the “21 box” Risk Assessment Matrix, which yields hazard ratings of High, Serious, Medium, Low, and Eliminated. UTA’s hazard mitigation procedures are outlined in Chapter 2, “Risk Management,” of the Transit Agency Safety Plan (TASP). The simplified process of hazard mitigation follows a “Find > Fix > Follow Up” approach to identify hazards, implement corrective actions, and check the effectiveness of the mitigation. The most effective corrective action is to eliminate the hazard.
One of UTA’s top core values is safety. To foster and maintain a consistent culture of safety among its employees and contractors, UTA has developed an official Transit Agency Safety Plan (TASP). The TASP covers a variety of safety-related topics, including the process used to identify hazards early during design so that the risk severity of any identified hazards can either be eliminated or mitigated to the lowest levels possible.
UTA recognizes that to effectively identify and assess the risk levels of potential hazards for an individual project, collaboration between UTA and the contr
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .